2023.10.05 District Board Agenda Packet 10-5-23 50VTH TAHOF
Se tet,
AEI M'er 1950 ' 44a
6��c t1TILITY
SOUTH TAHOE PUBLIC UTILITY DISTRICT
REGULAR BOARD MEETING AGENDA
Thursday, October 5, 2023 - 2:00 p.m.
District Board Room
1275 Meadow Crest Drive, South Lake Tahoe, California
David Peterson, President BOARD MEMBERS Kelly Sheehan, Director
Nick Haven, Director Shane Romsos, Vice President Nick Exline, Director
Paul Hughes, General Manager
1. CALL TO ORDER REGULAR MEETING - PLEDGE OF ALLEGIANCE (At this time, please silence phones and
other electronic devices so as not to disrupt the business of the meeting.)
2. COMMENTS FROM THE PUBLIC (This is an opportunity for members of the public to address the Board on
any short non-agenda items that are within the subject matter jurisdiction of the District. No discussion or action can
be taken on matters not listed on the agenda, per the Brown Act. Each member of the public who wishes to
comment shall be allotted five minutes, and no more than four individuals shall address the same subject.)
3. CORRECTIONS TO THE AGENDA OR CONSENT CALENDAR (For purposes of the Brown Act, all Action and
Consent items listed give a brief description of each item of business to be transacted or discussed.
Recommendations of the staff, as shown, do not prevent the Board from taking other action.)
4. ADOPTION OF CONSENT CALENDAR (Any item can be removed to be discussed and considered separately
upon request. Comments and questions from members of the public, staff or Board can be taken when the
comment does not necessitate separate action.)
5. CONSENT ITEMS BROUGHT FORWARD FOR SEPARATE DISCUSSION/ACTION
6. PRESENTATION: Award Government Finance Officers Certificate of Achievement of
Excellence in Financial Reporting (President Peterson)
7. ITEMS FOR BOARD ACTION
a. Recycled Water Strategic Plan
(Stephen Caswell, Principal Engineer)
1) Approve proposal from Carollo Engineers, Inc. in the amount of $425,367 for
engineering services for the Recycled Water Strategic Plan Phase 2; and 2) Authorize
the General Manager to execute Task Order No. 31 to the Master Services Agreement
with Carollo Engineers, Inc.
b. Water Meter Installation Project- Property Corner Restoration
(Trevor Coolidge,Senior Engineer)
(1) Approve the proposed Scope of Work from Lumos & Associates for professional
surveying services to replace property corners disturbed by water meter projects; and
(2) Authorize the General Manager to execute Task Order No. 18 in an amount not to
exceed $359,380.
REGULAR BOARD MEETING AGENDA- October 5, 2023 PAGE-2
C. Storage System Upgrade
(Chris Skelly, Information Technology Manager)
1) Waive formal bidding procedures as allowed for in the District's Purchasing Policy
when an item is economically preferable to match or be compatible with other
equipment presently on hand and the purchase is made from the supplier who
supplied such equipment; and 2) Authorize the purchase of a new Nimble SAN and
compatible server and switching infrastructure from Cadence Team in the total amount
(includes tax) of $189,084.84.
8. STANDING AND AD-HOC COMMITTEES AND LIAISON REPORTS (Discussions may take place; however,
no action will be taken.)
9. BOARD MEMBER REPORTS (Discussions may take place; however, no action will be taken.)
10. STAFF/ATTORNEY REPORTS (Discussions may take place; however, no action will be taken.)
a. Website Redesign
(Shelly Thomsen, Director of Public and Legislative Affairs)
11 . GENERAL MANAGER REPORT (Discussion may take place; however, no action will be taken.)
a. Staffing Update
b. September 12, 2023 El Dorado Water Agency Meeting
12. NOTICE OF PAST AND FUTURE MEETINGS/EVENTS
Past Meetings/Events
09/07/2023—2:00 p.m. Regular Board Meeting at the District
09/13/2023— 10:00 a.m. El Dorado Water Agency Meeting in Placerville
09/19/2023—8:00 a.m. Employee Communications Committee Meeting (Exline Representing)
Future Meetings/Events
10/1 1/2023— 10:00 a.m. El Dorado Water Agency Meeting at the District
10/16/2023—3:30 p.m. Operations Committee Meeting at the District
10/19/2023 - 2:00 p.m. Regular Board Meeting at the District
ADJOURNMENT (The next Regular Board Meeting is Thursday, October 19,2023,at 2:00 p.m.)
The South Tahoe Public Utility District Board of Directors regularly meets the first and third Thursday of each month.A complete Agenda
packet is available for review at the meeting and at the District office during the hours of 8:00 a.m.and 5:00 p.m.,Monday through Friday.
A recording of the meeting is retained for 30 days after Minutes of the meeting have been approved.Items on the Agenda are numbered
for identification purposes only and will not necessarily be considered in the order in which they appear.Designated times are for particular
items only.Public Hearings will not be called to order prior to the time specified,but may occur slightly later than the specified time.
Public participation is encouraged.Public comments on items appearing on the Agenda will be taken at the same time the Agenda items
are heard;comments should be brief and directed to the specifics of the item being considered.Please provide the Clerk of the Board with
a copy of all written materials presented at the meeting.Comments on items not on the Agenda can be heard during "Comments from
the Audience;"however,action cannot be taken on items not on the Agenda.
Backup materials relating to an open session item on this Agenda,which are not included with the Board packet,will be made available
for public inspection at the same time they are distributed or made available to the Board,and can be viewed at the District office,at the
Board meeting and upon request to the Clerk of the Board.
The meeting location is accessible to people with disabilities.Every reasonable effort will be made to accommodate participation of the
disabled in all of the District's public meetings. If particular accommodations are needed,please contact the Clerk of the Board at(530)
544-6474,extension 6203.All inquiries must be made at least 48 hours in advance of the meeting.
REGULAR BOARD MEETING AGENDA- October 5, 2023 PAGE -3
SOUTH rAHOF
AGe _ e
`,C r 1950
UTILITY D
SOUTH TAHOE PUBLIC UTILITY DISTRICT
CONSENT CALENDAR
Thursday, October 5, 2023
ITEMS FOR CONSENT
a. WINTER STORMS EMERGENCY RESPONSE
(Paul Hughes, General Manager)
Pursuant to Public Contract Code Section 22050(c), continue the emergency action to
respond to the Winter Storms Emergency pursuant to Resolution No. 3242-23.
b. FLEET TRUCK PURCHASES
(Cliff Bartlett, Fleet Equipment Supervisor)
Authorize purchases of up to 6 light- and heavy-duty trucks through the National Auto Fleet
Group competitively bid Sourcewell Contracts, in an amount not to exceed $430,000 including
estimated tax, registration and delivery charges.
c. BLACK BART WATERLINE PROJECT
(Trevor Coolidge,Senior Engineer)
Authorize General Manager to approve Notice of Completion with the El Dorado County Clerk
for the Black Bart Waterline Project.
d. KELLER HEAVENLY WATER SYSTEM IMPROVEMENTS, PHASE 2 PROJECT
(Trevor Coolidge,Senior Engineer)
Authorize General Manager to approve Notice of Completion with the El Dorado County Clerk
for the Keller-Heavenly Water System Improvements, Phase 2 Project.
e. WATERSMART CONTRACT RENEWAL
(Chris Skelly, Information Technology Manager and Ryan Lee, Customer Service Manager)
1) Waive formal bidding procedures as allowed for in the District's Purchasing Policy when
purchasing special services; and 2) Authorize staff to renew the WaterSmart platform contract
established in 2017 for an additional three-year term in the amount of $80,746.67.
t. 2023 FLAGPOLE 2 - IROQUOIS 2 TANKS RECOATING PROJECT
(Megan Colvey,Senior Engineer and Heidi Baugh, Purchasing Agent)
1) Approve Change Order No. 2 to Farr Construction Corporation dba Resource Development
Group (RDC) in the amount $63,572.00; 2) Authorize the General Manager to execute Change
Order No. 2; and 3) Authorize the General Manager to sign the Notice of Completion to be
filed with El Dorado County Clerk for the 2023 Flagpole 2- Iroquois 2 Tanks Recoating Project.
g. BARTON VALVE INSTALLATION PROJECT
(Adrian Combes,Senior Engineer)
1) Approve Change Order No. 1 to Haen Constructors in the amount of $72,827.88 and 2)
Authorize the General Manager to execute Change Order No. 1.
REGULAR BOARD MEETING AGENDA- October 5, 2023 PAGE-4
h. 2023 LUTHER PASS AND HEAVENLY TANKS REHAB PROJECT
(Brent Goligoski,Associate Engineer)
1) Approve Change Order No. 1 to Farr Construction dba Resource Development Company,
in the amount of $18,600.00; and 2) Authorize the General Manager to execute Change Order
No. 1 .
L PALOMA WELL REHABILITATION PROJECT- REBID
(Mark Seelos, Water Resources Manager)
1) Approve Change Order No. 4 to Zim Industries, adding 124 days at no cost; and 2) Authorize
the General Manager to execute Change Order No. 4.
j. SURPLUS EQUIPMENT
(Heidi Baugh, Purchasing Agent)
Authorize TNT Auction of Nevada, Inc. to auction South Tahoe Public Utility District surplus at
public on-line sale.
k. LIABILITY CLAIM AGAINST SOUTH TAHOE PUBLIC UTILITY DISTRICT RECEIVED FROM LACHLAN
RICHARDS
(Ryan Lee, Customer Service Manager)
Reject the Claim against South Tahoe Public Utility District for losses allegedly sustained by
Lachlan Richards and request the Joint Powers Insurance Authority (JPIA) to resolve the Claim.
I. LIABILITY CLAIM AGAINST SOUTH TAHOE PUBLIC UTILITY DISTRICT RECEIVED FROM BRYAN ROSNER
(Ryan Lee, Customer Service Manager)
Reject the Claim against South Tahoe Public Utility District for losses allegedly sustained by
Bryan Rosner and request the Joint Powers Insurance Authority (JPIA) to resolve the Claim.
m. RECEIVE AND FILE PAYMENT OF CLAIMS
(Greg Dupree,Accounting Manager)
Receive and file Payment of Claims in the amount of $6,794,732.01 .
n. REGULAR BOARD MEETING MINUTES: September 7, 2023
(Melonie Guttry, Executive Services Manager/Clerk of the Board)
Approve September 7, 2023, Minutes
General Manager
Paul Hughes
Yg5p Directors
��e� h'8ter 5outh Tahoe NicK Haven
Shane'Romsos
_ David Peterson
Public, Utility District KellY$heehan
NicK Exline
1275 Meadow Crest Prive•South Lake Tahoe■CA 96150-7401
Phone 530 544-0474•Fax 530 541-0614•www.5tpud.u5
BOARD AGENDA ITEM 4a
TO: Board of Directors
FROM: Paul Hughes, General Manager
MEETING DATE: October 5, 2023
ITEM- PROJECT NAME: Winter Storms Emergency Response
REQUESTED BOARD ACTION: Pursuant to Public Contract Code Section 22050(c),
continue the emergency action to respond to the Winter Storms Emergency pursuant to
Resolution No. 3242-23.
DISCUSSION: The Board declared the Winter Storms Emergency Response as an
emergency on March 16, 2023. District staff will provide an update to the Board
regarding the status of the emergency.
Public Contract Code Section 22050(c) requires the Board to review the emergency
action at every Board meeting thereafter until the emergency action is terminated. The
Board must determine by a 4/5 vote that there is a need to continue the emergency
action. District staff is requesting that the Board continue the emergency action for the
response to the Winter Storms Emergency.
As you may recall, on March 9th, 2023, Governor Gavin Newsom proclaimed a state of
emergency throughout California to support the recent winter storm events that hit the
state. These storms caused widespread damage and disruption with heavy snow,
freezing temperatures, and strong winds causing avalanches, debris flow, and flooding
across the state. The emergency proclamation provides critical support for emergency
relief efforts, including assistance for local response efforts to address the impacts of the
winter storms.
The District has proactively tracked its storm-related expenses, including labor, parts,
fuel, materials, and contractor assistance. Given the significant costs associated with
responding to, and recovering from, these events, the District will be seeking
reimbursement for eligible expenses through the Cal-OES Hazard Mitigation Assistance
Paul Hughes
October 5, 2023
Page 2
Program. Under this program, eligible costs may be reimbursed at a 75 percent state,
and 25 percent local, cost share.
SCHEDULE: N/A
COSTS: $1,400,000
ACCOUNT NO: N/A
BUDGETED AMOUNT AVAILABLE: N/A
ATTACHMENTS: Resolution No. 3242-23
CONCURRENCE WITH REQUESTED ACTION: . CATEGORY: Sewer/Water
GENERAL MANAGER: YES NO
CHIEF FINANCIAL OFFICER: YES NO
Interim General Manager
Paul Hughes
Yg5p Directors
��e� h'8ter 5outh Tahoe Nici<Haven
Shane'Romsos
_ David Peterson
Public, Utility District Kelly$heehan
NicK Exline
1275 Meadow Crest Prive•South Lake Tahoe■CA 96150-7401
Phone 530 544-0474•Fax 530 541-0614•www.5tpud.u5
BOARD AGENDA ITEM 4b
TO: Board of Directors
FROM: Cliff Bartlett, Fleet Equipment Supervisor
MEETING DATE: October 5, 2023
ITEM- PROJECT NAME: Fleet Truck Purchases
REQUESTED BOARD ACTION: Authorize purchases of up to 6 light- and heavy-duty trucks
through the National Auto Fleet Group competitively bid Sourcewell Contracts, in an
amount not to exceed $430,000 including estimated tax, registration and delivery
charges.
DISCUSSION: Staff requests that the Board of Directors authorize and approve the
purchase of up to six budgeted, light- and heavy-duty pickups and utility trucks, when
they become available. In recent years obtaining these vehicles has been challenging
due to production line quantities. When these vehicles become available, they are only
in limited supply to a limited number of dealers and sell very quickly - usually before we
can bring an item before the Board. Staff requests that the Board authorize and
approve the purchase of these vehicles in advance, so that when they do become
available, we are able to provide a purchase order immediately. All vehicles
identified below are budgeted. Some were budgeted in the previous fiscal years but
purchase was postponed for various reasons, including lack of availability.
Trucks to be replaced include Pump Runs Department Trucks #16 and #17 - both 1/4 ton
pickups; Electric Department Truck #2 - a 1-ton utility box truck; Heavy Maintenance
Department Truck #14 - a 2-ton welding/repair truck with boom; Equipment Repair
Department Truck #33 - a 1.5 ton utility box truck; and U/R Water Department Truck #77-
a 1.5 ton utility box truck.
Purchase of these vehicles will occur by using the competitively awarded contracts
through Sourcewell. As stated in the District's Purchasing Policy, participating in a
"purchasing coalition contract, which has recently been competitively awarded,
qualifies as having met the formal public competitive requirement."
This has been reviewed and approved by the District's Purchasing Agent.
SCHEDULE: ASAP
COSTS: NTE $430,000 Sewer/Water
ACCOUNT NO: 10.28.8070 $55,000; 20.28/8070 $60,000; 10.28/8380 $40,000; 10.28/8382
$140,000; 20.28/8390 $45,000; 20.28/8458 $50,000
BUDGETED AMOUNT AVAILABLE: $390,000
ATTACHMENTS: N/A
CONCURRENCE WITH REQUESTED ACTION:
CATEGORY: Sewer/Water
GENERAL MANAGER: YES ` NO
CHIEF FINANCIAL OFFICER: YES NO
General Manager
Paul Hughes
Directors
�g5p W NicK Haven
8te� 5outh
Tahoe
ShaneR,omsos
David Peterson
_ Kelly Sheehan
Public Utility District NicKExline
1275 Meadow Crest Prive•South Lake Tahoe■CA 96150-7401
Phone 530 544-0474•Fax 530 541-0614•www.5tpud.u5
BOARD AGENDA ITEM 4c
TO: Board of Directors
FROM: Trevor Coolidge, Senior Engineer
MEETING DATE: October 5, 2023
ITEM- PROJECT NAME: Black Bart Waterline Project
REQUESTED BOARD ACTION: Authorize General Manager to approve Notice of
Completion with the El Dorado County Clerk for the Black Bart Waterline Project.
DISCUSSION: District staff has inspected the Black Bart Waterline Project (Project) and
has found that Vinciguerra Construction, Inc., has substantially met all the Contract
requirements, effective September 22, 2023. The Project constructed approximately
10,000 feet of new 8" water line, transferred over 100 water services, abandoned old 2"
mains, installed new fire hydrants, and replaced an undersized main that required
frequent repairs on Ham Lane.
Staff requests approval to file a Notice of Completion with the El Dorado County
Recorder, which will initiate the Stop Notice filing period. Staff will bring a Closeout
Agreement and Final Pay Estimate to the Board separately as a future item, following
the end of the 30-day Stop Notice filing period.
SCHEDULE: Upon Board approval
COSTS: Contract: $3,425,176.00, total pending final CCO.
ACCOUNT NO: BLKBRT
BUDGETED AMOUNT AVAILABLE: N/A
ATTACHMENTS: N/A
CONCURRENCE WITH REQUESTED ACTION: , CATEGORY: Water
GENERAL MANAGER: YES NO
CHIEF FINANCIAL OFFICER: YES- NO
General Manager
Paul Hughes
Directors
is5o W NicK Haven
8te� 5outh
Tahoe
ShaneR,omsos
David Peterson
_ Kelly Sheehan
Public Utility District NicKExline
1275 Meadow Crest Prive•South Lake Tahoe■CA 96150-7401
Phone 530 544-0474•Fax 530 541-0614•www.5tpud.u5
BOARD AGENDA ITEM 4d
TO: Board of Directors
FROM: Trevor Coolidge, Senior Engineer
MEETING DATE: October 5, 2023
ITEM- PROJECT NAME: Keller Heavenly Water System Improvements, Phase 2 Project
REQUESTED BOARD ACTION: Authorize General Manager to approve Notice of
Completion with the El Dorado County Clerk for the Keller-Heavenly Water System
Improvements, Phase 2 Project.
DISCUSSION: District staff has inspected the second phase of the Keller-Heavenly Water
System Improvements Project (Project) and has found that White Rock Construction,
Inc., has substantially met all the Contract requirements, effective September 22, 2023.
The Project constructed a new 150,000-gallon water tank on the Keller Tank site off of
Sherman Way adjacent to the Heavenly ski resort. The tank is currently in use and has
successfully passed all coating, water loss, and water quality tests.
Staff requests approval to file a Notice of Completion with the El Dorado County
Recorder, which will initiate the Stop Notice filing period. Staff will bring a Closeout
Agreement and Final Pay Estimate to the Board separately as a future item, following
the end of the 30-day Stop Notice filing period.
SCHEDULE: Upon Board approval
COSTS: $553,282.87; $5.9 million for total Project
ACCOUNT NO: 2030-7022/15WO07
BUDGETED AMOUNT AVAILABLE: N/A
ATTACHMENTS: N/A
CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water
GENERAL MANAGER: YES NO
CHIEF FINANCIAL OFFICER: YES / t NO
General Manager
Paul Hughes
e( r 1950 ■ w8t Directors
NiCK Haven
South Tahoe ShaneR,omsos
- David Peterson
public Utility District
Kelly Sheehan
NicK Exline
1275 Meadow Crest[)rive•South Lake Tahoe■CA 96150-7401
Phone 530 544-6474■Fax 530 541-0614•www otpud.uo
BOARD AGENDA ITEM 4e
TO: Board of Directors
FROM: Chris Skelly, Information Technology Manager
Ryan Lee, Customer Service Manager
MEETING DATE: October 5, 2023
ITEM- PROJECT NAME: WaterSmart Contract Renewal
REQUESTED BOARD ACTION: 1) Waive formal bidding procedures as allowed for in
the District's Purchasing Policy when purchasing special services; and 2)
authorize staff to renew the WaterSmart platform contract established in 2017 for
an additional three-year term in the amount of $80,746.67.
DISCUSSION: The District and its customers have been utilizing the WaterSmart platform
consistently since its adoption in 2017. The District has invested time and resources in
promoting the adoption of the platform in the community for better insight into personal
water use, leak alerting, and data integrations with District enterprise systems for a full-
featured experience. Many District staff and departments have come to heavily utilize
the District's side of the of the WaterSmart platform for easy water consumption data
analytics, troubleshooting water use questions, and regulatory reporting.
If authorized by the Board, this contract renewal will be reimbursed from a current grant
(Water Efficiency/Water Loss Data System project from the California Department of
Water Resources IRWM Grant in the drought program) to pay for the contract and
utilize all the terms and conditions the District and WaterSmart (now VertexOne) agreed
upon in the original contract for a new term of 10/1/2023 - 9/30/2026.
SCHEDULE: Contract Term 10/1/2023 - 9/30/2026
COSTS: $80,746.67
ACCOUNT NO: 20.56.6030
BUDGETED AMOUNT AVAILABLE: $95,679.50
ATTACHMENTS: WaterSmart Quote
CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer/Water
GENERAL MANAGER: YESr. NO
i �
CHIEF FINANCIAL OFFICER: YES NO
vertexone TM 1321 Upland Dr.Suite 8389
Houston,TX 77043
United States
ORDER FORM Prepared By: Eric Thompson
Email: eric.thompson@vertexone.net
Phone:
Client Name: South Tahoe Public Utilities District,CA Offer Valid Through: 10/11/2023
Contact Name: Chris Skelly Effective Date: 10/1/2023
Email: csketty@stpud.us Contract Term (months): 36
Phone: (530) 543-6281 Contract End Date: 9/30/2026
Payment Frequency: Annually in Advance
Payment Terms: Net 30
Discount:
Year 1
QuantityServices
WaterSmart Platform 18,660.00 $1.40 $26,124.00
TOTAL: $26,124.00
Year 2
[Services Quantity Sales Price Total Price
WaterSmart Platform 18,660.00 $1.44 $26,907.72
TOTAL: $26,907.72
Year 3
Quantity Sales Price Total Price
WaterSmart Platform 18,660.00 $1.49 $27,714.95
TOTAL: $27,714.95
ORDER TOTAL $80,746.67
Terms and Conditions
Introduction
This legally binding Quote will be governed by the Agreement dated 7/3/2017 made between WaterSmart
Software Inc and South Tahoe Public Utilities District, CA ("Client"). Fees and further information for invoicing
will be incuded in an Order Form as part of the Agreement. VertexOne pricing is presented in USD. VertexOne
will provide an Order Form during contracting.
Page 1 of 2
vertexone TM 1321 Upland Dr.Suite 8389
Houston,TX 77043
United States
Transactional Fees
Transactional Fees include, Composition Fee, Document Archival, SMS Pass Through and Print Pass
Through. The Annual Pricing detailed in this Quote are based on average usage, actual pricing will be
based on Client usage on a monthly basis. Transactional Fees are calculated by the volume of Services
consumed.Unless explicitly stated otherwise, Transactional Fees are not cancelable, and Fees paid are not
refundable.
Payment Terms
The pricing quote may include payment terms, which are non-binding and subject to change at any time
without notice. You are responsible for paying all fees and charges associated with the products or services
provided by VertexOne.
Liability
We are not liable for any loss or damage, including but not limited to, indirect or consequential loss or damage,
arising out of or in connection with the use of the pricing quote.
Confidentiality
All information contained in the pricing quote is confidential and may not be disclosed to any third party without
our prior written consent.
Signatures
VertexOne Client
Name: Name:
Title: Title:
Date: Date:
Signature: Signature:
Page 2 of 2
General Manager
Paul Hughes
Yg5p Directors
` '�� Tahoe
NicK Haven
5u Shane'12,omsos
_ David Peterson
Public, Utility District KellY$heehan
NicK Exline
1275 Meadow Crest Prce•South Lake Tahoe■CA 96150-7401
Phone 530 544-0474•Fax 530 541-0614•www.5tpu,i.u5
BOARD AGENDA ITEM M
TO: Board of Directors
FROM: Megan Colvey, Senior Engineer
Heidi Baugh, Purchasing Agent
MEETING DATE: October 5, 2023
ITEM- PROJECT NAME: 2023 Flagpole 2- Iroquois 2 Tanks Recoating Project
REQUESTED BOARD ACTION: 1) Approve Change Order No. 2 to Farr Construction
Corporation dba Resource Development Group (RDC) in the amount $63,572.00; 2)
Authorize the General Manager to execute Change Order No. 2; and 3) Authorize the
General Manager to sign the Notice of Completion to be filed with El Dorado County
Clerk for the 2023 Flagpole 2- Iroquois 2 Tanks Recoating Project.
DISCUSSION: This project includes recoating work on two (2) water storage tanks-
Flagpole 2 and Iroquois 2-over the 2023 summer season. Change Order No. 2
increases the Contract Price by $63,572.00 to cover additional labor, material, and
equipment required to remove the existing coating. During the abrasive blasting and
surface preparation work at Iroquois 2, it was discovered that the existing coating
thickness was two times (2x) more than anticipated. The existing coating thickness
exceeded 60 mils at over 75% of the interior shell and floor surfaces, which required
additional labor, materials, and equipment to remove. RDC's original bid included
eight (8) days in the schedule for abrasive blasting and cleanup for the interior shell and
floor. The actual time required to remove the existing coating, prepare the surface, and
cleanup was 20 days. Staff recommends that the Board authorize the General
Manager to execute Change Order No. 2 to RDC.
RDC is nearing completion of recoating work at both tanks, which are expected to be
cleaned, disinfected, refilled, tested for water quality, and placed back into service by
October 22. With Board approval and upon completion of the Contractor's on-site
work, District staff will work with the General Manager to prepare, sign, and file a Notice
of Completion with the El Dorado County Clerk for the 2023 Flagpole 2- Iroquois 2 Tanks
Recoating Project. This filing will initiate the Stop Notice filing period for the work under
this contract.
Staff will return following the Stop Notice filing period for the Board to consider a
Closeout Agreement for the Project and, if needed, a final balancing Change Order.
Megan Colvey
Page 2
October 5, 2023
SCHEDULE: Upon Board Approval
COSTS: $63,572.00 (IR2CTG)
ACCOUNT NO: 2030-8483 (IR2CTG)
BUDGETED AMOUNT AVAILABLE: $0- Requires the use of reserves
ATTACHMENTS: Change Order No. 2
CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water
GENERAL MANAGER: YES NO
CHIEF FINANCIAL OFFICER: YES- NO
50UTH TAIIOF
Change Order #: 2
AG seer 1950 tl'1a'e,
6�IC UTILITY 0
Project: 2023 Flagpole 2/Iroquois 2 Tanks Recoating Project
Date: 9/18/2023 Purchase Order No. : 2023-1212
Farr Construction Corporation dba Resource Development
Contractor: Company
Dollar Amounts Contract Times
Original Contract $446,900.00 Calendar Days
Previous Change Orders $33,843.00 Calendar Days
Current Contract $480,743.00 154 Calendar Days
THIS CHANGE ORDER $63,572.00 Calendar Days
Total Change Orders to Date $97,415.00 5 Calendar Days
New Contract Total $544,315.00 159 Calendar Days
Contractor agrees to make the herein-described changes in accordance with the terms hereof. The change in
contract price and/or contract time noted is full settlement for costs incurred as a result of the change(s)
described, unless specifically noted in individual description(s).
Authorized by STPUD
General Manager: Date:
Accepted by
Contractor: Date: 9/27/23
Reviewed by STPUD
Project Manager Date: 9/18/2023
yOVTH TANOF
Change Order M
�seWer 195U
e��C UTILITY O�
Project: 2023 Flagpole 2/Iroquois 2 Tanks Recoating Project
Bid Schedule: A: Flagpole 2 Potable Water Tank
Date: 9/18/2023
Farr Construction Corporation dba Resource
Contractor: Development Company
fDollar Amounts
Original Bid Schedule Subtotal $242,200.00
Previous Change Orders $16,336.00
Current Bid Schedule Subtotal $258,536.00
THIS CHANGE ORDER $0.00
Total Change Orders to Date $16,336.00
New Bid Schedule Subtotal $258,536.00
The Contract Shall Be Changed As Follows:
y�%3T4 TAHOF
_- Change Order#:
�SeWer 1950
e<�unuTv o� P
Project: 2023 Flagpole 2/Iroquois 2 Tanks Recoating Project
Bid Schedule: B: Iroquois 2 Potable Water Tank
Date: 9/1 812 0 2 3
Farr Construction Corporation dba Resource
Contractor: Development Company
Dollar Amounts
Original Bid Schedule Subtotal $204,700.00
Previous Change Orders $17,507.00
Current Bid Schedule Subtotal $222,207.00
THIS CHANGE ORDER $63,572.00
Total Change Orders to Date $81,079.00
New Bid Schedule Subtotal $285,779.00
The Contract Shall Be Changed As Follows:
213.1 Increase Bid Item 5B by$39,870 to cover additional labor, material, and equipment
costs for blasting due to the existing coating thickness being more than 2x anticipated
(existing thickness exceeded 60 mils in over 75% of shell and floor).The original bid
was based on 8 days required for blasting and cleaning; however, actual work took 20
days. Contract time to complete interior coating work at Iroquois has been extended by
5 days- Interior coating must be complete by October 5; demobilization complete by
October 15.
TOTAL FOR ITEM 2B.1 IS: $39,870.00
213.2 Increase Bid Item 5C by$23,702 to cover additional labor, material, and equipment
costs for blasting due to the existing coating thickness being more than 2x anticipated
(existing thickness exceeded 60 mils in over 75% of shell and floor).The original bid
was based on 8 days required for blasting and cleaning; however, actual work took 20
days. Contract time to complete interior coating work at Iroquois has been extended by
5 days- Interior coating must be complete by October 5; demobilization complete by
October 15.
TOTAL FOR ITEM 26.2 IS: $23,702.00
General Manager
Paul Hughes
Yg5p Directors
��e� h'8ter 5outh Tahoe Nici<Haven
Shane'Romsos
_ David Peterson
Public, Utility District Kelly$heehan
NicK Exline
1275 Meadow Crest Prive•South Lake Tahoe■CA 96150-7401
Phone 530 544-0474•Fax 530 541-0614•www.5tpud.u5
BOARD AGENDA ITEM 4g
TO: Board of Directors
FROM: Adrian Combes, Senior Engineer
MEETING DATE: October 5, 2023
ITEM- PROJECT NAME: Barton Valve Installation Project
REQUESTED BOARD ACTION: 1) Approve Change Order No. 1 to Haen Constructors in
the amount of $72,827.88 and 2) Authorize the General Manager to execute Change
Order No. 1.
DISCUSSION: Change Order No. 1 includes four items which include one reduction in
work, two items of additional work and a one item extending the contract time.
Item 1 A.1 is a credit to the District documented in DCM #1 based on the result of
potholing leading to a smaller size insertion valve and type due to availability. The
change results in a credit to the District of $4,941 .
Item 1 A.2 is an additional bid item to install both 3/4" and 1" services to facilitate the
abandonment of undocumented dead-end waterlines in the system found during the
project as documented in DCM #2. A total of eight services needed to be transferred
to existing lines at a cost of $6,030 per service resulting in an increase of $48,240 to the
Contract. The actual abandonment of the waterlines will be documented and paid for
using T&M due to the unknowns associated with how they are currently tied into the
system.
Item 1 A.3 is an additional bid item to install a manhole on an existing line in the Bal Bijou
Center per DCM #3. The installation of this manhole was originally added on the Rocky
1 Pipeline replacement project under As-Needed Sewer Improvements; however, the
contractor was not able to install the manhole prior to the early snow season. To close
the Rocky 1 project, the material for the manhole was purchased from the contractor
and the installation was cancelled. This is the same contractor and they have agreed
to hold their price from last year and complete the installation under this contract for a
lump sum price of $29,528.88.
Item 1 A.4 is to add additional contract time to allow for the extra work added to the
Adrian Combes
October 5, 2023
Page 2 of 2
contract to be complete. This item adds 120 calendar days to the contract, effectively
extending the contract date to October 31, 2023.
Change Order No. 1 results in an increase to the contract of $72,827.88 from $440,973 to
$513,800.88 and increases the contract time to 180 calendar days ending on October
31, 2023.
SCHEDULE: Upon Board Approval
COSTS: $72,827.88
ACCOUNT NO: 20.30.7004, 20.30.8348
BUDGETED AMOUNT AVAILABLE: $351,000
ATTACHMENTS: Change Order No. 1
CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer/Water
GENERAL MANAGER: YES NO
CHIEF FINANCIAL OFFICER: YES NO
y0Or 14 TAHOF
Change Order #:
S@ r t
AGe`,C UTILITY Q��`G�
Project: Barton Area Valve Installation Project
Date: 10/5/2023 Purchase Order No. : 2023-1262
Contractor: Haen Constructors
Dollar Amounts Contract Times
Original Contract $440,973.00 60 Calendar Days
Previous Change Orders $0.00 0 Calendar Days
Current Contract $440,973.00 60 Calendar Days
THIS CHANGE ORDER $72,827.88 Calendar Days
Total Change Orders to Date $72,827.88 120 Calendar Days
New Contract Total $513,800.88 180 Calendar Days
Contractor agrees to make the herein-described changes in accordance with the terms hereof. The
change in contract price and/or contract time noted is full settlement for costs incurred as a result of the
change(s) described, unless specifically noted in individual descriptionls►.
Accepted by
Contractor: Date:
Reviewed by STPUD
Project Manager: Date:
Authorized by STPUD
General Manager: Date:
YOUTH TAHOF
Change Order #:
1950
e�1C UTILITY 0
Project: Barton Area Valve Installation Project
Bid Schedule: Barton Valve Installation Project
Date: 10/5/2023
Contractor: Haen Constructors
Dollar Amounts
Original Bid Schedule Subtotal $440,973.00
Previous Change Orders $0.00
Current Bid Schedule Subtotal $440,973.00
THIS CHANGE ORDER $72,827.88
Total Change Orders to Date $72,827.88
New Bid Schedule Subtotal $513,800.88
The Contract Shall Be Changed As Follows:
Amend Bid Item 10 to reflect a decrease in cost due to a change in size of insertion
valve from 8-inch to 6-inch and a change in type of insertion valve approved based on
availability per DCM#1. The change results in a credit to the District of$4,941.00.
There is no change to the Contract Time related to this change in work.
TOTAL FOR ITEM 1A.1 IS: ($4,941.00)
1A.2 Add Bid Item 16 to reflect additional work to install both 3/4" and 1" services as
directed in DCM #2 to facilitate the abandonment of undocumented mains discovered
in the project area. The unit price was agreed upon as $6,030 per service. There
were (8) eight services installed under this directive resuling in additional cost to the
District of$48,240. There is an increase to the Contract Time related to this change in
work as well as item 1A.3 of an additonal 120 contract days.
TOTAL FOR ITEM 1A.2 IS: $48,240.00
YOUTH TAHOF
Change Order #:
1950
e�1C UTILITY 0
Project: Barton Area Valve Installation Project
Bid Schedule: Barton Valve Installation Project
1 A.3
Add Bid Item 17 to reflect additional work to install a manhole at the Bal Bijou Center
as directed in DCM #3. The lump sum price was agreed upon as $29,528.88 reflecting
the cost originally negotiated in 2022 under a seperate contract minus the material
which the District has already paid for. There is an increase to the Contract Time
related to this change in work as well as item 1A.2 of an additonal 120 contract days.
TOTAL FOR ITEM 1A.3 IS: $29,528.88
1 A.4 Amend the Contract Time to add an additional 120 consecutive calendar days to
allow the additional work to be performed by the contractor identified in DCM #2 and
DCM #3. This additional time moves the contract end date from July 3rd, 2023 to
October 31, 2023.
TOTAL FOR ITEM 1A.4 IS: $0.00
General Manager
Paul Hughes
�g5p rectors
` '�� Tahoe
NicK Haven
5u Shane Romsos
_ David Peterson
Public, Utility District Kellysheehan
NICK Exline
1275 Meadow Crest Prive•South Lake Tahoe■CA 96150-7401
Phone 530 544-0474•Fax 530 541-0614•www.5tpud.u5
BOARD AGENDA ITEM 4h
TO: Board of Directors
FROM: Brent Goligoski, Associate Engineer
MEETING DATE: October 5, 2023
ITEM- PROJECT NAME: 2023 Luther Pass and Heavenly Tanks Rehab Project
REQUESTED BOARD ACTION: 1) Approve Change Order No. 1 to Farr Construction dba
Resource Development Company, in the amount of $18,600.00; and 2) Authorize the
General Manager to execute Change Order No. 1.
DISCUSSION: Change Order #1 amends the contract amount and contract time to
provide for one item of additional work to install a French Drain adjacent to the Luther
Pass Pump Station Tank #1 as directed by District Staff.
During the course of mobilization to rehabilitate the recycled water storage tank,
significant ground water was found ponded adjacent to the tank. This water was
deeper than the concrete stem wall and intruding beneath the tank floor. A French
Drain was designed and constructed to alleviate this flooding both to support
construction activities and protect the steel tank from this water intruding below the
tank floor and causing further corrosion.
Resource Development Company (RDC) provided a lump sum cost proposal in the
amount of $18,600.00 to perform this work. RDC also requested a 5-day contract time
extension associated with this delay. Change Order #1 amends the contract amount
and contract time accordingly for this additional work.
SCHEDULE: N/A
COSTS: $18,600.00
ACCOUNT NO: LPTNKS/10.30.7057
BUDGETED AMOUNT AVAILABLE: $735,193
ATTACHMENTS: Change Order #1
CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer/Water
GENERAL MANAGER: YES NO
CHIEF FINANCIAL OFFICER: YES %A— NO
Type text here
5OoTH T,gNO�
Change Order #:
see� �se
IC UTILITY
Project: 2023 Luther Pass and Heavenly Tanks Rehab Project
Date: 10/5/2023 Purchase Order No. : 2023-1188
Contractor: Farr Construction dba Resource Development Company
Dollar Amounts Contract Times
Original Contract $1,178,000.00 210 Calendar Days
Previous Change Orders $0.00 0 Calendar Days
Current Contract $171787000.00 210 Calendar Days
THIS CHANGE ORDER $18,600.00 Calendar Days
Total Change Orders to Date $187600.00 5 Calendar Days
New Contract Total $1,1967600.00 215 Calendar Days
Contractor agrees to make the herein-described changes in accordance with the terms hereof. The
change in contract price and/or contract time noted is full settlement for costs incurred as a result of the
change(s) described, unless specifically noted in individual description(s).
Accepted by
Contractor: Date:
Reviewed by STPUD
Project Manager: Date:
Authorized by STPUD
General Manager: Date:
y0UTH TpH()�
Change Order#:
ewer• tsso a G
A��C UTILITY q` P�
Project: 2023 Luther Pass and Heavenly Tanks Rehab Project
Bid Schedule: Luther Pass Tank 1
Date: 10/5/2023
Contractor: Farr Construction dba Resource Development Company
Dollar Amounts
Original Bid Schedule Subtotal $970,600.00
Previous Change Orders $0.00
Current Bid Schedule Subtotal $970,600.00
THIS CHANGE ORDER $18,600.00
Total Change Orders to Date $18,600.00
New Bid Schedule Subtotal $989,200.00
The Contract Shall Be Changed As Follows:
1 Add an additional Bid Item in the amount of$18,600.00 to perform work as directed in
Design Construction Memorandum #1, dated June 7, 2023. This additional work is to
install a french drain infiltration trench around a portion of Luther Pass Tank#1. The
lump sum cost proposal is provided by Resource Development Company as Contract
Change Request#1. Five days are added to the Contract Time and Intermediate
Milestone#2 related to this change in work .
TOTAL FOR ITEM 1A.1 IS: $18,600.00
General Manager
Paul Hughes
• 195d W Directors
NICK Haven
5outh Tahoe ShaneRomsos
- - David Peterson
Public Utility District
Kelly Sheehan
NICK Exline
1275 Meadow Crest Drive•5outh Lake Tahoe■CA 96150-7401
Phone 530 544-0474•Fax 530 541-0614•www.5tpud.uF,
BOARD AGENDA ITEM 4i
TO: Board of Directors
FROM: Mark Seelos, Water Resources Manager
MEETING DATE: October 5, 2023
ITEM- PROJECT NAME: Paloma Well Rehabilitation Project - Rebid
REQUESTED BOARD ACTION: 1) Approve Change Order No. 4 to Zim Industries, adding
124 days at no cost; and 2) Authorize the General Manager to execute Change Order
No. 4.
DISCUSSION: Substantial unexpected supply chain and permitting delays prohibited
completion of the project by the current contract end date of August 30, 2023.
Disruptions to the Contractor's pump supplier extended lead times for manufacture of
the pump bowl assembly. Flooding impacts in the Upper Truckee Marsh following the
storms of Winter 2023 have extended the time for California Tahoe Conservancy (CTC)
to consider re-issuing the temporary license agreement for the project, allowing well
testing to proceed. CTC property in the marsh is the planned discharge site for the well
pumping tests, which are the final step of the Paloma Well Rehabilitation Project. After
negotiation between District staff and CTC, CTC has agreed to renew the license
agreement to permit the discharge to the Upper Truckee Marsh as planned. With this
contract time extension, Paloma Well is expected to be back in service by November
17, 2023. No compensation is to be paid for this change in contract time.
Approval of Change Order No. 4 will extend the contract time by 124 days.
SCHEDULE: As soon as possible
COSTS: $0
ACCOUNT NO: 20.30.7009
BUDGETED AMOUNT AVAILABLE: N/A
ATTACHMENTS: Change Order No. 4
CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water
GENERAL MANAGER: YES NO
CHIEF FINANCIAL OFFICER: YES NO
hOOTH TaN�F CHANGE ORDER NUMBER NO. 4
Project: PALOMA WELL REHABILITATION PROJECT — REBID
AGeewer 195V`keG� Contractor: Zim Industries, Inc.
UTILITY O�S�
Date: 10.05.2023 PO #: 2022-594
The Contract Shall Be Changed As Follows:
1) Add 124 contract days to the Contract Time to change the current contract completion
date from August 30, 2023 to December 31 , 2023. The added contract time is to account for
substantial unexpected delays prohibiting completion of the project by August 30, 2023. An
updated Construction Schedule supporting this request will be accepted as Submittal No. 19
Schedule for Test Pump Testing. No compensation is to be paid for this change in contract
time.
Total Item 1 is $0.00
TOTAL FOR CHANGE ORDER NO. 4: $0.00
TOTAL FOR CHANGE ORDER NO. 4, ITEMS 1 IS: $0.00
Dollar Amounts Contract Time
Original Contract $566,347.00 297 Calendar Days
Previous Change Order $35,108 410 Calendar Days
Current Contract $6013455.00 707 Calendar Days
THIS CHANGE ORDER $0 124 Calendar Days
New Contract Total $601.455.00 831 Calendar Days
Contractor agrees to make the herein-described changes in accordance with the terms hereof. The change
in contract price and/or contract time noted is full settlement for costs incurred because of the change(s)
described, unless specifically noted in individual description(s).
Date:
Authorized By STPUD Board President
Date:
Accepted By Contractor
Date:
Reviewed By
X:\Projects\Water\2020 Paloma Well Casing Liner Pump Rplcmnt\2nd Bid Period REBID\03 Change Orders\CO 4 Contract Time Extension-III
1
General Manager
Paul Hughes
Yg5p Directors
��e� h'8ter 5outh Tahoe Nici<Haven
Shane'Romsos
_ David Peterson
Public, Utility District Kelly$heehan
NicK Exline
1275 Meadow Crest Prive•South Lake Tahoe■CA 96150-7401
Phone 530 544-0474•Fax 530 541-0614•www.5tpud.u5
BOARD AGENDA ITEM 4j
TO: Board of Directors
FROM: Heidi Baugh, Purchasing Agent
MEETING DATE: October 5, 2023
ITEM- PROJECT NAME: Surplus Equipment
REQUESTED BOARD ACTION: Authorize TNT Auction of Nevada, Inc. to auction South
Tahoe Public Utility District surplus at public on-line sale.
DISCUSSION: TNT Auction of Nevada, Inc. (TNT) specializes in municipal and fleet
auctions. They will be holding an on-line auction in October for all non-titled items, and
another auction in November for titled items. The District will be piggybacking off the
State of Nevada contract and will have the surplus picked up from our site by the
buyers to avoid transportation costs.
The following surplus items will be listed on the on-line auction in November:
(1) 2006 Caterpillar 252B skid steer (Equipment #81). Vehicle runs but no longer
meets District needs. Estimated value of this item is approximately $4,500.
(2) Erskin snow blower attachment model ES2000 (skid steer type). This attachment
needs repair. Estimated value is $500.
(3) Caterpillar backhoe attachment BH30 (skid steer type). This attachment is in
good condition and operable. Does not fit any District equipment. Estimated value is
$1,500.
SCHEDULE: N/A
COSTS: N/A
ACCOUNT NO: N/A
BUDGETED AMOUNT AVAILABLE: N/A
ATTACHMENTS: N/A
CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer/Water
GENERAL MANAGER: YES z4L NO
CHIEF FINANCIAL OFFICER: YES NO
General Manager
Paul Hughes
�g5p rectors
` '�� Tahoe
NicK Haven
5u Shane Romsos
_ David Peterson
Public, Utility District Kellysheehan
NICK Exline
1275 Meadow Crest Prive•South Lake Tahoe■CA 96150-7401
Phone 530 544-0474•Fax 530 541-0614•www.5tpud.u5
BOARD AGENDA ITEM 4k
TO: Board of Directors
FROM: Ryan Lee, Customer Service Manager
MEETING DATE: October 5, 2023
ITEM- PROJECT NAME: Liability Claim Against South Tahoe Public Utility District
Received from Lachlan Richards
REQUESTED BOARD ACTION: Reject the Claim against South Tahoe Public Utility District
for losses allegedly sustained by Lachlan Richards and request the Joint Powers
Insurance Authority (JPIA) to resolve the Claim.
DISCUSSION: The Claimant, Lachlan Richards, filed a Claim against the District on
September 22, 2023, for alleged damages related to flood damage at his home. The
Claimant alleges that several weirs and a culvert designed to drain the Truckee Marsh
have not been properly maintained and did not function as designed in the spring of
2023. The Claim alleges that the nonfunctioning culvert and weirs prevented the marsh
from draining, causing flood damage to the Claimant's property.
The Claim alleges damages in the amount of $5,470.00 for the remediation of flood
damage to the Claimant's home. The Claim alleges that the District may be responsible
for maintaining the blocked culverts and weirs around the Truckee Marsh, and thus
liable for the flood damage to the Claimant's property.
The JPIA has reviewed this Claim and recommends that the District reject the Claim on
the grounds that the District has not ever owned or maintained the culvert and weirs
described in the Claim, and has no responsibility for the ongoing maintenance of these
structures.
The District can reject a Claim, allow a Claim, reject or allow a Claim in part, or
compromise a Claim. If the District does not take action on the Claim within the six-
month timeframe, the Claim is deemed rejected on the last day of that period. Once
the Claim is deemed rejected, the Claimants may file a lawsuit. If written notice is not
given that the Claim was rejected or deemed rejected, a two-year statute of limitations
applies to the Claim. In contrast, rejection of the Claim coupled with a notice of
rejection triggers a shorter six-month limitations period in which to file a lawsuit.
Ryan Lee
October 5, 2023
Page 2 of 2
Staff recommends that the District reject the Claim and request the JPIA to resolve the
Claim.
SCHEDULE: Upon Board Recommendations
COSTS: N/A
ACCOUNT NO: N/A
BUDGETED AMOUNT AVAILABLE: N/A
ATTACHMENTS: Richards Claim for Damages
CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water/Sewer
GENERAL MANAGER: YES NO
CHIEF FINANCIAL OFFICER: YES NO
Lachlan M. Richards
September 18, 2023
Mr. Paul Hughes6L ODD
Generel Manager
South Tahoe Public Utility District S E P 2 2 2023
1275 Meadow Crest Drive Q
South Lake Tahoe, CA 96150 BY •r•==� R:.......
ChiefFinancialOfficerTdstoud.us
Mr. Hughes and all concerned:
I am a homeowner at S. Lake Tahoe. In late March and
April this year my home and garage were flooded by the overflowing of the Truckee Marsh due to lack
of any maintenance whatsoever of at least the following two man-made structures meant to drain the
marsh: 1)the culvert under Pope Beach Road; and 2)the weirs at the Lake Tahoe's edge near Tahoe
Keys Lighthouse Shores )see attached aerial photo). My family has owned this home since the 1940s
and this is the second time in recent history that our property has flooded. The purpose of this letter is
to:i)seek reimbursement for damages to my property; and ii)to place responsible parties on notice that
any further such flooding in future years will likely be met with legal action.
I attach photos of the fully blocked culvert under Pope Beach Road, which drains the Jameson Beach
portion of the Truckee Marsh eastward out toward at least two outlets-one at Lighthouse Shores and
another at 15"& Venice )note map),which in turn ultimately drain into Tahoe. I also attach photos of
the weir system near Lighthouse Shores. When the flood occurred, both the Pope Beach Rd culvert and
the Lighthouse Shores weirs were blocked and completely non-functional. The Jameson Beach Property
Owner's association, at our expense, had to hire Ebright, Inc. to excavate all the sand covering the weirs
to avoid even more severe and prolonged flooding.The weir photos shown are post excavation.
The root cause of this problem lies with the environmental disaster caused by the destruction of natural
wetlands in order to build Tahoe Keys. Before the Keys development was built,water would drain
naturally from the Truckee Marsh into the Upper Truckee River and into Lake Tahoe.When the Keys was
built, a system of weirs was installed which were supposed to control the water level of the Truckee
Marsh. At this time it appears no governmental agency Is monitoring, maintaining, or controlling the
weirs/culverts, which represents gross negligence on behalf of the various agencies responsible.
As the USDA Forest Service controls Pope Beach and Pope Beach Road, and the property is within the
County of El Dorado,with additional jurisdiction by the TRPA, I am seeking redress from and providing
notice to all such agencies,as well as those listed below.
I attach receipts for just some of the expenses I incurred in remediating the flood damage at 3071
Jameson Beach Rd, as summarized here:
• Replace carpeting: $2,042
• Replace drywall: $2,700
• Replace dishwasher: $ 527
• Misc. clean-up & repair supplies $ 201
TOTAL BEING CLAIMED: $Sp70.00
Please either: 1)remit the total damages to me at 2) if you claim
no responsibility for maintenance of either the culvert orthe weirs,please inform me who, in your view,
is responsible for such maintenance; or 3) provide me further instructions on recouping these damages.
Sincerely,
ds
Cc: Mr. Erick Walker
USDA Forest Service
Lake Tahoe Basin Management Unit
35 College Drive
So. Lake Tahoe, CA 96150
ewalkerPfs.fed.us
Cc: Clerk of the Board
County of El Dorado
330 Fair Lane
Placerville, CA 95667
edc.cobPedc og v_us
cc: Lahontan Water District
2501 Lake Tahoe Blvd.
So. Lake Tahoe, CA 96150
cc:Tahoe Regional Planning Agency(TRPA)
PO Box 5310
Stateline, NV 89449
r wry. t ..fir I•M -
Mr
lb r�r
RW
�� r i j _ 1•
ii .J a.s ri r
RLO
AW
co
co
co ji
s � '•� �. � �..A1'�71� •���. .� �,. � •'�— "fit 1 a—.'.-.•r� r�� .r
L � -� L .w, �a - r �•� r�w.s"' 'e'er-
� _ ��•�. -�-` ,- .. _ ,�► _ "-rya'"..•t--, s
. ; �f � - �.�►,,..�-_ �� • ~ .� Try �F _-, _ _ �: - _ ,.._
7��i'� 3 •1
Gl;
111 Ae/ ,
1
l
K,
p
F : l'
r
�ted� '2�"�ye-Kr�rD/3
PROJECT QUOTE (•k/: Opp
oaaoment craned. oeolsozs
SareSPUM Caalle, Pnlhony
1 1 11
4 I •
Ella Smith Etlesmith LOWE'SOF CARSON CITY,NV
#1024
city R VO9701-50 Carson
MM city,NV89701-5304
(776) 881-2460
rcarpel
al Project Quote:12' Carpet Quote - 780 sgft [CQj #749409
Product Telel 91,067.00
Labor Price $850.90
PROvider Measurement(Deduction) IS 0.0T i
Delivery Fees 990,00
O= Tax (Est.) 96.53
Total Price $ 2�042.42
This QW.0 rayaetl Wit WMIM23.This Ie an BrlMele My.This ommale Cass net include lee,s0edel ins la,a.,Whlla
GondsTa.l,or dalWny Chmgea.aY'yary N all maledeb Where!In ffinro limam are subject to a raeawily From the
m9eaaclI asap,tann Ihomour it be vleadmpWena,BpeWilts sprelaMaxacaisdbawbeenaedllaieriy
aceepMFlultlombnl dbl NiaeNar WJlae'acetlaaarrip bllbee aeralgea(bnaanl la nonmluntleMe, vap,nr
�r� wtL Rn.—�.cPa ll
FUN To
A&C REMODELING Paymentterms Due upon recelpt
lnaaicc# 160
Date 06/10/2023
Demlpdon lbtal
Hall house- $Z700.00
Rfmc and rePlacellaad damagedrytnll4amfrart reem.helksy peniry,l:I:chen andwallat
the leaving roan 2 Teet nlgn a0om 1 W linear het aatnmomramm part atcealing and 4 feat
hlght on walls replete with newdrywall and texture
(lpt ..�) ea.l c2,700.00
Taal $Z70o.00
r 1\
�7Lp
'r-
comello Rarigel Lock Pothers House
snvzy530 vM
Pioneer Appliance Repair, Inc.
530-544-3090; pioneerappliencerepaircom
-- next time, book your job on-line —
RICHARD 6/19/23, 0131172
DISHWASHER, MAYTAG
MDB49498HZO, F93467639
wash motor lolled. part is 259.99. total will be S525.09. 3-5 days shipping.
1 pump&Wor 259.99
by Jared R Page Total 259,99
i.afw 124.95
e.an 119.00
sales iaa 22.78
Total Tlclrat 526,69
G'lh V[v1ae:1MN>'+=F��'1 Yaarq>a.f L•N'MOPe•%R!<I'
+Natol:'a%Nay. WVV"xm,.+ MC•-rrN.•.m4'14 N.•.azca-U4441 %•wriewawm» Totalard119R04,508:S119.00
,pc:t>x?��N9OIR:kVWriNUf•%i✓xrls:N»RMr:A a:{II:RONLS;taBx£i,d (card 1f9.00 i.!50937202118)
Batence due=8407.69
nepa%Ifaell,eooatapprNe,YVwUMNerchWlelnvmnal/pNJeda,.tamaaeeyePanlMO.t to
LANOENFELD ACE HARDWARE
U 1931 Lake Tales Siva.
® '�I�� Trtn South take Tahoe,ial , CA %ISO
530-541-3eD1
eacliooN: A46423
HOM ■ C�NTRR Axr(ate: eranda
A - Dale: 06115/4029 Ilse: 01:19:22 PM
•' I
rw SALE Ae.
THAN( Y09 FOR SHOPPING AT Bill To:
BIY HOME CENTER LAKE TAHOE LOCNADOD BESIIINS
1875 LANE TAF.'OE BLVD, IOCK400D DESIGNS
SOUTH LANE TAHOE, CA, 96150 ACE ReraNe I IN215BIP59
(530) 541-4349
06/15/23 1:14PN 4194 555 BALE GRIN MIRL SPIRITS Oka GL-1528201
__________________ 1.00 EACH B 919.D9 1 119.99
486365 1 EA 919.941EA C
ABWF45100 DSP CAAIVE NIT LO 8 $19.94
Subtotal: 119.99
S•;6-TOTAL:F 19,94 TAX; $ _1 - 8.759 - state 7
TOTAL: $ 1.6 : 32i.7e
BC ANC S ,
VISA: 121.7E
BK CAROM: XXMXXUXXX04BB 1G.W
MID:<urt444195fi TIOMS6579
AIRH: 0747M MIT: B 21.613 ,
Most reference 9:bBC373 BEE@ MYER AGREES TO PAY TaTAI AMOUNT A90VE
Authorizing Ugh:ork: VISA ACCOWIN3 10 CAADHOLDES'S AOAEENW
1 WI1H ISSUES
Want less I VISA CREDIT .,rna*Au,D49e L
CARD TVPE:VISA EXpR: XXKX APPRWAL:072341
AIO I A=0000031010 . Epp; 69/*4
TOR : CUOOGO0000 AID: AODOW01031010
14 : 06D21203AGW00 TC Bt5EFEZ13EEEBND 40
TSI : TERMINAL: C6010720 000K)ODS007
ARC : 00 VALUATION; ei9eature
NODE : 15RAaT PAYMENT SAME: 05
CON I No 0VM
Name CHASE VISA NAME. A;uAe3:.:�a,AJN
ATC :0030 AM: 3E1.74
AC : 07930BOD2BD3937F In_
TXAID/PslCodei 622309 Auttartnd Signature
Sauk card USuB 21.68
fI17II III IIII��I���l��l *TIR[GNINS.M:ATERS C IN SALE A* ITEM
a=N jW 080373/21 ME Or RETURNABLE,,
COST No;s300 LOC6300 DESIGWS
THANK YOU VISA GROWER Act REWARDS 10 1 198219.51989
FOR VOIF PATRONAGE
AOCt: SENIOR CITIZEN DISCOUNT ,
Customer Ckpy ,
rL. .
LA%uAiRO ASS IWIWABt.
Lsll AxA ^aaae elva.
BontA Luke YAaOA� G 96190
• b90.611-9601 '
ltmvaogesN: BSA3642
As•. ' MdR l
31aei AP. ..
BALL ua
8411 Tal
GU1K ALIXY Q1 SO.I08 - 12a p9
2.na :'• 1 99.99 T I1.32
GVLN AMA, MY.I9'C 10.10[-SBO3.1 _
TAB %ACB 3 '13.99 T B1.98
nm BA3 Bam. BOB xwgg B -60909
1.06 BACiI
BW.NAx 3%ISOMMUM KIT - 401e61
1.00 GCB a $5.99 T. 11.94
93 BCBAB00 - BF10186
1.00 GCB B -49.00 T 48,00
Ia•9 Bv1.aa 26.001
SubbotTT"+i!!i14��g31.91
B A9h - et rta
926.09
VISAi 31e.a]
CHRONIC: 00.00
,• Ba ABBBaB TO My TOTAL ANCBBT A9rtIB
ACCO.4L1-' CAAON01&BA'e AGRENHE]T
WIDTH 398 G.
VISA CIWIT ..r.yva6aee0/B3 1
ATTBWAS.:a"M
"Tr9. Aa00134300]3a10
AB3a 91BC906183306 BO
TABBIILVO ee02001aT1T 000000000
MYI¢BS I9X+CC8: OT
B. ' S /O1LA
M1T: 010...
9f
AukEvzisaa 94ULseuxa
-------------------
"9ITURNS W" BE IN OR10 FM. IK3"
ITIATCHA±B9,NERTFRY L ON 9ALE ITEH9
ARE NOT EX"UNNAHLF•"
ACC 93h s IC 4 19141551989
LAWWRI) ACE NARDIDRE
1931 Like Note BIA,
Bluth Lake Tahte,:CA 86150
Trensoctitns: MSW49
ARM16ie: Blaze
'r Data: OB/D4R023 lEw: 1C:33a9 AN
. ... SALE •o.
Bill To:
Susie Richards '
• Susie Richards
ALE A4NBrde A 19149143SI4
C+N IVT ECG NB 102'A4S9
1,00 EACH S 521.99 1 SEIM
Paint Rmmry fat Ot -
1,U: EACH D MSG N
TOILET SEAT EL PL NC NN - /57b80f '
1.00 EAU B 932.09 1
SACtistal: BEES!;;� e
MA - State TeX; $4.81 A„AT
U - Tax &Wt: EMS IS;t/
TOTAL: SSD.03 ,,y4tr
BIFt: MAI Sry,..aJ• '
VISA: $32.61
CXIIP4E: 50.00
SOYER AGREES iD PAT TOTAL MOUNT ABOVE
ACVMIM IS CARONEDER 4 AUREENENi
NI IN ISSUER
A0Provei:EFVN9N-S527
. ULtt:GIfT-asoAPaAsrwx�E3
.YMIE:ACEVYALDELINI
OA7T:27.41
SAL: 50,00
U)
Au7trlRtl 519MNre
VISA CREDIT too *** Ao.D406 7
APPaOVAL:01438D -
UpP .NoV
A1D: AC300000 IOI0
ARaC C37319DBBAC20AM CO
1ERNINAL: OE'10720 DOOEVAGE0
VALIDATION: none
PAYMENT SERVICE: 07 ,
NAME: CaRaMOL9ERN19A
ME $32.69
(R1
� I
THANK YOU FOR SHOPPING AT ,.
DIY NYE CENTER LANE TAHOE
1875 LANE TAHOE BLVD. '
SDH'N LANE TME, CA. 96150 '
3 = (6301 541.4349
06/04/23 10:26AN 3940 352 SALE
.._.__.--------------------__._._-____
156205 1 EA N31,341EA C
R-13 15"X32'XRFT ROLLIBMI284 831.34 '
• SIJ8-TOTAL:3 31.34 TAN: N 2.74
TOTAL: S 34,08
6C ANT: 0 34,08 '
6K CARDo: XXXXXXNXIWIX0480
HIO:yf0aar1996 1I0 M5579
AUTH: 089510 ANT: 8 �34,09
Host mferama N47213D Bata
ANthorizina Notwrk: VISA
contactleas
CARD TYPE:VISA EXPR: XNXX '
AID : ACOMODO031010
TYR : 0000090000
IAD : 060212MAODDOU
ARC : 00
HOGE : Issuer
CVN : No CVH
Naaa : CHASE VISA
ATC :0D34
AC : 6657452COSMAEOE
WID/ValCado: 573901
Bank card USDS 34,C8
pI II�IINIIIIIIIIIN�llllll
_+> JRNLA 672130/21
MT N0:43W
IHANA YOU VISA CARDHOLDER
FOR YOUR PATRONAGE
A^tt SEHION CITIZEN DISCOUNT
Custamor C"
YOU SAV6J 8 1.65 BY SHOPPING AT
OlY HJNE CENTER LAKE TAHOE
0INMI
J H0MB�'cpN`T1mI
1VANK YOU FCA SHIIPPIAO At
DIV OF CENTER LANE TMQF
1875 LATE TAHOE BLVO.
Mild LAKE MOE, CA. 96150
L530) 941-4349
DV28/23 12:OOPR 1222 335 RALF
479426•..-.......:.I.to 66.ZAC
P:HT ALLR KIT 3/BX9" 3PC
10814 1 EA E35.091EA C
SAT.ACRV.VTNT-EXT.H/HI06 HHi .0
67,n ADF0 ,65_Iq q
y.+3,nn FAINT STEWARONF' FEE • GALL
0 A1t"3.65
41G554 1 EA t" .391EA C
SUPER PRO FLAT DAL.NHT.BASE 630,39
' - NOFO 1 FA .65 EA +
PAINT STECABOSHIP FEE - GALLO t,65
SUB-TOTAL;t 75.5 TAX: t 6.64
TOM t 02.49
BC ANT: t 62.49
BX CARCN: XXKX.XXXX.XXXX0488
HID:ryrrr+c#fg26 rTO;r416579
A:1TH: 004820 ANT: E 62.49
H59t referenCa N:6116955 Bath
Authorizing Nsuork: VISA
Contactless
CARO IYPE:VISA EXPR: XX.XX
AID : AODW000031013
IAD : 06021203AOW00
TST
ARC ; 00
NNE Is%zH-
CVB ; No CVH
NOW : CHASE VISA
AID :OL99
M : 2B66B6003ECA051f
TsnID/VB ICOde: 542917
Burk Card LWS 02.41
illli�!IIVI 'lillalllfllll!fCa
_=» JRNLN 086985/�1
COST 14J:130D
IHAN7. YOU VISA CARDHOLOER
Fro •e..10 .t.apryynr:c
General Manager
Paul Hughes
Yg5p Directors
` '�� Tahoe
NicK Haven
5u Shane'12,omsos
_ David Peterson
Public, Utility District KellY$heehan
NicK Exline
1275 Meadow Crest Prive•South Lake Tahoe■CA 96150-7401
Phone 530 544-0474•Fax 530 541-0614•www.5tpud.u5
BOARD AGENDA ITEM 41
TO: Board of Directors
FROM: Ryan Lee, Customer Service Manager
MEETING DATE: October 5, 2023
ITEM- PROJECT NAME: Liability Claim Against South Tahoe Public Utility District
Received from Bryan Rosner
REQUESTED BOARD ACTION: Reject the Claim against South Tahoe Public Utility District
for losses allegedly sustained by Bryan Rosner and request the Joint Powers Insurance
Authority (JPIA) to resolve the Claim.
DISCUSSION: The Claimant, Bryan Rosner, filed a Claim against the District on
September 14, 2023, for alleged damages related to a leaking kitchen faucet. Mr.
Rosner initially contacted the District on September 12 and said that his tenants
reported hearing a bubbling sound in their toilet and that the kitchen sink faucet
started leaking around the same time. District staff responded to Mr. Rosner's property
and confirmed that the bubbling in the toilet was due to the District hydrocleaning the
sewer main line that serves his property.
Mr. Rosner's Claim alleges that the District's sewer main cleaning resulted in pressure
fluctuations that caused his kitchen faucet to leak. The Claim alleges damages in the
amount of $406.69 to reimburse the cost of hiring a plumber to repair the leaking
kitchen faucet.
The JPIA has reviewed this Claim and recommends that the District reject the Claim on
the grounds that the District's sewer main cleaning does not affect the water
distribution system and could not have caused pressure fluctuations in the water system
resulting in damage to the Claimant's faucet. In addition, Section 3.1 .2 of the District's
Administrative Code states: "The District will exercise reasonable care and
diligence to deliver to its customers a continuous and sufficient supply of potable water
at a proper pressure and to avoid shortages or interruptions in service. The District,
however, shall not be liable for interruptions, shortages, or insufficient supplies,
fluctuations or variations in pressure, or any related losses or damage."
Ryan Lee
October 5, 2023
Page 2 of 2
The District can reject a Claim, allow a Claim, reject or allow a Claim in part, or
compromise a Claim. If the District does not take action on the Claim within the six-
month timeframe, the Claim is deemed rejected on the last day of that period. Once
the Claim is deemed rejected, the Claimants may file a lawsuit. If written notice is not
given that the Claim was rejected or deemed rejected, a two-year statute of limitations
applies to the Claim. In contrast, rejection of the Claim coupled with a notice of
rejection triggers a shorter six-month limitations period in which to file a lawsuit.
Staff recommends that the District reject the Claim and request the JPIA to resolve the
Claim.
SCHEDULE: Upon Board Recommendations
COSTS: N/A
ACCOUNT NO: N/A
BUDGETED AMOUNT AVAILABLE: N/A
ATTACHMENTS: Rosner Claim for Damages
CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water
GENERAL MANAGER: YESr NO
CHIEF FINANCIAL OFFICER: YES NO
u �
C4 ei4
Y
� Claim Form
(A claim shall be presented by the claimant or by a person acting on his behalf. )
NAME OF DISTRICT: South Tahoe Public Utility District Type text here
.� Claimant name, address (nuillng address if different), phone number, social security number, e-mail address, and date of birth.
Effective January t, 2010, the Medicare Secondary Payer Act (Federal Lew) requires the Dist►icYApency to report all claims involving
peymnts for bodily inj
�e ury end/or medical treatments to Medicare. As such, r,` you are seeking medical damages we MUST have both your
Social Security Number and your date of birth.
Nerve: '� Q V\ � 0 � � � �` Phone Number:
AddneSs(es): rA eL � � ton Social Security No.:
Date of Birth:
E-mail:
2 List name, address, and phone number of any witnesses.
F
: 1 e � � h� � e � -t-e � aress:
e Number.
3 List the deb, time, plooe, and other oiraumshnoes of the occurrence or transaction, which gave rise to the claim asserted.
%b
Date: 40P l 3 Time: A& o ( N r iJ Place:
Tell What Happened (dive complete information):
4C 4 )Lyle4�Q
4e 4e
ff 4 re 509 CJ
c� ireu .( e,
P
NOTE: Attach any photographs you may have regarding this claim.
4 Give a general desuiption of the indebtedness, obligation, injury, damage, or loss incurred so far as it may be known at the time of
presentation of the claim.
ST�u !� t? CA4/Q � cs� af c,�� d
� y
cemooe
Give the name or names of the public employee or employees causing the injury, damage, or loss, if known.
�( r () %D w 9
WE
s The amount claimed if it totals less than ten thousand dollars ($10,000) as of the date of presentation of the claim, including the estimated
amount of any prospective injury, damage or loss, insofar as it may be known at the time of the presentation of the claim, together with the
basis of computation of the amount claimed. If the amount claimed exceeds ton thousand dollars ($ 10,000), no dollar amount shall be included
in the claim. However, it shall indicate whether the claim would be a limited civil case.
Date: .� L Time: l I a I've Signature: If
ANSWER ALL QUESTIONS. OMITTING INFORMATION COULD MAKE YOUR CLAIM LEGALLY INSUFFICIENTI
Revised —July 2019
All Seasons Plumbing $ Heating
P. O. Box 9435 1.
South Lake Tahoe, CA 96158 P�PLUMBIS GNS
530-577-9039 HEATING
owner@allseasonsplumbingtahoe .com (530) 577-9039
Ousrnr YOU C4" rn,u i
INVOICE
BILL TO INVOICE #
Bryan Rosner DATE 09/13/2023
South Lake Tahoe, CA 96150
JOB NAME JOB LOCATION
Kitchen faucet.
DESCRIPTION OTY RATE AMOUNT
9 :34- 11 :00
Shut the water off to the building , removed and replaced bad water
supply stops . Turned water back on & checked for leaks. Removed
leaking old kitchen faucet with side sprayer. Replaced it with a new pull
out sprayer faucet and covered the sprayer hole with a sink hole cover.
Hooked up the faucet and checked for leaks.
Tenant called back & said new faucet would not work with their portable
wash machine connection .
11 :49- 12 :22
Picked up new faucet. Returned & removed faucet, replaced it with a
regular single handle chrome kitchen faucet. Checked for leaks.
Cleveland single handle kitchen faucet. 1 118.56 118 .56T
Water supply stop valve. 2 17.40 34.80T
Water supply flex connector. 2 9. 50 19.00T
Sink hole cover. 1 8.50 8 .50T
Subtotal : 180 .86
Hrs. Labor - Carlos 1 .50 140.00 210 . 00
Thank your SUBTOTAL 390. 86
TAX (0.0875) 15. 83
TOTAL 406. 69
BALANCE DUE $406m69
Gmail Bryan Ross
1142 O ' Malley Dr.
Elena Stevens <estevens@stpud . us > Tue, Sep 12 at 2043 PM
To :
Cc : Richard Jones IV <rjones@stpud . us>, CSR <CustomerServiceReps@stpud .dst .ca . us>
Hi Bryan,
See attached for the requested Claim Form.
Per our conversation I did ex lain that our Underground Sewer Dept, was out in the Sierra Tract neighborhood near your
residence at doing routine maintenance to keep the mains clean . This process is also referred to as
Hydro cleaning Sewer Lines . It is very normal for the toilets to bubble and make gurgling noises.
A solution to this would be to have a Backwater Device . South Tahoe Public Utility District would pay to have this device
installed . This would be installed on your Sewer Lateral and would be your responsibility as the homeowner to
maintenance. I did find out a little more about the maintenance that would be required by you as the homeowner. It is
very minimal maintenance, roughly every 1 -2 years. There is a vent style filter that you would lift out of the ground and
hose off. Then simply replace it once cleaned , and that 's it.
If you would like any additional information on the maintenance required, our Sewer Supervisor IV Jones, would be more
than happy to answer your questions. I have cc 'd him in this email .
Please let me know if there is anything else I can help you with .
Have a great day!
`�J
Elena Stevens
Customer Service Representative
South Tahoe Public Utility District
530 - 543. 6224 Direct Phone 1530 . 541 .. 0614 Fax I
stpud - logo- blue
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150 -7401
Confidentiality Notice: This e- mail message , including any attachments, is for the sole use of the intended recEpie nt (s)
and may contain confidential and privileged information . Any unauthorized review, use, disclosure or distribution is
prohibited . If you are not the intended recipient, please contact the sender by reply e- mail or calling 530- 543 - 6224 and
destroy all copies of the original message
This email message has been delivered safely and archived online by Mimecast.
claim Form .pdf
PAYMENT OF CLAIMS
FOR APPROVAL
October 5, 2023
Payroll 9/5/23 611,918.45
Payroll 9/19/23 597,626.18
Total Payroll 1,209,544.63
ADP & Insight eTools 573.59
AFLAC/WageWorks claims and fees 252.30
BNY Mellon 580,400.00
CalPERS -other 700.00
Cal Bank&Trust fiscal agent fees 45.00
PNC Bank 851,548.83
California SWRCB SRF loan payments 295,161.87
Ameritas - Insurance Payments 13,227.02
Total Vendor EFT 1,741,908.61
Weekly Approved Check Batches Water Sewer Total
Wednesday, September 6, 2023 155,258.61 219,829.85 375,088.46
Wednesday, September 13, 2023 331,601.27 369,619.42 701,220.69
Wednesday, September 20, 2024 105,826.43 212,192.82 318,019.25
Wednesday, September 27, 2025 1,464,007.82 972,266.84 2,436,274.66
Checks, Voids and Reissues -134.77 -161.40 -296.17
Total Accounts Payable Checks 3,830,306.89
Utility Management Refunds 12,971.88
Total Utility Management Checks 12,971.88
Grand Total $6,794,732.01
Payroll EFTs & Checks 9/5/2023 9/19/2023
EFT CA Employment Taxes &W/H 25,680.43 25,456.06
EFT Federal Employment Taxes &W/H 131,295.15 128,803.01
EFT CalPERS Contributions 86,953.75 86,231.13
EFT Empower Retirement-Deferred Comp 25,273.06 25,273.06
EFT Stationary Engineers Union Dues 2,759.25 2,789.79
EFT CDHP Health Savings (HSA) 4,258.48 4,110.98
EFT Retirement Health Savings 15,955.44 0.00
EFT United Way Contributions 10.00 10.00
EFT Employee Direct Deposits 319,573.66 324,792.92
CHK Employee Garnishments 159.23 159.23
Total 611,918.45 597,626.18
S0U-T " TA Payment of Claims
Payment Date Range 08/30/23 - 09/27/23
t
Report By Vendor - Invoice
00, 0" r - 195a s��'�G� Summary Listing
UTILITY D
Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount
Vendor 50044-DONALD ABICHT
2369324 Clothes Washer Rebate Program Paid by Check#113567 09/22/2023 09/27/2023 09/30/2023 09/27/2023 200.00
Vendor 50044-DONALD ABICHT Totals Invoices 1 $200.00
Vendor 44199-ACME CONSTRUCTION SUPPLY
S4347469.001 Field,Shop&Safety Supplies Paid by Check#113371 08/24/2023 09/06/2023 08/31/2023 09/06/2023 420.75
Inventory
Vendor 44199-ACME CONSTRUCTION SUPPLY Totals Invoices 1 $420.75
Vendor 49165-MARK ACRI
2223212 Water Use Reduction Rebates Paid by Check#113431 09/05/2023 09/13/2023 09/30/2023 09/13/2023 85.91
Vendor 49165-MARK ACRI Totals Invoices 1 $85.91
Vendor 43721-ACWA/]PIA
0700382 ACWA Medical/Vision Insurance Paid by Check#113432 08/01/2023 09/13/2023 09/30/2023 09/13/2023 202,004.26
Payable
Vendor 43721-ACWA/]PIA Totals Invoices 1 $202,004.26
Vendor 44039-AFLAC
327020 Insurance Supplement Payable Paid by Check#113568 09/01/2023 09/27/2023 09/30/2023 09/27/2023 928.48
Vendor 44039-AFLAC Totals Invoices 1 $928.48
Vendor 48605-AIRGAS USA LLC
9141253017 Field,Shop&Safety Supplies Paid by Check#113372 08/21/2023 09/06/2023 08/31/2023 09/06/2023 729.46
Inventory
9141303947 Field,Shop&Safety Supplies Paid by Check#113372 08/22/2023 09/06/2023 08/31/2023 09/06/2023 574.87
Inventory
Vendor 48605-AIRGAS USA LLC Totals Invoices 2 $1,304.33
Vendor 43949-ALPEN SIERRA COFFEE ROASTING CO
233637 Office Supply Issues Paid by Check#113373 08/29/2023 09/06/2023 08/31/2023 09/06/2023 111.25
233638 Office Supply Issues Paid by Check#113373 08/29/2023 09/06/2023 08/31/2023 09/06/2023 61.00
233812 Office Supply Issues Paid by Check#113433 09/06/2023 09/13/2023 09/30/2023 09/13/2023 111.25
233813 Office Supply Issues Paid by Check#113433 09/06/2023 09/13/2023 09/30/2023 09/13/2023 64.25
233936 Office Supply Issues Paid by Check#113510 09/12/2023 09/20/2023 09/30/2023 09/20/2023 111.25
233937 Office Supply Issues Paid by Check#113510 09/12/2023 09/20/2023 09/30/2023 09/20/2023 64.25
234080 Office Supply Issues Paid by Check#113569 09/19/2023 09/27/2023 09/30/2023 09/27/2023 111.25
234081 Office Supply Issues Paid by Check#113569 09/19/2023 09/27/2023 09/30/2023 09/27/2023 64.25
Vendor 43949-ALPEN SIERRA COFFEE ROASTING CO Totals Invoices 8 $698.75
Vendor 10954-ALPINE METALS
47335 Shop Supplies Paid by Check#113434 08/31/2023 09/13/2023 08/31/2023 09/13/2023 32.20
47411 Shop Supplies Paid by Check#113511 09/12/2023 09/20/2023 09/30/2023 09/20/2023 18.75
Vendor 10954-ALPINE METALS Totals Invoices 2 $50.95
Vendor 49337-AMAZON CAPITAL SERVICES INC.
16FY-T1RN-6LYQ Automotive Paid by Check#113435 08/14/2023 09/13/2023 08/31/2023 09/13/2023 68.84
1XH3-QXXL-GGJG Safety Equipment-Physicals Paid by Check#113435 08/15/2023 09/13/2023 08/31/2023 09/13/2023 1,410.05
1GJ7-TQXV-JLTH Buildings Paid by Check#113435 08/29/2023 09/13/2023 09/30/2023 09/13/2023 199.75
1KK7-W79G-T69G Grounds&Maintenance Paid by Check#113435 08/30/2023 09/13/2023 08/31/2023 09/13/2023 156.66
Run by Erika Franco on 09/27/2023 12:38:02 PM Page 1 of 25
" TA"OF Payment of Claims
_ Payment Date Range 08/30/23 - 09/27/23
19 so Report By Vendor - Invoice
e�M U Summary Listing
Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount
1X64-GMPW-WQVY Grounds&Maintenance Paid by Check#113570 08/31/2023 09/27/2023 09/30/2023 09/27/2023 362.95
19GW-VR9M-CVWM Small Tools Paid by Check#113435 09/01/2023 09/13/2023 09/30/2023 09/13/2023 1,466.96
1FR7-CRF4-FHKV Small Tools Paid by Check#113570 09/01/2023 09/27/2023 09/30/2023 09/27/2023 147.47
1VMN-13RG-13WN Grounds&Maintenance Paid by Check#113570 09/13/2023 09/27/2023 09/30/2023 09/27/2023 483.77
Vendor 49337-AMAZON CAPITAL SERVICES INC.Totals Invoices 8 $4,296.45
Vendor 50006-AMS.NET INC
0069606 Access Control/Surveillance Paid by Check#113436 08/31/2023 09/13/2023 08/31/2023 09/13/2023 45,416.64
Vendor 50006-AMS.NET INC Totals Invoices 1 $45,416.64
Vendor 47919-AQUATIC INFORMATICS INC
105813 Service Contracts Paid by Check#113374 08/22/2023 09/06/2023 08/31/2023 09/06/2023 147.00
105991 Service Contracts Paid by Check#113571 09/11/2023 09/27/2023 09/30/2023 09/27/2023 120.00
Vendor 47919-AQUATIC INFORMATICS INC Totals Invoices 2 $267.00
Vendor 44580-ARAMARK UNIFORM SERVICES
5980128112 Uniform Payable Paid by Check#113437 08/30/2023 09/13/2023 08/31/2023 09/13/2023 67.01
5980128113 Uniform Payable Paid by Check#113437 08/30/2023 09/13/2023 08/31/2023 09/13/2023 63.68
5980128114 Uniform Payable Paid by Check#113437 08/30/2023 09/13/2023 08/31/2023 09/13/2023 84.40
5980128115 Uniform Payable Paid by Check#113437 08/30/2023 09/13/2023 08/31/2023 09/13/2023 50.21
5980128116 Uniform Payable Paid by Check#113437 08/30/2023 09/13/2023 08/31/2023 09/13/2023 90.67
5980128117 Uniform Payable Paid by Check#113437 08/30/2023 09/13/2023 08/31/2023 09/13/2023 97.44
5980128118 Uniform Payable Paid by Check#113437 08/30/2023 09/13/2023 08/31/2023 09/13/2023 21.64
5980128119 Uniform Payable Paid by Check#113437 08/30/2023 09/13/2023 08/31/2023 09/13/2023 36.58
5980128120 Uniform Payable Paid by Check#113437 08/30/2023 09/13/2023 08/31/2023 09/13/2023 4.64
5980128121 Uniform Payable Paid by Check#113437 08/30/2023 09/13/2023 08/31/2023 09/13/2023 13.03
5980128122 Uniform Payable Paid by Check#113437 08/30/2023 09/13/2023 08/31/2023 09/13/2023 15.14
5980128123 Uniform Payable Paid by Check#113437 08/30/2023 09/13/2023 08/31/2023 09/13/2023 17.84
5980128124 Uniform Payable Paid by Check#113437 08/30/2023 09/13/2023 08/31/2023 09/13/2023 24.33
5980130042 Uniform Payable Paid by Check#113437 09/06/2023 09/13/2023 09/30/2023 09/13/2023 65.79
5980130043 Uniform Payable Paid by Check#113437 09/06/2023 09/13/2023 09/30/2023 09/13/2023 83.68
5980130044 Uniform Payable Paid by Check#113437 09/06/2023 09/13/2023 09/30/2023 09/13/2023 84.40
5980130045 Uniform Payable Paid by Check#113437 09/06/2023 09/13/2023 09/30/2023 09/13/2023 50.21
5980130046 Uniform Payable Paid by Check#113437 09/06/2023 09/13/2023 09/30/2023 09/13/2023 93.58
5980130048 Uniform Payable Paid by Check#113437 09/06/2023 09/13/2023 09/30/2023 09/13/2023 23.00
5980130049 Uniform Payable Paid by Check#113437 09/06/2023 09/13/2023 09/30/2023 09/13/2023 37.40
5980130050 Uniform Payable Paid by Check#113437 09/06/2023 09/13/2023 09/30/2023 09/13/2023 4.64
5980130051 Uniform Payable Paid by Check#113437 09/06/2023 09/13/2023 09/30/2023 09/13/2023 13.03
5980130052 Uniform Payable Paid by Check#113437 09/06/2023 09/13/2023 09/30/2023 09/13/2023 15.14
5980130053 Uniform Payable Paid by Check#113437 09/06/2023 09/13/2023 09/30/2023 09/13/2023 17.84
5980130054 Uniform Payable Paid by Check#113437 09/06/2023 09/13/2023 09/30/2023 09/13/2023 24.33
5980131915 Uniform Payable Paid by Check#113572 09/13/2023 09/27/2023 09/30/2023 09/27/2023 96.71
5980131917 Uniform Payable Paid by Check#113572 09/13/2023 09/27/2023 09/30/2023 09/27/2023 73.68
5980131921 Uniform Payable Paid by Check#113572 09/13/2023 09/27/2023 09/30/2023 09/27/2023 84.40
5980131925 Uniform Payable Paid by Check#113572 09/13/2023 09/27/2023 09/30/2023 09/27/2023 49.39
Run by Erika Franco on 09/27/2023 12:38:02 PM Page 2 of 25
" TA Payment of Claims
_ Payment Date Range 08/30/23 - 09/27/23
Report By Vendor - Invoice
�' 1950 .Na`�`G� Summary Listing
UTILITY
Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount
5980131931 Uniform Payable Paid by Check#113572 09/13/2023 09/27/2023 09/30/2023 09/27/2023 93.42
5980131937 Uniform Payable Paid by Check#113572 09/13/2023 09/27/2023 09/30/2023 09/27/2023 95.58
5980131940 Uniform Payable Paid by Check#113572 09/13/2023 09/27/2023 09/30/2023 09/27/2023 23.00
5980131942 Uniform Payable Paid by Check#113572 09/13/2023 09/27/2023 09/30/2023 09/27/2023 37.40
5980131944 Uniform Payable Paid by Check#113572 09/13/2023 09/27/2023 09/30/2023 09/27/2023 4.64
5980131945 Uniform Payable Paid by Check#113572 09/13/2023 09/27/2023 09/30/2023 09/27/2023 13.03
5980131946 Uniform Payable Paid by Check#113572 09/13/2023 09/27/2023 09/30/2023 09/27/2023 15.14
5980131949 Uniform Payable Paid by Check#113572 09/13/2023 09/27/2023 09/30/2023 09/27/2023 17.84
5980131951 Uniform Payable Paid by Check#113572 09/13/2023 09/27/2023 09/30/2023 09/27/2023 24.33
5980134204 Uniform Payable Paid by Check#113572 09/20/2023 09/27/2023 09/30/2023 09/27/2023 64.78
5980134205 Uniform Payable Paid by Check#113572 09/20/2023 09/27/2023 09/30/2023 09/27/2023 63.68
5980134206 Uniform Payable Paid by Check#113572 09/20/2023 09/27/2023 09/30/2023 09/27/2023 84.40
5980134207 Uniform Payable Paid by Check#113572 09/20/2023 09/27/2023 09/30/2023 09/27/2023 146.49
5980134208 Uniform Payable Paid by Check#113572 09/20/2023 09/27/2023 09/30/2023 09/27/2023 122.40
5980134209 Uniform Payable Paid by Check#113572 09/20/2023 09/27/2023 09/30/2023 09/27/2023 95.85
5980134210 Uniform Payable Paid by Check#113572 09/20/2023 09/27/2023 09/30/2023 09/27/2023 23.00
5980134211 Uniform Payable Paid by Check#113572 09/20/2023 09/27/2023 09/30/2023 09/27/2023 37.40
5980134212 Uniform Payable Paid by Check#113572 09/20/2023 09/27/2023 09/30/2023 09/27/2023 4.64
5980134213 Uniform Payable Paid by Check#113572 09/20/2023 09/27/2023 09/30/2023 09/27/2023 13.03
5980134214 Uniform Payable Paid by Check#113572 09/20/2023 09/27/2023 09/30/2023 09/27/2023 15.14
5980134215 Uniform Payable Paid by Check#113572 09/20/2023 09/27/2023 09/30/2023 09/27/2023 17.84
5980134216 Uniform Payable Paid by Check#113572 09/20/2023 09/27/2023 09/30/2023 09/27/2023 24.33
Vendor 44580-ARAMARK UNIFORM SERVICES Totals Invoices 51 $2,441.19
Vendor 47961-ARETE SYSTEMS
10703323 Contractual Services Paid by Check#113573 09/12/2023 09/27/2023 09/30/2023 09/27/2023 3,750.00
Vendor 47961-ARETE SYSTEMS Totals Invoices 1 $3,750.00
Vendor 49951-ARIAT INTERNATIONAL INC
906342168 Safety Equipment-Physicals Paid by Check#113375 05/12/2023 06/21/2023 06/30/2023 09/06/2023 269.54
906742543 Safety Equipment-Physicals Paid by Check#113375 07/06/2023 09/06/2023 08/31/2023 09/06/2023 (73.91)
907223543 Safety Equipment-Physicals Paid by Check#113574 09/12/2023 09/27/2023 09/30/2023 09/27/2023 1,217.32
Vendor 49951-ARIAT INTERNATIONAL INC Totals Invoices 3 $1,412.95
Vendor 40521-AT&T
088 080-5493 923 Telephone Paid by Check#113438 08/28/2023 09/13/2023 09/30/2023 09/13/2023 200.00
Vendor 40521-AT&T Totals Invoices 1 $200.00
Vendor 45202-AT&T MOBILITY
287306407514 823 Telephone Paid by Check#113439 09/02/2023 09/13/2023 09/30/2023 09/13/2023 3,723.87
Vendor 45202-AT&T MOBILITY Totals Invoices 1 $3,723.87
Vendor 48000-AT&T/CALNET 3
000020461685 Telephone Paid by Check#113440 09/01/2023 09/13/2023 08/31/2023 09/13/2023 26.14
000020461687 Telephone Paid by Check#113440 09/01/2023 09/13/2023 08/31/2023 09/13/2023 26.14
000020466887 Telephone Paid by Check#113440 09/01/2023 09/13/2023 08/31/2023 09/13/2023 1,716.57
000020491282 Telephone Paid by Check#113440 09/07/2023 09/13/2023 09/30/2023 09/13/2023 26.20
Run by Erika Franco on 09/27/2023 12:38:02 PM Page 3 of 25
11 TA Payment of Claims
_ Payment Date Range 08/30/23 - 09/27/23
m Report By Vendor - Invoice
1950 �� Summary Listing
UTILITY D1
Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount
000020491283 Telephone Paid by Check#113440 09/07/2023 09/13/2023 09/30/2023 09/13/2023 26.20
000020491284 Telephone Paid by Check#113440 09/07/2023 09/13/2023 09/30/2023 09/13/2023 32.00
000020491285 Telephone Paid by Check#113440 09/07/2023 09/13/2023 09/30/2023 09/13/2023 33.55
000020539543 Telephone Paid by Check#113575 09/15/2023 09/27/2023 09/30/2023 09/27/2023 24.77
000020539544 Telephone Paid by Check#113575 09/15/2023 09/27/2023 09/30/2023 09/27/2023 24.73
000020560260 Telephone Paid by Check#113575 09/20/2023 09/27/2023 09/30/2023 09/27/2023 24.69
000020560262 Telephone Paid by Check#113575 09/20/2023 09/27/2023 09/30/2023 09/27/2023 541.74
000020560263 Telephone Paid by Check#113575 09/20/2023 09/27/2023 09/30/2023 09/27/2023 97.01
000020560469 Telephone Paid by Check#113575 09/20/2023 09/27/2023 09/30/2023 09/27/2023 158.49
000020560516 Signal Charges Paid by Check#113575 09/20/2023 09/27/2023 09/30/2023 09/27/2023 31.43
Vendor 48000-AT&T/CALNET 3 Totals Invoices 14 $2,789.66
Vendor 48612-AUTOMATION DIRECT
15503220 Pump Stations Paid by Check#113376 08/28/2023 09/06/2023 08/31/2023 09/06/2023 1,810.69
Vendor 48612-AUTOMATION DIRECT Totals Invoices 1 $1,810.69
Vendor 50033-MICHAEL AYALA
3470409 Toilet Rebate Program Paid by Check#113441 09/05/2023 09/13/2023 09/30/2023 09/13/2023 199.00
Vendor 50033-MICHAEL AYALA Totals Invoices 1 $199.00
Vendor 49890-AZURE TAHOE RESORTS LLC
100 Incentive&Recognition Program Paid by Check#113442 08/29/2023 09/13/2023 08/31/2023 09/13/2023 2,512.50
Vendor 49890-AZURE TAHOE RESORTS LLC Totals Invoices 1 $2,512.50
Vendor 50045-KENT BAER
2614315 Turf Buy-Back Program Paid by Check#113576 09/19/2023 09/27/2023 09/30/2023 09/27/2023 750.00
Vendor 50045-KENT BAER Totals Invoices 1 $750.00
Vendor 11800-BARTON HEALTHCARE SYSTEM
150-82716 Safety Equipment-Physicals Paid by Check#113443 09/01/2023 09/13/2023 08/31/2023 09/13/2023 936.84
Vendor 11800- BARTON HEALTHCARE SYSTEM Totals Invoices 1 $936.84
Vendor 49339-BASEFORM INC
07252023-203 Pipe-Covers &Manholes Paid by Check#113444 07/25/2023 09/13/2023 08/31/2023 09/13/2023 2,349.00
08282023-207 Pipe-Covers &Manholes Paid by Check#113444 08/28/2023 09/13/2023 08/31/2023 09/13/2023 2,430.00
08282023-208 Pipe-Covers &Manholes Paid by Check#113444 08/28/2023 09/13/2023 08/31/2023 09/13/2023 2,349.00
Vendor 49339-BASEFORM INC Totals Invoices 3 $7,128.00
Vendor 50029-TERRYL BAUGHMAN
2363413 Toilet Rebate Program Paid by Check#113377 08/29/2023 09/06/2023 08/31/2023 09/06/2023 100.00
Vendor 50029-TERRYL BAUGHMAN Totals Invoices 1 $100.00
Vendor 44591-BAY AREA COATING CONSULTANTS
E08041 Forest Mountain Tank Coating Paid by Check#113378 08/23/2023 09/06/2023 08/31/2023 09/06/2023 6,567.00
E08042 Iroquois No. 2 Tank Coatings Paid by Check#113378 08/23/2023 09/06/2023 08/31/2023 09/06/2023 15,901.98
E08045 Flagpole Tank 2 Coating Paid by Check#113378 08/23/2023 09/06/2023 08/31/2023 09/06/2023 21,786.36
E08051 Echo View Tank Coatings Paid by Check#113378 08/23/2023 09/06/2023 08/31/2023 09/06/2023 11,057.58
Vendor 44591-BAY AREA COATING CONSULTANTS Totals Invoices 4 $55,312.92
Vendor 49419-BEND GENETICS LLC
ST2307 Monitoring Paid by Check#113379 08/08/2023 09/06/2023 08/31/2023 09/06/2023 250.00
Run by Erika Franco on 09/27/2023 12:38:02 PM Page 4 of 25
S0U-T " TA Payment of Claims
Payment Date Range 08/30/23 - 09/27/23
- Report By Vendor - Invoice
t
00, 0" r - 195a s��'�G� Summary Listing
UTILITY 0
Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount
ST2308 Monitoring Paid by Check#113512 09/14/2023 09/20/2023 09/30/2023 09/20/2023 250.00
Vendor 49419-BEND GENETICS LLC Totals Invoices 2 $500.00
Vendor 49773-LAUREN BENEFIELD
MILEAGE 090623 Travel-Meetings-Education Paid by Check#113445 09/06/2023 09/13/2023 09/30/2023 09/13/2023 156.09
Vendor 49773-LAUREN BENEFIELD Totals Invoices 1 $156.09
Vendor 45009-BENTLY AGROWDYNAMICS
210452 Biosolid Disposal Costs Paid by Check#113380 08/24/2023 09/06/2023 08/31/2023 09/06/2023 1,480.95
210467 Biosolid Disposal Costs Paid by Check#113380 08/31/2023 09/06/2023 08/31/2023 09/06/2023 2,040.60
210488 Biosolid Disposal Costs Paid by Check#113380 08/31/2023 09/06/2023 08/31/2023 09/06/2023 1,504.05
210529 Biosolid Disposal Costs Paid by Check#113446 09/08/2023 09/13/2023 09/30/2023 09/13/2023 1,579.20
210555 Biosolid Disposal Costs Paid by Check#113513 09/14/2023 09/20/2023 09/30/2023 09/20/2023 1,462.35
210583 Biosolid Disposal Costs Paid by Check#113577 09/20/2023 09/27/2023 09/30/2023 09/27/2023 1,204.65
Vendor 45009- BENTLY AGROWDYNAMICS Totals Invoices 6 $9,271.80
Vendor 48291-BEST BEST&KRIEGER LLP
974298 Personnel Legal Paid by Check#113447 09/07/2023 09/13/2023 08/31/2023 09/13/2023 629.00
Vendor 48291-BEST BEST&KRIEGER LLP Totals Invoices 1 $629.00
Vendor 50030-CHAD BROWN
2937226 Toilet Rebate Program Paid by Check#113381 08/29/2023 09/06/2023 08/31/2023 09/06/2023 74.50
Vendor 50030-CHAD BROWN Totals Invoices 1 $74.50
Vendor 42978-BROWNSTEIN HYATT
953779 Legal Services August 2023 Paid by EFT#79 09/12/2023 09/20/2023 09/30/2023 09/20/2023 18,473.60
Vendor 42978-BROWNSTEIN HYATT Totals Invoices 1 $18,473.60
Vendor 44730-BSK ASSOCIATES
AG20419 Monitoring Paid by Check#113382 08/30/2023 09/06/2023 08/31/2023 09/06/2023 1,935.00
AG20420 Monitoring Paid by Check#113382 08/30/2023 09/06/2023 08/31/2023 09/06/2023 1,228.00
Vendor 44730-BSK ASSOCIATES Totals Invoices 2 $3,163.00
Vendor 48681-CADENCE TEAM INC
3893 Service Contracts Paid by Check#113383 07/05/2023 09/06/2023 08/31/2023 09/06/2023 11,510.00
Vendor 48681-CADENCE TEAM INC Totals Invoices 1 $11,510.00
Vendor 48482-CALIF DEPT OF INDUSTRIAL
E 1991432 SA Buildings Paid by Check#113578 09/06/2023 09/27/2023 09/30/2023 09/27/2023 225.00
Vendor 48482-CALIF DEPT OF INDUSTRIAL Totals Invoices 1 $225.00
Vendor 48767-CALIFORNIA LAB SERVICE
3080642 Monitoring Paid by Check#113384 08/14/2023 09/06/2023 08/31/2023 09/06/2023 256.00
3080778 Monitoring Paid by Check#113384 08/16/2023 09/06/2023 08/31/2023 09/06/2023 126.00
3090335 Monitoring Paid by Check#113514 09/11/2023 09/20/2023 09/30/2023 09/20/2023 256.00
Vendor 48767-CALIFORNIA LAB SERVICE Totals Invoices 3 $638.00
Vendor 13230-CAROLLO ENGINEERS
FB39935 Contractual Services Paid by Check#113448 08/09/2023 09/13/2023 08/31/2023 09/13/2023 16,851.50
Run by Erika Franco on 09/27/2023 12:38:02 PM Page 5 of 25
11 TA Payment of Claims
_ Payment Date Range 08/30/23 - 09/27/23
m Report By Vendor - Invoice
1950 �� Summary Listing
UTILITY D1
Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount
FB40196 Secondary Clarifier#2 Rehab Paid by Check#113448 08/10/2023 09/13/2023 08/31/2023 09/13/2023 13,419.00
Vendor 13230-CAROLLO ENGINEERS Totals Invoices 2 $30,270.50
Vendor 42328-CDW-G CORP
LG94877 District Computer Supplies Paid by Check#113385 08/11/2023 09/06/2023 08/31/2023 09/06/2023 151.64
U85765 Service Contracts Paid by Check#113385 08/17/2023 09/06/2023 08/31/2023 06/30/2023 09/06/2023 140.44
LN96583 Service Contracts Paid by Check#113449 08/26/2023 09/13/2023 09/30/2023 09/13/2023 3,900.76
LR30323 Computer Purchases Paid by Check#113449 08/31/2023 09/13/2023 08/31/2023 09/13/2023 3,517.97
LSO4460 Computer Purchases Paid by Check#113449 09/05/2023 09/13/2023 09/30/2023 09/13/2023 760.28
Vendor 42328-CDW-G CORP Totals Invoices 5 $8,471.09
Vendor 48406-CHARTER COMMUNICATIONS
176157701090123 Telephone Paid by Check#113450 09/01/2023 09/13/2023 09/30/2023 09/13/2023 149.98
Vendor 48406-CHARTER COMMUNICATIONS Totals Invoices 1 $149.98
Vendor 40343-CHEMSEARCH INC
8358817 Service Contracts Paid by Check#113386 08/20/2023 09/06/2023 08/31/2023 09/06/2023 401.09
Vendor 40343-CHEMSEARCH INC Totals Invoices 1 $401.09
Vendor 49756-CINDERLITE TRUCKING CORP
414677 Pipe-Covers &Manholes Paid by Check#113387 08/04/2023 09/06/2023 08/31/2023 09/06/2023 457.25
416627 Pipe-Covers &Manholes Paid by Check#113387 08/24/2023 09/06/2023 08/31/2023 09/06/2023 463.41
416760 Pipe-Covers &Manholes Paid by Check#113387 08/25/2023 09/06/2023 08/31/2023 09/06/2023 898.46
416953 Pipe-Covers &Manholes Paid by Check#113387 08/28/2023 09/06/2023 08/31/2023 09/06/2023 1,608.50
417093 Pipe-Covers &Manholes Paid by Check#113387 08/29/2023 09/06/2023 08/31/2023 09/06/2023 470.67
417320 Pipe-Covers &Manholes Paid by Check#113387 08/31/2023 09/06/2023 08/31/2023 09/06/2023 226.13
418306 Pipe-Covers &Manholes Paid by Check#113579 09/11/2023 09/27/2023 09/30/2023 09/27/2023 236.78
418440 Pipe-Covers &Manholes Paid by Check#113579 09/12/2023 09/27/2023 09/30/2023 09/27/2023 235.19
418567 Pipe-Covers &Manholes Paid by Check#113579 09/13/2023 09/27/2023 09/30/2023 09/27/2023 663.76
418680 Pipe-Covers &Manholes Paid by Check#113579 09/14/2023 09/27/2023 09/30/2023 09/27/2023 234.19
418802 Pipe-Covers &Manholes Paid by Check#113579 09/15/2023 09/27/2023 09/30/2023 09/27/2023 477.55
Vendor 49756-CINDERLITE TRUCKING CORP Totals Invoices 11 $5,971.89
Vendor 48672-CINTAS CORP
5174682054 Safety Equipment-Physicals Paid by Check#113451 09/08/2023 09/13/2023 09/30/2023 09/13/2023 602.32
Vendor 48672-CINTAS CORP Totals Invoices 1 $602.32
Vendor 12535-CITY OF SOUTH LAKE TAHOE
AR196023 Pipe-Covers &Manholes Paid by Check#113452 08/11/2023 09/13/2023 08/31/2023 06/30/2023 09/13/2023 45,927.00
Vendor 12535-CITY OF SOUTH LAKE TAHOE Totals Invoices 1 $45,927.00
Vendor 13557-CLEMENT COMMUNICATIONS INC
9353863063 Safety Programs Paid by Check#113388 08/08/2023 09/06/2023 08/31/2023 09/06/2023 234.82
Vendor 13557-CLEMENT COMMUNICATIONS INC Totals Invoices 1 $234.82
Vendor 40512-CODALE ELECTRIC SUPPLY
S008106087.003 Misc Sewer Motor Rebuilds(TBD) Paid by Check#113453 09/01/2023 09/13/2023 09/30/2023 09/13/2023 1,227.95
S008138676.002 Misc Motor Rebuilds,Water Paid by Check#113515 09/07/2023 09/20/2023 09/30/2023 09/20/2023 32.56
S008221917.001 Primary Equipment Paid by Check#113580 09/19/2023 09/27/2023 09/30/2023 09/27/2023 1,555.25
Vendor 40512-CODALE ELECTRIC SUPPLY Totals Invoices 3 $2,815.76
Run by Erika Franco on 09/27/2023 12:38:02 PM Page 6 of 25
11 TA Payment of Claims
_ Payment Date Range 08/30/23 - 09/27/23
m Report By Vendor - Invoice
1950 �� Summary Listing
UTILITY D1
Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount
Vendor 48181-CONSTRUCTION MATERIALS ENG INC
14404 Tahoe Keys Sewer PS Rehab Paid by Check#113454 08/31/2023 09/13/2023 08/31/2023 09/13/2023 1,350.00
14424 Secondary Clarifier#2 Rehab Paid by Check#113454 08/31/2023 09/13/2023 08/31/2023 09/13/2023 280.00
Vendor 48181-CONSTRUCTION MATERIALS ENG INC Totals Invoices 2 $1,630.00
Vendor 49070-JOSEPH CONTI
1084341 REIMB Travel-Meetings-Education Paid by Check#113389 08/25/2023 09/06/2023 08/31/2023 09/06/2023 153.25
Vendor 49070-JOSEPH CONTI Totals Invoices 1 $153.25
Vendor 48281-CRYSTAL DAIRY FOODS
57904 Safety Equipment-Physicals Paid by Check#113581 09/21/2023 09/27/2023 09/30/2023 09/27/2023 49.92
Vendor 48281-CRYSTAL DAIRY FOODS Totals Invoices 1 $49.92
Vendor 42897-CWEA
LYNCH LA II 24 Dues-Memberships- Paid by Check#113582 09/06/2023 09/27/2023 09/30/2023 09/27/2023 103.00
Certification
ROSS CSM III 24 Dues-Memberships- Paid by Check#113582 09/06/2023 09/27/2023 09/30/2023 09/27/2023 108.00
Certification
GOODALE CSM1 APP Dues-Memberships- Paid by Check#113516 09/13/2023 09/20/2023 09/30/2023 09/20/2023 413.00
Certification
WHITE CSM2 APP Dues-Memberships- Paid by Check#113516 09/13/2023 09/20/2023 09/30/2023 09/20/2023 207.00
Certification
WHITE MT1 APP Dues-Memberships- Paid by Check#113516 09/13/2023 09/20/2023 09/30/2023 09/20/2023 192.00
Certification
DIRIDONI CSMI AP Dues-Memberships- Paid by Check#113582 09/19/2023 09/27/2023 09/30/2023 09/27/2023 413.00
Certification
Vendor 42897-CWEA Totals Invoices 6 $1,436.00
Vendor 48654-D&H BROADCASTING LLC
4497 Public Relations Expense Paid by Check#113390 08/23/2023 09/06/2023 08/31/2023 09/06/2023 1,120.00
4516 Public Relations Expense Paid by Check#113455 09/08/2023 09/13/2023 08/31/2023 09/13/2023 1,120.00
Vendor 48654-D&H BROADCASTING LLC Totals Invoices 2 $2,240.00
Vendor 49989-DAVID DENNIS
3342309-2 Turf Buy-Back Program Paid by Check#113583 09/18/2023 09/27/2023 09/30/2023 09/27/2023 2,664.00
Vendor 49989-DAVID DENNIS Totals Invoices 1 $2,664.00
Vendor 48289-DIY HOME CENTER
Aug 23 Stmt Shop Supplies&Small Tools Paid by Check#113456 08/31/2023 09/13/2023 08/31/2023 09/13/2023 1,125.86
Vendor 48289-DIY HOME CENTER Totals Invoices 1 $1,125.86
Vendor 48852-ANDREW DORMAN
OPEXAMGIREIMB23 Dues-Memberships- Paid by Check#113517 09/11/2023 09/20/2023 09/30/2023 09/20/2023 120.00
Certification
Vendor 48852-ANDREW DORMAN Totals Invoices 1 $120.00
Vendor 43649-DOUGLAS DISPOSAL
2748254 Refuse Disposal Paid by Check#113457 09/01/2023 09/13/2023 09/30/2023 09/13/2023 21.88
Vendor 43649-DOUGLAS DISPOSAL Totals Invoices 1 $21.88
Vendor 49909-JAMES DROWN
REIMB-EYEWEAR 24 Safety Equipment-Physicals Paid by Check#113584 09/19/2023 09/27/2023 09/30/2023 09/27/2023 202.00
Run by Erika Franco on 09/27/2023 12:38:02 PM Page 7 of 25
11 TA Payment of Claims
_ Payment Date Range 08/30/23 - 09/27/23
m Report By Vendor - Invoice
1950 �� Summary Listing
UTILITY D1
Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount
Vendor 49909-JAMES DROWN Totals Invoices 1 $202.00
Vendor 49746-GREGORY DUPREE
MILEAGE072723 Travel-Meetings-Education Paid by Check#113391 08/29/2023 09/06/2023 08/31/2023 09/06/2023 237.11
Vendor 49746-GREGORY DUPREE Totals Invoices 1 $237.11
Vendor 48819-PAULA DURAN
3453104 Turf Buy-Back Program Paid by Check#113458 09/11/2023 09/13/2023 09/30/2023 09/13/2023 3,000.00
Vendor 48819-PAULA DURAN Totals Invoices 1 $3,000.00
Vendor 45115-EBIX INC
635357 Subscription Expense Paid by Check#113392 08/09/2023 09/06/2023 08/31/2023 09/06/2023 224.32
Vendor 45115-EBIX INC Totals Invoices 1 $224.32
Vendor 45227-EMPIRE SAFETY&SUPPLY
0120219-IN Field,Shop&Safety Supplies Paid by Check#113459 06/15/2023 09/13/2023 08/31/2023 06/30/2023 09/13/2023 520.25
Inventory
0120634-IN Field,Shop&Safety Supplies Paid by Check#113459 07/20/2023 09/13/2023 08/31/2023 09/13/2023 733.97
Inventory
0120842-IN Field,Shop&Safety Supplies Paid by Check#113459 08/07/2023 09/13/2023 08/31/2023 09/13/2023 534.77
Inventory
Vendor 45227- EMPIRE SAFETY&SUPPLY Totals Invoices 3 $1,788.99
Vendor 44263-ENS RESOURCES INC
3411 Contractual Services Paid by Check#113460 09/04/2023 09/13/2023 09/30/2023 09/13/2023 5,038.46
Vendor 44263-ENS RESOURCES INC Totals Invoices 1 $5,038.46
Vendor 44032-ENVIRONMENTAL EXPRESS
1000752843 Laboratory Supplies Paid by Check#113393 08/24/2023 09/06/2023 08/31/2023 09/06/2023 664.65
Vendor 44032-ENVIRONMENTAL EXPRESS Totals Invoices 1 $664.65
Vendor 42100-ENVIRONMENTAL RESOURCES ASSO
052048 Laboratory Supplies Paid by Check#113461 08/24/2023 09/13/2023 08/31/2023 09/13/2023 179.78
Vendor 42100-ENVIRONMENTAL RESOURCES ASSO Totals Invoices 1 $179.78
Vendor 18550-EUROFINS EATON ANALYTICAL LLC
3800018818 Monitoring Paid by Check#113394 02/27/2023 09/06/2023 08/31/2023 09/06/2023 30.00
3800028423 Monitoring Paid by Check#113394 07/26/2023 09/06/2023 08/31/2023 09/06/2023 30.00
3800028493 Monitoring Paid by Check#113394 07/27/2023 09/06/2023 08/31/2023 09/06/2023 420.00
3800028495 Monitoring Paid by Check#113394 07/27/2023 09/06/2023 08/31/2023 09/06/2023 735.00
3800028618 Monitoring Paid by Check#113394 07/30/2023 09/06/2023 08/31/2023 09/06/2023 295.00
3800028960 Monitoring Paid by Check#113394 08/02/2023 09/06/2023 08/31/2023 09/06/2023 240.00
3800028971 Monitoring Paid by Check#113394 08/02/2023 09/06/2023 08/31/2023 09/06/2023 1,095.00
3800029566 Monitoring Paid by Check#113394 08/09/2023 09/06/2023 08/31/2023 09/06/2023 270.00
3800029567 Monitoring Paid by Check#113394 08/09/2023 09/06/2023 08/31/2023 09/06/2023 300.00
3800030226 Monitoring Paid by Check#113394 08/17/2023 09/06/2023 08/31/2023 09/06/2023 975.00
3800030227 Monitoring Paid by Check#113394 08/17/2023 09/06/2023 08/31/2023 09/06/2023 975.00
3800030505 Monitoring Paid by Check#113394 08/22/2023 09/06/2023 08/31/2023 09/06/2023 35.00
3800030582 Monitoring Paid by Check#113394 08/22/2023 09/06/2023 08/31/2023 09/06/2023 270.00
3800030804 Monitoring Paid by Check#113394 08/24/2023 09/06/2023 08/31/2023 09/06/2023 40.00
Run by Erika Franco on 09/27/2023 12:38:02 PM Page 8 of 25
" TA Payment of Claims
_ Payment Date Range 08/30/23 - 09/27/23
Report By Vendor - Invoice
.o�IeCw�, 1950 .Na`�`G� Summary Listing
UTILITY
Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount
3800030810 Monitoring Paid by Check#113394 08/24/2023 09/06/2023 08/31/2023 09/06/2023 2,355.00
3800031084 Monitoring Paid by Check#113394 08/28/2023 09/06/2023 08/31/2023 09/06/2023 320.00
3800031086 Monitoring Paid by Check#113394 08/29/2023 09/06/2023 08/31/2023 09/06/2023 165.00
3800031087 Monitoring Paid by Check#113394 08/29/2023 09/06/2023 08/31/2023 09/06/2023 90.00
3800031192 Monitoring Paid by Check#113394 08/29/2023 09/06/2023 08/31/2023 09/06/2023 230.00
3800031193 Monitoring Paid by Check#113394 08/29/2023 09/06/2023 08/31/2023 09/06/2023 240.00
3800031194 Monitoring Paid by Check#113394 08/29/2023 09/06/2023 08/31/2023 09/06/2023 80.00
3800031604 Monitoring Paid by Check#113462 09/04/2023 09/13/2023 09/30/2023 09/13/2023 60.00
3800031608 Monitoring Paid by Check#113462 09/04/2023 09/13/2023 09/30/2023 09/13/2023 200.00
3800031612 Monitoring Paid by Check#113462 09/04/2023 09/13/2023 09/30/2023 09/13/2023 300.00
3800031758 Monitoring Paid by Check#113462 09/05/2023 09/13/2023 09/30/2023 09/13/2023 165.00
3800031966 Monitoring Paid by Check#113462 09/07/2023 09/13/2023 09/30/2023 09/13/2023 1,695.00
3800032313 Monitoring Paid by Check#113518 09/11/2023 09/20/2023 09/30/2023 09/20/2023 1,530.00
3800032319 Monitoring Paid by Check#113518 09/11/2023 09/20/2023 09/30/2023 09/20/2023 240.00
3800032325 Monitoring Paid by Check#113518 09/11/2023 09/20/2023 09/30/2023 09/20/2023 290.00
Vendor 18550-EUROFINS EATON ANALYTICAL LLC Totals Invoices 29 $13,670.00
Vendor 47836-EVOQUA WATER TECHNOLOGIES LLC
906026527 Service Contracts Paid by Check#113463 08/10/2023 09/13/2023 08/31/2023 09/13/2023 420.17
906064430 Service Contracts Paid by Check#113463 09/01/2023 09/13/2023 09/30/2023 09/13/2023 136.86
Vendor 47836- EVOQUA WATER TECHNOLOGIES LLC Totals Invoices 2 $557.03
Vendor 48571-EYEZONE TAHOE
DROWN24 Safety Equipment-Physicals Paid by Check#113585 09/19/2023 09/27/2023 09/30/2023 09/27/2023 125.00
Vendor 48571-EYEZONE TAHOE Totals Invoices 1 $125.00
Vendor 41696-FARR CONSTRUCTION
23-03A Luther Pass PS Tanks Rehab Paid by Check#113586 08/31/2023 09/27/2023 09/30/2023 09/27/2023 132,469.50
23-03AR Luther Pass PS Tanks Rehab Paid by Check#113586 08/31/2023 09/27/2023 09/30/2023 09/27/2023 (6,623.47)
Retainage
23-03B Heavenly Tank Rehabilitation Paid by Check#113586 08/31/2023 09/27/2023 09/30/2023 09/27/2023 99,135.00
23-03BR Heavenly Tank Rehabilitation Paid by Check#113586 08/31/2023 09/27/2023 09/30/2023 09/27/2023 (4,956.75)
Retainage
23/02A Flagpole Tank 2 Coating Paid by Check#113586 08/31/2023 09/27/2023 09/30/2023 09/27/2023 109,195.40
23/02AR Flagpole Tank 2 Coating Paid by Check#113586 08/31/2023 09/27/2023 09/30/2023 09/27/2023 (5,459.76)
Retainage
23/02B Iroquois No. 2 Tank Coatings Paid by Check#113586 08/31/2023 09/27/2023 09/30/2023 09/27/2023 138,035.00
23/02BR Iroquois No. 2 Tank Coatings Paid by Check#113586 08/31/2023 09/27/2023 09/30/2023 09/27/2023 (6,901.75)
Retainage
Vendor 41696-FARR CONSTRUCTION Totals Invoices 8 $454,893.17
Vendor 14890-FEDEX
8-234-93679 Postage Expenses Paid by Check#113395 08/25/2023 09/06/2023 08/31/2023 09/06/2023 438.59
8-241-82156 Postage Expenses Paid by Check#113395 09/01/2023 09/06/2023 08/31/2023 09/06/2023 132.47
8-249-36504 Postage Expenses Paid by Check#113464 09/08/2023 09/13/2023 09/30/2023 09/13/2023 122.44
8-255-69552 Postage Expenses Paid by Check#113519 09/15/2023 09/20/2023 09/30/2023 09/20/2023 158.56
Run by Erika Franco on 09/27/2023 12:38:02 PM Page 9 of 25
11 TA Payment of Claims
_ Payment Date Range 08/30/23 - 09/27/23
m Report By Vendor - Invoice
1950 �� Summary Listing
UTILITY D1
Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount
Vendor 14890-FEDEX Totals Invoices 4 $852.06
Vendor 41263-FERGUSON ENTERPRISES LLC
0776150 Small Tools Paid by Check#113396 08/25/2023 09/06/2023 08/31/2023 09/06/2023 146.93
0784524 Secondary Equipment Paid by Check#113396 08/30/2023 09/06/2023 08/31/2023 09/06/2023 111.90
0787344 Buildings Paid by Check#113587 08/31/2023 09/27/2023 09/30/2023 09/27/2023 40.08
0793078 Shop Supplies Paid by Check#113465 09/06/2023 09/13/2023 09/30/2023 09/13/2023 13.70
0794471 Buildings Paid by Check#113465 09/07/2023 09/13/2023 09/30/2023 09/13/2023 1,546.77
0811102 Buildings Paid by Check#113587 09/15/2023 09/27/2023 09/30/2023 09/27/2023 302.71
Vendor 41263-FERGUSON ENTERPRISES LLC Totals Invoices 6 $2,162.09
Vendor 15000-FISHER SCIENTIFIC
5623800 Laboratory Supplies Paid by Check#113397 08/23/2023 09/06/2023 08/31/2023 09/06/2023 258.41
Vendor 15000-FISHER SCIENTIFIC Totals Invoices 1 $258.41
Vendor 48402-FLYERS ENERGY LLC
23-901680 Gasoline Fuel Inventory Paid by Check#113398 08/22/2023 09/06/2023 08/31/2023 09/06/2023 1,337.68
23-901743 Oil&Lubricants Paid by Check#113398 08/24/2023 09/06/2023 08/31/2023 09/06/2023 2,689.53
23-903975 Gasoline Fuel Inventory Paid by Check#113398 08/26/2023 09/06/2023 08/31/2023 09/06/2023 2,592.96
23-907799 Gasoline&Diesel Expense Paid by Check#113466 08/30/2023 09/13/2023 08/31/2023 09/13/2023 2,360.63
23-915301 Gasoline Fuel Inventory Paid by Check#113520 09/02/2023 09/20/2023 09/30/2023 09/20/2023 3,465.01
23-910757 Diesel Fuel Inventory Paid by Check#113466 09/05/2023 09/13/2023 09/30/2023 09/13/2023 9,500.91
23-919949 Gasoline Fuel Inventory Paid by Check#113520 09/16/2023 09/20/2023 09/30/2023 09/20/2023 5,473.52
23-924284 Gasoline Fuel Inventory Paid by Check#113588 09/21/2023 09/27/2023 09/30/2023 09/27/2023 2,806.85
Vendor 48402-FLYERS ENERGY LLC Totals Invoices 8 $30,227.09
Vendor 49053-ERIKA FRANCO
FRANCO100123 Travel-Meetings-Education Paid by Check#113589 08/15/2023 09/27/2023 09/30/2023 09/27/2023 248.00
Vendor 49053-ERIKA FRANCO Totals Invoices 1 $248.00
Vendor 48288-FRONTIER COMMUNICATIONS
5306942753 923 Telephone Paid by Check#113521 09/01/2023 09/20/2023 09/30/2023 09/20/2023 338.65
Vendor 48288-FRONTIER COMMUNICATIONS Totals Invoices 1 $338.65
Vendor 50046-JAMES GALLANTY
8016101 Water Use Reduction Rebates Paid by Check#113590 09/13/2023 09/27/2023 09/30/2023 09/27/2023 100.00
Vendor 50046-JAMES GALLANTY Totals Invoices 1 $100.00
Vendor 44684-GEA WESTFALIA GEA MECHANICAL EQUIPMENT US
3586502635 Primary Equipment Paid by Check#113467 02/14/2023 09/13/2023 08/31/2023 06/30/2023 09/13/2023 487.42
Vendor 44684-GEA WESTFALIA GEA MECHANICAL EQUIPMENT US Totals Invoices 1 $487.42
Vendor 49910-DAVID GERHARDT
Final Check Final Check Paid by Check#113591 09/27/2023 09/27/2023 09/30/2023 09/27/2023 1,765.75
Vendor 49910-DAVID GERHARDT Totals Invoices 1 $1,765.75
Vendor 15600-GRAINGER
9820068816 Shop Supplies Paid by Check#113468 08/28/2023 09/13/2023 09/30/2023 09/13/2023 1,156.20
9823340691 Generators Paid by Check#113468 08/30/2023 09/13/2023 08/31/2023 09/13/2023 13.63
9823340709 Shop Supplies Paid by Check#113468 08/30/2023 09/13/2023 08/31/2023 09/13/2023 627.61
9823489621 Shop Supplies Paid by Check#113468 08/30/2023 09/13/2023 08/31/2023 09/13/2023 267.37
Run by Erika Franco on 09/27/2023 12:38:02 PM Page 10 of 25
" TA"OF Payment of Claims
_ Payment Date Range 08/30/23 - 09/27/23
Report By Vendor - Invoice
.o�IeCw�, 1950 .Na`�`G� Summary Listing
UTILITY
Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount
9823710471 Automotive Paid by Check#113468 08/30/2023 09/13/2023 08/31/2023 09/13/2023 690.49
9823759387 Generators Paid by Check#113468 08/31/2023 09/13/2023 09/30/2023 09/13/2023 57.68
9824693288 Pump Stations Paid by Check#113468 08/31/2023 09/13/2023 08/31/2023 09/13/2023 333.98
9818552540 Shop Supplies Paid by Check#113468 09/05/2023 09/13/2023 09/30/2023 09/13/2023 1,170.43
9818552557 Shop Supplies Paid by Check#113468 09/05/2023 09/13/2023 09/30/2023 09/13/2023 (1,156.20)
9827845000 Pump Stations Paid by Check#113468 09/05/2023 09/13/2023 09/30/2023 09/13/2023 1,165.90
9818543135 Pump Stations Paid by Check#113468 09/06/2023 09/13/2023 09/30/2023 09/13/2023 1,181.86
9818543143 Pump Stations Paid by Check#113468 09/06/2023 09/13/2023 09/30/2023 09/13/2023 (1,165.90)
9829322628 Biosolids Equipment-Building Paid by Check#113522 09/06/2023 09/20/2023 09/30/2023 09/20/2023 3,749.53
9829322636 Pump Stations Paid by Check#113468 09/06/2023 09/13/2023 09/30/2023 09/13/2023 135.51
9829836163 Safety Equipment-Physicals Paid by Check#113522 09/07/2023 09/20/2023 09/30/2023 09/20/2023 997.65
9830062908 Safety Equipment-Physicals Paid by Check#113522 09/07/2023 09/20/2023 09/30/2023 09/20/2023 1,189.86
9830283124 Shop Supplies Paid by Check#113522 09/07/2023 09/20/2023 09/30/2023 09/20/2023 41.82
9834255193 Automotive Paid by Check#113592 09/12/2023 09/27/2023 09/30/2023 09/27/2023 749.30
9842482060 Buildings Paid by Check#113592 09/18/2023 09/27/2023 09/30/2023 09/27/2023 147.13
Vendor 15600-GRAINGER Totals Invoices 19 $11,353.85
Vendor 43403-GRANITE CONSTRUCTION CO
2554430 Pipe-Covers &Manholes Paid by Check#113469 08/31/2023 09/13/2023 08/31/2023 09/13/2023 3,831.42
Vendor 43403-GRANITE CONSTRUCTION CO Totals Invoices 1 $3,831.42
Vendor 48233-GRAYBAR ELECTRIC COMPANY INC
9333621145 Buildings Paid by Check#113593 08/24/2023 09/27/2023 09/30/2023 09/27/2023 707.35
9333763950 Buildings Paid by Check#113593 09/05/2023 09/27/2023 09/30/2023 09/27/2023 2,593.26
Vendor 48233-GRAYBAR ELECTRIC COMPANY INC Totals Invoices 2 $3,300.61
Vendor 15800-HACH CO
13676856 Laboratory Supplies Paid by Check#113470 07/28/2023 09/13/2023 08/31/2023 09/13/2023 156.60
Vendor 15800-HACH CO Totals Invoices 1 $156.60
Vendor 44430-HIGH SIERRA BUSINESS SYSTEMS
133968 Service Contracts Paid by Check#113471 09/01/2023 09/13/2023 08/31/2023 09/13/2023 789.10
134024 Service Contracts Paid by Check#113471 09/05/2023 09/13/2023 08/31/2023 09/13/2023 44.89
Vendor 44430-HIGH SIERRA BUSINESS SYSTEMS Totals Invoices 2 $833.99
Vendor 49604-HOUSTON MAGNANI AND ASSOCIATES
6893 Contractual Services Paid by Check#113399 08/31/2023 09/06/2023 08/31/2023 09/06/2023 800.00
Vendor 49604-HOUSTON MAGNANI AND ASSOCIATES Totals Invoices 1 $800.00
Vendor 48832-NANCY HUSSMANN
Sept2023 Personnel Expense Paid by Check#113400 09/01/2023 09/06/2023 09/30/2023 09/06/2023 454.45
Vendor 48832-NANCY HUSSMANN Totals Invoices 1 $454.45
Vendor 10103-IDEXX DISTRIBUTION CORP
3135483623 Laboratory Supplies Paid by Check#113401 08/23/2023 09/06/2023 08/31/2023 09/06/2023 58.94
3136260847 Laboratory Supplies Paid by Check#113472 09/05/2023 09/13/2023 09/30/2023 09/13/2023 3,768.61
Vendor 10103-IDEXX DISTRIBUTION CORP Totals Invoices 2 $3,827.55
Vendor 48056-INFOSEND INC
246523 Printing&Postage Expenses Paid by Check#113594 08/31/2023 09/27/2023 09/30/2023 09/27/2023 11,081.20
Run by Erika Franco on 09/27/2023 12:38:02 PM Page 11 of 25
S0U-T " TA Payment of Claims
Payment Date Range 08/30/23 - 09/27/23
- Report By Vendor - Invoice
t
00, 0" r - 195o s��'�G� Summary Listing
UTILITY D
Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount
Vendor 48056-INFOSEND INC Totals Invoices 1 $11,081.20
Vendor 13235-INSTROTEK INC
PS-INVI42900 Shop Supplies Paid by Check#113402 08/25/2023 09/06/2023 08/31/2023 09/06/2023 377.87
Vendor 13235-INSTROTEK INC Totals Invoices 1 $377.87
Vendor 48193-INSTRUMENT TECHNOLOGY CORP
22483 Leak Listening Device Paid by Check#113595 02/24/2023 09/27/2023 09/30/2023 09/27/2023 6,133.50
Vendor 48193-INSTRUMENT TECHNOLOGY CORP Totals Invoices 1 $6,133.50
Vendor 44110-J&L PRO KLEEN INC
29649 Janitorial Services Paid by Check#113523 09/14/2023 09/20/2023 09/30/2023 09/20/2023 4,666.20
Vendor 44110-J&L PRO KLEEN INC Totals Invoices 1 $4,666.20
Vendor 49782-JOE BENIGNO TREE SERVICE
8408 Grounds&Maintenance Paid by Check#113524 09/01/2023 09/20/2023 09/30/2023 09/20/2023 13,030.90
Vendor 49782-JOE BENIGNO TREE SERVICE Totals Invoices 1 $13,030.90
Vendor 50024-JONES MAYER
118205 Legal Services August 2023 Paid by Check#113596 08/31/2023 09/27/2023 08/31/2023 09/27/2023 8,584.72
Vendor 50024-JONES MAYER Totals Invoices 1 $8,584.72
Vendor 43694-KIMBALL MIDWEST
101362737 Shop Supplies Paid by Check#113403 08/21/2023 09/06/2023 08/31/2023 09/06/2023 503.07
101393556 Shop Supplies Paid by Check#113473 08/30/2023 09/13/2023 08/31/2023 09/13/2023 223.53
101405096 Shop Supplies Paid by Check#113473 09/01/2023 09/13/2023 09/30/2023 09/13/2023 670.43
101410067 Small Tools Paid by Check#113525 09/05/2023 09/20/2023 09/30/2023 09/20/2023 1,313.21
101411697 Shop Supplies Paid by Check#113597 09/06/2023 09/27/2023 09/30/2023 09/27/2023 1,382.19
101433584 Small Tools Paid by Check#113525 09/12/2023 09/20/2023 09/30/2023 09/20/2023 656.67
Vendor 43694-KIMBALL MIDWEST Totals Invoices 6 $4,749.10
Vendor 44945-KUMAR&GERCHICK
12674 Auditing Paid by Check#113598 08/31/2023 09/27/2023 09/30/2023 09/27/2023 210.00
Vendor 44945-KUMAR&GERCHICK Totals Invoices 1 $210.00
Vendor 44209-LA PERKS PLUMBING&HEAT INC
882654 District Computer Supplies Paid by Check#113474 07/21/2023 09/13/2023 09/30/2023 09/13/2023 950.00
Vendor 44209-L A PERKS PLUMBING&HEAT INC Totals Invoices 1 $950.00
Vendor 49725-LAKESIDE TERMITE&PEST CONTROL
016239909 Buildings Paid by Check#113475 08/31/2023 09/13/2023 08/31/2023 09/13/2023 95.00
013771377 Buildings Paid by Check#113599 09/13/2023 09/27/2023 09/30/2023 09/27/2023 150.00
Vendor 49725-LAKESIDE TERMITE&PEST CONTROL Totals Invoices 2 $245.00
Vendor 22200-LANGENFELD ACE HARDWARE
C352555 Field,Shop&Safety Supplies Paid by Check#113476 08/03/2023 09/13/2023 08/31/2023 09/13/2023 260.48
Inventory
Aug 23 Stmt Shop Supplies&Small Tools Paid by Check#113476 08/31/2023 09/13/2023 08/31/2023 09/13/2023 1,284.97
Vendor 22200-LANGENFELD ACE HARDWARE Totals Invoices 2 $1,545.45
Vendor 49591-JUDY LEONG
Sept 2023 Contractual Services Paid by Check#113404 09/01/2023 09/06/2023 09/30/2023 09/06/2023 20.00
Vendor 49591-JUDY LEONG Totals Invoices 1 $20.00
Run by Erika Franco on 09/27/2023 12:38:02 PM Page 12 of 25
11 TA Payment of Claims
_ Payment Date Range 08/30/23 - 09/27/23
m Report By Vendor - Invoice
1950 �� Summary Listing
UTILITY D1
Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount
Vendor 45135-LES SCHWAB TIRE CENTER
66100477512 Automotive Paid by Check#113405 08/24/2023 09/06/2023 08/31/2023 09/06/2023 1,466.14
66100479474 Automotive Paid by Check#113526 09/08/2023 09/20/2023 09/30/2023 09/20/2023 526.76
Vendor 45135-LES SCHWAB TIRE CENTER Totals Invoices 2 $1,992.90
Vendor 22550-LIBERTY UTILITIES
6982011 Electricity Paid by Check#113406 08/14/2023 09/06/2023 08/31/2023 09/06/2023 23.20
6984519 Electricity Paid by Check#113406 08/15/2023 09/06/2023 08/31/2023 09/06/2023 131,286.73
6984520 Electricity Paid by Check#113406 08/17/2023 09/06/2023 08/31/2023 09/06/2023 7,749.13
6984521 Electricity Paid by Check#113406 08/17/2023 09/06/2023 08/31/2023 09/06/2023 81.79
6992094 Electricity Paid by Check#113406 08/21/2023 09/06/2023 08/31/2023 09/06/2023 18,134.47
6992101 Electricity Paid by Check#113406 08/22/2023 09/06/2023 08/31/2023 09/06/2023 5,965.51
7001122 Electricity Paid by Check#113406 08/29/2023 09/06/2023 08/31/2023 09/06/2023 650.70
7001203 Electricity Paid by Check#113406 08/29/2023 09/06/2023 08/31/2023 09/06/2023 23.58
7001204 Electricity Paid by Check#113406 08/29/2023 09/06/2023 08/31/2023 09/06/2023 120.03
7001205 Electricity Paid by Check#113406 08/29/2023 09/06/2023 08/31/2023 09/06/2023 73.78
7001220 Electricity Paid by Check#113406 08/29/2023 09/06/2023 08/31/2023 09/06/2023 37.85
7001312 Electricity Paid by Check#113406 08/29/2023 09/06/2023 08/31/2023 09/06/2023 399.99
7001332 Electricity Paid by Check#113406 08/29/2023 09/06/2023 08/31/2023 09/06/2023 5,814.00
7003608 Electricity Paid by Check#113406 08/31/2023 09/06/2023 08/31/2023 09/06/2023 61.03
7004040 Electricity Paid by Check#113406 08/31/2023 09/06/2023 08/31/2023 09/06/2023 87.89
7004043 Electricity Paid by Check#113406 08/31/2023 09/06/2023 08/31/2023 09/06/2023 89.41
7004298 Electricity Paid by Check#113406 08/31/2023 09/06/2023 08/31/2023 09/06/2023 560.19
7004440 Electricity Paid by Check#113406 08/31/2023 09/06/2023 08/31/2023 09/06/2023 1,144.87
7004504 Electricity Paid by Check#113406 08/31/2023 09/06/2023 08/31/2023 09/06/2023 52.47
7005707 Electricity Paid by Check#113527 08/31/2023 09/20/2023 09/30/2023 09/20/2023 153,393.81
7008037 Electricity Paid by Check#113527 08/31/2023 09/20/2023 09/30/2023 09/20/2023 8,793.95
7006164 Electricity Paid by Check#113477 09/01/2023 09/13/2023 08/31/2023 09/13/2023 3,837.37
7006646 Electricity Paid by Check#113477 09/01/2023 09/13/2023 08/31/2023 09/13/2023 23.20
7007191 Electricity Paid by Check#113477 09/01/2023 09/13/2023 08/31/2023 09/13/2023 3,954.41
7007408 Electricity Paid by Check#113477 09/01/2023 09/13/2023 08/31/2023 09/13/2023 48.84
7008078 Electricity Paid by Check#113406 09/05/2023 09/06/2023 08/31/2023 09/06/2023 55.58
7008088 Electricity Paid by Check#113406 09/05/2023 09/06/2023 08/31/2023 09/06/2023 493.07
7008205 Electricity Paid by Check#113406 09/05/2023 09/06/2023 08/31/2023 09/06/2023 27.16
7008207 Electricity Paid by Check#113406 09/05/2023 09/06/2023 08/31/2023 09/06/2023 27.16
7008303 Electricity Paid by Check#113406 09/05/2023 09/06/2023 08/31/2023 09/06/2023 257.53
7008322 Electricity Paid by Check#113406 09/05/2023 09/06/2023 08/31/2023 09/06/2023 27.48
7008362 Electricity Paid by Check#113406 09/05/2023 09/06/2023 08/31/2023 09/06/2023 7,787.60
7008561 Electricity Paid by Check#113406 09/05/2023 09/06/2023 08/31/2023 09/06/2023 117.48
7008923 Electricity Paid by Check#113406 09/05/2023 09/06/2023 08/31/2023 09/06/2023 814.44
7016832 Electricity Paid by Check#113527 09/05/2023 09/20/2023 09/30/2023 09/20/2023 3,622.68
7010975 Electricity Paid by Check#113477 09/06/2023 09/13/2023 09/30/2023 09/13/2023 855.13
7011017 Electricity Paid by Check#113477 09/06/2023 09/13/2023 09/30/2023 09/13/2023 898.53
Run by Erika Franco on 09/27/2023 12:38:02 PM Page 13 of 25
11 TA Payment of Claims
_ Payment Date Range 08/30/23 - 09/27/23
m Report By Vendor - Invoice
1950 �� Summary Listing
UTILITY D1
Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount
7011496 Electricity Paid by Check#113477 09/06/2023 09/13/2023 09/30/2023 09/13/2023 61.63
7011560 Electricity Paid by Check#113477 09/06/2023 09/13/2023 09/30/2023 09/13/2023 3,739.61
7011947 Electricity Paid by Check#113477 09/06/2023 09/13/2023 09/30/2023 09/13/2023 897.12
7016896 Electricity Paid by Check#113527 09/06/2023 09/20/2023 09/30/2023 09/20/2023 1,883.48
7013598 Electricity Paid by Check#113527 09/07/2023 09/20/2023 09/30/2023 09/20/2023 26.04
7013756 Electricity Paid by Check#113527 09/07/2023 09/20/2023 09/30/2023 09/20/2023 155.02
7013960 Electricity Paid by Check#113527 09/07/2023 09/20/2023 09/30/2023 09/20/2023 1,573.72
7014653 Electricity Paid by Check#113527 09/07/2023 09/20/2023 09/30/2023 09/20/2023 145.25
7014657 Electricity Paid by Check#113527 09/07/2023 09/20/2023 09/30/2023 09/20/2023 224.57
7016984 Electricity Paid by Check#113527 09/08/2023 09/20/2023 09/30/2023 09/20/2023 5,511.04
7020153 Electricity Paid by Check#113527 09/11/2023 09/20/2023 09/30/2023 09/20/2023 2,619.10
7020957 Electricity Paid by Check#113527 09/11/2023 09/20/2023 09/30/2023 09/20/2023 203.52
7022370 Electricity Paid by Check#113527 09/12/2023 09/20/2023 09/30/2023 09/20/2023 71.73
7022375 Electricity Paid by Check#113527 09/12/2023 09/20/2023 09/30/2023 09/20/2023 218.47
7022505 Electricity Paid by Check#113527 09/12/2023 09/20/2023 09/30/2023 09/20/2023 169.96
7022580 Electricity Paid by Check#113527 09/12/2023 09/20/2023 09/30/2023 09/20/2023 175.13
7022585 Electricity Paid by Check#113527 09/12/2023 09/20/2023 09/30/2023 09/20/2023 164.45
7022587 Electricity Paid by Check#113527 09/12/2023 09/20/2023 09/30/2023 09/20/2023 224.88
7022597 Electricity Paid by Check#113527 09/12/2023 09/20/2023 09/30/2023 09/20/2023 230.66
7022640 Electricity Paid by Check#113527 09/12/2023 09/20/2023 09/30/2023 09/20/2023 8,114.78
7024154 Electricity Paid by Check#113527 09/13/2023 09/20/2023 09/30/2023 09/20/2023 66.82
7024155 Electricity Paid by Check#113527 09/13/2023 09/20/2023 09/30/2023 09/20/2023 39.67
7024156 Electricity Paid by Check#113527 09/13/2023 09/20/2023 09/30/2023 09/20/2023 328.60
7024157 Electricity Paid by Check#113527 09/13/2023 09/20/2023 09/30/2023 09/20/2023 163.24
7024160 Electricity Paid by Check#113527 09/13/2023 09/20/2023 09/30/2023 09/20/2023 31.74
7024162 Electricity Paid by Check#113527 09/13/2023 09/20/2023 09/30/2023 09/20/2023 45.15
7024192 Electricity Paid by Check#113527 09/13/2023 09/20/2023 09/30/2023 09/20/2023 760.31
7024328 Electricity Paid by Check#113527 09/13/2023 09/20/2023 09/30/2023 09/20/2023 34.79
7024329 Electricity Paid by Check#113527 09/13/2023 09/20/2023 09/30/2023 09/20/2023 34.20
7024332 Electricity Paid by Check#113527 09/13/2023 09/20/2023 09/30/2023 09/20/2023 33.88
7024334 Electricity Paid by Check#113527 09/13/2023 09/20/2023 09/30/2023 09/20/2023 71.73
7024558 Electricity Paid by Check#113527 09/13/2023 09/20/2023 09/30/2023 09/20/2023 23.20
7024866 Electricity Paid by Check#113527 09/13/2023 09/20/2023 09/30/2023 09/20/2023 114.13
7025172 Electricity Paid by Check#113527 09/13/2023 09/20/2023 09/30/2023 09/20/2023 334.73
7025173 Electricity Paid by Check#113527 09/13/2023 09/20/2023 09/30/2023 09/20/2023 3,684.40
7025188 Electricity Paid by Check#113527 09/13/2023 09/20/2023 09/30/2023 09/20/2023 97.64
7028931 Electricity Paid by Check#113600 09/13/2023 09/27/2023 09/30/2023 09/27/2023 123,909.82
7027277 Electricity Paid by Check#113527 09/14/2023 09/20/2023 09/30/2023 09/20/2023 6,592.05
7027329 Electricity Paid by Check#113527 09/14/2023 09/20/2023 09/30/2023 09/20/2023 11,931.80
7027339 Electricity Paid by Check#113527 09/14/2023 09/20/2023 09/30/2023 09/20/2023 351.47
7027571 Electricity Paid by Check#113527 09/14/2023 09/20/2023 09/30/2023 09/20/2023 634.01
7029104 Electricity Paid by Check#113527 09/15/2023 09/20/2023 09/30/2023 09/20/2023 34.20
Run by Erika Franco on 09/27/2023 12:38:02 PM Page 14 of 25
" TA Payment of Claims
_ MEL. Payment Date Range 08/30/23 - 09/27/23
Report By Vendor - Invoice
iOtieA°"or 1950 �'a��►�°� Summary Listing
UTILITY p15�
Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount
7029834 Electricity Paid by Check#113527 09/15/2023 09/20/2023 09/30/2023 09/20/2023 3,050.83
7030013 Electricity Paid by Check#113527 09/15/2023 09/20/2023 09/30/2023 09/20/2023 416.46
7030069 Electricity Paid by Check#113527 09/15/2023 09/20/2023 09/30/2023 09/20/2023 173.31
7030426 Electricity Paid by Check#113527 09/15/2023 09/20/2023 09/30/2023 09/20/2023 345.38
7032055 Electricity Paid by Check#113527 09/18/2023 09/20/2023 09/30/2023 09/20/2023 303.91
7032743 Electricity Paid by Check#113527 09/18/2023 09/20/2023 09/30/2023 09/20/2023 7,724.06
7034393 Electricity Paid by Check#113600 09/18/2023 09/27/2023 09/30/2023 09/27/2023 8,720.83
7034394 Electricity Paid by Check#113600 09/18/2023 09/27/2023 09/30/2023 09/27/2023 111.06
7034720 Electricity Paid by Check#113600 09/19/2023 09/27/2023 09/30/2023 09/27/2023 1,420.55
7035043 Electricity Paid by Check#113600 09/19/2023 09/27/2023 09/30/2023 09/27/2023 25.94
7035386 Electricity Paid by Check#113600 09/19/2023 09/27/2023 09/30/2023 09/27/2023 2,395.67
7037237 Electricity Paid by Check#113600 09/20/2023 09/27/2023 09/30/2023 09/27/2023 26.54
7040501 Electricity Paid by Check#113600 09/21/2023 09/27/2023 09/30/2023 09/27/2023 279.47
7040590 Electricity Paid by Check#113600 09/21/2023 09/27/2023 09/30/2023 09/27/2023 67.42
7040783 Electricity Paid by Check#113600 09/21/2023 09/27/2023 09/30/2023 09/27/2023 27.48
7043757 Electricity Paid by Check#113600 09/22/2023 09/27/2023 09/30/2023 09/27/2023 597.12
Vendor 22550-LIBERTY UTILITIES Totals Invoices 95 $558,805.81
Vendor 47903-LINDE GAS&EQUIPMENT INC
37780172 Shop Supplies Paid by Check#113407 08/21/2023 09/06/2023 08/31/2023 09/06/2023 66.45
37840907 Shop Supplies Paid by Check#113478 08/22/2023 09/13/2023 08/31/2023 09/13/2023 232.91
38060267 Shop Supplies Paid by Check#113407 08/31/2023 09/06/2023 08/31/2023 09/06/2023 64.11
Vendor 47903-LINDE GAS&EQUIPMENT INC Totals Invoices 3 $363.47
Vendor 45059-LUMOS&ASSOCIATES
119334 Waterline Replacements Paid by Check#113601 09/12/2023 09/27/2023 09/30/2023 09/27/2023 25,190.00
Consulting
119335 Contractual Services Paid by Check#113601 09/12/2023 09/27/2023 09/30/2023 09/27/2023 1,365.00
Vendor 45059-LUMOS&ASSOCIATES Totals Invoices 2 $26,555.00
Vendor 49840-MACKER TEK LTD
1605 District Computer Supplies Paid by Check#113602 08/29/2023 09/27/2023 09/30/2023 09/27/2023 911.98
Vendor 49840- MACKER TEK LTD Totals Invoices 1 $911.98
Vendor 19248-MALLORY SAFETY&SUPPLY LLC
5702744 Field,Shop&Safety Supplies Paid by Check#113408 08/29/2023 09/06/2023 08/31/2023 09/06/2023 228.29
Inventory
Vendor 19248-MALLORY SAFETY&SUPPLY LLC Totals Invoices 1 $228.29
Vendor 17900-MC MASTER CARR SUPPLY CO
13581332 Shop Supplies Paid by Check#113479 08/31/2023 09/13/2023 08/31/2023 09/13/2023 599.40
13968551 Mobile Equipment Paid by Check#113528 09/08/2023 09/20/2023 09/30/2023 09/20/2023 342.49
13989844 Automotive Paid by Check#113479 09/08/2023 09/13/2023 09/30/2023 09/13/2023 2,249.48
14294835 Small Tools Paid by Check#113603 09/14/2023 09/27/2023 09/30/2023 09/27/2023 453.09
14359915 Small Tools Paid by Check#113603 09/15/2023 09/27/2023 09/30/2023 09/27/2023 168.81
14666883 Wells Paid by Check#113603 09/21/2023 09/27/2023 09/30/2023 09/27/2023 139.04
Vendor 17900-MC MASTER CARR SUPPLY CO Totals Invoices 6 $3,952.31
Run by Erika Franco on 09/27/2023 12:38:02 PM Page 15 of 25
11 TA Payment of Claims
_ Payment Date Range 08/30/23 - 09/27/23
m Report By Vendor - Invoice
1950 �� Summary Listing
UTILITY D1
Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount
Vendor 49076-BUCK McLELLAND
1084338 REIMB Travel -Meetings-Education Paid by Check#113409 08/25/2023 09/06/2023 08/31/2023 09/06/2023 143.25
Vendor 49076-BUCK McLELLAND Totals Invoices 1 $143.25
Vendor 18150-MEEKS LUMBER&HARDWARE
Aug 23 Stmt Shop Supplies&Buildings Paid by Check#113480 08/31/2023 09/13/2023 09/30/2023 09/13/2023 2,325.45
Vendor 18150-MEEKS LUMBER&HARDWARE Totals Invoices 1 $2,325.45
Vendor 43889-MME MUNICIPAL MAINTENANCE
012463 Automotive Paid by Check#113481 08/10/2023 09/13/2023 08/31/2023 09/13/2023 1,070.86
012869 Automotive Paid by Check#113481 08/23/2023 09/13/2023 08/31/2023 09/13/2023 737.43
013104 Automotive Paid by Check#113529 08/29/2023 09/20/2023 09/30/2023 09/20/2023 475.54
013169 Automotive Paid by Check#113604 08/30/2023 09/27/2023 09/30/2023 09/27/2023 194.68
013222 Automotive Paid by Check#113481 09/05/2023 09/13/2023 09/30/2023 09/13/2023 116.18
Vendor 43889-MME MUNICIPAL MAINTENANCE Totals Invoices 5 $2,594.69
Vendor 50047-BRUCE MOON
2214118 Turf Buy-Back Program Paid by Check#113605 09/14/2023 09/27/2023 09/30/2023 09/27/2023 450.00
Vendor 50047- BRUCE MOON Totals Invoices 1 $450.00
Vendor 50048-JIM MRAZEK
2233111 Turf Buy-Back Program Paid by Check#113606 09/07/2023 09/27/2023 09/30/2023 09/27/2023 450.00
Vendor 50048-JIM MRAZEK Totals Invoices 1 $450.00
Vendor 43123-MSC INDUSTRIAL SUPPLY CO
76900877 Pressure Reducing Valves Paid by Check#113607 09/11/2023 09/27/2023 09/30/2023 09/27/2023 1,873.20
Vendor 43123-MSC INDUSTRIAL SUPPLY CO Totals Invoices 1 $1,873.20
Vendor 49765-NAPA AUTO PARTS
Aug 23 Stmt Automotive&Shop Supplies Paid by Check#113482 08/31/2023 09/13/2023 09/30/2023 09/13/2023 5,857.71
Vendor 49765-NAPA AUTO PARTS Totals Invoices 1 $5,857.71
Vendor 40124-NORTHERN TOOL&EQUIP
52581280 Pump Stations Paid by Check#113483 08/31/2023 09/13/2023 09/30/2023 09/13/2023 337.13
52625246 Small Tools Paid by Check#113608 09/12/2023 09/27/2023 09/30/2023 09/27/2023 125.05
Vendor 40124-NORTHERN TOOL&EQUIP Totals Invoices 2 $462.18
Vendor 48315-O'REILLY AUTO PARTS
Aug 23 Stmt Automotive&Small Tools Paid by Check#113484 08/28/2023 09/13/2023 08/31/2023 09/13/2023 253.31
Vendor 48315-O'REILLY AUTO PARTS Totals Invoices 1 $253.31
Vendor 44607-OLIN PIONEER AMERICAS LLC
900316002 Hypochlorite Paid by Check#113410 08/24/2023 09/06/2023 08/31/2023 09/06/2023 13,607.74
900320029 Hypochlorite Paid by Check#113485 09/04/2023 09/13/2023 09/30/2023 09/13/2023 12,389.18
900324397 Hypochlorite Paid by Check#113609 09/14/2023 09/27/2023 09/30/2023 09/27/2023 13,984.53
Vendor 44607-OLIN PIONEER AMERICAS LLC Totals Invoices 3 $39,981.45
Vendor 49806-OUTSIDE INTERACTIVE INC
34747 Public Relations Expense Paid by Check#113411 06/23/2023 09/06/2023 08/31/2023 06/30/2023 09/06/2023 2,011.00
35033 Public Relations Expense Paid by Check#113411 07/13/2023 09/06/2023 08/31/2023 09/06/2023 2,011.00
35667 Public Relations Expense Paid by Check#113411 08/01/2023 09/06/2023 08/31/2023 09/06/2023 2,011.00
Vendor 49806-OUTSIDE INTERACTIVE INC Totals Invoices 3 $6,033.00
Run by Erika Franco on 09/27/2023 12:38:02 PM Page 16 of 25
11 TA Payment of Claims
_ Payment Date Range 08/30/23 - 09/27/23
m Report By Vendor - Invoice
1950 �� Summary Listing
UTILITY D1
Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount
Vendor 41272-PAC MACHINE CO
91852 Pump Stations Paid by Check#113486 09/07/2023 09/13/2023 09/30/2023 09/13/2023 795.75
91962 Bellevue#2 Pump/Motor Paid by Check#113610 09/21/2023 09/27/2023 09/30/2023 09/27/2023 9,365.36
91963 Bellevue#2 Pump/Motor Paid by Check#113610 09/21/2023 09/27/2023 09/30/2023 09/27/2023 7,793.88
Vendor 41272- PAC MACHINE CO Totals Invoices 3 $17,954.99
Vendor 49997-PACIFIC STEEL&RECYCLING
8478218 Shop Supplies Paid by Check#113487 08/31/2023 09/13/2023 08/31/2023 09/13/2023 1,791.86
8483795 Buildings Paid by Check#113487 09/07/2023 09/13/2023 09/30/2023 09/13/2023 190.31
8488175 Mobile Equipment Paid by Check#113530 09/12/2023 09/20/2023 09/30/2023 09/20/2023 246.99
Vendor 49997-PACIFIC STEEL&RECYCLING Totals Invoices 3 $2,229.16
Vendor 49945-PAPE MACHINERY INC
14741497 Automotive Paid by Check#113488 09/01/2023 09/13/2023 09/30/2023 09/13/2023 3,380.06
Vendor 49945- PAPE MACHINERY INC Totals Invoices 1 $3,380.06
Vendor 50041-JACK PHILLIPS
REIMB-BOOTS 24 Safety Equipment-Physicals Paid by Check#113611 09/19/2023 09/27/2023 09/30/2023 09/27/2023 100.00
Vendor 50041-JACK PHILLIPS Totals Invoices 1 $100.00
Vendor 50049-SUZANNE PLATTNER
3366108 Clothes Washer Rebate Program Paid by Check#113612 09/20/2023 09/27/2023 09/30/2023 09/27/2023 200.00
Vendor 50049-SUZANNE PLATTNER Totals Invoices 1 $200.00
Vendor 48591-POTABLE DIVERS INC
23152 Repair-Maintenance Water Paid by Check#113412 08/28/2023 09/06/2023 08/31/2023 09/06/2023 2,500.00
Tanks
23153 Repair-Maintenance Water Paid by Check#113412 08/28/2023 09/06/2023 08/31/2023 09/06/2023 1,900.00
Tanks
23154 Repair-Maintenance Water Paid by Check#113412 08/28/2023 09/06/2023 08/31/2023 09/06/2023 1,600.00
Tanks
23155 Repair-Maintenance Water Paid by Check#113412 08/28/2023 09/06/2023 08/31/2023 09/06/2023 1,600.00
Tanks
23156 Repair-Maintenance Water Paid by Check#113412 08/28/2023 09/06/2023 08/31/2023 09/06/2023 1,100.00
Tanks
Vendor 48591-POTABLE DIVERS INC Totals Invoices 5 $8,700.00
Vendor 50050-GREG POULEN
2555209 Toilet Rebate Program Paid by Check#113613 09/22/2023 09/27/2023 09/30/2023 09/27/2023 300.00
Vendor 50050-GREG POULEN Totals Invoices 1 $300.00
Vendor 49923-QUADIENT FINANCE USA INC
09/03/23 Postage prepaid Paid by Check#113489 09/03/2023 09/13/2023 09/30/2023 09/13/2023 3,000.00
Vendor 49923-QUADIENT FINANCE USA INC Totals Invoices 1 $3,000.00
Vendor 48553-RAUCH COMMUNICATION
08-2023-01 Contractual Services Paid by Check#113413 08/28/2023 09/06/2023 08/31/2023 09/06/2023 206.25
Vendor 48553-RAUCH COMMUNICATION Totals Invoices 1 $206.25
Vendor 43332-RED WING SHOE STORE
121410 Safety Equipment-Physicals Paid by Check#113614 09/07/2023 09/27/2023 09/30/2023 09/27/2023 237.58
Vendor 43332-RED WING SHOE STORE Totals Invoices 1 $237.58
Run by Erika Franco on 09/27/2023 12:38:02 PM Page 17 of 25
11 TA Payment of Claims
_ Payment Date Range 08/30/23 - 09/27/23
m Report By Vendor - Invoice
1950 �� Summary Listing
UTILITY D1
Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount
Vendor 47803-REDWOOD PRINTING
34315 Office Supplies Paid by Check#113615 09/20/2023 09/27/2023 09/30/2023 09/27/2023 132.44
Vendor 47803-REDWOOD PRINTING Totals Invoices 1 $132.44
Vendor 48144-RELIANCE STANDARD
SEP23 Voluntary Life Payable Paid by Check#113490 09/01/2023 09/13/2023 09/30/2023 09/13/2023 325.74
SEP23A LTD/Life Insurance Union/Board Paid by Check#113490 09/01/2023 09/13/2023 09/30/2023 09/13/2023 2,354.49
Payable
SEP23B LTD/Life Insurance Management Paid by Check#113490 09/01/2023 09/13/2023 09/30/2023 09/13/2023 3,423.28
Vendor 48144-RELIANCE STANDARD Totals Invoices 3 $6,103.51
Vendor 48684-RS
9018290867 Secondary Equipment Paid by Check#113414 08/21/2023 09/06/2023 08/31/2023 09/06/2023 2,361.28
Vendor 48684-RS Totals Invoices 1 $2,361.28
Vendor 44581-SCP SCIENCE
IN0000368545 Laboratory Supplies Paid by Check#113491 09/06/2023 09/13/2023 09/30/2023 09/13/2023 120.36
Vendor 44581-SCP SCIENCE Totals Invoices 1 $120.36
Vendor 49911-SEARCHPROS STAFFING LLC
23082234 Contractual Services Paid by Check#113415 08/22/2023 09/06/2023 08/31/2023 09/06/2023 1,473.80
23082934 Contractual Services Paid by Check#113415 08/29/2023 09/06/2023 08/31/2023 09/06/2023 1,502.11
23090536 Contractual Services Paid by Check#113492 09/05/2023 09/13/2023 09/30/2023 09/13/2023 1,511.54
23091938 Contractual Services Paid by Check#113616 09/19/2023 09/27/2023 09/30/2023 09/27/2023 1,511.54
Vendor 49911-SEARCHPROS STAFFING LLC Totals Invoices 4 $5,998.99
Vendor 49965-SEMITORR GRP LLC dba EWS
5571361 Secondary Equipment Paid by Check#113617 09/19/2023 09/27/2023 09/30/2023 09/27/2023 2,738.22
Vendor 49965-SEMITORR GRP LLC dba EWS Totals Invoices 1 $2,738.22
Vendor 43552-SHERWIN-WILLIAMS
0172-6 Buildings Paid by Check#113416 08/16/2023 09/06/2023 08/31/2023 09/06/2023 472.89
0183-3 Buildings Paid by Check#113416 08/16/2023 09/06/2023 08/31/2023 09/06/2023 147.21
0187-4 Shop Supplies Paid by Check#113416 08/16/2023 09/06/2023 08/31/2023 09/06/2023 415.91
0258-3 Buildings Paid by Check#113416 08/17/2023 09/06/2023 08/31/2023 09/06/2023 467.52
0557-8 Buildings Paid by Check#113416 08/24/2023 09/06/2023 08/31/2023 09/06/2023 214.48
0230-2 Buildings Paid by Check#113531 09/07/2023 09/20/2023 09/30/2023 09/20/2023 363.52
0308-6 Buildings Paid by Check#113618 09/11/2023 09/27/2023 09/30/2023 09/27/2023 350.12
1220-2 Belleview Buildings Paid by Check#113618 09/11/2023 09/27/2023 09/30/2023 09/27/2023 60.15
0550-3 Buildings Paid by Check#113618 09/20/2023 09/27/2023 09/30/2023 09/27/2023 112.75
Vendor 43552-SHERWIN-WILLIAMS Totals Invoices 9 $2,604.55
Vendor 22620-SIERRA SPRINGS
5152426 082623 Supplies Paid by Check#113417 08/26/2023 09/06/2023 08/31/2023 09/06/2023 15.03
Vendor 22620-SIERRA SPRINGS Totals Invoices 1 $15.03
Vendor 48735-SILVER STATE ANALYTICAL LAB
LV304810 Monitoring Paid by Check#113493 09/06/2023 09/13/2023 09/30/2023 09/13/2023 258.00
LV304811 Monitoring Paid by Check#113493 09/06/2023 09/13/2023 09/30/2023 09/13/2023 258.00
Vendor 48735-SILVER STATE ANALYTICAL LAB Totals Invoices 2 $516.00
Run by Erika Franco on 09/27/2023 12:38:02 PM Page 18 of 25
11 TA"0R Payment of Claims
_ Payment Date Range 08/30/23 - 09/27/23
Report By Vendor - Invoice
1950 �� Summary Listing
UTILITY D1
Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount
Vendor 40233-SILVER STATE INT'L INC
X201116719:01 Automotive Paid by Check#113494 07/14/2023 09/13/2023 08/31/2023 09/13/2023 287.73
Vendor 40233-SILVER STATE INT'L INC Totals Invoices 1 $287.73
Vendor 48944-CHRIS SKELLY
PER DIEM 092323 Travel -Meetings-Education Paid by Check#113532 07/24/2023 09/20/2023 09/30/2023 09/20/2023 94.00
Vendor 48944-CHRIS SKELLY Totals Invoices 1 $94.00
Vendor 44577-SOUNDPROS INC
230822-47 Public Relations Expense Paid by Check#113495 08/22/2023 09/13/2023 09/30/2023 09/13/2023 49.00
Vendor 44577-SOUNDPROS INC Totals Invoices 1 $49.00
Vendor 48628-SOUTH LAKE TAHOE ACE HARDWARE
071620 Buildings Paid by Check#113533 09/07/2023 09/20/2023 09/30/2023 09/20/2023 48.46
Vendor 48628-SOUTH LAKE TAHOE ACE HARDWARE Totals Invoices 1 $48.46
Vendor 47876-SOUTH TAHOE CHAMBER
1113 Dues-Memberships- Paid by Check#113619 10/01/2023 09/27/2023 09/30/2023 09/27/2023 75.00
Certification
Vendor 47876-SOUTH TAHOE CHAMBER Totals Invoices 1 $75.00
Vendor 23400-SOUTH TAHOE PUBLIC UTILITY DISTRICT
2506132-001 0823 Water&Other Utilities Paid by Check#113534 08/31/2023 09/20/2023 09/30/2023 09/20/2023 1,449.56
2612107-001 0823 Water Paid by Check#113534 08/31/2023 09/20/2023 09/30/2023 09/20/2023 100.92
2718021-001 0823 Water Paid by Check#113534 08/31/2023 09/20/2023 09/30/2023 09/20/2023 152.24
3102034-001 0823 Water Paid by Check#113534 08/31/2023 09/20/2023 09/30/2023 09/20/2023 250.90
3103021-001 0823 Water Paid by Check#113534 08/31/2023 09/20/2023 09/30/2023 09/20/2023 152.24
3122506-001 0823 Water&Other Utilities Paid by Check#113534 08/31/2023 09/20/2023 09/30/2023 09/20/2023 94.78
3221118-001 0823 Other Utilities Paid by Check#113534 08/31/2023 09/20/2023 09/30/2023 09/20/2023 35.06
Vendor 23400-SOUTH TAHOE PUBLIC UTILITY DISTRICT Totals Invoices 7 $2,235.70
Vendor 23450-SOUTH TAHOE REFUSE
2752379 Grounds&Maintenance Paid by Check#113418 09/01/2023 09/06/2023 08/31/2023 09/06/2023 77.55
2752402 Refuse Disposal Paid by Check#113418 09/01/2023 09/06/2023 08/31/2023 09/06/2023 1,147.50
2752425 Refuse Disposal Paid by Check#113418 09/01/2023 09/06/2023 08/31/2023 09/06/2023 170.00
2752439 Refuse Disposal Paid by Check#113418 09/01/2023 09/06/2023 08/31/2023 09/06/2023 170.00
2752440 Refuse Disposal Paid by Check#113418 09/01/2023 09/06/2023 08/31/2023 09/06/2023 510.00
2752457 Refuse Disposal Paid by Check#113418 09/01/2023 09/06/2023 08/31/2023 09/06/2023 1,700.00
2752660 Refuse Disposal Paid by Check#113418 09/01/2023 09/06/2023 08/31/2023 09/06/2023 510.00
2752819 Refuse Disposal Paid by Check#113418 09/01/2023 09/06/2023 08/31/2023 09/06/2023 85.00
2753701 Refuse Disposal Paid by Check#113418 09/01/2023 09/06/2023 08/31/2023 09/06/2023 1,020.00
Vendor 23450-SOUTH TAHOE REFUSE Totals Invoices 9 $5,390.05
Vendor 50019-SOUTHERN TIRE MART LLC
7590017537 Automotive Paid by Check#113620 08/30/2023 09/27/2023 09/30/2023 09/27/2023 4,537.39
7590017539 Automotive Paid by Check#113496 08/30/2023 09/13/2023 09/30/2023 09/13/2023 1,235.94
7590017799 Automotive Paid by Check#113620 08/30/2023 09/27/2023 09/30/2023 09/27/2023 1,930.75
Vendor 50019-SOUTHERN TIRE MART LLC Totals Invoices 3 $7,704.08
Vendor 45168-SOUTHWEST GAS
Run by Erika Franco on 09/27/2023 12:38:02 PM Page 19 of 25
" TA"OF Payment of Claims
_ MEL. Payment Date Range 08/30/23 - 09/27/23
Report By Vendor - Invoice
iOtieA°"�r '950 �'a��►�°� Summary Listing
UTILITY p15�
Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount
910000183539 723 Natural Gas Paid by Check#113497 07/18/2023 09/13/2023 09/30/2023 09/13/2023 11.00
910000426082 723 Natural Gas Paid by Check#113497 07/19/2023 09/13/2023 09/30/2023 09/13/2023 15.63
910000639911 723 Natural Gas Paid by Check#113419 07/21/2023 09/06/2023 08/31/2023 09/06/2023 11.00
910000192416 823 Natural Gas Paid by Check#113419 08/23/2023 09/06/2023 08/31/2023 09/06/2023 11.00
910000421501 823 Natural Gas Paid by Check#113419 08/24/2023 09/06/2023 08/31/2023 09/06/2023 168.78
910000421502 823 Natural Gas Paid by Check#113419 08/24/2023 09/06/2023 08/31/2023 09/06/2023 297.25
910000429959 823 Natural Gas Paid by Check#113419 08/24/2023 09/06/2023 08/31/2023 09/06/2023 39.13
910000429960 823 Natural Gas Paid by Check#113419 08/24/2023 09/06/2023 08/31/2023 09/06/2023 1,793.92
910000175574 823 Natural Gas Paid by Check#113419 08/28/2023 09/06/2023 08/31/2023 09/06/2023 14.14
910000175902 823 Natural Gas Paid by Check#113419 08/28/2023 09/06/2023 08/31/2023 09/06/2023 11.00
910000865770 823 Natural Gas Paid by Check#113419 08/28/2023 09/06/2023 08/31/2023 09/06/2023 15.69
910000416224 823 Natural Gas Paid by Check#113497 08/30/2023 09/13/2023 08/31/2023 09/13/2023 11.00
910000657163 823 Natural Gas Paid by Check#113497 08/30/2023 09/13/2023 08/31/2023 09/13/2023 14.14
910000040369 823 Natural Gas Paid by Check#113497 09/05/2023 09/13/2023 09/30/2023 09/13/2023 26.65
910000041349 823 Natural Gas Paid by Check#113497 09/05/2023 09/13/2023 09/30/2023 09/13/2023 12.57
910000041350 823 Natural Gas Paid by Check#113535 09/08/2023 09/20/2023 09/30/2023 09/20/2023 11.00
910000665034 823 Natural Gas Paid by Check#113535 09/11/2023 09/20/2023 09/30/2023 09/20/2023 11.00
910000183539 923 Natural Gas Paid by Check#113621 09/15/2023 09/27/2023 09/30/2023 09/27/2023 11.00
910000426082 923 Natural Gas Paid by Check#113621 09/18/2023 09/27/2023 09/30/2023 09/27/2023 15.61
910000175915 923 Natural Gas Paid by Check#113621 09/20/2023 09/27/2023 09/30/2023 09/27/2023 11.00
910000639911 923 Natural Gas Paid by Check#113621 09/20/2023 09/27/2023 09/30/2023 09/27/2023 12.53
910000416139 923 Natural Gas Paid by Check#113621 09/21/2023 09/27/2023 09/30/2023 09/27/2023 34.13
Vendor 45168-SOUTHWEST GAS Totals Invoices 22 $2,559.17
Vendor 48617-STEEL-TOE-SHOES.COM
STP083123 Safety Equipment-Physicals Paid by Check#113420 08/31/2023 09/06/2023 08/31/2023 09/06/2023 184.86
STP091223 Safety Equipment-Physicals Paid by Check#113536 09/12/2023 09/20/2023 09/30/2023 09/20/2023 244.63
Vendor 48617-STEEL-TOE-SHOES.COM Totals Invoices 2 $429.49
Vendor 50035-KENJI SUGIYAMA
5141 REIMB Miscellaneous Liability Claims Paid by Check#113498 09/06/2023 09/13/2023 09/30/2023 09/13/2023 350.00
Vendor 50035-KENJI SUGIYAMA Totals Invoices 1 $350.00
Vendor 47798-T&S CONSTRUCTION CO INC
22-15A Tahoe Keys Sewer PS Rehab Paid by Check#113622 08/31/2023 09/27/2023 09/30/2023 09/27/2023 156,600.00
22-15AR Tahoe Keys Sewer PS Rehab Paid by Check#113622 08/31/2023 09/27/2023 09/30/2023 09/27/2023 (15,660.00)
Retainage
23-03A Upper Truckee Sewer PS Rehab Paid by Check#113622 08/31/2023 09/27/2023 09/30/2023 09/27/2023 40,000.00
23-03AR Upper Truckee Sewer PS Rehab Paid by Check#113622 08/31/2023 09/27/2023 09/30/2023 09/27/2023 (2,000.00)
Retainage
23/04A Secondary Clarifier#2 Rehab Paid by Check#113622 08/31/2023 09/27/2023 09/30/2023 09/27/2023 498,400.00
23/04AR Secondary Clarifier#2 Rehab Paid by Check#113622 08/31/2023 09/27/2023 09/30/2023 09/27/2023 (49,840.00)
Retainage
Vendor 47798-T&S CONSTRUCTION CO INC Totals Invoices 6 $627,500.00
Vendor 24050-TAHOE BASIN CONTAINER SERVICE
Run by Erika Franco on 09/27/2023 12:38:02 PM Page 20 of 25
11 TA Payment of Claims
_ Payment Date Range 08/30/23 - 09/27/23
m Report By Vendor - Invoice
1950 �� Summary Listing
UTILITY D1
Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount
2753993 Refuse Disposal Paid by Check#113421 09/01/2023 09/06/2023 08/31/2023 09/06/2023 260.00
2754002 Refuse Disposal Paid by Check#113421 09/01/2023 09/06/2023 08/31/2023 09/06/2023 32.50
2754018 Refuse Disposal Paid by Check#113421 09/01/2023 09/06/2023 08/31/2023 09/06/2023 30.00
2754144 Refuse Disposal Paid by Check#113421 09/01/2023 09/06/2023 08/31/2023 09/06/2023 38.00
Vendor 24050-TAHOE BASIN CONTAINER SERVICE Totals Invoices 4 $360.50
Vendor 24100-TAHOE BLUEPRINT
053786 Contractual Services Paid by Check#113422 08/30/2023 09/06/2023 08/31/2023 09/06/2023 54.77
Vendor 24100-TAHOE BLUEPRINT Totals Invoices 1 $54.77
Vendor 48229-TAHOE DAILY TRIBUNE
IN107427 Public Relations Expense Paid by Check#113423 08/31/2023 09/06/2023 08/31/2023 09/06/2023 523.65
IN107428 Ads-Legal Notices Paid by Check#113423 08/31/2023 09/06/2023 08/31/2023 09/06/2023 744.50
Vendor 48229-TAHOE DAILY TRIBUNE Totals Invoices 2 $1,268.15
Vendor 24325-TAHOE SAND&GRAVEL
Aug 23 Stmt Pipe-Covers &Manholes Paid by Check#113499 08/31/2023 09/13/2023 08/31/2023 09/13/2023 20,194.65
Vendor 24325-TAHOE SAND&GRAVEL Totals Invoices 1 $20,194.65
Vendor 24450-TAHOE VALLEY ELECTRIC SUPPLY
5126114 Pipe-Covers &Manholes Paid by Check#113424 08/14/2023 09/06/2023 08/31/2023 09/06/2023 783.00
Vendor 24450-TAHOE VALLEY ELECTRIC SUPPLY Totals Invoices 1 $783.00
Vendor 48927-TAHOE VALLEY LODGE
1057 Standby Accommodations Paid by Check#113500 08/31/2023 09/13/2023 09/30/2023 09/13/2023 1,015.00
Vendor 48927-TAHOE VALLEY LODGE Totals Invoices 1 $1,015.00
Vendor 49420-THATCHER COMPANY OF NEVADA INC
2023400114485 Hypochlorite Paid by Check#113501 06/29/2023 09/13/2023 08/31/2023 06/30/2023 09/13/2023 2,944.35
2023400114838 Hypochlorite Paid by Check#113501 06/29/2023 09/13/2023 08/31/2023 06/30/2023 09/13/2023 2,026.80
2023400114525 Hypochlorite Paid by Check#113501 08/16/2023 09/13/2023 08/31/2023 09/13/2023 3,252.78
2023400114526 Hypochlorite Paid by Check#113501 08/16/2023 09/13/2023 08/31/2023 09/13/2023 1,834.33
Vendor 49420-THATCHER COMPANY OF NEVADA INC Totals Invoices 4 $10,058.26
Vendor 48465-THOLL FENCE INC
2743 Access Control/Surveillance Paid by Check#113425 08/24/2023 09/06/2023 08/31/2023 09/06/2023 14,198.00
Vendor 48465-THOLL FENCE INC Totals Invoices 1 $14,198.00
Vendor 48477-THOMAS SCIENTIFIC
3040156 Laboratory Supplies Paid by Check#113426 08/07/2023 09/06/2023 08/31/2023 09/06/2023 356.75
3055585 Laboratory Supplies Paid by Check#113426 08/22/2023 09/06/2023 08/31/2023 09/06/2023 168.33
Vendor 48477-THOMAS SCIENTIFIC Totals Invoices 2 $525.08
Vendor 40114-TRPA
0004452 Regulatory Operating Permits Paid by Check#113427 08/07/2023 09/06/2023 08/31/2023 09/06/2023 4,120.00
Vendor 40114-TRPA Totals Invoices 1 $4,120.00
Vendor 49743-JANET E TURK
23456 REIMB Meter Installations Final Phase Paid by Check#113428 08/30/2023 09/06/2023 08/31/2023 09/06/2023 2,000.00
Vendor 49743-JANET E TURK Totals Invoices 1 $2,000.00
Vendor 50038-RUBY TURNER
8014601 Turf Buy-Back Program Paid by Check#113537 09/12/2023 09/20/2023 09/30/2023 09/20/2023 1,185.00
Run by Erika Franco on 09/27/2023 12:38:02 PM Page 21 of 25
" TA"OF Payment of Claims
_ Payment Date Range 08/30/23 - 09/27/23
" "� Report By Vendor - Invoice
i00&°"c'r ysso ��� � Summary Listing
��UTILIT'Y D��
Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount
Vendor 50038-RUBY TURNER Totals Invoices 1 $1,185.00
Vendor 49976-UNIFIED FIELD SERVICES CORP
23-02A Echo View Tank Coatings Paid by Check#113502 08/31/2023 09/13/2023 08/31/2023 09/13/2023 95,402.22
23-02AR Echo View Tank Coatings Paid by Check#113502 08/31/2023 09/13/2023 08/31/2023 09/13/2023 (4,770.11)
Retainage
23-02B Forest Mountain Tank Coating Paid by Check#113502 08/31/2023 09/13/2023 08/31/2023 09/13/2023 69,327.20
23-02BR Forest Mountain Tank Coating Paid by Check#113502 08/31/2023 09/13/2023 08/31/2023 09/13/2023 (3,466.36)
Retainage
Vendor 49976-UNIFIED FIELD SERVICES CORP Totals Invoices 4 $156,492.95
Vendor 48262-UPS FREIGHT
0000966628373 Postage Expenses Paid by Check#113623 09/16/2023 09/27/2023 09/30/2023 09/27/2023 500.00
Vendor 48262-UPS FREIGHT Totals Invoices 1 $500.00
Vendor 47973-US BANK CORPORATE
ARCE0823 Aug 23 Stmt Paid by Check#113503 08/22/2023 09/13/2023 09/30/2023 09/13/2023 1,513.94
ASCHENBACH0823 Aug 23 Stmt Paid by Check#113503 08/22/2023 09/13/2023 09/30/2023 09/13/2023 687.14
BARTLETTB0823 Aug 23 Stmt Paid by Check#113503 08/22/2023 09/13/2023 09/30/2023 09/13/2023 4,107.07
BARTLETTC0823 Aug 23 Stmt Paid by Check#113503 08/22/2023 09/13/2023 09/30/2023 09/13/2023 217.69
BUCKMAN0823 Aug 23 Stmt Paid by Check#113503 08/22/2023 09/13/2023 09/30/2023 09/13/2023 60.62
CASWELL0823 Aug 23 Stmt Paid by Check#113503 08/22/2023 09/13/2023 09/30/2023 09/13/2023 566.31
COLVEY0823 Aug 23 Stmt Paid by Check#113503 08/22/2023 09/13/2023 09/30/2023 09/13/2023 144.33
COOLIDGE0823 Aug 23 Stmt Paid by Check#113503 08/22/2023 09/13/2023 09/30/2023 09/13/2023 400.00
CULLEN0823 Aug 23 Stmt Paid by Check#113503 08/22/2023 09/13/2023 09/30/2023 09/13/2023 178.79
FRANCO0823 Aug 23 Stmt Paid by Check#113503 08/22/2023 09/13/2023 09/30/2023 09/13/2023 449.00
GLAZE0823 Aug 23 Stmt Paid by Check#113503 08/22/2023 09/13/2023 09/30/2023 09/13/2023 696.48
GOLIGOSKI0823 Aug 23 Stmt Paid by Check#113503 08/22/2023 09/13/2023 09/30/2023 09/13/2023 122.00
GUTTRY0823 Aug 23 Stmt Paid by Check#113503 08/22/2023 09/13/2023 09/30/2023 09/13/2023 227.39
HUGHES0823 Aug 23 Stmt Paid by Check#113503 08/22/2023 09/13/2023 09/30/2023 09/13/2023 553.33
IONES0823 Aug 23 Stmt Paid by Check#113503 08/22/2023 09/13/2023 09/30/2023 09/13/2023 450.32
KAUFFMAN0823 Aug 23 Stmt Paid by Check#113503 08/22/2023 09/13/2023 09/30/2023 09/13/2023 301.81
LEE0823 Aug 23 Stmt Paid by Check#113503 08/22/2023 09/13/2023 09/30/2023 09/13/2023 872.80
RUTHERDALE0823 Aug 23 Stmt Paid by Check#113503 08/22/2023 09/13/2023 09/30/2023 09/13/2023 35.00
RYAN0823 Aug 23 Stmt Paid by Check#113503 08/22/2023 09/13/2023 09/30/2023 09/13/2023 2,890.59
SCHRAUBEN0823 Aug 23 Stmt Paid by Check#113503 08/22/2023 09/13/2023 09/30/2023 09/13/2023 804.80
SEELOS0823 Aug 23 Stmt Paid by Check#113503 08/22/2023 09/13/2023 09/30/2023 09/13/2023 395.39
SIAN00823 Aug 23 Stmt Paid by Check#113503 08/22/2023 09/13/2023 09/30/2023 09/13/2023 22.29
SKELLY0823 Aug 23 Stmt Paid by Check#113503 08/22/2023 09/13/2023 09/30/2023 09/13/2023 657.75
STANLEY0823 Aug 23 Stmt Paid by Check#113503 08/22/2023 09/13/2023 09/30/2023 09/13/2023 57.30
THOMSEN0823 Aug 23 Stmt Paid by Check#113503 08/22/2023 09/13/2023 09/30/2023 09/13/2023 486.28
Vendor 47973-US BANK CORPORATE Totals Invoices 25 $16,898.42
Vendor 49947-USABLUEBOOK
INVO0124593 Luther Pass Pump Station Paid by Check#113504 09/05/2023 09/13/2023 09/30/2023 09/13/2023 426.95
INVO0124708 Pump Stations Paid by Check#113624 09/06/2023 09/27/2023 09/30/2023 09/27/2023 5,705.71
Run by Erika Franco on 09/27/2023 12:38:02 PM Page 22 of 25
" TA"OF Payment of Claims
_ Payment Date Range 08/30/23 - 09/27/23
Report By Vendor - Invoice
�' 1950 .Na`�`G� Summary Listing
UTILITY
Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount
INVO0130920 Pump Stations Paid by Check#113538 09/12/2023 09/20/2023 09/30/2023 09/20/2023 3,118.84
INVO0131341 Safety Equipment-Physicals Paid by Check#113624 09/12/2023 09/27/2023 09/30/2023 09/27/2023 426.95
INVO0137125 Biosolids Equipment-Building Paid by Check#113624 09/19/2023 09/27/2023 09/30/2023 09/27/2023 3,643.18
Vendor 49947-USABLUEBOOK Totals Invoices 5 $13,321.63
Vendor 50032-JENNIFER VAN GILDER
2540219 Water Use Reduction Rebates Paid by Check#113505 09/05/2023 09/13/2023 09/30/2023 09/13/2023 500.00
Vendor 50032-JENNIFER VAN GILDER Totals Invoices 1 $500.00
Vendor 45243-VELOCITY VEHICLE GROUP
XA261114068:01 Automotive Paid by Check#113539 09/08/2023 09/20/2023 09/30/2023 09/20/2023 237.23
XA261114512:01 Automotive Paid by Check#113625 09/15/2023 09/27/2023 09/30/2023 09/27/2023 3,459.14
XA261114867:01 Automotive Paid by Check#113625 09/20/2023 09/27/2023 09/30/2023 09/27/2023 71.70
XA261114917:01 Automotive Paid by Check#113625 09/21/2023 09/27/2023 09/30/2023 09/27/2023 71.30
Vendor 45243-VELOCITY VEHICLE GROUP Totals Invoices 4 $3,839.37
Vendor 49296-VERIZON WIRELESS
9944026867 Telephone Paid by Check#113626 09/09/2023 09/27/2023 09/30/2023 09/27/2023 548.32
Vendor 49296-VERIZON WIRELESS Totals Invoices 1 $548.32
Vendor 48586-VINCIGUERRA CONSTRUCTION INC
23/08A Waterline, Black Bart Paid by Check#113627 08/31/2023 09/27/2023 09/30/2023 09/27/2023 807,875.25
23/08AR Waterline, Black Bart Retainage Paid by Check#113627 08/31/2023 09/27/2023 09/30/2023 09/27/2023 (40,393.76)
Vendor 48586-VINCIGUERRA CONSTRUCTION INC Totals Invoices 2 $767,481.49
Vendor 25700-WEDCO INC
S100038131.001 Buildings Paid by Check#113506 08/17/2023 09/13/2023 08/31/2023 09/13/2023 1,044.74
S100039572.001 Buildings Paid by Check#113540 09/07/2023 09/20/2023 09/30/2023 09/20/2023 1,429.94
Vendor 25700-WEDCO INC Totals Invoices 2 $2,474.68
Vendor 48408-WELCOME'S AUTO BODY&TOWING
66862 Automotive Paid by Check#113429 07/25/2023 09/06/2023 08/31/2023 09/06/2023 200.00
66125 Automotive Paid by Check#113429 08/01/2023 09/06/2023 08/31/2023 09/06/2023 200.00
Vendor 48408-WELCOME'S AUTO BODY&TOWING Totals Invoices 2 $400.00
Vendor 25850-WESTERN NEVADA SUPPLY
19868568 Storm Drain Relocates Paid by Check#113430 07/31/2023 09/06/2023 08/31/2023 09/06/2023 681.76
39891981 Secondary Clarifier#2 Rehab Paid by Check#113430 08/11/2023 09/06/2023 08/31/2023 09/06/2023 400.57
19908786 Repair Clamps Inventory Paid by Check#113430 08/24/2023 09/06/2023 08/31/2023 09/06/2023 678.51
19908827 Saddles&Fittings Inventory Paid by Check#113430 08/24/2023 09/06/2023 08/31/2023 09/06/2023 1,299.04
19908832 Pipe-Covers &Manholes Paid by Check#113430 08/24/2023 09/06/2023 08/31/2023 09/06/2023 1,102.36
39911071 Small Tools Paid by Check#113430 08/24/2023 09/06/2023 08/31/2023 09/06/2023 28.00
39906339 Biosolids Equipment-Building Paid by Check#113430 08/25/2023 09/06/2023 08/31/2023 09/06/2023 160.95
19840566-1 Saddles&Fittings Inventory Paid by Check#113430 08/29/2023 09/06/2023 08/31/2023 09/06/2023 1,180.85
39916625 Couplings Omni Parts Inventory Paid by Check#113430 08/29/2023 09/06/2023 08/31/2023 09/06/2023 299.19
19916526 Valves Elbows Ts Flanges Paid by Check#113430 08/30/2023 09/06/2023 08/31/2023 09/06/2023 1,409.86
Inventory
39836165 Force Mains Paid by Check#113430 08/30/2023 09/06/2023 08/31/2023 09/06/2023 8,689.63
39875507 Couplings Omni Parts Inventory Paid by Check#113430 08/30/2023 09/06/2023 08/31/2023 09/06/2023 376.23
Run by Erika Franco on 09/27/2023 12:38:02 PM Page 23 of 25
" TA Payment of Claims
_ Payment Date Range 08/30/23 - 09/27/23
Report By Vendor - Invoice
AGe�M r 1950 �N `G� Summary Listing
UTILITY D
Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount
19917451 Fire Hydrants&Parts Paid by Check#113430 08/31/2023 09/06/2023 08/31/2023 09/06/2023 1,152.40
19909256 Repair Clamps Inventory Paid by Check#113507 09/05/2023 09/13/2023 09/30/2023 09/13/2023 508.88
19920213 Water Meters&Parts Paid by Check#113507 09/05/2023 09/13/2023 09/30/2023 09/13/2023 4,181.21
19922193 Pipe Inventory Paid by Check#113507 09/05/2023 09/13/2023 09/30/2023 09/13/2023 531.35
19922199 Saddles&Fittings Inventory Paid by Check#113507 09/05/2023 09/13/2023 09/30/2023 09/13/2023 4,069.99
19922208 Small Brass Parts Inventory Paid by Check#113507 09/05/2023 09/13/2023 09/30/2023 09/13/2023 735.20
19922602 Valves Elbows Ts Flanges Paid by Check#113507 09/05/2023 09/13/2023 09/30/2023 09/13/2023 3,972.75
Inventory
19922605 Valves Elbows Ts Flanges Paid by Check#113507 09/05/2023 09/13/2023 09/30/2023 09/13/2023 964.56
Inventory
19922611 Repair Clamps Inventory Paid by Check#113507 09/05/2023 09/13/2023 09/30/2023 09/13/2023 3,562.52
19922612 Pipe-Covers &Manholes Paid by Check#113507 09/05/2023 09/13/2023 09/30/2023 09/13/2023 334.80
19922614 Pipe-Covers &Manholes Paid by Check#113507 09/05/2023 09/13/2023 09/30/2023 09/13/2023 463.76
19840566-2 Saddles&Fittings Inventory Paid by Check#113507 09/06/2023 09/13/2023 09/30/2023 09/13/2023 259.43
39925937 Small Tools Paid by Check#113628 09/06/2023 09/27/2023 09/30/2023 09/27/2023 44.50
19922199-1 Saddles&Fittings Inventory Paid by Check#113507 09/07/2023 09/13/2023 09/30/2023 09/13/2023 4,506.36
19925305 Saddles&Fittings Inventory Paid by Check#113507 09/07/2023 09/13/2023 09/30/2023 09/13/2023 1,167.26
39916621 Small Brass Parts Inventory Paid by Check#113507 09/08/2023 09/13/2023 09/30/2023 09/13/2023 246.73
19922208-1 Small Brass Parts Inventory Paid by Check#113507 09/11/2023 09/13/2023 09/30/2023 09/13/2023 142.30
19929087 Valves Elbows Ts Flanges Paid by Check#113507 09/11/2023 09/13/2023 09/30/2023 09/13/2023 3,703.46
Inventory
39919386 Pipe-Covers &Manholes Paid by Check#113541 09/11/2023 09/20/2023 09/30/2023 09/20/2023 197.84
19840566-3 Saddles&Fittings Inventory Paid by Check#113541 09/12/2023 09/20/2023 09/30/2023 09/20/2023 713.44
19922208-2 Small Brass Parts Inventory Paid by Check#113541 09/12/2023 09/20/2023 09/30/2023 09/20/2023 121.20
39934954 Small Tools Paid by Check#113541 09/12/2023 09/20/2023 09/30/2023 09/20/2023 257.41
19922185 Pipe-Covers &Manholes Paid by Check#113541 09/13/2023 09/20/2023 09/30/2023 09/20/2023 1,344.80
19922211 Couplings Omni Parts Inventory Paid by Check#113541 09/14/2023 09/20/2023 09/30/2023 09/20/2023 4,992.15
19938195 Pipe Inventory Paid by Check#113541 09/14/2023 09/20/2023 09/30/2023 09/20/2023 1,744.35
19938199 Boxes-Lids-Extensions Inventory Paid by Check#113541 09/14/2023 09/20/2023 09/30/2023 09/20/2023 4,757.51
19938203 Saddles&Fittings Inventory Paid by Check#113541 09/14/2023 09/20/2023 09/30/2023 09/20/2023 700.98
19938208 Valves Elbows Ts Flanges Paid by Check#113541 09/14/2023 09/20/2023 09/30/2023 09/20/2023 7,450.54
Inventory
19938211 Small Brass Parts Inventory Paid by Check#113541 09/14/2023 09/20/2023 09/30/2023 09/20/2023 435.86
19938219 Pipe-Covers &Manholes Paid by Check#113541 09/14/2023 09/20/2023 09/30/2023 09/20/2023 301.24
19907000 Valves Elbows Ts Flanges Paid by Check#113628 09/18/2023 09/27/2023 09/30/2023 09/27/2023 7,263.67
Inventory
19908786-1 Repair Clamps Inventory Paid by Check#113628 09/18/2023 09/27/2023 09/30/2023 09/27/2023 1,865.91
19916677 Repair Clamps Inventory Paid by Check#113628 09/18/2023 09/27/2023 09/30/2023 09/27/2023 3,413.10
19917425 Fire Hydrants&Parts Paid by Check#113628 09/18/2023 09/27/2023 09/30/2023 09/27/2023 2,743.98
19922185-1 Pipe-Covers &Manholes Paid by Check#113628 09/18/2023 09/27/2023 09/30/2023 09/27/2023 2,998.54
19938208-1 Valves Elbows Ts Flanges Paid by Check#113628 09/18/2023 09/27/2023 09/30/2023 09/27/2023 572.24
Inventory
39767103 Pipe-Covers &Manholes Paid by Check#113541 09/18/2023 09/20/2023 09/30/2023 09/20/2023 219.54
Run by Erika Franco on 09/27/2023 12:38:02 PM Page 24 of 25
11 TA Payment of Claims
_ Payment Date Range 08/30/23 - 09/27/23
m Report By Vendor - Invoice
1950 �� Summary Listing
UTILITY D1
Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount
19917361 Pipe-Covers &Manholes Paid by Check#113628 09/19/2023 09/27/2023 09/30/2023 09/27/2023 3,298.56
19917425-1 Fire Hydrants&Parts Paid by Check#113628 09/19/2023 09/27/2023 09/30/2023 09/27/2023 1,728.60
19943945 Valves Elbows Ts Flanges Paid by Check#113628 09/19/2023 09/27/2023 09/30/2023 09/27/2023 1,007.08
Inventory
19927041 Pipe-Covers &Manholes Paid by Check#113628 09/20/2023 09/27/2023 09/30/2023 09/27/2023 1,073.36
39937557 Biosolids Equipment-Building Paid by Check#113628 09/20/2023 09/27/2023 09/30/2023 09/27/2023 4,998.66
19947842 Saddles&Fittings Inventory Paid by Check#113628 09/21/2023 09/27/2023 09/30/2023 09/27/2023 750.38
19922611-1 Repair Clamps Inventory Paid by Check#113628 09/25/2023 09/27/2023 09/30/2023 09/27/2023 716.19
19950216 Pipe-Covers &Manholes Paid by Check#113628 09/25/2023 09/27/2023 09/30/2023 09/27/2023 877.61
Vendor 25850-WESTERN NEVADA SUPPLY Totals Invoices 57 $103,399.15
Vendor 42323-WHITE ROCK CONSTRUCTION
22-04A Keller Heavenly Water System Paid by Check#113629 08/31/2023 09/27/2023 09/30/2023 09/27/2023 112,500.00
Improvement
22-04AR Keller Heavenly Water System Paid by Check#113629 08/31/2023 09/27/2023 09/30/2023 09/27/2023 (5,625.00)
Improvement Retainage
23-09A Keller Heavenly Water System Paid by Check#113629 08/31/2023 09/27/2023 09/30/2023 09/27/2023 171,842.50
Improvement
23-09AR Keller Heavenly Water System Paid by Check#113629 08/31/2023 09/27/2023 09/30/2023 09/27/2023 (8,592.13)
Improvement Retainage
Vendor 42323-WHITE ROCK CONSTRUCTION Totals Invoices 4 $270,125.37
Vendor 40298-WILLIAMS INDUSTRIAL SALES CO
2023-303362-00 Shop Supplies Paid by Check#113508 09/07/2023 09/13/2023 09/30/2023 09/13/2023 339.29
Vendor 40298-WILLIAMS INDUSTRIAL SALES CO Totals Invoices 1 $339.29
Vendor 48781-WORLD OIL REFINING
I500-00964439 Service Contracts Paid by Check#113509 08/31/2023 09/13/2023 09/30/2023 09/13/2023 100.00
Vendor 48781-WORLD OIL REFINING Totals Invoices 1 $100.00
Vendor 50052-ALLEN ZALKIND
3529614 Clothes Washer Rebate Program Paid by Check#113630 09/22/2023 09/27/2023 09/30/2023 09/27/2023 200.00
Vendor 50052-ALLEN ZALKIND Totals Invoices 1 $200.00
Vendor 49917-ZTEC SERVICES INC
1085 Service Contracts Paid by Check#113542 09/14/2023 09/20/2023 09/30/2023 09/20/2023 525.00
Vendor 49917-ZTEC SERVICES INC Totals Invoices 1 $525.00
Grand Totals Invoices 653 $3,830,603.06
Branded Screen Printing void chk# 113061 (588.03}
Branded Screen Printing chic# 1133TO 588.03
Ariat void chl 112649 (269.64)
Southb"Jest Gast void ch4, 113042 (26.63)
10.+05.+23 P.O.C. Total $ 3,830,306.89
Run by Erika Franco on 09/27/2023 12:38:02 PM Page 25 of 25
yOVTH TA
s
a
A(/ ek,ef 1950
UTILITY
SOUTH TAHOE PUBLIC UTILITY DISTRICT
David Peterson, President BOARD MEMBERS Kelly Sheehan, Director
Nick Haven, Director Shane Romsos, Vice President Nick Exline, Director
Paul Hughes, General Manager
REGULAR MEETING OF THE BOARD OF DIRECTORS
SOUTH TAHOE PUBLIC UTILITY DISTRICT
September 7, 2023
MINUTES
The South Tahoe Public Utility District Board of Directors met in a regular session, 2:01 p.m., at the
District Office, located at 1275 Meadow Crest Drive, South Lake Tahoe, California.
ROLL CALL: Board of Directors: Vice President Romsos, Directors Haven, Sheehan, Exline
Absent: President Peterson
Staff: Paul Hughes, Keith Collins, Melonie Guttry, Julie Ryan, Trevor Coolidge, Donielle Morse, Greg
Dupree, Dan Arce, Mark Seelos, Brent Goligoski, Heidi Baugh, Adrian Combes, Megan Colvey, Bren
Borley, Shannon Chandler, Chris Skelly, Ryan Lee, Stephen Caswell, Lauren Benefield, Cliff Bartlett
Guests: Rob Brueck, Hauge Brueck Associates LLP (HBA)
1. PLEDGE OF ALLEGIANCE:
2. COMMENTS FROM THE PUBLIC: None
3. CORRECTIONS TO THE AGENDA OR CONSENT CALENDAR:
4. ADOPTION OF CONSENT CALENDAR:
Moved Haven/Second Sheehan/Peterson Absent/Haven Yes/Romsos Yes/Sheehan Yes/Exline Yes
to approve the Consent Calendar as presented.
a. WINTER STORMS EMERGENCY RESPONSE
(Paul Hughes, General Manager)
Pursuant to Public Contract Code Section 22050(c), continued the emergency action to
respond to the Winter Storms Emergency pursuant to Resolution No. 3242-23.
b. WATER AND SEWER RATE STUDIES
(Paul Hughes, General Manager)
Approved the proposal from HDR Engineering to conduct comprehensive water and sewer
rate studies at the estimated cost of $59,825.
REGULAR BOARD MEETING MINUTES: September 7, 2023 PAGE -2
c. JUNE 30, 2023 PRELIMINARY FISCAL YEAR END FINANCIAL STATEMENTS
(Paul Hughes, General Manager)
Received and filed the June 30, 2023 Preliminary Income Statement and Balance Sheet
Reports.
d. 2023 FLAGPOLE 2- IROQUOIS 2 TANKS RECOATING PROJECT
(Megan Colvey,Senior Engineer and Heidi Baugh, Purchasing Agent)
Authorized the General Manager to execute Change Order No. 1 to Farr Construction
Corporation, dba Resource Development Group, in the amount $33,843.
e. RAS PUMP STATION BUILDING REHABILITATION PROJECT
(Megan Colvey,Senior Engineer)
1) Approved the proposed Scope of Work from Carollo Engineers, Inc., for engineering design
services for the RAS Pump Station Building Rehabilitation Project; and 2) Authorized the
General Manger to execute Task Order No. 30 to the Master Services Agreement with Carollo
Engineers, Inc. in the amount of $62,789.
f. 2023 FILTERS NO. 3 AND NO. 4 REHABILITATION PROJECT
(Megan Colvey,Senior Engineer)
Authorized staff to advertise for Bids for the 2023 Filters No. 3 and No. 4 Rehabilitation Project.
g. REBID 2023-2024 TANK COATINGS TOUCHUP PROJECT
(Megan Colvey,Senior Engineer and Heidi Baugh, Purchasing Agent)
Authorized the General Manger to sign Notice of Completion to be filed with the El Dorado
County Clerk for the REBID 2023-2024 Tank Coatings Touchup Project.
h. CALPERS REQUIRED PAY LISTING BY POSITION
(Greg Dupree,Accounting Manager)
Adopted Resolution No. 3256-23 which incorporates the Pay Listing by Position for the pay
listing effective August 31, 2023.
i. KELLER-HEAVENLY WATER SYSTEM IMPROVEMENTS PROJECT, PHASE 3
(Trevor Coolidge,Senior Engineer)
1) Approved DOWL's Proposal for continued permitting support on the Lookout Tank Access
Road Project, in addition to construction and as-built services for the Keller-Heavenly Water
System Improvements Project; and 2) Authorized the General Manager to execute Task Order
No. 2 in an amount not to exceed $20,935.
j. PURCHASE OF TWO 2023 PLUG-IN HYBRID SUV'S
(Cliff Bartlett, Fleet/Equipment Supervisor)
Approved the purchase of two new plug-in hybrid SUV's for the Engineering and Information
Technology Departments through the State of California Department of General Services
Contract in the total amount of approximately $82,570 including tax.
k. PURCHASING POLICY UPDATE
(Heidi Baugh, Purchasing Agent)
Adopted Purchasing Policy Update
I. RECEIVE AND FILE PAYMENT OF CLAIMS (Greg Dupree, Accounting Manager)
Received and filed Payment of Claims in the amount of $3,603,104.76.
REGULAR BOARD MEETING MINUTES: September 7, 2023 PAGE -3
m. REGULAR BOARD MEETING MINUTES: August 17, 2023
(Melonie Guttry, Executive Services Manager/Clerk of the Board)
Approved August 17, 2023, Minutes
5. CONSENT ITEMS BROUGHT FORWARD FOR SEPARATE DISCUSSION/ACTION: None
6. ITEMS FOR BOARD ACTION:
a. Secondary Clarifier No. 1 Rehabilitation Project (Stephen Caswell, Principal Engineer) -Vice President
Romsos opened the Public Hearing at 2:01 p.m. to receive public comments regarding the
Secondary Clarifier No. 1 Rehabilition Project. Stephen Caswell provided details regarding the
Secondary Clarifier No. 1 Rehabilitation Project and addressed questions from the Board. This
project is considered substantially complex due to: 1) two or more different trades or
subcontractors are anticipated to be involved in the construction of this project; 2) the project
involves instrumentation, controls and/or mechanical equipment; 3) the construction schedule
is a significant concern because of the compressed construction season within the Lake Thoe
Basin. No public comments were received, and the Public Hearing was closed at 2:05 p.m.
Moved Sheehan/Second Exline/Peterson Absent/Haven Yes/Romsos Yes/Sheehan Yes/Exline
Yes to pursuant to the facts, find the Project substantially complex and require a 10% retention
limit; and authorize staff to advertise for construction bids for this Project.
b. Wastewater Treatment Plant 1.339MW Solar Array (Julie Ryan, Engineering Department Manager)—
Vice President Romsos opened the Public Hearing at 2:06 p.m. to receive public comments
regarding the Mitigated Negative Declaration of Environmental Impact. Julie Ryan provided
details regarding the Wastewater Treatment Plant 1.339MW Solar Array and addressed
questions from the Board. Rob Brueck with HBA provided information regarding the results of
the environmental document. No public comments were received, and the Public Hearing
was closed at 2:19 p.m.
Moved Exline/Second Romsos/Peterson Absent/Haven Yes/Romsos Yes/Sheehan Yes/Exline
Yes to certify the Mitigated Negative Declaration of Environmental Impact; and, authorize the
filing of a Notice of Determination with the El Dorado County Clerk.
c. City of South Lake Tahoe - Barton Avenue and 2nd Street Drainage Project (Adrian Combes,Senior
Engineer) -Adrian Combes provided information regarding the City of South Lake Tahoe -
Barton Avenue and 2nd Street Drainage Project and addressed questions form the Board.
Moved Haven/Second Romsos/Peterson Absent/Haven Yes/Romsos Yes/Sheehan Yes/Exline
Yes to authorize staff to reimburse the City of South Lake Tahoe up to $165,000 for relocation of
District facilities.
7. STANDING AND AD-HOC COMMITTEES AND LIAISON REPORTS:
Vice President Romsos provide details regarding a Diamond Valley Ranch (DVR) tour he
attended with District staff and Congressman Kevin Kiley on August 31, 2023.
8. BOARD MEMBER REPORTS:
Director Haven reported that he received a call from an owner of multiple local laundry mats
expressing his appreciation of the recent District policy change affecting commercial washer
rates and the positive impact it has had on his business.
REGULAR BOARD MEETING MINUTES: September 7, 2023 PAGE -4
9. STAFF/ATTORNEY REPORTS:
Shelly Thomsen provided a legislative update including details from a tour with Congressman
Kiley last week at DVR. Vice President Romsos thanked Trevor Coolidge, Shelly Thomsen and Paul
Hughes for their excellent representation of the District throughout the tour. Shelly Thomsen further
reported on progress made regarding the state's water budget and the issues involving seasonal
population. The state has invited the District to be a presenter at one of their public hearings in
October. Director Haven offered his assistance regarding collaboration with other agencies
experiencing issues with regulation related to seasonal population.
Dan Arce provided information regarding the Indian Creek Reservoir (ICR) cyanobacteria bloom
issue and addressed questions from the Board. This is a worldwide problem and not native to ICR.
10. INTERIM GENERAL MANAGER REPORT:
Paul Hughes reported on several items:
• Provided a staffing update and introduced Donielle Morse, Grants Coordinator
• Reviewed the list of General Manager goals that he had previously emailed to the Board
11. NOTICE OF PAST AND FUTURE MEETINGS/EVENTS
ADJOURNMENT: 3:05 p.m.
Shane Romsos, Board Vice President
South Tahoe Public Utility District
Melonie Guttry, Executive Services Manager/
Clerk of the Board
South Tahoe Public Utility District
General Manager
Paul Hughes
Yg5p Directors
��e� h'8ter 5outh Tahoe Nici<Haven
Shane'Romsos
_ David Peterson
Public, Utility District Kelly$heehan
NicK Exline
1275 Meadow Crest Prive•South Lake Tahoe■CA 96150-7401
Phone 530 544-0474•Fax 530 541-0614•www.5tpud.u5
BOARD AGENDA ITEM 7a
TO: Board of Directors
FROM: Stephen Caswell, Principal Engineer
MEETING DATE: September 7, 2023
ITEM- PROJECT NAME: Recycled Water Strategic Plan
REQUESTED BOARD ACTION: 1) Approve proposal from Carollo Engineers, Inc. in the
amount of $425,367 for engineering services for the Recycled Water Strategic Plan
Phase 2; and 2) Authorize the General Manager to execute Task Order No. 31 to the
Master Services Agreement with Carollo Engineers, Inc.
DISCUSSION: In October 2021, the Board authorized Phase 1 of the Recycled Water
Strategic Plan with Carollo Engineers after District staff conducted a competitive
Request for Proposal (RFP) process. The RFP requested identification of potential
alternatives and a high-level feasibility screening of each of these alternatives as well as
a detailed analysis of the most feasible alternatives. Because of the inherent difficulty in
predicting how many alternatives will be deemed feasible, District staff and Carollo
agreed to split the project into two phases.
Phase 1 is currently wrapping up and will be finalized this fall. Phase 2 will be an in-depth
evaluation of the current practices and 6 distinct alternatives. In addition, five system
modifications that could apply to any alternative will be evaluated. Implementation
plans will be developed for each alternative to outline the steps and approximate
timeline the District would need to take to implement any alternative. Public outreach
efforts will continue with both a stakeholder advisory group and public workshops to
receive feedback from the community. A final Strategic Plan will be developed from
the efforts of both phases. The Alternatives Evaluation is anticipated to be complete by
May 2024, with the Strategic Plan finalized in September 2024.
To continue seamless progress on the project, staff is requesting that the Board approve
the proposal from Carollo Engineers, Inc. in the amount of $425,367 for engineering
services for the Recycled Water Strategic Plan Phase 2 and authorize the General
Manager to execute Task Order No. 31 to the Master Services Agreement with Carollo
Engineers, Inc.
Stephen Caswell
October 5, 2023
Page 2 of 2
SCHEDULE: October 2023 -September 2024
COSTS: $425,367
ACCOUNT NO: 1030-4405/RECWMP
BUDGETED AMOUNT AVAILABLE: $284,000 in 2023/24; $141,000 in 2024/25
ATTACHMENTS: Carollo Scope of Services and Fee Estimate
CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer
GENERAL MANAGER: YES_ NO
CHIEF FINANCIAL OFFICER: YES NO
2880 Gateway Oaks Drive,Suite 300
Sacramento,California 95833
P 916-565-4888
arcaff &AVIV carollo.com
September 27, 2023
Mr. Stephen Caswell, PE, Principal Engineer
South Tahoe Public Utility District(District)
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150
Subject: STPUD Recycled Water Strategic Plan— Phase 2 Engineering Services Final Scope of Work
Phase 2 — Engineering Services Scope of Work
The STPUD Recycled Water Strategic Plan will provide a technically defensible strategy for the end use of the
District's treated recycled water. This scope of work builds off the work completed in Phase 1. The Phase 2 tasks
include Task 6 (Alternatives Evaluation), Task 7 (Public Outreach), Task 8 (Strategic Plan) and Task 9 (Project
Management).
Task 6: Alternatives Evaluation
Task 6.1 — Develop more detailed analysis of the most feasible alternatives identified in Phase 1.The detailed
analysis will consist of conceptual design of each of the feasible alternatives and will involve analysis of treatment
and infrastructure as well as relevant physical conditions (water resources, hydrogeology, and geology). While
not standalone alternatives,the system modifications will also be assessed as part of the alternatives evaluation.
In addition, the detailed analysis will outline the regulatory and environmental elements of the project.The
regulatory, environmental, and geotechnical subconsultants will contribute to the analyses.The alternatives will
be compared to a "No Project" alternative and will include an evaluation of energy usage and greenhouse gas
(GHG) production of each alternative.
Task 6.2— Develop recommendations for improvements necessary to implement each alternative and applicable
system modifications.
Task 6.3— Develop planning level life-cycle costs and identify potential funding opportunities for each alternative
and applicable system modifications. Costing should incorporate the value of the District's existing property and
subtract any anticipated costs that might be avoided with replacement of current operations.
Task 6.4—Develop an implementation plan for each alternative and applicable system modifications.
Task 6.5—Compile findings from Tasks 6.1 through 6.4 for a stakeholder advisory group (SAG)workshop.The
findings will include recommendations on the preferred strategy (developed in coordination with the District).
The analysis and compilation of findings will include contributions from the regulatory, environmental, and
geotechnical subconsultants.
Task 6.6—Prepare Draft Technical Memorandum No. 3 summarizing the alternatives and system modifications
evaluations and all relevant assumptions.The Draft Technical Memorandum No. 3 will incorporate input received
from the SAG, the District, and the general public.
Task 6.7—Hold a workshop with the District to review Draft Technical Memorandum No. 3.
Task 6.8—Prepare Final Technical Memorandum No. 3 based on comments received in District workshop.
00030084 STP011 I STPUDRWStrategicPlanPh2SOW-LP0923(003).docx
.a'r/1' it<;t•-' v. , , , _ . .. , ;..... �
Mr. Stephen Caswell, PE
South Tahoe Public Utility District
September 27, 2023
Page 2
Deliverables:
■ Draft Technical Memorandum No. 3—Alternatives Evaluation
■ Final Technical Memorandum No. 3 —Alternatives Evaluation
Assumptions:
■ Up to six alternatives (in addition to the "No Project" alternative)will be evaluated as part of this task.There is
a range of effort associated with the analysis of these alternatives based on the complexity of the alternative,
with Alternatives 2 and 3 as generally less complex in comparison to Alternatives 4, 6A, 613, and 7B.These
alternatives include:
Alternative 2—Expanded Secondary 23 Recycled Water Reuse in Alpine County-Analysis will include
assessment of reuse expansion, relying primarily on existing treatment and infrastructure.
Alternative 3—Expanded Reuse via Disinfected Tertiary Recycled Water Reuse in Alpine County-Analysis will
include treatment upgrades and additional conveyance infrastructure.
» Alternative 4—Discharge to West Fork Carson River:Analysis will require coordination with Lahontan
Regional Water Quality Control Board(LRWQCB), Nevada Department of Environmental Protection (NDEP),
NV State Engineer, Carson Water Subconservancy District, determination of potential permit conditions given
the West Fork Vision Project, and assessment of treatment upgrades to meet anticipated permit
requirements.
» Alternative 6A —Expanded Reuse in Nevada via discharge to Indian Creek:Analysis will require coordination
with LRWQCB, NDEP, and NV State Engineer, determination of potential permit conditions (and potential
flexibility in governing water quality objectives), and assessment of treatment upgrades to meet anticipated
permit requirements.
» Alternative 6B—Expanded Reuse in Nevada via discharge to Mud Lake:Analysis will require coordination
with NDEP and NV State Engineer, and determination of potential permit conditions for an unclassified
waterbody, assessment of treatment upgrades to meet anticipated permit requirements, and evaluation of
conveyance infrastructure.
Alternative 7B—Conveyance to Douglas County Lake Tahoe Sewer Authority(DCLTSA) and Reuse in NV-
Analysis will require coordination with NDEP and DCLTSA, determination of potential permit conditions,
assessment of treatment upgrades to meet anticipated permit requirements, and evaluation of conveyance
infrastructure.
■ Up to 5 system modifications, associated with several of the alternatives, will be included in this task.These
modifications include:
Export System Energy Recovery- This analysis will rely primarily on Carollo's 2072 analysis of the
hydroelectric facility and potential energy recovery opportunities.
» Urban Fire Protection— This analysis will be relatively limited and will primarily include documentation of the
assessment that has already been completed in the Phase 1 scope.
» Tunneling— This analysis will include assessing opportunities for trenchless tunneling along new or existing
pipeline alignments. The concept of a regional tunnel will be addressed at a high level, including the
assessment of subsurface conditions and associated potential impacts on tunneling feasibility.
» Split Treatment— The concept of split treatment will be incorporated as an option for the alternatives that
include requirements for treatment upgrades.
Mr. Stephen Caswell, PE
South Tahoe Public Utility District
September 27, 2023
Page 3
Constructed Wetlands— The analysis of constructed wetlands will be considered as part of any alternatives
that involve conveyance of effluent into Alpine County. The concepts of treatment wetlands and/or a
wetlands mitigation bank will be evaluated.
■ The implementation plan will include conceptual layouts for the six alternatives (in addition to the existing
system alternative) with rough footprint and rough infrastructure alignments.
■ Level 5 planning-level cost estimates will be based on previous projects and flow scaling. High-level
operations and maintenance (O&M) costs will be based on similar projects. The energy and GHG analysis will
focus on comparing the major differences between the alternatives and will not reflect a complete analysis of
operational energy consumption and GHG emissions.
■ Selection of the preferred strategy will be based on established evaluation criteria developed in collaboration
with the District team.
■ In addition to cost, energy, and GHG emissions, the evaluation criteria will also include the suite of criteria
used for the screening analysis (technical, legal [based on Phase 1 analysis], regulatory, financial, sustainability,
natural resources, political considerations, and public acceptance, etc.).
■ The District workshop will be virtual.
■ The budget for the SAG Workshop is included in Task 7.
Task 7: Public Outreach
Task 7.1 —Conduct one SAG workshop to present task findings and receive feedback.
Task 7.2—Conduct one public workshop to present task findings and receive feedback.
Task 7.3—Additional coordination meetings with NDEP, NV State Engineer(water rights), Carson Water
Subconservancy District, DCLTSA, and LRWQCB.
Deliverables:
■ SAG workshop presentation materials, set-up, sign-in, meeting notes, and comment/response log.
■ Public workshop presentation materials, set-up, sign-in, meeting notes, and comment/response log.
■ Coordination meeting materials and notes.
Assumptions:
■ The SAG workshop will be conducted as an in-person workshop (with option for virtual participation).
■ The public workshop will be conducted as an in-person workshop (with option for virtual participation).
■ District facilities will be used to provide virtual participation in the workshops, as needed.
■ One additional meeting with each of the following agencies: NDEP, NV State Engineer (water rights), Carson
Water Subconservancy District, DCLTSA, and LRWQCB.
Task 8: Strategic Plan
Task 8.1 — Prepare Draft Recycled Water Strategic Plan detailing project objectives; alternatives considered;
process for identification, screening, and evaluation of alternatives; and final recommendations for District action.
Mr. Stephen Caswell, PE
South Tahoe Public Utility District
September 27, 2023
Page 4
Task 8.2—Conduct a workshop with the District to review the Draft Recycled Water Strategic Plan.
Task 8.3— Prepare Final Recycled Water Strategic Plan, based on District comments received in District workshop.
Task 8.4— Present findings to the District's Board.
Deliverables:
■ Draft Recycled Water Strategic Plan.
■ Final Recycled Water Strategic Plan.
■ District Board presentation materials.
Assumptions:
■ The Recycled Water Strategic Plan will consist of a summary report that compiles the findings of the technical
memorandums developed in Tasks 1 through 4, 6 and 7, with the original technical memorandums included
as appendices. Public and SAG meeting materials and minutes will also be included as appendices.
■ The Recycled Water Strategic Plan will include the recommended alternatives, along with any system
modifications, and a decision matrix or flow chart that identifies key points of flexibility if conditions or drivers
change.
■ The District workshop will be virtual.
■ The Board presentation will be in-person. It is assumed that the Board presentation will be open to the public.
Task 9: Project Management
Task 9.1 —Conduct monthly calls to coordinate with the District on project tasks and deliverables.
Task 9.2— Prepare invoices and monthly progress reports.
Schedule
The proposed schedule assumes a notice to proceed on October1, 2023, with completion no later than
September 30, 2024.Approximately timeframes for key deliverables include:
■ May 2024—TM 3 Alternatives Evaluation.
■ August 2024— Recycled Water Strategic Plan.
Budget
The proposed budget for the Phase 2 scope of work is $425,367 (see attachment A).
Sincerely,
CAROLLO ENGINEERS, INC.
�"_ � %
Elisa Garvey, PhD, PE Beverly Hann, PE
Project Manager Principal-in-Charge
Attachment A
00030084 STP011 I STPUDRWStrategicPlanPh2SOW-LP0923(003).docx
.a'ril' it<;t•.. - ". �, ...,..:.::::.. - -
STPUD Recycled Water Strategic Plan
Phase 2 Fee Estimate
Permitting,Environmental Assessment,
Carollo Public Outreach Geotech and dro eolo Energy/Emissions ODCs Total
Technical- Misc Costs
Treatment Technical- Technical- Document Total Labor+ Total Total Total Total Total Total Subs and
Tech Advisors PIC PM PE Processes Infrastructure EnergyGIS Graphics ProcessingHours Labor PECE PECE Hours labor Geotech H droGeo Hours Labor Hours Labor Total Subs MarkupPrintingMiles Mileage Total ODCs
C E
H m O O
O
Cr O
q Y L N 'O Y O E
E E? 9 O
E
1= xo a` - uo c a` m ae m` z W a
2023 Rates $347 $ 347 $301 $301 $272 $254 $ 272 $ 301 $ 272 $ 347 $ 208 $149 $ 157 $ 139 $ 14 $95 $95 $ 130 $ 255 $ 235 $325 $ 225 $ 150 5.0D% 0.56
2024 Escalated Rates $368 $ 368 $319 $319 $289 $270 $ 289 $ 319 $ 289 $ 368 $ 220 $153 $ 166 $ 147
PHASE/TASK/SUBTASK
PHASE 2
Task 6 Alternatives Evaluation
6.10etailed analysis 0 0 0 0 30 24 16 12 20 16 36 0 0 0 154 $ 40,700 $ 2,156 $ 42,856 4 4 0 8 $ 760 24 24 48 $11,760 6 16 120 142 $ 23,550 $ 36,070 $ 1,804 $ 0 $ - $ 1,804 $ 80,730
6.2 Recommended
Improvements 0 0 1 8 0 1 4 24 16 1 12 20 16 36 24 0 0 160 $ 39,492 $ 2,240 $ 41,7321 0 0 1 0 0 $ 8 4 12 $ 2,980 0 0 0 0 $ $ 2,980 $ 149 $ 0 $ - $ 149 $ 44,861
6.3 Planning level cost
estimates 0 0 0 0 16 20 16 8 12 0 40 4 0 0 116 $ 30,080 $ 1,624 $ 31,704 0 0 0 0 $ 8 24 32 $ 7,680 0 0 0 0 $ $ 7,680 $ 384 $ 0 $ - $ 384 $ 39,768
6.4 Implementation Plan 0 0 8 0 28 16 20 8 8 0 24 0 0 0 112 1$ 30,888 1$ 1,568 $ 32,456 0 0 0 0 $ 8 4 12 $ Z980 2 8 12 22 $ 4,250 $ 7,230 $ 362 $ 0 $ - $ 362 $ 40,048
6.5 Compile
recommendations for SAG& 2 2 2 4 8 18 8 0 0 0 4 0 0 0 48 $ 13,750 $ 672 $ 14,422 0 0 0 0 $ 0 0 0 $ 2 8 20 30 $ 5,450 $ 5,450 $ 273 $ 0 $ - $ 273 $ 20,145
6.6 Draft Memo#3 0 0 1 0 1 2 4 22 1 8 0 0 0 20 8 12 12 88 $ 19,426 $ 1,232 $ 20,658 1 0 0 0 0 $ 6 6 12 $ 2,940 0 0 0 0 $ $ 2,940 $ 147 $ 0 $ - $ 147 $ 23,745
6.7 Alternatives Evaluation
Workshop with District 0 0 0 2 4 10 4 0 0 0 0 0 0 0 20 $ 5,650 $ 280 $ 5,930 1 0 0 0 0 $ 0 0 0 $ 0 0 0 0 $ $ $ $ 0 $ - $ $ 5,930
6.8 Final Memo#3 0 0 0 0 2 12 4 1 0 0 0 10 4 4 8 1 44 $ 9,626 $ 616 $ 10,242 0 0 0 0 $ 0 0 0 $ 0 0 0 0 $ $ $ $ 0 $ - $ $ 10,242
Task Total 2 2 18 8 96 146 92 40 60 32 170 40 16 20 742 $ 189,612 $ 10,388 $ 200,000 4 4 0 8 $ 760 54 62 116 $28,340 10 32 152 194 $ 33,250 $ 62,350 $ 3,118 0 0 $ - $ 3,118 $ 265,468
Task 7 Public Outreach
7.1 SAG Worksho 1 0 0 1 0 1 2 1 6 10 2 0 0 0 0 1 0 3 0 23 $ 6,148 $ 322 $ 6,470 30 20 2 1 52 $ 5,010 0 0 0 1$ 0 4 0 4 $ 900 $ 5,910 $ 296 $ 285 $ 160 $ 455 $ 12,835
7.2 Publ is Workshop 1 0 0 0 2 6 10 2 0 0 0 0 0 3 0 23 $ 6,148 $ 322 $ 6,470 104 80 6 190 $18,260 1 0 0 0 $ 0 2 0 2 $ 450 $ 18,710 $ 936 $ 285 $ 160 $ 1,095 $ 26,275
7.35 edfic SAG Meet!n s 5 0 0 0 0 24 40 0 0 0 0 0 0 0 0 1 64 $ 17,736 $ 896 $ 18,632 0 0 0 0 $ 0 0 0 $ 0 0 0 0 $ $ $ $ 0 $ - $ $ 18,632
Task Total 0 0 0 4 36 60 4 0 0 0 0 0 6 0 110 $ 30,032 $ 1,540 $ 31,572 134 100 8 242 $23,270 0 0 0 $ 0 6 0 6 $ 1,3S0 $ 24,620 $ 1,231 0 570 $ 319 $ 1,550 $ 57,742
Task 8Strategic Plan
8.1 Draft Strategic Plan 0 0 0 0 32 60 20 0 1 0 0 40 0 0 12 164 $ 41,792 $ 2,296 $ 44,088 8 1 8 1 4 20 $ 2,040 0 0 0 1$ 4 8 12 24 $ 4,900 $ 6,940 1$ 347 $ 0 $ - $ 347 $ 51,375
8.2 Strategic Plan Review
Workshop with District 0 0 0 2 8 12 0 0 0 0 0 0 0 0 22 $ 6,190 $ 308 $ 6,498 0 0 0 0 $ 0 0 0 $ 0 0 0 0 $ $ $ $ 0 $ - $ $ 6,498
8.3 Final Strategic Plan 0 0 1 0 0 16 20 8 0 0 0 20 0 0 8 72 $ 17,912 $ 1,008 $ 18,920 2 2 0 4 $ 380 0 0 0 $ 2 4 1 4 10 $ 2,150 $ 2,530 $ 127 1$ 0 $ - $ 127 $ 21,577
8.4 Presentation to Board 0 0 0 8 16 0 0 0 0 0 0 12 1 16 0 52 $ 11,668 $ 728 $ 12,396 0 0 0 0 $ 0 0 1 0 $ 0 0 0 0 $ $ $ $ 0 $ - $ $ 12,396
Task Total 0 0 0 10 72 92 28 0 0 0 60 12 16 20 310 $ 77,562 1$ 4,340 $ 81,902 10 10 4 24 $ 2,420 0 0 0 $ 6 12 16 34 $ 7,050 $ 9,470 $ 474 0 0 $ - $ 474 $ 91,846
Task 9 Project Manan ement
9.1 Monthly Calls 0 0 0 0 10 15 0 0 0 0 0 0 0 0 25 $ 6,530 $ 350 $ 6,880 0 0 0 0 1$ 0 0 0 $ 0 0 0 0 $ $ $ $ 0 $ - $ $ 6,880
9.2 Progress Reporting 0 0 0 0 12 0 0 0 0 0 0 0 0 1 0 12 $ 3,264 $ 168 $ 3,432 0 0 0 0 $ 0 0 0 $ 0 0 0 0 $ $ $ $ 0 $ - $ $ 3,432
Task Total 0 t 0 0 0 22 15 0 0 0 0 0 0 0 0 37 $ 9,794 $ 518 $ 10,312 0 0 0 0 $ 0 0 0 $ 0 0 0 0 $ $ $ 0 0 $ - $ $ 10,312
Phase 2Total 2 2 18 22 226 313 124 40 60 32 230 52 38 40 1199 $ 307,000 $ 16,786 $ 323,786 148 114 12 274 $26.450 54 62 116 $28,340 16 50 168 234 $ 41,650 $ 96,4401$ 4,9221 0 570 1$ 319 $ 5,141 $ 425,367
00030084 STP011 I STPUDRWStrategicPlanPh2SOW-LP0923(003).docx
r,.
General Manager
Paul Hughes
Directors
1 19510 Water NICK Haven
uf a h ShaneRomsos
V �� David Peterson
Kelly Sheehan
Public, Utility District NicKExline
1275 Meadow Crest Prive•South Lake Tahoe■CA 96150-7401
Phone 530 544-0474•Fax 530 541-0614•www.5tpud.u5
BOARD AGENDA ITEM 7b
TO: Board of Directors
FROM: Trevor Coolidge, Senior Engineer
MEETING DATE: October 5, 2023
ITEM- PROJECT NAME: Water Meter Installation Project- Property Corner
Restoration
REQUESTED BOARD ACTION: (1) Approve the proposed Scope of Work from Lumos &
Associates for professional surveying services to replace property corners disturbed by
water meter projects; and (2) Authorize the General Manager to execute Task Order
No. 18 in an amount not to exceed $359,380.
DISCUSSION: The District has invested over$21,000,000 to install approximately 10,000
water meters on meter installation projects over the past 10 years to meet the State's
metering mandates and to promote water conservation. Meters are typically installed
adjacent to the existing water service valve (curb stop), located at the property line of
a customer's parcel. In some instances, the meter installation work results in a property
corner survey marker being disturbed during the course of excavation. In California,
replacement of a survey marker must be completed and documented by a licensed
surveyor for recording with the County Surveyor's office. The District has compiled a list
of 158 property markers that require restoration.
In 2021, Lumos & Associates (Lumos), a regional surveying and engineering consultant,
submitted a statement of qualifications and scored highly for their experience in the
Tahoe Basin. The District awarded a small task order to Lumos to replace 5 property
markers to evaluate how to best contract for the larger remaining list of survey markers.
The District and Lumos found that the level of effort for a given survey marker was highly
variable depending on available records and nearby reference markers, making the
work most effectively performed on a time and materials basis.
Lumos was efficient in the restoration of pins in 2021 and the work was well received by
the County Surveyor. Due to the meter installation projects being largely complete,
and the missing markers being a source of complaints from both customers and
surveyors, Staff recommends award of a task order to complete the restoration of the
Coolidge
Page 2
October 5, 2023
remaining property markers throughout the District's water service area that were
disturbed by the meter projects.
The work will be performed by Lumos & Associates on a time & materials basis as Task
Order No. 18 under the current Master Services Agreement for Consulting Services.
Attached are a proposal and fee estimate from Lumos not to exceed $359,380.
SCHEDULE: Upon Board approval
COSTS: $359,380.00
ACCOUNT NO: 2030-8079
BUDGETED AMOUNT AVAILABLE:
ATTACHMENTS: Lumos Proposal and Fee Estimate
CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water
GENERAL MANAGER: YES_ / NO
CHIEF FINANCIAL OFFICER: YES NO
L Carson City El Dorado Hills Fallon Lake Tahoe Reno www.LumosInc.com
Lake Tahoe
312 Dorla Court, Suite 202 1 PO Box 890
LUMOS
Zephyr Cove, Nevada 89448
775.588.6490
August 30, 2023
LA23.756
Mr. Trevor Coolidge, PE
South Tahoe Public Utility District
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150
Via email: tcoolidge@stpud.dst.ca.us
Subject; REVISED 2023 Land Survey Proposal for Property Corner Replacements
South Tahoe Public Utility District, South Lake Tahoe, CA
Dear Trevor:
Lumos and Associates, Inc. (LUMOS) is pleased to provide you with this proposal for land surveying
services to replace multiple property corner monuments that have been disturbed or removed by
the District's water meter project.
Project Understanding
The proposed project is within the service area of the South Tahoe Public Utility District (STPUD) in
the South Lake Tahoe area of El Dorado County, California. It is our understanding that the scope
of work for this project will be to ultimately replace as many as 158 such property corners currently
identified by STPUD as needing replacement.
Project History
In October of 2021, LUMOS contracted with STPUD to replace an initial set of corners along Skyline
Drive in Tahoe Paradise Unit No. 14. These initial corners had been identified to serve as a "pilot"
project for the replacement of these specific corners only. The work was completed and a Record
of Survey was filed with El Dorado County in March of 2022 in Book 38 of Surveys at Page 22.
The intent with pursuing a "pilot" project was to allow both LUMOS and STPUD to evaluate the cost
and the procedures involved for the purpose of addressing additional work. The contract amount
was $4,000 plus review and recording fees. The actual billable time for the work performed by
LUMOS was $7,857, which equates to $1,571 for each of the five corners set. STPUD was only
billed for the contract amount.
The efforts of the "pilot" project were well received by the El Dorado County Surveyor's office as a
professional effort to replace and document the missing corners lost to the water meter project.
As a result of the above information, we propose the Scope of Services for the project found on the
following page.
August 30, 2023
Page 2
Project Scope — Property Corner Replacement
LUMOS will perform field surveys sufficient to replace each of the designated 158 remaining
property corners listed on the spreadsheet data provided by the District. Each property corner
will be replaced and monumented in accordance with the requirements of the California Land
Surveyors Act.
Upon completion of the field work for each corner, a determination will be made as to whether a
single Corner Record will prepared for each corner, or whether a Record of Survey drawing will be
prepared for a group of corners as was done in the 2021 "pilot" project.
Corner Records can only be utilized when the location of the re-established corner is substantially
consistent with the existing public record information for the subject property. If material
discrepancies are found between the existing adjoining property corners and the information found
in the public record, a Record of Survey will be required. A Record of Survey may also be
considered as a preferred option to individual Corner Records when a group of re-established
property corners can be combined into one exhibit, as was done in the 2021 'pilot" project.
Both Corner Records and Record of Surveys are reviewed by the El Dorado County Surveyor. The
Corner Records are indexed and kept by the County Surveyor, and the Record of Surveys are filed
with the County Recorder. All review and recording fees will be paid by the District.
Estimated Hourly Fees, For Each Corner:
Calculations (Pre & Post Initial Survey) 2hr @ $135/hr $270.00
Field Survey (Control & Set Corner— 2 visits) Or @ $330/hr** 1,320.00
Prepare Corner Record 2hr @ $135/hr 270.00
Supervision 390.00
Total $2,250.00
** Indicates the hourly rate for a two-person crew required to satisfy CA DIR prevailing wage rates
for El Dorado County.
The above fees are simply estimates. Work will be billed strictly on an hourly basis. Hourly rates are
inclusive of vehicle, equipment, and any other incidental charges. The hourly rates for the
anticipated contract period are shown on the attached fee calculator spreadsheet.
There will be opportunities for savings when corners are grouped in close proximity to one another.
It is our anticipation that we will work on setting multiple corners concurrently within specific
neighborhoods. There will obviously be times when conflicting evidence between adjoining corners
will require greater effort, and therefore, more time for each corner.
Invoices will be generated monthly for work completed during that billing period. Lumos will
provide information relating to the number of points set, records completed, and work in progress
during each billing cycle.
August 30, 2023
Page 3
Ell Dorado County Fees
LUMOS will pay the El Dorado County review fees, and pass those costs to STPUD with a 15%
processing fee added to the actual fee amounts. Those fees, not including the 15%, are as follows:
Corner Record Review $17 for each record
Record of Survey Review $135 for a 1-sheet map
Recording fee for Record of Survey $94 for a 1-sheet map
Schedule — LUMOS will be able to begin the field surveys, immediately upon approval of a
contract. We will work on the project, in conjunction with our other previously committed contracts,
until significant snowfall this fall. Work will resume upon snowmelt in the spring of 2024. It is
anticipated that all 158 corners can be set before significant snowfall in the fall of 2024. Corner
Records or Record of Survey drawings will be submitted to El Dorado County upon completion of
the field work for each corner, or set of corners.
Supervision &Certification
All work will be performed under the direction of a California licensed Professional Land Surveyor,
license number L-9129.
Field work will be scheduled and supervised by Michael Craven, PLS CA L-9685, from the Tahoe
office.
Thank you for allowing Lumos and Associates to provide you with this proposal. Please do not
hesitate to call me if you have any questions.
Sincerely,
Rick Byrem, PLS CA L-9129
Survey Project Manager
Cc: Greg Phillips, PLS,WRS, Director-Surveying Division
Michael Craven, PLS, Survey Project Manager-Tahoe Office
Page 1 LA23.756 Fee Estimate Spreadsheet
Project Name: 2023 South Tahoe Public Utility District Property Corner Replacement
Proposal/Job No: LA23.756
Date: 30-Aug-23
By: Rick Byrem
FEE SCHEDULE: Contract Rates through 12/31/2024
PW is 2 man rate set per El Dorado County Prevaling Wage Rates
Control: *County Fees include 15%processing mark-up
2 Man Crew COUNTY
Task Survey Tech 3 Project Manager PW FEES* Grand Total
135 $/hr 210$/hr 330$/hr
Office/ Prep 316 hr
Field Work 632 hr
Documentation 316 hr
Supervision 290 hr
Total Hours 632 hr 290 hr 632 hr 1,554 hi
TOTALS $85,320.00 $60,900.00 $208,560.00 $4,600.00 $359,380.OL
See letter proposal dated 813012023 for project assumptions and details.
L:\Marketing\Proposals\2023 Proposals\LA23.756-STPUD 2023 Corner Rep l ace ments\LA23.756 Fee Estimate Spreadsheet
General Manager
Paul Hughes
South
Tahoe
Directors
e( w8t Nici<Haven
Shaneltomsos
David Peterson
public Utility District Kelly$heehan
Nick Exline
1275 Meadow Crest Prive•South Lake Tahoe■CA 96150-7401
Phone 530 544-6474•Fax 530 541-0614•www otpud.u5
BOARD AGENDA ITEM 7c
TO: Board of Directors
FROM: Chris Skelly, Information Technology Manager
MEETING DATE: October 5, 2023
ITEM- PROJECT NAME: Storage System Upgrade
REQUESTED BOARD ACTION: 1) Waive formal bidding procedures as allowed for in the
District's Purchasing Policy when an item is economically preferable to match or be
compatible with other equipment presently on hand and the purchase is made from
the supplier who supplied such equipment; and 2) Authorize the purchase of a new
Nimble SAN and compatible server and switching infrastructure from Cadence Team in
the total amount (includes tax) of $189,084.84.
DISCUSSION: The Information Technology (IT) Department is requesting the Board
recognize the purchase of a new Nimble SAN and server infrastructure as exempt from
formal bidding procedures and authorize the purchase of the quoted storage
upgrades from Cadence Team (Cadence). This purchase will allow IT to continue to use
the District's existing Nimble in order to better support disaster recovery plans; support
business continuity goals; provide additional storage space for projects like the sewer
pipe inspection efforts; and continue to have the low cost of ownership that has been
proven by Nimble in the past.
In respect to staff time in managing and troubleshooting the current Nimble, the cost of
ownership has been effectively zero. Nimble has the best customer service experience
on the market because they keep constant contact with each system, monitoring for
space, failed drives, configuration issues, virtual machine issues and more. When an
issue is detected, Nimble automatically opens a case, and in the event of a failed
drive, automatically ships the drive to the District, calls to confirm the drive has arrived
and offers over the phone assistance replacing the failed drive. This could happen in
the middle of the night and the drive could be shipped out before the IT Department
notices the failed drive in the morning. It is because of this experience with Nimble, IT
staff has been able to focus on other projects instead of being stuck managing and
operating a more complex storage solution saving time and money.
Keeping with the Nimble SAN product line will allow us to leverage our existing
infrastructure to improve our Disaster Recovery processes. Purchasing a new Nimble
Chris Skelly
October 5, 2023
Page 2 of 2
SAN will allow the current Nimble and requested Nimble to replicate data between
each other automatically. The current Nimble can be moved to Diamond Valley Ranch
(DVR) where the IT Department can replicate existing mission critical servers and data
to DVR. The District would need to purchase two storage units from another
manufacturer to get this some functionality. This same technology will allow the
migration our 34 Terabytes (1 TB = 1000 GB) of data to the new Nimble SAN effortlessly
as the current SAN and new SAN can be configured to do this transfer automatically
and without downtime for District staff or overtime for the IT department.
Authorizing the purchase to Cadence Team will provide the District with the best price
and because Cadence has been hired by the District in the past for complex network
design and implementation, the intimate existing knowledge Cadence has of the
District's network infrastructure, virtual infrastructure, and security policies, will allow the
installation to proceed without the need to retrain a vendor. In the technology market,
vendors can use a purchasing avenue called a "deal registration." Typically, hardware
manufacturers will only grant one deal registration per customer per project to a
vendor and Cadence has that deal registration for the District's SAN Upgrade project.
This deal registration provides Cadence (a certified small business) the ability to
compete with bigger resellers and transfer some additional savings to the District.
In summary, staff feels this purchase is exempt from the formal competitive solicitation
process due to item #2 in the District's purchasing policy "when the item is required or is
economically preferable to match or be compatible with other furnishings, materials, or
equipment presently on hand, and the purchase is made from the manufacturer or
supplier who supplied other such furnishings, materials or equipment." The new SAN is
required to be compatible with the District's current SAN in order to have robust backup
recovery and business continuity infrastructure. It would also save staff time because of
the familiar interface, current knowledge of the hardware and proven track record of
being easy to manage and fast to repair.
This item has been reviewed by the District's Purchasing Agent.
SCHEDULE: Placed into production before June 30, 2024
COSTS: $189,084.40
ACCOUNT NO: 20.56.8251, 20.56.8411, 10.56.8325
BUDGETED AMOUNT AVAILABLE: $190,000
ATTACHMENTS: Quote
CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer/Water
GENERAL MANAGER: YESt NO
CHIEF FINANCIAL OFFICER: YES_ NO
Cadence Team,Inc Phone:844.934.8326
Remittance Address: cence.
Fax:844.923.5878
4010 Foothills Blvd,Ste 103 PMB205 TEAM '^�'^w.cadence.team
Roseville,CA 95747
Company: STPUD Date: 9/19/2023 Expiration: 10/19/2023
Attn: Chris Skelly Shipping Method: NA Sales Rep: Jeremy Caudill
Project: DHCI Est.Delivery: TBD Direct: 916.710.8264
Contract#: NASPO#AR2882 Terms: NET30 Email: jeremy@cadence.team
Part Number Description Qty. List Price Unit Price Extended Tx Disc
Server Hardware
UCID:5134605663-02 DHCI Solution 1 0%
Refer to BOM HIDE ProLiant DL360 Gent 8SFF INC Configure-to-order 3 $52,843.00 $7,398.02 $22,194.06 T 86
Server
Server Support 5 Years
HIRE 5Y Tech Care Essential SVC 3 $9,557.00 $7,645.60 $22,936.80 N 20
ToR Switches
Aruba 8360-16Y2C v2 Power to Port Airflow 3 Fans 2 Power 2 $29,955.00 $9,585.60 $19,171.20 T 68
Supply Units HPE Attached Bundle
J9996A Aruba 2-port 40GbE QSFP+v3 z12 Module 2 $9,649.00 $4,824.50 $9,649.00 T 50
JH235A HPE X242 40G QSFP+to QSFP+3m DAC Cable 4 $661.00 $330.50 $1,322.00 T 50
Switch Support 5 Years
HPE Aruba 8360 12/16/24p Support 2 $24,211.00 $19,368.80 $38,737.60 N 20%
Cables
Cables 1 $20,649.00 $6,607.68 $6,607.68 T 68%
Storage
HPE Nimble Storage c1HCI with Alletra 5010 Configure-to-order 1 $176,331.81 $22,923.14 $22,923.14 T 87
Base Array
Storage Support 5 Years
HPE 5Y Tech Care Essential Service 1 $56,230.00 $44,984.00 $44,984.00 N 20
Professional Services
HPE Technical Installation Startup SVC 1 $16,792.00 $8,396.00 $8,396.00 N 50%
1-1 Cadence Team-Installation and Configuration 1 $5,000.00 $5,000.00 $5,000.00 N 0
Credit 1 ($20,000.00) -$20,000.00 -$20,000.00 C 0%
Sub Total: $81,867.08
Non Taxable: $120,054.40
Tax: $7,163.37
Credit: -$20,000.00
Freight: $0.00
Total: $189,084.84
Tax Rate: 8.750
Attachment to Board Agenda Item 10a
you-rH TA110
AGe`,C UTILITY
South Tahoe Public Utility District
NOTICE OF REQUEST FOR PROPOSALS
Website Redesign for South Tahoe Public Utility District
1275 Meadow Crest Drive, South Lake Tahoe, CA 96150
Attn: Bren Borley, 530.543.6285
SOLICITATION NUMBER: RFP-23-24-IT01
SOLICITATION RELEASE DATE: October 5, 2023
PROPOSAL DUE DATE AND TIME: November 2, 2023,AT 2:00 p.m. (PST)
NOTICE IS HEREBY GIVEN that the South Tahoe Public Utility District (District) is seeking proposals for the
redesign of our organization's website, https://stpud.us/. Respondents must FIRST register online to
access all solicitation documents related to this Request for Proposals (RFP). As a registered vendor
within the District's vendor database, you will be automatically notified of Q & A alerts, updates and
addenda. The PlanetBid-Portal Button provided on the District's 'Request for Proposals' web page (link
provided below) is the entry to the Registration/Vendor Profile and Bid Opportunities modules.
Registration is free and immediate.
Table of Contents
NOTICE OF REQUEST FOR PROPOSALS.........................................................................................................1
ELECTRONIC (E-BID) SUBMITTALS.................................................................................................................2
NEW VENDOR REGISTRATION .........................................................................................................2
INSTRUCTIONS FOR UPLOADING PROPOSALS ELECTRONICALLY....................................................3
PLACINGan eBID..............................................................................................................................3
SECTION 1. PROJECT OVERVIEW...................................................................................................................5
SECTION 2. SCOPE OF WORK........................................................................................................................5
SECTION 3. PROJECT SCHEDULE ...................................................................................................................9
SECTION 4. PROJECT BUDGET......................................................................................................................9
SECTION 5. PROJECT SUBMISSION INSTRUCTION AND REQUIREMENTS....................................................9
SECTION 6. SELECTION CRITERIA AND AWARD PROCESS...........................................................................11
SECTION 7. DISCRETION AND LIABILITY WAIVER........................................................................................21
SECTION 8. DISTRICT PROVIDED FORMS ....................................................................................................22
EXHIBIT B - COST PROPOSAL FORM..................................................................................22
Exhibit D- Notice of"No Proposal Submittal"..................................................................23
EXHIBIT E - RESPONDENT SIGNATURE/COVER PAGE......................................................24
EXHIBIT H— NONCOLLUSION DECLARATION TO BE EXECUTED........................................25
EXHIBIT I—CERTIFICATION OF INSURABILITY...................................................................26
EXHIBIT J - BIDDER DISCLOSURE STATEMENTS.................................................................27
EXHIBIT K—CLIENT REFERENCES ......................................................................................28
EXHIBIT L- DEVIATIONS and/or EXCEPTIONS FORM........................................................30
EXHIBIT M —SUBCONTRACTOR STATEMENT....................................................................31
EXHIBIT N—MASTER AGREEMENT FOR CONSULTING SERVICES .....................................32
1
ELECTRONIC (E-BID) SUBMITTALS
All questions, inquiries and comments regarding this solicitation must be submitted in writing via the
PlanetBids (PBTM) online system no later than Friday, October 19th, 2023 at 4:00 p.m. at https://stpud.us
using the"Questions and Answer"tab.Answers provided by the District will be answered using the PBTM
online system.
Respondents are responsible for obtaining the solicitation and any attachments from the District's
PlanetBidsTM online system linked at https://stpud.us. Respondents are required to review the entire
solicitation package before submitting questions. It shall be the sole responsibility of the Respondent to
verify issuance of any addenda and to check all avenues of document availability prior to the opening date
and time. By submitting a proposal,the Respondent shall be deemed to have received all addendums and
to have incorporated them into its proposal.All such addenda shall become a part of the resulting contract
and all Respondents shall be bound by such addenda whether or not received by the Respondent.
Solicitation Release Date:OCTOBER 5,2023
NEW VENDOR REGISTRATION
To ensure successful vendor registration,follow these steps:
1. Go to the District's official website https://stpud.us
2. Choose the Doing Businesses banner. Choose Request for Proposals option.
https://stpud.us/doing-business/request-for-consultant-proposals/
3. Choose titled, [South Tahoe Public Utility District Vendor Portal]. You will have entered into the
PlanetBids Vendor Portal.
New Vendor Registration Bid Opportunities
46
rs
]i
News&Events
X-
4. Choose [New Vendor Registration].
Create your own username/password. When completing your company profile, choose as many
commodity codes that are representative of the products and services your company offers.The
database only allows one (1) email address. If your company has a common group email address,
it is recommended a company (group) email address be used instead of an individual's email
address to ensure all company sales and/or procurement staff are automatically notified by the
system (based on the commodity codes chosen) that the District is seeking bids or proposals.
Otherwise, be sure to share the email address used with co-workers.
Download the Vendor Portal User Guide for instructions on editing a vendor profile and/or view a
Bid Detail.
2
Note: Vendors will not be able to access the BID OPPORTUNITIES module until successful vendor
registration has been completed.
INSTRUCTIONS FOR UPLOADING PROPOSALS ELECTRONICALLY
1. On the Vendor Portal page, log into the system (lower right hand corner of screen) with your
assigned user name and password. (You must be registered in order to download documents and
submit a bid proposal.)
Choose [Bid Opportunities] and then on the Bid/Invitation Number and Description that you wish
to bid on. The selected bid will open to allow you to access all tabs, documents and the pricing
sheet, if applicable.
2. Choose the [Documents&Attachments]tab to be sure you have downloaded all documents that
are part of this bid.
NOTE: If you have not already downloaded all bid documents,you must download them now, in
order to submit your bid.The screen will indicate which documents you've already downloaded.
3. Choose the tab [Addenda&Emails]to be sure you have read and acknowledged all addenda that
have been issued for this bid.
NOTE: The screen will display "yes" or "no" next to each addendum (if applicable) to indicate
whether you have viewed and acknowledged it. If you have not previously acknowledged an
addendum, do so now by clicking on the addendum to open and read it, then click on the
[Acknowledge] button on the lower left hand corner of screen.
PLACING an eBID
4. On the Bid Detail Page, the bid will state if the response format is Electronic, Electronic & Paper
or Paper only. To place/upload a bid proposal electronically, click on [Place eBid] on the lower
right corner of the screen. The bid "Terms and Conditions" will pop up with a button for you to
click [Accept]to acknowledge your agreement to the terms of the bid.
5. Enter the Respondent information on the [Detail] tab.
6. Go to the [Attachments] tab and click the [ATTACH] button to upload your bid proposal. The
District will provide a Response File to be used to submit a response (proposal) in a separate file.
The District may add-on or allows General Attachments (often renamed to specifically request
certain type(s) of information, i.e., cost proposal, marketing materials, etc.) Note: If only one
Response File is offered, all requested information must be uploaded as one (1) document. It is
not necessary to use all General Attachments that may be offered.
7. When you have finished uploading(eBid)your proposal,choose the[Save]button.This saves your
bid proposal as a draft for you to review or revise as needed anytime up to the bid submittal
deadline. When you are ready to submit your bid proposal, choose the [Submit] button. You will
receive a confirming message that looks like this:
Bid Successfully Submitted
Thank You!
Your bid has been successfully submitted to South Tahoe Public Utility District.
Bid Confirmation#nnnnn (Date and Time)
Your eBid can be edited or withdrawn at any time prior to bid Closing.
[Summary] [OK]
NOTE: E-Bids are sealed and cannot be viewed by the District until the closing date and time.As
noted above, if you need to withdraw your bid, you may do so any time before the bid
3
deadline by going back into the system and selecting [withdraw].
Please enter your bid proposal in sufficient time to complete and submit it prior to the stated deadline.
The official closing time for the bid is determined, and controlled, by the electronic clock in the bid
management system. Once the deadline is reached, the system will not allow any bids to be submitted,
and any in processes that are not completed will be rejected. The amount of time required to enter and
submit your bid depends on the complexity of the bid and the processing speed of your server and internet
connections.
Technical Support
In the event you encounter technical difficulties during the uploading process, please contact the
PlanetBids, Bids Online system team as shown below Monday through Friday from 8:00 a.m.to 5:00 p.m.
support@planetbids.com or call (818) 992-1771 Ext. 0 - Monday - Friday, between 7am and Spm
(Pacific), excluding statutory U.S. holidays.
Bid prices must be entered and required documents uploaded to the PlanetBids system no later than
the date and time indicated on the cover sheet of the Solicitation. No late bids will be accepted. No
other method of bid submittal will be accepted.
4
SECTION 1. PROJECT OVERVIEW
The South Tahoe Public Utility District(District) is seeking proposals for the redesign of our organization's
website, https://stpud.us/. The purpose of this project is to create a more user-friendly, modern, and
functional website that aligns with our organization's objectives and state regulations. The proposed
solution should encompass various design and functional enhancements, integrations with specific
platforms, and improved content management.
SECTION 2. SCOPE OF WORK
1. Overview. Contractor to provide the following for the https://stpud.us/website, including but
not limited to website hosting, website development, and regular website maintenance.
2. Web Hosting. Contractor shall be responsible for the secure hosting of the https://stpud.us/
website based on the following standards:
a) Contractor shall host a website with the complex traffic levels of https://stpud.us/.
Contractor shall provide STPUD with uptime of 99.99 percent and has sufficient
bandwidth and storage to support STPUD's needs. Additionally, website shall be
scalable to support future needs.
b) The Contractor shall be responsible for the migration of all content and structure on
the STPUD website, in collaboration with District staff. Additionally, the Contractor
should actively seek feedback from District staff to incorporate any 'ease of access'
recommendations during the migration process.
c) Physical location of hosting servers shall be within the continental United States at a
tier II data center with 24/7/365 system monitoring.
d) Contractor shall offer nightly auto backups of website files and provide a safeguard
against file loss.Additionally,all backups of website files shall be saved for up to thirty
(30) days and be Geographically redundant backups. Backups to be stored within the
continental United States.
e) Contractor's hosting solution shall have the capacity to accommodate the following:
• Up to 250,000 monthly site visits;
• Up to 1,000,000 monthly page view;
3.Website Maintenance. Contractor shall perform website maintenance to provide ongoing
maintenance and support, emergency site recovery, back-up site implementation, and special
projects. Maintenance services shall include, but are not limited to:
a) Regularly scheduled Maintenance: Contractor shall review the site's pages and
coding on a scheduled basis to fix any detriments to the site that might cause failure
or threaten the stability of the site. This includes, but is not limited to, bad coding,
system updates, plugin updates, and patches that no longer function correctly.
Contractor shall also verify that ongoing back-ups are working properly and readily
available shall STPUD need them. The schedule for regular maintenance, including
the total hours allocated for this task, shall be mutually agreed upon by both the
Contractor and the District before the commencement of work.
b) Responding to Issues: Contractor shall troubleshoot site issues and maintain the
integrity of the site.Contractor shall provide emergency site recovery(within 2 hours)
in the event the website becomes unresponsive. Contractor shall have an established
protocol for site backups and disaster recovery in place. Contractor shall provide a
5
description of established response and resolution times for site outages, bug fixes,
updates, requested changes, or other potential site events or requests, in the
management of the site.
c) Site Security: Contractor shall help ensure the security and integrity of the site by
ensuring site software is updated to the latest software security levels and provide
the ability to limit administrator logon IP addresses. Contractor shall monitor for new
security updates and patches and install necessary updates.Contractor shall maintain
site security including updates and monitoring of site software for security, patches,
and other updates needed to maintain security.
d) ADA Accessibility: Contractor shall be responsible for ensuring stpud.us remains
accessible for ADA site readers and meets all federal and California State ADA
regulations today and in the future for ADA compliance and provide documentation
of compliance.
e) Language Assistance: Contractor shall be responsible for ensuring the website's
language translation feature for people with limited English proficiency is maintained.
Contractor shall avoid use of graphics or other content features that contain text that
is not translatable.
f) Site Analytics: Contractor shall be responsible for ensuring website pages and usage
are tracked and monitored through programs such as, Google Analytics (or a similar
platform), to provide metrics and insights about the use and effectiveness of site
design, content, and search optimization.
g) Content Links: Contractor shall be responsible for monitoring links and ensuring any
broken links are identified and quickly reestablished.
h) Optional Tasks: Optional tasks may be necessary to support larger maintenance or
updates which shall improve the overall functionality, add new features, and/or
stability of the STPUD website. The total hours that shall be allowed for these tasks
shall be approved by STPUD's Project Manager prior to commencement of work.
i) Site Backup and Recovery: Contractor shall outline the approach for backups and
disaster recovery, as well as the test schedule that Contractor adheres to. Full site
restoration shall be completed within an agreed upon time frame (please include
standard and priority full restore time in response to RFP and any associated costs for
restore time contract options). Contractor shall act as the emergency contact in the
event the site is compromised, to review the coding and any other back-end
processes, to find the symptom of the failure and remedy it, as soon as possible.
Contractor shall be available to respond and begin work on the issue within two (1)
hours of being contacted by STPUD. Emergency site recovery approach shall be
approved by STPUD's Project Manager and prior to Contactor's commencement of
work.
4. Minimum Feature Requests.
a) Azure SSO:Ability to integrate with Azure to authenticate internal website editors.
b) Out-of-the-Box Website Designer and Editor: Implement an intuitive and user-
friendly website builder/editor for District staff that empowers administrators and
content creators to easily design, modify, and manage website content without
technical expertise.
c) Live Streaming Option: Integrate a seamless live streaming feature that enables real-
time broadcasting of events, webinars, and other interactive sessions directly on the
6
website.
d) Granular Permissions Management: Develop sophisticated user permission sets
allowing administrators to assign precise editing permissions to individual District
Staff, restricting them to editing only their designated pages. Allow system
administrators to establish levels of rights for staff to update/manage/access content
based upon roles.
e) Change Approval Process: Establish a workflow that mandates approval for changes
made by specific District Staff before they go live on the website, ensuring content
quality and accuracy.
f) Application Integration: Integrate with internal document management system to
enable seamless uploading and sharing of documents and forms on the website.
g) ESRI GIS Integration: Integrate ESRI's GIS technology to leverage location-based
services and interactive mapping features, enhancing the website's functionality and
user/customer engagement.
h) Automatic Retention and Unpublishing: Develop a system that automatically
archives or unpublishes posts and documents after a predetermined period or when
their relevance expires. This feature should also prevent archived items from being
searchable on search engines. Set dates for content to automatically publish and
expire.
i) Alerts for Annual Postings: Implement a notification system that alerts
administrators to renew or update annual postings and announcements, ensuring
timely updates of time-sensitive content.
j) Seamless Navigation: Design a user-centric navigation structure for the customer
with a maximum of two clicks to access any page, enhancing the user experience for
the customer and ensuring quick access to desired information.
k) Calendar: Update/publish calendars for departments/categories with a main
calendar to display all events.
1) Bill Calculator:Built in feature for customers to calculate their monthly bills and allow
the tool's calculations to be easily updated by District web admins when District rates
are changed.
m) Responsive Web Design: Fully mobile responsive design - site adjusts to the screen
size of all devices it's being viewed on, includes forms, calendars, etc.
n) Social Media Plugin Integration: Integrate social media plugins that allow District
Staff to easily share website content across various social media platforms,expanding
the website's reach and engagement.
o) Chatbot or Al Functionality: Implement a chatbot or AI-powered assistant that can
engage with customers, answer common queries, and provide assistance, enhancing
customer interaction and support.
p) Notification Banner: Configurable site-wide banner with options to customize color
and text.
q) Short URL Generator: Short URL generator built into solution with reporting
capabilities.
r) Agenda Posting: Upload existing, create new, categorize, approve, and manage
agendas as well complies with CA laws that apply to Special Districts and their
websites (ADA, S13272, the one click agenda). Allow last three years of agendas to be
7
displayed and remove those that age out.
s) Archival of Recurring Documents: Store agendas, minutes, newsletters, and other
documents
t) RFP/RFQ/Bid Posting: Create an integration with our bid service, PlanetBids.
u) Document Storage: Upload/download capability for files 1GB and larger, back-end
ability to search within published and unpublished documents.
v) Modern Visual Design: Incorporate modern design elements, such as clean
aesthetics, ample white space, and visually appealing graphics, aligning with current
design trends.
w) Search Engine Optimization (SEO): Optimize the website's structure and content for
search engines to ensure higher visibility and better organic search rankings.
x) Analytics and Reporting: Integrate robust analytics tools to track user/customer
behavior, website performance, and engagement metrics, enabling data-driven
decision-making.
y) Accessibility Compliance: Ensure the website meets accessibility standards to
accommodate website users with disabilities and provide an inclusive online
experience.
z) Security Measures: Implement robust security measures, including SSL certificates,
firewall protection, and regular security audits, to safeguard user data and maintain
website integrity.
aa) Backup and Recovery: Set up automated and regular backup processes to prevent
data loss and facilitate quick recovery in case of technical issues.
bb) Content Versioning:Enable content version control,allowing administrators to revert
to previous versions of pages or documents if needed.
cc) Multilingual Support: Using Google Translate or similar.
dd) Printable Pages: Print-friendly function.
ee) E-Notifications: Electronic subscription, scheduled notifications for email and SMS
ff) Retain or Exceed Existing Functionality: The proposed solution must include or
exceed all existing website functionality, features, and capabilities that are currently
operational. The vendor shall ensure that the new solution retains or exceeds the
same level of functionality as the existing website, without any compromise or
omission.
5. Project Management and Implementation
a) The scope of work outlined in this RFP is non-negotiable and shall be performed by
the selected contractor team without any deviations, unless explicitly agreed upon in
writing by both parties.
b) No changes in the project team will be made without explicit permission from the
District for the life of the project.
c) The chosen vendor will supply a professional project team to oversee and provide the
implementation services needed for a successful implementation of the District's new
website. The vendor's project team shall be responsible for developing a
comprehensive project management plan to include outlining methods of
communication for implementation, supplying a detailed project timeline, and
identifying tasks and deliverables for both District staff and vendor's staff.
d) The selected vendor is responsible for the complete and accurate migration of all data
and documents as on the current website (stpud.us). The vendor shall ensure the
8
seamless transition of data and documents from the existing systems to the new
solution, with no loss or corruption of data.
e) It is expected for the vendor to provide at least three (3) website mockup examples
for the District before a final design or format is selected.
6.Technical Support and training.
a) Technical Support — The vendor shall provide U.S.-based, live technical support,
including emergency support after business hours. Technical support shall be
available through multiple communication channels, including phone, email, and
chat.
b) Self-service training (video tutorials, documents, or webpages) shall be available for
district staff to access at any time.
c) Provide comprehensive training for administrators and District Staff on using the new
website features effectively. Offer ongoing technical support to address any issues
that may arise post-launch.
d) The Contractor shall provide general end-user documentation for managing the
website internally.
SECTION 3. PROJECT SCHEDULE
Preliminary Schedule Tasks
October 5, 2023 • RFP Opportunity Announcement
October 19, 2023 @ 4:00 • End of Vendor Q&A Period
October 26, 2023 • District Response to Questions
November 2, 2023 • Proposal Due Date
December 7, 2023 • Award Date
December 2024 • Project Start Date
May 2024 • Anticipated Website Launch
SECTION 4. PROJECT BUDGET
Include a detailed, proposed budget based on the scope of work provided.The bid will be awarded to the
lowest responsive responsible bidder. A billing schedule will be determined during contract negotiations
with the selected consultant.
SECTION 5. PROJECT SUBMISSION INSTRUCTION AND REQUIREMENTS
Proposals shall be submitted in any easy-to-read format. Each section of the proposal shall be tabbed in
accordance with the below numbering system as to aid in expedient location of information and provide
for consistent proposal organization:
a) Tab 1: Cover Letter. Identify the proposal by the RFP title. Provide a summary
emphasizing the distinguishing factors that highlight Proposer's ability to perform the
services described herein. It should be brief (two (2) pages maximum), and include all
contact information inclusive of the name, address, telephone number, title, and
9
signature of the contact person for this procurement.The signatory shall also be a person
with the official authority to bind the Proposer.
b) Tab 2: Qualifications and Experience. Provide a summary of proposed team's
background, skills and experience in the subject-matter and overall performance of
services associated with the Scope of work. Provide a detailed list of key personnel in the
proposed team, their titles, and tasks to be assigned relative to the services identified in
the Scope of work. Proposers must demonstrate successfully migrating and hosting sites
with a similar profile to STPUD's. Provide any examples that showcase experience.
c) Tab 3: Past Performance (references). Describe specifically Proposer's experience in
providing services listed in the Scope of work similar in scope,magnitude,and complexity.
This should include references from past and current projects (including with STPUD, if
applicable).This should also include relevant past performance from the proposed team,
including Proposer and its subcontractors.
d) Tab 4:Technical Approach. Provide a narrative illustrating the approach to providing the
deliverables for each task, which shall include but is not limited to: quality assurance
methods, proposed schedule/timelines with milestones, roles and responsibilities,
capabilities and capacities, and administrative approach. If any items/requirements
cannot be met, please list proposed workarounds, development efforts, and/or other
recommendations for those items/requirements. Any such licenses needed by STPUD
shall be issued in STPUD's name and associated costs shall be listed in the Price Proposal.
e) Tab 5: Required Submittal Documents. Complete and sign all attachments to the RFP.
f) Tab 6: Price Proposal. Include price proposal and any other pertinent cost information.
Separate Document-Complete Proposal Pricing—Exhibit B: Cost Proposal Form
See instructions on Page 26. The District-provided MS Excel Spreadsheet must be submitted with
Respondent's proposal.
For evaluation, the District shall assume specification items left blank will not be furnished and shall be
automatically interpreted as a "NO" for that particular item. Bidders are to itemize any and all additional
charges to furnish and deliver services bid. Proposal price alone will not be the sole determining factor
in the selection of the contractor for this work. The District will consider the proposal costs for all
proposal items identified herein together with the selection criteria defined herein.
Enter unit prices for Website Redesign for South Tahoe Public Utility District. Pricing shall be firm fixed
price and shall include all costs in accordance with all contract requirements, including but not limited to
fully-burdened labor, payroll and other taxes, fringes, licenses and permits, insurance, workforce
productivity, coordination, transportation, field overhead, general and administrative overhead, and
profit. The respondent shall submit a cost proposal containing all costs to the District. Non-disclosure of
all costs during the RFP process may result in disqualification. Optional or supplemental pricing will not
be considered as part of the evaluation process.
DOWNLOAD THE EXCEL PRICING FILE: Respondents can access and download Excel Pricing File for this
Request for Proposal by logging into PlanetBids'"" with your username and password. Once you have
located the RFP project, double click on the appropriate line to open the bid. All bid related information
is located within the different tabs of the bid details. Only applicable tabs will be available within the Bid.
Go to the Documents/Attachments tab which allows you to view and/or download RFP documents
10
associated with the project. Select the document titled,Exhibit B—Cost Proposal Form by double clicking
on the title or click the"Download" button on the lower, left corner of the Electronic Attachments section.
The Proposal shall be valid for 120 calendar days from the date stipulated in the RFP for receipt of
Proposals. If this offer is accepted within that time period,the Proposer agrees to furnish all services and
items as stipulated in the RFP and any accompanying addenda. The Proposer shall submit a Firm Fixed
Price for performing all Work specified in the Scope of Services. The Pricing Proposal must be complete
and address all components in the Scope of Work/Services or the proposal will be deemed as non-
responsive at the District's discretion.
SECTION 6. SELECTION CRITERIA AND AWARD PROCESS
This solicitation has been developed in the Request for Proposals (RFP)format.Accordingly, firms should
take note that multiple factors as identified in the RFP will be considered by the Evaluation Committee to
determine which proposal best meets the requirements set forth in the RFP document. The District
reserves the right to negotiate the terms and conditions of any resulting contract.
An Evaluation Committee, using the following evaluation criteria for this RFP, will evaluate all responsive
proposals to this RFP. The Evaluation Committee may request, if desired by District, formal
presentations/interviews from short listed firms at a future date of which the format and presentation
evaluation criteria shall be provided at the time to short listing. Participation in any phase of this RFP
process, including the interview phase if conducted, is at the sole expense of the firms replying to this
RFP.The District shall NOT be responsible for any costs incurred by any firm in response to,or participation
in, this RFP.
Best Value is the expected outcome, in the District's estimation, which provides the greatest overall
benefit response to this RFP. The award decision is based on the evaluation factors that are tailored to
this acquisition. Evaluation factors represent the key areas of importance and emphasis that will be
considered in the award decision and support meaningful comparison and discrimination between and
among competing proposals.
The evaluation factors that apply to this acquisition and their relative importance are within the discretion
of acquisition officials, include, but are not limited to subject to the following requirements:
1. Price or cost to the District shall be evaluated in every source selection.
2. The quality of the product or service shall be addressed in every source selection through
consideration of one or more non-cost evaluation factors such as past performance, compliance
with solicitation requirements, technical excellence, management capability, personnel
qualifications, and prior experience. All factors other than cost or price, when combined, are
"significantly more important than cost or price", "approximately equal to cost or price", or
"significantly less than cost or price".
Selection Criteria and Scoring
Criteria Maximum
Score
11
Company experience during the past 5 years in providing Website Hosting, migration,
25 Points
and Design services
• Past Performance and Experience based on responses from
Maximum
Client References and proposal response (25 points maximum)
Proposer's ability to perform the services as reflected by technical employee training and
education, knowledge of governing safety standards, general and specific experience in
providing the required services, and the qualifications and abilities of personnel
proposed to be assigned to perform the services. 20 Points
• Key Personnel Resumes—experience of key staff on comparable projects, or in Maximum
performing comparable services(10 points maximum)
• Adequate proof of required staff certifications to include dates acquired and
dates of expiration. (10 points maximum)
Cost Proposal. Determination whether proposed costs are realistic, complete and 25 Points
reasonable in relation to the RFP requirements.
Maximum
(See District-provided Exhibit B—Cost Proposal Form—provided in separate document)
Technical Approach to Work (migration, implementation, and training plans). 30 Points
Demonstrate the company's ability to deliver the requirements of this RFP. The overall
Maximum
quality of the proposed plan for performing the required services and the demonstration
of a clear understanding of the project.
TOTAL POINTS MAXIMUM 100
The District may also contact and evaluate the Respondent's references;contact any Respondent to clarify
any response; contact any current users of a Respondent's services;solicit information from any available
source concerning any aspect of a proposal;and seek and review any other information deemed pertinent
to the evaluation process. The District shall not be obligated to accept the lowest priced proposal, but
shall make an award in the best interests of the District.
PRIOR DISTRICT WORK:
If your firm has prior experience working with the District, DO NOT assume this prior work is known to
the evaluation committee. To be fair to all respondents, the evaluation process may consider only
information that is included in the respondent's bid proposal. Therefore, all respondents must fully
respond to the requirements of the RFP, regardless of their previous history with the District.
The District reserves the right to make an award to a Respondent whose proposal it judges to be the best
value and most advantageous to the District based on the evaluation criteria,without conducting written
or oral discussions with any Respondent and without soliciting BAFOs.
Best and Final Offers(BAFO)
When desired,the District reserves the right to seek a best and Final Offer from one or more Respondents
who have been"short-listed"during the evaluation process. Respondents chosen to submit Best and Final
Offers will be given instructions on preparing their Best and Final Offer including an indication of which
areas of the RFP must be addressed. Best and Final Offers will be evaluated as an adjustment to the scores
already awarded by the Evaluation Committee. After receiving best and Final Offers, the Procurement
Officer may conduct additional discussion with Respondents. If a Respondent does not submit a Best and
Final Offer, its immediate previous offer will be considered as its Best and Final Offer.
12
Unsolicited Best and Final Offers from Respondents will not be considered. Each Respondent in the
competitive range may be afforded the opportunity to amend its proposal and make one BAFO. The
request for BAFOs will include the following:
1. Notice that this is the opportunity to submit a written BAFO.
2. A common date and time for submission of a BAFO by each Respondent in the competitive range,
allowing a reasonable opportunity to prepare BAFOs.
3. Notice that if any modification to a BAFO is submitted, it must be received by the date and time
specified for receipt of BAFOs.
4. Notice to Respondents that do not submit a notice of withdrawal or a BAFO that their immediately
previous proposal will be construed as their BAFO.
The District will evaluate BAFOs based on the same requirements and criteria applicable to initial
proposals. Based on the criteria defined in this RFP document, the District will then perform final scoring
and prepare final rankings.The Evaluation Committee will recommend the proposal that is the best value
and most advantageous to the District based on the evaluation criteria.The results of the evaluation and
the selection of a Respondent for any award will be documented in the procurement file.
Contract Award
It is understood that the District reserves the right to accept or reject any and all proposals and to re-
solicit for proposals, as it shall deem to be in the best interests of the District. Receipt and consideration
of any proposals shall under no circumstances obligate the District to accept any proposals.The award of
a contract shall be made to the responsible vendor or firm whose proposal is determined to be the best
evaluated offer, taking into consideration demonstrated competence, qualifications and response to the
Scope of Services and/or Work to perform the work and/or service solicited and specified criteria, etc. in
accordance with South Tahoe Public Utility District's Purchasing Policy.
The District reserves the right to award a contract to multiple Vendors or to a single Vendor,or to make
no award, whichever is in the best interest of the District.
District Authorized Representative. After award of this contract, the Finance Manager, or his/her
designee, shall be the District's authorized representative in all matters pertaining to the administration
of the terms and conditions of the resulting contract and to whom all notices must be sent.The successful
Respondent's contract manager shall be responsible for coordinating all matters pertaining to the
resultant contract with the District's Finance Manager and/or designee.
STANDARD CONTRACT TERMS AND CONDITIONS
1) Definitions of Key Words Used in the Solicitation.
Shall, Will, Must: Indicates a mandatory requirement. Failure to meet these mandatory requirements
may result in the rejection of proposal as non-responsive.
Should: Indicates something that is recommended but not mandatory. If the Respondent fails to provide
recommended information, the District may, at its sole option, ask the Respondent to provide the
information or evaluate the offer without the information.
13
May: Indicates something that is not mandatory but permissible.
II) Business License. Respondent's business license must be submitted with their proposal response.
Business licenses must be made in the official name of the firm or the individual under which
business is conducted (showing the official business addresses) and must be signed.
III) Exceptions to Solicitation and/or Contract for Services Provisions. Any exceptions to the
specifications and requirements stated in this RFP and/or terms and provisions of the Master
Agreement for Consulting Services (Exhibit N) shall be clearly identified including the specific
objection(s) and/or exceptions on the District provided Deviations and/or Exceptions Form
(Exhibit Q.
The District will consider any deviations and/or exceptions indicated in its award decisions. The District
reserves the right to accept or reject any and all responses based on any deviation and/or exception
indicated on this form. Respondents are cautioned that by taking any exception they may be materially
deviating from the RFP.
Proposals including supplemental terms and conditions will be considered, but supplemental conditions
that conflict with those contained in this RFP, or that diminish the District's rights under any contract
resulting from the RFP, will be considered null and void. The District is not responsible for identifying
conflicting supplemental terms and conditions before issuing a contract award.After award of contract:
a. If conflict arises between a supplemental term or condition included in the proposal and a term or
condition of the RFP,the term or condition of the RFP will prevail; and
b. If the District's rights would be diminished as a result of application of a supplemental term or
condition included in the proposal,the supplemental term or condition will be considered null and
void.
Failure to list an exception or objection shall preclude a request for changes to the Contract.The proposed
form of contract is included as a part of this Solicitation. In your Offer you must include a statement that
you have reviewed the contract and list any objections to them. Any objections to the form contract will
be considered and included in District's evaluation of your offer. If you fail to list any objections to the
form of contract, you will not be allowed to raise any objections later if you are selected for award. An
offer that takes exception to a material requirement of any part of the Solicitation or Contract may be
rejected as non-responsive.
To ensure compliance with this bid proposal document, Respondent should forward this Solicitation
and the Model Contract for Services to their attorney prior to bid proposal submittal.
D. Subcontractors.
If subcontracting is proposed, the contractor is required to state the name and address of each
subcontractor who will perform work in an amount in excess of one-half of one percent (1%) of the total
contract price and the portion of the work that each subcontractor will do. In the event of subcontracting,
the sole responsibility for fulfillment of all terms and conditions of the resulting contract rests with the
successful contractor. Both, successful contractor and subcontractors must meet the District's insurance
requirements. Complete Exhibit M—Subcontractor Statement.
14
E. Change Orders. No oral statement of any person shall modify or otherwise change, or affect the
terms, conditions or specifications stated in the resulting contract. All change orders to the
contract shall be made in writing.
F. Bid Proposal Prices and/or Fee Schedules. Bid Proposal Prices and/or Fee Schedules must remain
firm for the first full contract period. The District will not add clauses or provisions pertaining to
economic price adjustments into this solicitation. Should the District exercise its right and option
to extend the term of the resulting contract for additional year periods, the following set forth
conditions for price adjustments in option period(s):
Conditions for Price Adjustments in Option Periods
The Contractor may apply for a cost adjustment after first full contract period. In order for the rate
adjustment to be considered by the DISTRICT, the Contractor shall be in full compliance with all of the
performance standards as established by this Contract. The rate may be adjusted by the Contractor as
provide herein solely on the basis of the change in the Consumer Price Index for All Urban Consumers
(CPI-U)for the Los Angeles, Riverside,Orange County, provided, however,that those adjustments in rates
based solely on the change in CPI-U will not exceed five (5) percent per annum.The Contractor assumes
all risks associated with increased costs of service not reflected in the rate adjustments. The Contractor
shall use the CPI-U for the most recent twelve month period prior to the contract's anniversary date.
Changes in Davis-Bacon wage determinations issued under the Service Contract Act,or from amendments
changing the minimum wage required by the Fair Labor Standards Act.
G. Invoicing.The selected contractor shall provide itemized billing for each invoice. Each invoice shall
include:
• Invoice Date
• Reference the Agreement Number and/or Purchase Order Number
• Indication of District department, division, or employee that ordered the service
• Basic description of service
• Total cost for labor
• Description and total cost for parts and materials
• Total costs for other items such as equipment rental,fuel charges, etc., if applicable
Mail invoices to: South Tahoe Public Utility District
ATTN: Accounts Payable
1275 Meadow Crest Drive
South Lake Tahoe, CA 96150
Email invoices to: AccountsPayable@stpud.dst.ca.us
Payments to the Contractor pursuant to this Contract shall be made no later than 45 days after the
District's receipt of a proper invoice from the Vendor.
Discounts for Prompt Payment
Discounts for prompt payment will not be considered in the evaluation of bids. However, if a prompt
payment discount is offered, the discount period shall be computed from the date of the invoice. If the
15
Contractor has not placed a date on the invoice,the discount period shall be calculated from the date the
Accounts Payable office receives a proper invoice, provided the Accounts Payable office annotates such
invoice with the date of receipt. For the purpose of computing the discount earned, payment shall be
considered to have been made on the date that appears on the payment check or,for an electronic funds
transfer, if authorized, the specified date of payment. When the discount period ends on a Saturday,
Sunday, or District observed holiday, such period shall be deemed extended until the following business
day.
H. Overlapping Contract Items
The products and/or services included in this solicitation may be available for other DISTRICT contracts
and/or other contracts made available for the District's use. The existence of these contracts containing
like or similar products and/or services could be either known or unknown to the DISTRICT at the time
this Request for Proposals(RFP)has been published. Unless otherwise stated in this contract,the DISTRICT
may acquire these products and/or services from any available source.The DISTRICT will make purchases
from sources that are deemed to be in the best interest of the DISTRICT.
I. Health and Safety
All items or services to be supplied hereunder by Respondent shall conform in all respects to the
requirements of applicable and government health and safety regulations, including regulations
administered by OSHA.
J. Prevailing Wage
For all proposals over$15,000, the proposer is required to abide by all applicable provisions of the Labor
Code, including payment of the minimum prevailing wage rate (if applicable) as determined by the State
Department of Industrial Relations (DIR).
INSTRUCTIONS, TERMS AND CONDITIONS FOR BIDDING
A. No Response. If your company does not intend to submit an offer, complete Exhibit D-Notice of
"No Proposal Submittal". Submit the form prior to the closing date and time as shown on the
Notice for Request for Proposals.
B. Receipt and Preparation of the Proposal Response.
1. Facsimile or Non-PlanetBidslm Electronic Mail Offers. Offers may NOT be submitted in facsimile
or electronically outside the District's PlanetBidsT"' Bid Management Database.
Sealed Bid Proposal (Paper Submission & Media Device—Option 2)
"Media Device"—Compact Disc (CD), DVD (Digital Versatile Disc), or Flash Drive
The South Tahoe Public Utility District's Information Technology Department will receive sealed proposals
until the date and time specified in the Notice—Request for Proposals. Respondents choosing Option 2—
Paper Submission, must submit one (1) unbound original and three (3) copies) in a sealed envelope or
package.The original proposal must be clearly marked and contain original signatures and must be easily
reproducible on a standard copying machine
16
2. Labeling of Bid Proposal Envelope& Media Device:The signed bid and copies should be returned
in the same sealed envelope or package, addressed as directed on the (Notice of Request for
Proposals (Page 1). Proposals forwarded to the District via express or overnight delivery services
must be plainly marked on the outside of the delivery package "SEALED PROPOSAL FOR
"PROPOSAL NO. RFP-20-21-IT01 Website Redesign for South Tahoe Public Utility District"
"SPECIAL NOTE" - The U.S. Postal Service DOES NOT deliver any mail (U.S. Postal, Express Mail,
Certified, Priority, Overnight, etc.) to any District physical address(es) on Weekends (Saturday and
Sunday).The District's office hours are Monday through Friday from 8:00 a.m.to 5:00 p.m.
3. Respondents are responsible for making certain proposals are delivered to the Information
Technology Department. Mailing of a proposal does not insure that the proposal will be delivered
on time or delivered at all. If Respondent does not hand deliver proposal, it is suggested that
he/she use some sort of delivery service that provides a receipt.
4. Proposals must be signed by an official who has the legal authority to commit the firm to a
contractual agreement.An offer may be withdrawn any time before the solicitation due date and
time. The signer of the proposal, guaranteeing authentic, must initial any interlineations,
alteration, or erasure made before this deadline. An Offer may not be amended or withdrawn
after the Offer due date and time except as otherwise provided by applicable law.
5. Omissions. At the time of the opening of bid or proposals each Respondent will be presumed to
have read and to be thoroughly familiar with the requirements of the RFP.The failure or omission
of any Respondent to examine any form, instrument or contract document shall in no way relieve
any Respondent from any obligation in respect to their proposal response.
6. To minimize the size of proposals submitted, Respondents are instructed to only return pages of
the proposal packet that require written responses with their proposal response.
C. Solicitation Questions,Answers and Addenda
Respondents are responsible for obtaining the solicitation and any attachments from the District's PB"
online system at https://stpud.us. Respondents are required to review the entire solicitation package
before submitting questions. It shall be the sole responsibility of the Respondent to verify issuance of any
District responses to questions and addenda and to check all avenues of document availability prior to the
proposal due date and time. By submitting a proposal, the Respondent shall be deemed to have received
all District responses to questions and/or addendums, if applicable, and to have incorporated them into
its proposal. All such District responses and addenda shall become a part of the resulting contract and all
Respondents shall be bound by such District responses and addenda whether or not received by the
Respondent.
D. No Contact Policy
The District has attempted to provide all information available. It is the responsibility of each Respondent
to review, evaluate, and, where necessary, request any clarification prior to submission of a proposal.
Respondents are not to contact other District personnel with any questions or clarifications concerning
this Request for Proposal (RFP). The District's Information Technology Department contact set out on
Page 1 will provide all official communication concerning this RFP. Any District response relevant to this
17
RFP other than through or approved by District's Information Technology Department is unauthorized and
will be considered invalid.
After release of this Solicitation, no officer, employee, agent or representative of the Respondent shall
have any contact or discussion, verbal or written, with any members of the District Council, District staff
or District's consultants, or directly or indirectly through others, seek to influence any District Council
members, District staff, or District's consultants regarding any matters pertaining to this Solicitation,
except as herein provided. Respondents are specifically directed not to contact any other District
personnel for meetings, conferences or technical discussions related to this Request for Proposals. Failure
to adhere to this policy may be grounds for rejection of the Respondent's proposal.
E. Proposals from Related Parties/Multiple Proposals Received From One Respondent.
When two(2)or more related parties each submit a proposal or multiple proposals are received from one
(1) Respondent, for any contract, such proposals shall be judged non-responsive and will not be
considered. Related parties mean Respondents or the principles thereof, which have a direct or indirect
ownership interest in another company for the same contract or in which a parent company or the
principles thereof of one(1) company have a direct or indirect ownership interest in another company for
the same contract.
F. Conflict of Interest.The District reserves the right to disqualify a Respondent on the basis of any
real or apparent conflict of interest that is disclosed by the proposal submitted or any other data
available to the District. This disqualification is at the sole discretion of the District. Any
Respondent submitting a proposal herein waves any right to object now or at any future time,
before ay body or agency, including but not limited to, the District Council of the South Tahoe
Public Utility District or any court.
G. Collusion. The Respondent, by affixing its signature to this Bid Proposal, certifies that its Bid
Proposal is made without previous understanding, agreement, or connection either with any
persons,or entities offering a bid proposal for the same items and/or services,or with the District.
The Respondent also certifies that its Bid Proposal is in all respects fair, without outside control,
collusion,fraud,or otherwise illegal action.To insure integrity of the District's public procurement
process, all Respondents are hereby placed on notice that any and all Respondents who falsify the
certifications required in conjunction with this section may be prosecuted to the fullest extent of
the law.
Affidavit of Non-Collusion and Non-Discrimination.The Respondent shall submit Exhibit H -Affidavit of
Non-Collusion & Non Discrimination. By signing and submitting the offered proposal, the Respondent
certifies that:
1. The Respondent did not engage in collusion or other anti-competitive practices in
connection with the preparation or submission of its proposal; and
2. The Respondent does not discriminate against any employee or applicant for employment or
person to whom it provides services because of race, color, religion, age, sex, national origin, or
disability, and that it complies with all applicable Federal, state and local laws and executive
orders regarding employment.
18
3. The Respondent understands that the Respondent will be responsible for and shall pay all sales,
consumer, use, and other taxes. When equipment, materials or supplies generally taxable to the
Respondent are eligible for a tax exemption due to the nature of the item, Respondent shall assist
DISTRICT in applying for and obtaining such tax credits and exemptions which shall be paid or credited
to DISTRICT.
It shall be understood and agreed that Bid Proposals submitted by persons and entities are done so
independent of any other offers, and that Respondents will not knowingly participate in solicitations
where there exists a conflict of interest with their entity and a member of District staff or their immediate
family.
H. Expenses Incurred.All expenses incurred in the preparation and submission in response to this
solicitation shall be borne by the Respondent.
I. Examination of Documents and Requirements.
1. Each Respondent shall carefully examine all RFP documents and thoroughly familiarize itself with
all requirements prior to submitting a bid proposal to ensure that the goods or services being bid
meet the intent of these specifications.
2. Before submitting a bid proposal, each Respondent shall be responsible for making all
investigations and examinations that are necessary to ascertain conditions and requirements
affecting the requirements of this Request for Proposals. Failure to make such investigations and
examinations shall not relieve the bidder from obligation to comply, in every detail, with all
provisions and requirements of the Request for Proposals.
J. California Public Records Act. Proposals are not to be marked as confidential or proprietary.
Proposals received will become the property of the District. All proposals, tabulations, if
applicable, and any subsequent contracts will be subject to public disclosure per the "California
Public Records Act," California Government Code, sections 6250 — 6270, once the District has
awarded the contract resulting from this solicitation. The District reserves the right to make use
of any information or ideas in the proposals submitted.
Regardless of any identification otherwise, including marking some or all pages as "confidential" or
"proprietary," information in proposals shall become a part of the public record and subject to disclosure
without any further notice to the Respondent.The District shall not in any way be liable or responsible for
the disclosure of any such records.
Procedure to Protect Disclosure of Trade Secrets or Proprietary Information - In order for trade secrets or
proprietary information to be protected from disclosure, the vendor must comply with the following
procedure:
• Protection must be timely invoked -The vendor must invoke the protections of this section prior
to or upon submission of the data or other materials to the District, and must designate the data
or other materials to be protected and state the reasons why protection is necessary.
Designation must be valid - If a vendor identifies all materials as a trade secret or as proprietary
information, the procuring department or Information Technology Department may contact the vendor
19
and request that the vendor further explain in writing why all of the materials are, in fact, trade secrets
or proprietary information.
K. Protest.
1. All protest regarding the solicitation process must be submitted in writing to the South Tahoe
Public Utility District Information Technology Department. This includes all protests relating to
advertising of invitation to bid notices, deadlines, bid proposal opening, as well as any protest
relating to alleged improprieties with the solicitation process. The protest must specify the
grounds upon which the protest is based.Avalid protest must(1)come from an actual respondent
for the contract, and (2) who claim to be the rightful awardee. That is, protest is not valid if filed
by a respondent who cannot show they would be awarded the contract if their protest were
accepted. No protest shall lie to challenge the terms and conditions of the request for proposals.
No protest shall lie for a claim that the selected Respondent is not a responsible Bidder.
2. FAILURE TO PROTEST WITHIN THE TIME ALLOTTED SHALL CONSTITUTE A WAIVER OF ANY PROTEST.
South Tahoe Public Utility District is aware of the time and effort you expend in preparing and
submitting bids to South Tahoe Public Utility District. Please let us know of any bid requirement
causing you difficulty in responding to our Invitation for Bid. We want to facilitate your
participation so that all responsible vendors can compete for South Tahoe Public Utility District
business.Awards should be made approximately two to four weeks after the opening date. Except
as otherwise provided herein, the Information Technology Department shall reject any protest
that is either untimely received or fails to state the basis for the protest and the relief sought.
However, the Information Technology Department may, in its discretion, consider any protest
that is untimely, and may grant any remedy if the protest is determined to be meritorious and the
remedy granted is determined to be in the best interests of the District.
3. Respondents who have submitted a bid proposal are permitted to challenge the District's intent
to award a contract.A Respondent shall have five(5)calendar days after the issuance of the Intent
to Award to file a protest.A protest must include:
q. The name, address and telephone number of the protester;
r. The signature of the protester or its representative;
s. Identification of the project and the solicitation or contract number;
t. A detailed statement of the legal and factual grounds of the protest including copies of
relevant documents; and
u. The form of relief requested.
4. The Information Technology Department shall issue a response to the protest within ten (10)
calendar days after receipt of the protest. The response shall be in writing and shall state the
reasons for either denying or upholding the protest. The decision of the Information Technology
Department shall be final unless the protesting vendor appeals within three (3) business days of
receipt of the response.
L. Debarment Disclosure. If the firm, business or person submitting this bid proposal has been
debarred, suspended or otherwise lawfully precluded from participating in any public
procurement activity, including being disapproved as a subcontractor with any Federal, state or
local government, or if any such preclusion from participation from any public procurement
20
activity is currently pending, the Respondent shall fully explain the circumstances relating to the
preclusion or proposed preclusion in the offer.The Respondent shall include a letter with its offer
setting forth the name and address of the governmental entity, the effective date of this
suspension or debarment, the duration of the suspension or debarment, and the relevant
circumstances relating to the suspension or debarment. If suspension or debarment is currently
pending, a detailed description of all relevant circumstances including the details enumerated
above shall be provided. See Exhibit J—Bidder Disclosure Statements.
M. Offer Acceptance Period. All bid proposals shall remain open for 120 days after the day of the
opening of bid proposals, but the District may, at its sole discretion, release any Respondent and
return the security(as applicable) prior to that date. No Respondent may withdraw his/her offer
during this period without written permission to the District. Should any Respondent refuse to
enter into a contract, under the terms and conditions of the procurement,the District may retain
the security (as applicable), not as a penalty, but as liquidated damages.
N. Proposal Ambiguity.Any ambiguity in the proposal as a result of omission,error,and lack of clarity
or non-compliance by the Respondent with the specifications, instructions, and all conditions of
proposing shall be construed in the favor of the District.
O. Notice of Intent to Award.
After the completion of the evaluation and scoring process, the District's Information Technology
Department will issue and post a written Notice of Intent to Award using the PB'" Bid Management online
system to all known prospective bidders. The Notice of Intent to Award will indicate the name of the
successful and unsuccessful bidder(s).
When cost/price is the only evaluation factor in determining contract award, the bid tabulation will be
included as an attachment to the Notice of Intent to Award.
If you have any questions, or would like further information about an intended award, contact the Buyer
immediately. Any protest must be submitted to the Information Technology Department no later than
five (5) calendar days from the date of issuance of the Notice of Intent to Award.
SECTION 7. DISCRETION AND LIABILITY WAIVER
This RFP does not commit the District to enter into a contract, nor does it obligate the District to pay for
any costs incurred in preparation and submission of proposals or in anticipation of a contract.The District
reserves the right to:
• Submissions which, in the sole judgment of DISTRICT,fail to meet the requirements of the RFP or
which are in any way conditional, incomplete, obscure, contain additions or deletions from
requested information, or contain errors may be rejected. Conditional proposals will not be
considered.
• Make the selection based on its sole discretion;
• Reject any and all proposals;
• Issue subsequent Request for Proposals;
• Postpone opening proposals for its own convenience;
21
• Remedy errors in the Request for Proposals process;
• Negotiate with any, all or none of the Respondents;
• Accept other than the lowest offer;
• Waive informalities and irregularities in the proposals; and/or
• Enter into an agreement with another Respondent in the event the originally
selected Respondent defaults or fails to execute an agreement with the District.
Respondents will not be reimbursed for any cost associated with the preparation of their proposal for the
Plan. Upon submittal, all documents will become the property of the South Tahoe Public Utility District,
and as such, shall be public information. Proposals and attachments will not be returned to proposing
firms. The District reserves the right to reject any or all requests for proposals to waive technicalities or
informalities, and to accept any request for proposal deeded to be in the best interest of the District.
SECTION 8. DISTRICT PROVIDED FORMS
(To be completed and returned with proposal)
See Pages 18 through 32
EXHIBIT B - COST PROPOSAL FORM
RFP No. RFP-23-24-IT01 Title: Website Redesign for South Tahoe Public Utility District
Cost or price information shall not be included in any other part of the bid proposal unless specifically
requested.
For evaluation, the District shall assume specification items left blank will not be furnished and shall be
automatically interpreted as a "NO"for that particular item.Any deviations from the written specification
as shown in this RFP shall be noted on the District provided form, Exhibit L- Deviations and Exceptions
Form. Respondents are to itemize any and all additional charges to furnish and deliver services bid.
Proposal price alone will not be the sole determining factor in the selection of the contractor for this
work.The District will consider the proposal costs for all proposal items identified herein together with
the evaluation criteria stated herein to form the basis for its decision.
Enter unit prices for Website Redesign for South Tahoe Public Utility District and other support
services. Pricing shall be firm fixed price and shall include all costs in accordance with all contract
requirements, including but not limited to fully-burdened labor, payroll and other taxes, fringes, licenses
and permits, insurance,workforce productivity, coordination,transportation,field overhead,general and
administrative overhead, and profit. The respondent shall submit a cost proposal containing all costs to
the District.
DOWNLOAD THE EXCEL PRICING FILE: Bidders can access and download Excel Pricing File for this Request
for Proposal by logging into PlanetBids"' with your username and password. Once you have located the
RFP project, double click on the appropriate line to open the bid. All bid related information is located
within the different tabs of the bid details. Only applicable tabs will be available within the Bid. Go to the
Documents/Attachments tab which allows you to view and/or download RFP documents associated with
22
the project. Select the document titled, Exhibit B—Cost Proposal Form by double clicking on the title or
click the "Download" button on the lower, left corner of the Electronic Attachments section.
Exhibit B — Minimum Specifications & Cost Proposal Form
Is provided in a separate document
UNAPPROVED ALTERATIONS TO EXCEL PRICING FILE: Bidders who materially alter the original content of
the Excel pricing file (e.g. specifications, formulas, etc.) issued by the DISTRICT may be found non-
responsive and ineligible for award of this Request for Proposals.
Exhibit D - Notice of "No Proposal Submittal"
Receipt of this completed form will assist us in calling for future solicitations. Please state the reasons why
you are not proposing an offer or bidding. Complete and submit this form prior to the closing date and
time as shown on the Notice of Request for Proposals.
RFP No. RFP- 23-24-IT01 Title:Website Redesign for South Tahoe Public Utility District
A Proposal is not being submitted for the following reason(s):
Request for Proposal (RFP
[ ] Insufficient time to prepare quote/bid/proposal
[ ] We are unable to competitively quote/bid/propose at this time
[ ] Insufficient information to prepare quote/bid/proposal
[ ] Current client commitments, too busy to respond
[ ] The timeframe was too short for us to be able to adequately respond
[ ] The complexity of the RFP makes a response unreasonable
[ ] Is there something in the RFP which prevents interest?
[ ] If the District has stated a budget,the estimated District budget requirements within the RFP were
unrealistic. Please state why:
[ ] Specifications are not sufficiently defined
[ ] Cannot obtain raw materials/goods in time to meet delivery requirements
[ ] Other reasons or additional comments(please explain below)
23
Comments:
Company Name:
DBA:
Address:
Telephone: Email:
EXHIBIT E - RESPONDENT SIGNATURE / COVER PAGE
RFP No. RFP- 23-24-IT01 Title: Website Redesign for South Tahoe Public Utility District
3. RESPONDENT
Firm Name:
Contact Name:
Principal Address:
Local Address:
Phone: Fax:
Email:
Structure: [ ] Sole Proprietor [ ] Partnership [ ] Corporation [ ] Joint Venture
Tax ID No: California Contractor License No:
4. Department of Industrial Relations (DIR) Registration No.
Registration Date: Expiration Date:
Registration Date: Expiration Date:
Registration Date: Expiration Date:
Note: Public works contractors are now able to register for one, two, or three fiscal years (July 1-June
30)to ensure there is no period of lapse during project/contract term.
5. Prices:
A. Prices shall be F.O.B. Destination or for the service rendered.
24
B. Payment Terms: Net 45
C. Proposers shall honor proposal prices for one hundred twenty (120) days or for the stated
contract period whichever is longer.
THIS PROPOSAL IS BEING SUBMITTED BY.-
The undersigned offers and agrees to furnish the goods or services at the price(s)entered herein subject to the terms
and conditions attached hereto. I CERTIFY that (1)the proposal document has been read and understood and that
all of the conditions contained therein are acceptable, (2) 1 have thoroughly examined and become familiar with the
specifications and/or scope of services outlined in this solicitation and further, to the best of my knowledge the
information contained in this bid proposal is accurate and complete and that(3) 1 have the legal authority to commit
this firm to a contractual agreement.
Printed Name: Title:
Signature: Date:
EXHIBIT H -NONCOLLUSION DECLARATION TO BE EXECUTED
BY
BIDDER AND SUBMITTED WITH BID
The undersigned declares:
I am the (Position) of (Firm), the
party making the foregoing bid.
The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership,
company, association, organization, or corporation. The bid is genuine and not collusive or sham.
The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or
sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with
any bidder or anyone else to put in a sham bid, or to refrain from bidding. The bidder has not in
any manner, directly or indirectly, sought by agreement, communication, or conference with
anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost
element of the bid price, or of that of any other bidder. All statements contained in the bid are true.
The bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof,
or the contents thereof, or divulged information or data relative thereto, to any corporation,
partnership, company, association, organization, bid depository, or to any member or agent
thereof, to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or
entity for such purpose.
Any person executing this declaration on behalf of a bidder that is a corporation, partnership,joint
venture, limited liability company, limited liability partnership, or any other entity, hereby
represents that he or she has full power to execute, and does execute, this declaration on behalf
of the bidder.
25
I declare under penalty of perjury under the laws of the State of California that the foregoing is
true and correct and that this declaration is executed on [date], at
[city], [state].
Signature of Declarer
Subscribed and sworn to before me this day of , 20
Signature of Notary Public in and for the
County of
State of
EXHIBIT I - CERTIFICATION OF INSURABILITY
I hereby swear (or affirm) under the penalty of perjury:
As an authorized representative of the proposing company,should our Company be determined to be the
Successful Proposer,our Company will promptly provide such proof of insurance to the District within five
(5) business days in reply to the District's Notice of Intent to Award.The DISTRICT will remind the Apparent
Successful Proposer in the Notice of Intent to Award letter. Proof of insurance requirements may be
submitted electronically to the email address below with the RFP Number and Title referenced in the
Subject field:
To: cskelly@stpud.us
Contracts will not be executed until formal proof of all required insurance(s) pursuant to Exhibit N —
Master Agreement for Consulting Services for Proposal No. RFP- 23-24-IT01 Title:Website Redesign for
South Tahoe Public Utility District have been received and approved by the DISTRICT. It is agreed that the
Apparent Successful Proposer shall maintain in force at all times during the performance of the
engagement all policy or policies of insurance.
If the DISTRICT requires corrections (i.e., limits, endorsements) the Successful Proposer has five (5) days
from such request to complete all corrections. Failure to meet these deadlines will allow the DISTRICT the
right to reject the Proposer's proposal as non-responsive and proceed to the next finalist.
I hereby assure South Tahoe Public Utility District that the company has or is able to procure the insurance
coverage(s) required should the Company be awarded the Contract and shall maintain all the insurance
requirements by the submission of this offer.
26
Proposer Company Name
Signature of Authorized Representative signing on behalf on Proposer
Print Name of Authorized Representative of Proposer Company
Date
EXHIBIT J - BIDDER DISCLOSURE STATEMENTS
The Bidder must provide a declarative (yes/no) answer regarding the following questions. If any answer
is affirmative, the Bidder must provide full details about the matter. While not an automatic cause for
disqualification, an affirmative answer may result in an evaluation of the Bidder's responsibility. A
decision will then be made based on the seriousness of the matter, the matter's possible impact on the
performance of the contract, and the best interests of the South Tahoe Public Utility District.
Within the past five (5)years:
ITEM DISCLOSURE STATEMENT YES NO
A. Has the Bidder and/or subject company had a contract terminated for
default or cause?
B. Has the Bidder and/or subject company been assessed any penalties,
including liquidated damages, under any of its existing or past contracts
with any organization or governmental entity?
C. Has the Bidder and/or subject company been the subject of any
governmental action limiting the right of the Bidder and/or subject
company to do business with that entity or any other governmental entity?
D. Has trading in the stock of the subject company ever been suspended? Give
date and explanation.
E. Has the Bidder and/or subject company previously operated as a like-kind
business under any other business name and/or taxpayer identification
number?
F. Has the Bidder and/or subject company, any company officer,or any owner
of a twenty (20%) percent interest or greater in the subject company, filed
bankruptcy, reorganization, a debt arrangement, moratorium, or any
proceeding under any bankruptcy or insolvency law, or any dissolution or
liquidation proceeding?
27
G. Has the Bidder and/or subject company, any company officer,or any owner
of a twenty (20%) percent interest or greater in the company, been
convicted of a felony or is currently under indictment on any felony charge?
By the signature affixed to Exhibit E—Offer Signature/Cover Page of this Solicitation, Respondent hereby
certifies that the above information is true and accurate.
This completed form must be returned as part of the bid response. Failure to complete this page may
deem your bid not responsive.
EXHIBIT K— CLIENT REFERENCES
The following is a list of four (4) references that most closely reflect similar projects to the scope of
services/work of the South Tahoe Public Utility District within the past three (3)years. References will be
asked to complete a questionnaire and asked to return it to the Information Technology Department
directly by a designated date and time. It is the Respondent's responsibility to ensure that Reference
Contacts are willing to provide a reference. To expedite the evaluation process the District requests
accurate email and/or fax number information be provided.
Reference#1
Name of Organization:
Address:
Email Address: Fax:
Telephone: Contact Name:
Contact Title: Service Dates:
Project Manager: Bid No. (if applicable)
Summary of Project:
Project Cost:
Reference#2
Name of Organization:
28
Address:
Email Address: Fax:
Telephone: Contact Name:
Contact Title: Service Dates:
Project Manager: Bid No. (if applicable)
Summary of Project:
Project Cost:
Reference#3
Name of Organization:
Address:
Email Address: Fax:
Telephone: Contact Name:
Contact Title: Service Dates:
Project Manager: Bid No. (if applicable)
Summary of Project:
Project Cost:
Reference#4
Name of Organization:
Address:
29
Email Address: Fax:
Telephone: Contact Name:
Contact Title: Service Dates:
Project Manager: Bid No. (if applicable)
Summary of Project:
Project Cost:
EXHIBIT L - DEVIATIONS and/or EXCEPTIONS FORM
[ ]Specifications and/or Requirements
[ ] Contract for Services Provisions (No exceptions and/or deviations to insurance requirements allowed)
All deviations and/or exceptions to the requirements of this solicitation or provisions in the Master
Agreement for Consulting Services must be noted below. The District will consider any deviations and/or
exceptions indicated in its award decisions. The District reserves the right to accept or reject any and all
responses based on any deviation and/or exception indicated on this form. Respondents are cautioned
that by taking any exception they may be materially deviating from the RFP. Please do not attach a
company letterhead in lieu of any entry on the section below. In the absence of any entry on the section
below, the bidder assures the District of their full compliance with the specification and conditions as
listed in this solicitation. The page number, paragraph, and item number should be referenced when
deviating from the specification and must be included.
The District reserves the right to reject any or all cost proposals as a result of this RFP and to waive any
informality or irregularity in any bid proposal received and to be the sole judge of the merits of the
respective cost proposals received, and to accept or further negotiate cost, terms, or conditions of any
cost proposal determined by the District to be in the best interest of the District even though not the
lowest bid.This form may be duplicated if additional pages are needed.
Reference No. Description
30
Company Name
Printed Name and Title
Authorized Signature
EXHIBIT M - SUBCONTRACTOR STATEMENT
(IMPORTANT NOTE: This form MUST be returned with Respondent's bid proposal)
(This form may be duplicated to provide additional subcontractor information)
The Prime Contractor is required to state the name and address of each subcontractor who will perform
work in an amount in excess of one-half of one percent (0.5%) of the total contract price and the portion
of the work that each subcontractor will do.The undersigned submits herewith this list of subcontractors
whom they propose to employ on the work, with the proper firm name and business address of each and
a statement of work or proposed item that will be done by each subcontractor.
Check if Subcontractor will be used: Yes [ ] No [ ]
The following person(s)will be [ ] or [ ] have been contracted to furnish labor and/or materials for this
project:
Subcontractor Company Name:
DIR Contractor Registration Number:
Federal ID Number:
Street Address:
District, State, Zip:
Office Phone: Fax Number:
31
Primary Contact&Title:
Email Address:
Contract Amount:
Type of work:
[ ] Brickwork/ Masonry [ ] Carpentry/ Millwork [ ] Concrete
[ ] Electrical—Access Control [ ] Electrical—Fire Alarm [ ] Electrical—Telecommunications
[ ] Elevator [ ] Excavation—Grading [ ] Excavation—Grading (Site Utilities)
[ ] Fire Protection [ ] Flooring [ ] Heavy Construction
[ ] HVAC—Controls [ ] HVAC—Duckwork [ ] HVAC—Hydronic
[ ] Landscaping [ ] Painting [ ] Paving
[ ] Plumbing [ ] Roofing/Siding/ [ ] Windows/Curtainwall
Sheet Metal
[ ] Wrecking/Demolition [ ] Material Supplier Only [ ] Other: Specify
Comments:
Authorized Signature:
Printed Name/Title:
EXHIBIT N - MASTER AGREEMENT FOR CONSULTING SERVICES
Provided in separate document
32