Loading...
110123STPUD QUICK LOG Day & Date: ld"i.'L, 'Awl V)'s Project: Secondary Clarifier #2 Rehabilitation Project Contractor: T&S Construction ��%%% T%odav''s Weather Fore`cast: Chance /o`f Pre/jcipitatipon: �_ % Transcribe: Yes X No Inspector: G Butz Crews and Eauir)ment on site.: L/ Superintendent ir.� n _ Operator Laborer +� Foreman/)"Wf-au- :F-d _ Operator/Laborer Truck Driver Electrician ICHOR: Dave Boon, Andy Boon, Tony EQUIPMENT _ Ditch Witch FX25 Vac Tailer —Portable Fuel Cell (1000 Gallon) _ Portable Light Tower/Power Plant Work truck 1 Ton Ram Super HD —Water Buffalo G..Cn�e - Air Comp C185 49HP (Doosan) olvo H091 Loader �•crx�rc���- Contractor Requests (shutdowns, pours. etc.): Tests Performed: /0/)�_ Potential Chanae Order Items/T&M: Work Comoleted Todav: Gr9��lr.•�� ,hty�.�ry.N..A+� rx•.+�3i1,� err,+•;�` �f7` � Notes: (Vistors. Incidents. Acpidpnts): VIA 1