082423STPUD QUICK LOG
Day & Date: '%c J 0_01_5
Transcribe
Yes X No
Project: Secondary Clarifier #2 Rehabilitation Project
Contractor: T&S Construction
Todav's Weather Forecast: Chance of Precipitation:— %
Crews and Equipment on site:
_ Superintendent
Foreman blt *,A)
Electrician
C—Huvc uave croon, Anay ouur i, i cart'
c EEG CQ e"r 3 L, h Qp?_CA'S
EQUIPMENT
Case CX80 Excavator
_ Portable Fuel Cell (1000 Gallon)
_ Work Truck %z Ton
Kobelco CK1100G Crane
Operator
Operator/Laborer
Inspector: a / u:.L
�•• 40 7,1
S Laborer um/ s�
Truck Driver
_ Bobcat Skidsteer T300 _ Ditch Witch FX25 Vac Tailer
_ Portable Light Tower/Power Plant Vacuum Truck
Work truck 1 Ton Ram Super HD Water Buffalo
Air Comp C185 49HP (Doosan) Volvo H091 Loader
Contractor Requests (shutdowns, pours, etc.).
Tests Performed:
N W
Potential Chanqe Order Items/T&M:
N (A -
Work Completed Todav:
YlS" 37J S'rk c. c., FIE UIL w% k T r%02 C L-4Y''Er&%t. P Ls� JL
Cc'"c,--cRFri : APSla[c-
rR 2.�.( 3 t l=
FNs- f'
G *,AWD
<[S r ArA
0jk3 e_g;vT 1' Coc�J
ycsye'RDky, wcGL.
JedQ&WAC�
3r4 .6.
Notes: (Victors, Incidents, Accidents):
NlA-"
1