Loading...
2024.08.15 District Board Agenda Packet 8-15-24 SOUTH TAHOE PUBLIC UTILITY DISTRICT REGULAR BOARD MEETING AGENDA Thursday, August 15, 2024 - 2:00 p.m. District Board Room 1275 Meadow Crest Drive, South Lake Tahoe, California David Peterson, President BOARD MEMBERS Kelly Sheehan, Director Nick Haven, Director Shane Romsos, Vice President Nick Exline, Director Paul Hughes, General Manager Andrea Salazar, Chief Financial Officer 1. CALL TO ORDER REGULAR MEETING – PLEDGE OF ALLEGIANCE (At this time, please silence phones and other electronic devices so as not to disrupt the business of the meeting.) 2. COMMENTS FROM THE PUBLIC (This is an opportunity for members of the public to address the Board on any short non-agenda items that are within the subject matter jurisdiction of the District. No discussion or action can be taken on matters not listed on the agenda, per the Brown Act. Each member of the public who wishes to comment shall be allotted five minutes.) 3. CORRECTIONS TO THE AGENDA OR CONSENT CALENDAR (For purposes of the Brown Act, all Action and Consent items listed give a brief description of each item of business to be transacted or discussed. Recommendations of the staff, as shown, do not prevent the Board from taking other action.) 4. ADOPTION OF CONSENT CALENDAR (Any item can be removed to be discussed and considered separately upon request. Comments and questions from members of the public, staff or Board can be taken when the comment does not necessitate separate action.) 5. CONSENT ITEMS BROUGHT FORWARD FOR SEPARATE DISCUSSION/ACTION 6. PRESENTATION: ENS Resources Legislative Update (David French, Senior Vice President) 7. ITEMS FOR BOARD ACTION a. Water Supply Master Plan (Mark Seelos, Water Resources Manager) (1) Approve the proposed Scope of Work for Carollo Consultants to develop the District’s Water Supply Master Plan; and (2) Authorize the General Manager to execute Task Order No. 33 with Carollo Consultants for Tasks 1 and 2, totaling $229,983. b. Paloma Well and Keller Booster Station Backup Power Project (Mark Seelos, Water Resources Manager and Trevor Coolidge, Senior Engineer) (1) Find minor irregularities in the bid from White Rock Construction, Inc. to be immaterial, and waive minor irregularities; and (2) Award the project to the lowest responsive, responsible bidder, White Rock Construction, Inc., in the amount of $228,700. REGULAR BOARD MEETING AGENDA – August 15, 2024 PAGE – 2 8. STANDING AND AD-HOC COMMITTEES AND LIAISON REPORTS (Discussions may take place; however, no action will be taken.) 9. BOARD MEMBER REPORTS (Discussions may take place; however, no action will be taken.) 10. STAFF/ATTORNEY REPORTS (Discussions may take place; however, no action will be taken.) 11. GENERAL MANAGER REPORT (Discussion may take place; however, no action will be taken.) 12. NOTICE OF PAST AND FUTURE MEETINGS/EVENTS Past Meetings/Events 08/01/2023 – 2:00 p.m. Regular Board Meeting at the District 08/14/2024 – 10:00 a.m. El Dorado Water Agency Meeting in Placerville 08/14/2024 – 9:00 a.m. Tahoe Summit at Roundhill Pines Resort Future Meetings/Events 09/02/2024 – Labor Day Holiday District Offices Closed 09/05/2024 - 2:00 p.m. Regular Board Meeting at the District ADJOURNMENT (The next Regular Board Meeting is Thursday, September 5, 2024, at 2:00 p.m.) The South Tahoe Public Utility District Board of Directors regularly meets the first and third Thursday of each month. A complete Agenda packet is available for review at the meeting and at the District office during the hours of 8:00 a.m. and 5:00 p.m., Monday through Friday. A recording of the meeting is retained for 30 days after Minutes of the meeting have been approved. Items on the Agenda are numbered for identification purposes only and will not necessarily be considered in the order in which they appear. Designated times are for particular items only. Public Hearings will not be called to order prior to the time specified, but may occur slightly later than the specified time. Public participation is encouraged. Public comments on items appearing on the Agenda will be taken at the same time the Agenda items are heard; comments should be brief and directed to the specifics of the item being considered. Please provide the Clerk of the Board with a copy of all written materials presented at the meeting. Comments on items not on the Agenda can be heard during “Comments from the Audience;” however, action cannot be taken on items not on the Agenda. Backup materials relating to an open session item on this Agenda, which are not included with the Board packet, will be made available for public inspection at the same time they are distributed or made available to the Board, and can be viewed at the District office, at the Board meeting and upon request to the Clerk of the Board. The meeting location is accessible to people with disabilities. Every reasonable effort will be made to accommodate participation of the disabled in all of the District’s public meetings. If particular accommodations are needed, please contact the Clerk of the Board at (530) 544-6474, extension 6203. All inquiries must be made at least 48 hours in advance of the meeting. REGULAR BOARD MEETING AGENDA – August 15, 2024 PAGE – 3 SOUTH TAHOE PUBLIC UTILITY DISTRICT CONSENT CALENDAR Thursday, August 15, 2024 ITEMS FOR CONSENT a. WINTER STORMS EMERGENCY RESPONSE (Paul Hughes, General Manager) Pursuant to Public Contract Code Section 22050(c), terminate the emergency action to respond to the Winter Storms Emergency pursuant to Resolution No. 3242-23. b. JUNE 30, 2024, PRELIMINARY FISCAL YEAR END FINANCIAL STATEMENTS (Andrea Salazar, Chief Financial Officer) Receive and file the June 30, 2024, Preliminary Income Statement and Balance Sheet Reports. c. CAPITAL OUTLAY ROLLOVER ACCOUNTS (Greg Dupree, Accounting Manager) Authorize staff to direct rollover funds budgeted in 2023/2024 fiscal year to the 2024/2025 fiscal year. d. 2025 KEYS CAST-IN-PLACE SEWER REHABILITATION (Trevor Coolidge, Senior Engineer and Julie Ryan, Engineering Department Manager) 1) Approve the proposed Scope of Work from DOWL for engineering services; and 2) Authorize the General Manger to execute Task Order No. 3 to the Master Services Agreement with DOWL in the amount $173,827. e. RECEIVE AND FILE PAYMENT OF CLAIMS (Greg Dupree, Accounting Manager) Receive and file Payment of Claims in the amount of $3,594,762.15 f. REGULAR BOARD MEETING MINUTES: August 1, 2024 (Melonie Guttry, Executive Services Manager/Clerk of the Board) Approve August 1, 2024, Minutes BOARD AGENDA ITEM 4a TO: Board of Directors FROM: Paul Hughes, General Manager MEETING DATE: August 15, 2024 ITEM – PROJECT NAME: Winter Storms Emergency Response REQUESTED BOARD ACTION: Pursuant to Public Contract Code Section 22050(c), terminate the emergency action to respond to the Winter Storms Emergency pursuant to Resolution No. 3242-23. DISCUSSION: The Board declared the Winter Storms Emergency Response as an emergency on March 16, 2023. Repairs from the Winter Storms are now complete. Public Contract Code Section 22050(c) requires the Board to review the emergency action at every Board meeting thereafter until the emergency action is terminated. The Board must determine by a 4/5 vote that there is a need to continue or terminate the emergency action. SCHEDULE: N/A COSTS: $1,400,000 ACCOUNT NO: N/A BUDGETED AMOUNT AVAILABLE: N/A ATTACHMENTS: N/A ___________________________________________________________________________________ CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer/Water GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO General Manager Paul Hughes Directors Nick Haven Shane Romsos David Peterson Kelly Sheehan Nick Exline BOARD AGENDA ITEM 4b TO: Board of Directors FROM: Andrea Salazar, Chief Financial Officer MEETING DATE: August 15, 2024 ITEM – PROJECT NAME: June 30, 2024, Preliminary Fiscal Year End Financial Statements REQUESTED BOARD ACTION: Receive and file the June 30, 2024, Preliminary Income Statement and Balance Sheet Reports. DISCUSSION: The District auditors Mann, Urrutia, Nelson CPA’s and Associates recommend that the District’s quarterly financial statements be placed on the Board meeting Agenda for receipt and file by the Board of Directors. Attached are the June 30, 2024, preliminary fiscal year-end income statements and balance sheet for the water and sewer funds. The auditors will conduct their field work in September 2024 and the final year-end financial statements are expected to be complete by mid- November, followed by the auditor’s report to the Finance Committee and Board of Directors in December 2024. Revenue Analysis Water and sewer service charge revenues through the fourth quarter ending June 30, 2024, are at 99% and 101% of budget. With lower consumption of water throughout the year, the water service charges are below budget by $169,230. Other revenues included in the category “Charges for Sales and Services” include capacity fees and permit fees, the majority of which are collected at either the beginning or end of the fiscal year, during construction season. Water and sewer connection and service fees are at 101% and 59% of budget as of June 30, 2024. As has been projected, sewer connection and services fees ended the year approximately $338,000 below budget and have been projected to decrease 10% annually in outyears to account for a declining inventory of buildable lots in the District’s service area. Combined water and sewer tax revenue is at approximately 104% of budget, ($493,804 greater) with the April receipt due to actual property transfers being grater than El Dorado county estimated. General Manager Paul Hughes Directors Nick Haven Shane Romsos David Peterson Kelly Sheehan Nick Exline Andrea Salazar August 15, 2024 Page 2 As in past years, total investment earnings reflected on the preliminary June 30, 2024 statements are currently well over budget due to the reversal of the prior year-end fair market value adjustments, the not yet recorded Governmental Accounting Standards Board fair market value adjustments for the current fiscal year; both which are non-cash or otherwise “book value” required adjustments. In addition, the California Asset Management Program interest allocation is pending. Typically, grant revenues are negative in the first few months of the year due to the reversal of year-end accrual adjustments. This will normalize throughout the year as grant revenue is recognized and reconciled for the fiscal year as can be seen in the Water Fund for this period. Combined other operating and nonoperating revenues are at 128% of budget. These revenues are received sporadically throughout the year unlike service charges and as such there are no percentage expectations at quarter-end or year-end. Expense Analysis Water and sewer operating expenses less depreciation through June 30, 2024, are at 84.2% and 100% of budget. Depreciation is a non-cash entry and is generally excluded when comparing actual to budget figures. With the financial statements being at a preliminary status additional expense accruals may occur as deemed appropriate for closing the fiscal year. Water and sewer capital outlay spending through June 30, 2024, is $8.1 million and $6.6 million representing 48% and 31% of budget. Most of these expenditures are incurred at the beginning and end of the fiscal year, during construction season. At the end of the fiscal year an analysis is performed to determine the status of projects and the potential need to roll budgeted funds into the next year for incomplete projects, or to increase capital reserves for future use. The capital outlay rollover amounts have been determined and are expected to be approved by the Board at the August 15, 2024, regular meeting. The amounts requested to be rolled into fiscal year 2024/25 are $12 million in the Sewer fund and $3.8 million in the Water fund. Recommendation District staff recommends the Board receive and file the attached preliminary June 30, 2024, income statements and balance sheet as presented. SCHEDULE: N/A COSTS: N/A ACCOUNT NO: N/A BUDGETED AMOUNT AVAILABLE: N/A ATTACHMENTS: June 30, 2024 Preliminary Fiscal Year End Financial Statements __________________________________________________________________________________ CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer/Water GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO Fund Category Proprietary Funds Fund Type Enterprise Funds Fund 10 - Sewer Fund Operating Revenue Charges for sales and services Service charges 18,033,500.00 1,709,006.43 18,270,065.60 (236,565.60)101 16,655,398.80 Connection and service fees 824,227.00 57,861.36 485,859.60 338,367.40 59 722,871.74 Other operating income 484,750.00 24,265.92 595,674.01 (110,924.01)123 356,086.65 Charges for sales and services Totals $19,342,477.00 $1,791,133.71 $19,351,599.21 ($9,122.21)100%$17,734,357.19 Operating Revenue Totals $19,342,477.00 $1,791,133.71 $19,351,599.21 ($9,122.21)100%$17,734,357.19 Non Operating Revenue Tax revenue 7,828,100.00 .00 8,383,986.56 (555,886.56)107 8,808,823.33 Investment earnings 305,000.00 .78 662,415.16 (357,415.16)217 358,595.97 Aid from governmental agencies 1,029,000.00 304,507.71 (340,067.26)1,369,067.26 (33)795,803.13 Other nonoperating income 32,000.00 (4,653.99)177,016.90 (145,016.90)553 71,889.47 Non Operating Revenue Totals $9,194,100.00 $299,854.50 $8,883,351.36 $310,748.64 97%$10,035,111.90 Operating Expenses Wages Full Time 8,402,170.00 1,130,647.54 8,100,066.92 302,103.08 96 7,141,549.56 Wages Part-Time 170,300.00 21,849.14 134,517.01 35,782.99 79 61,937.39 Benefits 4,395,164.00 345,412.24 3,667,533.10 727,630.90 83 4,374,498.28 Depreciation and amortization 5,643,000.00 485,966.08 5,732,978.61 (89,978.61)102 5,762,984.50 Utilities 3,031,030.00 477,069.81 3,643,246.82 (612,216.82)120 3,035,856.95 Repairs and maintenance 1,392,559.00 187,565.42 1,492,039.93 (99,480.93)107 1,694,539.49 Other operating expenses 3,848,796.00 445,424.15 4,242,739.65 (393,943.65)110 4,504,100.71 Operating Expenses Totals $26,883,019.00 $3,093,934.38 $27,013,122.04 ($130,103.04)100%$26,575,466.88 Nonoperating Expenses Debt Service - Net 2,806,220.00 .00 .00 2,806,220.00 0 .00 Interest expense 428,115.00 201,034.54 435,002.30 (6,887.30)102 510,224.03 Other expense 746,556.00 4,609.08 747,549.23 (993.23)100 788,640.45 Nonoperating Expenses Totals $3,980,891.00 $205,643.62 $1,182,551.53 $2,798,339.47 30%$1,298,864.48 Capital Outlay Expenditures 21,540,788.00 1,696,743.74 6,651,634.39 14,889,153.61 31 (1.00) Fund 10 - Sewer Fund Totals REVENUE TOTALS 28,536,577.00 2,090,988.21 28,234,950.57 301,626.43 99%27,769,469.09 EXPENSE TOTALS 52,404,698.00 4,996,321.74 34,847,307.96 17,557,390.04 66%27,874,330.36 Fund 10 - Sewer Fund Net Gain (Loss)($23,868,121.00)($2,905,333.53)($6,612,357.39)$17,255,763.61 28%($104,861.27) Page 1 of 3Run by Andrea Salazar on 07/29/2024 10:13:19 AM Income Statement Through 06/30/24 Summary Listing Annual MTD YTD Budget Less % of Prior Year Budget Amount Actual Amount Actual Amount YTD Actual Budget Total ActualClassification Fund Category Proprietary Funds Fund Type Enterprise Funds Fund 20 - Water Fund Operating Revenue Charges for sales and services Service charges 15,248,000.00 1,463,449.50 15,078,769.48 169,230.52 99 13,758,694.67 Connection and service fees 671,000.00 85,989.91 675,406.52 (4,406.52)101 1,380,222.65 Other operating income 225,000.00 31,346.60 272,866.51 (47,866.51)121 268,517.71 Charges for sales and services Totals $16,144,000.00 $1,580,786.01 $16,027,042.51 $116,957.49 99%$15,407,435.03 Operating Revenue Totals $16,144,000.00 $1,580,786.01 $16,027,042.51 $116,957.49 99%$15,407,435.03 Non Operating Revenue Tax revenue 3,354,900.00 .00 3,292,817.75 62,082.25 98 2,601,965.98 Investment earnings 80,000.00 89.47 295,275.73 (215,275.73)369 102,240.17 Aid from governmental agencies 4,245,787.00 126,214.90 404,343.17 3,841,443.83 10 331,287.32 Other nonoperating income 266,000.00 46,948.82 252,829.88 13,170.12 95 303,472.88 Non Operating Revenue Totals $7,946,687.00 $173,253.19 $4,245,266.53 $3,701,420.47 53%$3,338,966.35 Operating Expenses Wages Full Time 5,577,004.00 769,389.97 5,189,765.17 387,238.83 93 4,222,721.34 Wages Part-Time 249,500.00 24,213.06 215,466.03 34,033.97 86 116,748.08 Benefits 2,799,169.00 220,532.23 2,284,651.22 514,517.78 82 2,557,694.80 Depreciation and amortization 4,711,000.00 413,626.83 4,789,873.77 (78,873.77)102 4,690,299.81 Utilities 1,358,780.00 88,709.08 1,390,302.27 (31,522.27)102 1,037,708.78 Repairs and maintenance 2,418,701.00 295,194.67 2,646,198.60 (227,497.60)109 2,090,194.68 Other operating expenses 3,908,267.00 220,075.28 2,014,874.99 1,893,392.01 52 1,793,928.59 Operating Expenses Totals $21,022,421.00 $2,031,741.12 $18,531,132.05 $2,491,288.95 88%$16,509,296.08 Nonoperating Expenses Debt Service - Net 927,974.00 58,385.26 58,385.26 869,588.74 6 .00 Interest expense 311,530.00 116,256.43 357,676.44 (46,146.44)115 322,967.47 Other expense 47,530.00 1,347.13 31,729.49 15,800.51 67 53,063.73 Nonoperating Expenses Totals $1,287,034.00 $175,988.82 $447,791.19 $839,242.81 35%$376,031.20 Capital Outlay Expenditures 16,750,473.00 2,836,802.06 8,114,096.19 8,636,376.81 48 3.00 Fund 20 - Water Fund Totals REVENUE TOTALS 24,090,687.00 1,754,039.20 20,272,309.04 3,818,377.96 84%18,746,401.38 EXPENSE TOTALS 39,059,928.00 5,044,532.00 27,093,019.43 11,966,908.57 69%16,885,330.28 Fund 20 - Water Fund Net Gain (Loss)($14,969,241.00)($3,290,492.80)($6,820,710.39)$8,148,530.61 46%$1,861,071.10 Fund Type Enterprise Funds Totals REVENUE TOTALS 52,627,264.00 3,845,027.41 48,507,259.61 4,120,004.39 92%46,515,870.47 EXPENSE TOTALS 91,464,626.00 10,040,853.74 61,940,327.39 29,524,298.61 68%44,759,660.64 Page 2 of 3Run by Andrea Salazar on 07/29/2024 10:13:19 AM Income Statement Through 06/30/24 Summary Listing Annual MTD YTD Budget Less % of Prior Year Budget Amount Actual Amount Actual Amount YTD Actual Budget Total ActualClassification Fund Category Proprietary Funds Fund Type Enterprise Funds Net Gain (Loss)($38,837,362.00)($6,195,826.33)($13,433,067.78)$25,404,294.22 35%$1,756,209.83 Fund Category Proprietary Funds Totals REVENUE TOTALS 52,627,264.00 3,845,027.41 48,507,259.61 4,120,004.39 92%46,515,870.47 EXPENSE TOTALS 91,464,626.00 10,040,853.74 61,940,327.39 29,524,298.61 68%44,759,660.64 Fund Category Proprietary Funds Net Gain (Loss)($38,837,362.00)($6,195,826.33)($13,433,067.78)$25,404,294.22 35%$1,756,209.83 Grand Totals REVENUE TOTALS 52,627,264.00 3,845,027.41 48,507,259.61 4,120,004.39 92%46,515,870.47 EXPENSE TOTALS 91,464,626.00 10,040,853.74 61,940,327.39 29,524,298.61 68%44,759,660.64 Grand Total Net Gain (Loss)($38,837,362.00)($6,195,826.33)($13,433,067.78)$25,404,294.22 35%$1,756,209.83 Page 3 of 3Run by Andrea Salazar on 07/29/2024 10:13:19 AM Income Statement Through 06/30/24 Summary Listing Annual MTD YTD Budget Less % of Prior Year Budget Amount Actual Amount Actual Amount YTD Actual Budget Total ActualClassification Current YTD Prior Year Classification Balance Total Actual Net Change Change % Fund Category Proprietary Funds Fund Type Enterprise Funds ASSETS Current Assets Cash and Cash Equivalents 11,895,103.96 11,424,786.58 470,317.38 4.12 Investments 909,807.73 1,801,341.55 (891,533.82)(49.49) Accounts Receivable 5,216,678.80 3,296,500.90 1,920,177.90 58.25 Current Lease Receivable 77,682.00 77,682.00 .00 .00 Due From Governmental Agencies 569,064.95 2,566,243.62 (1,997,178.67)(77.82) Property Tax Receivable .00 10,775,917.00 (10,775,917.00)(100.00) Interest Receivable 9,783.73 205,572.47 (195,788.74)(95.24) Other Current Assets 1,470,625.80 1,380,044.28 90,581.52 6.56 Current Assets Totals $20,148,746.97 $31,528,088.40 ($11,379,341.43)(36.09%) Noncurrent Assets Restricted Assets Cash and Cash Equivalents 117,973.24 117,092.83 880.41 .75 Certificate of Deposit 165,000.00 165,000.00 .00 .00 Restricted Assets Totals $282,973.24 $282,092.83 $880.41 0.31% Long-Term Accounts Receivable 229,526.39 739,191.40 (509,665.01)(68.95) Long Term Lease Receivable 1,694,535.44 1,694,535.44 .00 .00 Subscription Assets 58,890.00 58,890.00 .00 .00 Due From Other Governmental Agencies 146,040.00 146,040.00 .00 .00 Investments 27,335,248.58 25,449,021.02 1,886,227.56 7.41 Capital Assets 221,059,057.10 220,930,399.53 128,657.57 .06 Construction in Progress 16,887,843.02 20,620,819.69 (3,732,976.67)(18.10) Noncurrent Assets Totals $267,694,113.77 $269,920,989.91 ($2,226,876.14)(0.83%) Deferred Outflows of Resources Refunding Loan Costs 56,225.80 80,028.89 (23,803.09)(29.74) Changes in the Pension Liability 7,267,704.00 7,267,704.00 .00 .00 Deferred Outflows of Resources Totals $7,323,929.80 $7,347,732.89 ($23,803.09)(0.32%) ASSETS TOTALS $295,166,790.54 $308,796,811.20 ($13,630,020.66)(4.41%) LIABILITIES AND FUND EQUITY LIABILITIES Current Liabilities Accounts Payable and Other Liabilities 4,591,866.74 3,686,947.06 904,919.68 24.54 Unearned Revenue 17,337.00 11,005.00 6,332.00 57.54 Accrued Expenses 695,138.34 1,509,625.66 (814,487.32)(53.95) Accrued Interest Payable 334,281.60 313,185.76 21,095.84 6.74 Compensated Absences 1,943,675.76 1,924,305.89 19,369.87 1.01 Long Term Liabilities - Current Portion 3,473,237.63 3,473,237.63 .00 .00 Page 1 of 2Run by Andrea Salazar on 07/29/2024 10:14:54 AM Balance Sheet Through 06/30/24 Consolidated Summary Listing Current YTD Prior Year Classification Balance Total Actual Net Change Change % Fund Category Proprietary Funds Fund Type Enterprise Funds LIABILITIES AND FUND EQUITY LIABILITIES Current Liabilities Subscription Liabilities 13,630.00 13,630.00 .00 .00 Current Liabilities Totals $11,069,167.07 $10,931,937.00 $137,230.07 1.26% Noncurrent Liabilities Compensated Absences - Long Term Portion 871,815.89 873,854.37 (2,038.48)(.23) Long Term Liabilities - Long Term Portion 57,455,603.97 47,711,061.62 9,744,542.35 20.42 Net Pension Liability 14,442,141.00 14,442,141.00 .00 .00 Noncurrent Liabilities Totals $72,769,560.86 $63,027,056.99 $9,742,503.87 15.46% Deferred Inflows of Resources Property Tax Receivable .00 10,775,917.00 (10,775,917.00)(100.00) Lease Receivable 1,702,908.20 1,702,908.20 .00 .00 Changes in Net Pension Liabilty 470,114.00 470,114.00 .00 .00 Deferred Inflows of Resources Totals $2,173,022.20 $12,948,939.20 ($10,775,917.00)(83.22%) LIABILITIES TOTALS $86,011,750.13 $86,907,933.19 ($896,183.06)(1.03%) FUND EQUITY Restricted for capital asset purchases 117,306,067.16 117,306,067.16 .00 .00 Unrestricted 105,286,819.59 104,582,810.85 704,008.74 .67 FUND EQUITY TOTALS Prior to Current Year Changes $222,592,886.75 $221,888,878.01 $704,008.74 0.32% Prior Year Fund Equity Adjustment .00 .00 Fund Revenues (48,502,481.05).00 Fund Expenses 61,940,327.39 .00 FUND EQUITY TOTALS $209,155,040.41 $221,888,878.01 ($12,733,837.60)(5.74%) LIABILITIES AND FUND EQUITY $295,166,790.54 $308,796,811.20 ($13,630,020.66)(4.41%) Fund Type Enterprise Funds Totals $0.00 $0.00 $0.00 +++ Fund Category Proprietary Funds Totals $0.00 $0.00 $0.00 +++ Grand Totals $0.00 $0.00 $0.00 +++ Page 2 of 2Run by Andrea Salazar on 07/29/2024 10:14:55 AM Balance Sheet Through 06/30/24 Consolidated Summary Listing BOARD AGENDA ITEM 4c TO: Board of Directors FROM: Greg Dupree, Accounting Manager MEETING DATE: August 15, 2024 ITEM – PROJECT NAME: Capital Outlay Rollover Accounts REQUESTED BOARD ACTION: Authorize staff to direct rollover funds budgeted in 2023/2024 fiscal year to the 2024/2025 fiscal year. DISCUSSION: Each year budgeted funds that were not expended on capital projects, that will be needed to complete these projects in the new fiscal year, are transferred (or rolled over) from the old budget to the new one. The attached spreadsheet lists, by fund and department, the various rollovers and transfers of eligible amounts from fiscal year 2023/2024 projects for fiscal year 2024//2025 projects. SCHEDULE: N/A COSTS: As listed on accompanying list ACCOUNT NO: As listed on accompanying list BUDGETED AMOUNT AVAILABLE: As listed on accompanying list ATTACHMENTS: Capital Outlay Account Rollover Spreadsheet ___________________________________________________________________________________ CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer/Water GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO General Manager Paul Hughes Directors Nick Haven Shane Romsos David Peterson Kelly Sheehan Nick Exline DEPARTMENT ACCOUNT DESCRIPTION AMOUNT 12 - Operations 8204 Replace Chemical Storage Tank $40,000 12 - Operations 8209 Aeration Basin #1 Dissolved Oxygen Control Instrument $15,000 12 - Operations 8324 Replace Hypo Pumps $15,000 12 - Operations 8400 Replace Polymer Pump $40,000 12 - Operations 8401 30" ERB Valve $20,000 12 - Operations 8402 Returned Activated Sludge Line Rehab $67,000 12 - Operations 8403 10" #3 Water Meter $5,000 12 - Operations 8404 4" Portable Pump $60,000 12 - Operations 8470 Replace Aeration Basin Waterline $100,000 14 - Electric 8008 Plant Secondary/Final Effluent Motor Rebuild $40,000 14 - Electric 8201 Replace VFD SPS (TBD)$30,300 14 - Electric 8309 Replace WWTP Voice Radio/Handsets $40,000 14 - Electric 8423 Pump Station PLC's $5,000 16 - Heavy Maintenance 8196 Rebuild Biosolids Sludge Pump $12,000 16 - Heavy Maintenance 8197 Replace Roll Up Door $12,000 16 - Heavy Maintenance 8336 ERB Repairs $30,000 16 - Heavy Maintenance 8337 Pond 2 SUMP Pump $12,314 16 - Heavy Maintenance 8338 Final/Secondary Pump Rebuilds $40,000 16 - Heavy Maintenance 8343 Rebuild Liners for Sludge Augers $20,000 16 - Heavy Maintenance 8398 New Filter Valves $21,700 16 - Heavy Maintenance 8430 Bio Scrubber Media Replacement $20,000 16 - Heavy Maintenance 8431 Mist. Eliminator Media $20,000 16 - Heavy Maintenance 8432 South Road Gate $40,000 16 - Heavy Maintenance 8433 Engine Drive Welder $13,200 16 - Heavy Maintenance 8434 E.P. Station Roof $60,000 16 - Heavy Maintenance 8435 Bio Scrubber Chem. Pumps $25,000 16 - Heavy Maintenance 8437 16" Backwash Supply $16,000 16 - Heavy Maintenance 8438 ERB Repair Welder $10,000 16 - Heavy Maintenance 8471 Centrifuge Rebuild $50,000 16 - Heavy Maintenance 8472 New Scum Pump $30,000 16 - Heavy Maintenance 8488 Mobile Office Space - Trailer $25,000 22 - Underground Repair - Sewer 8394 Replace Hydraulic Jackhammer $5,000 22 - Underground Repair - Sewer 8395 Confined Space Equipment $17,500 22 - Underground Repair - Sewer 8397 Replace TV Cable $12,000 22 - Underground Repair - Sewer 8440 Line Locator $6,500 26 - Pumps 8212 Security Measures $19,000 26 - Pumps 8214 Replace Bijou SPS Pump #1 $25,000 26 - Pumps 8218 Confined Space Rescue Trailer/Equipment $6,300 26 - Pumps 8315 Rebuild LPPS Pumps #1 and #2 $136,200 26 - Pumps 8445 Replace Tallac #1 Pump/Motor $25,000 28 - Equipment Repair 8062 Carbon Monoxide Removal System $10,000 28 - Equipment Repair 8063 Replace Generator Fallen Leaf Lake Main Station $60,000 28 - Equipment Repair 8231 New 8" Godwin Pump, Pumps $80,000 28 - Equipment Repair 8232 Replace Engine/Transmission TBD $3,000 28 - Equipment Repair 8379 Replace Truck 59 $40,000 28 - Equipment Repair 8380 Replace Truck 2 $57,000 28 - Equipment Repair 8381 Replace Truck 19 $57,000 28 - Equipment Repair 8382 Replace Truck 14 $140,000 28 - Equipment Repair 8383 Replace Water Reuse Utility Vehicle $27,000 28 - Equipment Repair 8456 Replace #81 Skid Steer $62,400 28 - Equipment Repair 8457 Electrical - Boom Lift Truck $150,000 30 - Engineering 7055 Tahoe Keys Sewer PS Rehab $648,000 SEWER CAPITAL OUTLAY ACCOUNT ROLLOVERS From 2023-2024 to 2024-2025 Fiscal Year DEPARTMENT ACCOUNT DESCRIPTION AMOUNT 30 - Engineering 7056 Upper Truckee Sewer PS Rehab $2,551,400 30 - Engineering 7057 Luther Pass PS Tanks Rehab $520,890 30 - Engineering 7565 Storm Drain Relocates $10,000 30 - Engineering 7800 LPPS Pump Efficiency Monitoring $13,333 30 - Engineering 8058 Bijou PS Rehab $438,570 30 - Engineering 8090 Forcemain Bypass Tahoe Keys PS $37,550 30 - Engineering 8156 Blower System Upgrades $940,400 30 - Engineering 8159 Water Reuse Road Improvements $54,000 30 - Engineering 8162 Hay Barn, Water Reuse $358,680 30 - Engineering 8163 Sewer Field Communication Upgrades Phase 2 $61,239 30 - Engineering 8265 Bio Building HVAC Upgrades $6,000 30 - Engineering 8267 Server Room HVAC Upgrades $103,000 30 - Engineering 8276 Sewer System Access Imp Phase I $43,194 30 - Engineering 8277 Sewer Field Communication Upgrades Phase 3 $282,189 30 - Engineering 8278 LPPS Fuel Tank $105,358 30 - Engineering 8330 LPPS Power/Control Upgrade $26,900 30 - Engineering 8345 Water Reuse Dressler Ditch Erosion Control $397,000 30 - Engineering 8346 FM Inspection Ports - Bijou $103,000 30 - Engineering 8347 FM ARV Replacement $146,000 30 - Engineering 8349 HWY 50 - Ski Run to PT GM Replacement $258,000 30 - Engineering 8350 Fremont/HWY 50 GM Improvement $16,000 30 - Engineering 8354 WWTP UG Piping Access Improvement $159,000 30 - Engineering 8355 Mixed Liquor Splitter Box Rehab $69,395 30 - Engineering 8356 Emergency PS Wetwell Rehab $52,000 30 - Engineering 8357 AB Splitter Box Rehab $47,416 30 - Engineering 8358 Primary Effluent Junction Box Rehab $48,395 30 - Engineering 8360 SCADA Historian Upgrades $117,063 30 - Engineering 8362 Engineering Office Upgrades $218,507 30 - Engineering 8460 DVR Data Collection Improvements $52,000 30 - Engineering 8461 Keys CIPP Project $694,616 30 - Engineering 8462 Herbert Walkup Replacement $523,434 30 - Engineering 8464 Filters 3, 4 Rehab $878,641 30 - Engineering 8465 WWTP Electrical Submetering $38,000 30 - Engineering 8474 Upper Truckee River Gravity Main CIPP $52,000 30 - Engineering 8475 Montgomery Estates Easements CIPP $52,000 30 - Engineering 8478 WWTP Ballast Ponds $58,257 30 - Engineering 8480 Plant Electrical Upgrades $110,000 30 - Engineering 8486 FLL FM Shoreline Restoration $155,000 32 - Laboratory 8042 Replace Discreet Analyzer $75,000 32 - Laboratory 8311 Replace Hydrolab Data Sonde $10,000 32 - Laboratory 8419 Replace Raw Sampler $10,000 34 - Water Reuse 8302 Snowshoe Thompson II Ditch Piping $15,000 42 - Board of Directors 8289 Board Room Security Improvements $3,549 42 - Board of Directors 8418 Replace Boardroom Components $5,000 44 - Human Resources 8422 Replace Copier $15,000 56 - Information Technology 8188 Network/Equipment Improvements-SCADA $10,962 56 - Information Technology 8247 WWTP Access Controls, Ops/Shops $30,000 56 - Information Technology 8248 Remote SCADA Access $20,000 56 - Information Technology 8325 Virtual Server/Host $20,000 56 - Information Technology 8328 Finance System Enhancements $10,000 56 - Information Technology 8329 SQL Additional Licenses $10,000 56 - Information Technology 8331 Replace Domain Controller $10,000 SEWER (continued) CAPITAL OUTLAY ACCOUNT ROLLOVERS From 2023-2024 to 2024-2025 Fiscal Year DEPARTMENT ACCOUNT DESCRIPTION AMOUNT 56 - Information Technology 8406 Strategic Plan Implementation $20,000 56 - Information Technology 8410 IT Security Project $50,000 56 - Information Technology 8473 Radio System Upgrades $360,000 60 - Customer Service 8193 Customer Service Office Remodel $19,375 Total $13,013,727 SEWER (continued) CAPITAL OUTLAY ACCOUNT ROLLOVERS From 2023-2024 to 2024-2025 Fiscal Year DEPARTMENT ACCOUNT DESCRIPTION AMOUNT 14 - Electric 8310 Sunset Well - VFD, Pressure Trans, Enclosure $12,000 14 - Electric 8425 Pump Station PLC's $5,000 14 - Electric 8427 VFD Replacement $15,000 16 - Heavy Maintenance 8344 Admin Parking Lot Seal & Stripe $10,000 24 - Underground Repair - Water 8305 Replace Wacker $5,000 24 - Underground Repair - Water 8441 Vacuum - Standby Truck #61 $19,000 24 - Underground Repair - Water 8442 Valve Exercise Equipment $15,000 26 - Pumps 8393 Security Measures $26,500 26 - Pumps 8446 Filter Plant Pump #2 $6,000 26 - Pumps 8447 S.U.T. Spare Blower Unit $12,000 26 - Pumps 8448 Replace Boulder Mtn. Booster #1 Pump $15,000 26 - Pumps 8449 Flagpole Tank #2 Mixer System $11,000 26 - Pumps 8450 Forest Mtn. Tank Mixer System $11,000 26 - Pumps 8451 Iroquois Tank #1 Mixer System $11,000 26 - Pumps 8452 Iroquois Tank #2 Mixer System $11,000 26 - Pumps 8454 S.U.T. Epoxy Coated Pipe $25,000 26 - Pumps 8455 Flagpole Booster Flow Control Valve $12,000 28 - Equipment Repair 8243 Eq Repair Shop Improvements $2,454 28 - Equipment Repair 8388 Replace Truck Asset Mgmt Specialist $13,815 28 - Equipment Repair 8389 Replace Truck 46 $33,000 28 - Equipment Repair 8458 Replace Water Service Truck #77 $50,000 28 - Equipment Repair 8459 Replace Backhoe #48 $130,000 30 Engineering 7004 Valve & Hydrant Replacements $551,350 30 Engineering 7022 Keller Heavenly Water System Improvement $758,515 30 Engineering 7084 Lookout Tank Access Road $563,224 30 Engineering 7805 PRV, Washoan-Acoma $357,875 30 Engineering 8155 Water Field Communication Upgrades Phase 2 $44,451 30 Engineering 8266 Admin Building HVAC Upgrades $31,000 30 Engineering 8279 Meter Installations Final Phase $184,960 30 Engineering 8282 Apache Ave Waterline Improvements $344,774 30 Engineering 8284 Water Field Communication Upgrades Phase 3 $300,443 30 Engineering 8285 Elks Club Well Pump/Motor Replacement $258,000 30 Engineering 8367 Park Ave #1 WL $24,948 30 Engineering 8368 Pioneer Tr WL Impr. - Larch to Ski Run $101,500 30 Engineering 8369 Keller BS Generator $124,890 30 Engineering 8370 Paloma Well Generator $61,900 30 Engineering 8371 Al Tahoe Well Rehab $284,562 30 Engineering 8373 Bayview Well VFD & Controls Upgrade $132,000 30 Engineering 8374 Angora Creek Waterline $1,388 30 Engineering 8466 Cathodic Protection on Water Services $54,000 30 Engineering 8467 Regina/Donner Waterline $22,000 30 Engineering 8468 Replace Needle Peak #5 PRV $11,000 30 Engineering 8469 Bakersfield Pump/Motor Replacement $383,000 30 Engineering 8481 SUT Well and Motor Casing $129,064 30 Engineering 8482 Echo View Tank Coatings $851 30 Engineering 8484 Gardner No. 2 Tank Coatings $36,966 30 Engineering 8930 Heavenly Tank Rehabilitation $177,445 32 - Laboratory 8126 LIMS Software Upgrade $35,000 32 - Laboratory 8227 Replace Large Autoclave $10,000 32 - Laboratory 8228 Replace Block Digester $5,000 32 - Laboratory 8312 Replace Sterilizing Oven $6,000 From 2023-2024 to 2024-2025 Fiscal Year WATER CAPITAL OUTLAY ACCOUNT ROLLOVERS DEPARTMENT ACCOUNT DESCRIPTION AMOUNT 32 - Laboratory 8314 Lab Design Evaluation $35,000 32 - Laboratory 8421 Replace 20 Liter Water Bath $5,000 56 - Information Technology 8251 Virtual Host $20,000 56 - Information Technology 8253 Network Improvements $20,000 56 - Information Technology 8255 Software Upgrades, Misc $8,000 56 - Information Technology 8333 Software Upgrades $8,000 56 - Information Technology 8412 Laserfiche Upgrade $4,705 56 - Information Technology 8413 Database Software/Updates $15,000 56 - Information Technology 8414 SQL Additional Licenses $7,000 56 - Information Technology 8415 Backup/Disaster Recovery Appliance $15,000 $5,584,579 WATER (continued) CAPITAL OUTLAY ACCOUNT ROLLOVERS From 2023-2024 to 2024-2025 Fiscal Year BOARD AGENDA ITEM 4d TO: Board of Directors FROM: Trevor Coolidge, Senior Engineer Julie Ryan, Engineering Department Manager MEETING DATE: August 15, 2024 ITEM – PROJECT NAME: 2025 Keys Cast-in-Place Sewer Rehabilitation REQUESTED BOARD ACTION: 1) Approve the proposed Scope of Work from DOWL for engineering services; and 2) Authorize the General Manger to execute Task Order No. 3 to the Master Services Agreement with DOWL in the amount $173,827. DISCUSSION: The 2025 Keys Cast-in-Place Pipe (CIPP) Rehabilitation Project was first identified and funded as a project in Fiscal Year 2024 due to signs of infiltration and inflow (I&I) along approximately two miles of sewer mainline within the Tahoe Keys, which was identified using Closed Circuit Television by District Field Operations. CIPP is a primary method for sewer line rehabilitation incorporated into the District’s Sewer Rehabilitation and Replacement Program, as a cost-effective method to extend the life of existing pipes with a structural liner. While the District has worked with CIPP at Diamond Valley Ranch to rehabilitate a short segment of large diameter pipe, it has not yet undertaken a comprehensive rehabilitation project within its collection system. To help the District develop a template for specifications and details for CIPP projects, and to develop the Bid Documents for the 2025 Keys CIPP Sewer Rehabilitation Project, staff issued a Request for Proposals to three firms selected from the list it maintains of firms pre-approved to provide as-needed engineering support services. Two proposals were received, and Staff selected DOWL to support this project based on qualifications, prior experience and approach. The attached Scope of Work details DOWL proposed approach and includes: ● Performing a field investigation to assess condition and accessibility of laterals and manholes; ● Developing standard specifications and typical details for CIPP lining and manhole rehabilitation; ● Preparation of construction contract documents, including plans and technical specifications; ● Providing bid period support services; and ● Providing as-needed support services that might arise during the course of work. General Manager Paul Hughes Directors Nick Haven Shane Romsos David Peterson Kelly Sheehan Nick Exline Trevor Coolidge August 15, 2024 Page 2 With Board authorization the proposed engineering services will be performed on a Time and Materials Basis in an amount not to exceed $173,827. Bid documents will be complete by the end of March 2025, in time for bidding and construction in 2025. The Fiscal Year 2025 budget for this project, including engineering and construction is $2,159,000. Staff recommends that the Board approve the proposed Scope of Work and authorize the General Manager to execute Task Order No. 3 under the District’s existing Master Services Agreement with DOWL. SCHEDULE: See attached COSTS: $173,827 ACCOUNT NO: 10.30.8467 BUDGETED AMOUNT AVAILABLE: $2,159,000 ATTACHMENTS: DOWL Proposal ___________________________________________________________________________________ CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Sewer GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO South Tahoe PUD Cured-in-Place Pipe Standards and 2025 Keys CIPP Design A-1 July 2024 Exhibit A – Scope of Work 5510 Longley Lane • Reno, Nevada 89511 • (775) 851-4788 www.dowl.com EXHIBIT A SCOPE OF WORK South Lake Tahoe PUD Cured-in-Place Pipe Standards and 2025 Keys CIPP Design INTRODUCTION The South Lake Tahoe PUD (District) has requested DOWL, LLC (DOWL) to provide engineering support services for sewer system rehabilitation using cured-in-place pipe (CIPP) and manhole lining methods. DOWL will develop standard technical specifications and details for CIPP and manhole rehabilitation that the District can apply to future rehabilitation of 6” to 24” mainline pipe, primarily asbestos cement and clay pipe, and concrete manholes. DOWL will then apply the applicable standards to the development of bid documents (plans and technical specifications) for a project that the District intends to construct in the Spring of 2025. The project is expected to rehabilitate approximately 10,000 linear feet of existing 6” to 14” asbestos cement mainline pipe and manholes. Sewer laterals from the main to the edge of ROW will be evaluated in the technical memorandum only. Included with the design task is the review and evaluation of the existing District’s GIS database and sewer videos and providing recommendations to the District with regards to pipeline, lateral, and manhole rehabilitation. DOWL will provide the necessary design and related contract documents for the District’s use in bidding and construction. In addition, DOWL will provide bidding assistance by responding to bidder questions and attending the pre-bid meeting held by the District. The phase and task breakdown for the project is designated as follows: Design Services • Task 1 - Project Management • Task 2 - Review and Evaluation • Task 3 - Design • Task 4 - Bidding Assistance • Task 5 - Owner Directed Services DESIGN SERVICES Task 1 – Project Management Objective To plan, organize, direct, control, and communicate all relevant activities set forth in this Scope of Work within the approved budget and schedule. South Tahoe PUD Cured-in-Place Pipe Standards and 2025 Keys CIPP Design A-2 July 2024 Exhibit A – Scope of Work Approach DOWL will routinely review project progress and communicate project status on a regular basis. Communication will be through email and telephone, and with monthly project coordination meetings with the District and DOWL staff. This task will include the following activities: • Project administration includes scheduling maintenance, cost control, monthly invoicing, filing, resource allocation, subconsultant management, and routine communications. • Conducting a project kick-off meeting with DOWL and District staff via MS Teams. • Team coordination, including conference calls and internal meetings. • Monitoring changes to the scope, budget, or schedule and developing change management strategies with the District. Deliverables The following deliverables will be submitted under this task: • Project schedule. • Monthly status reports. Assumptions The following assumptions apply: • Monthly reports will be provided with timely invoices. • Project-related issues will be identified, communicated, and resolved. Task 2 – Review and Evaluation Objective To develop recommendations for CIPP lining and manhole rehabilitation based on available GIS data and CCTV videos. Approach The following approach applies: • Review District GIS database, which includes pipe and manhole condition assessment data for the existing sanitary sewer system, as-built drawings, and sewer main videos. Recommended spot repairs and lateral locations will be summarized in a spreadsheet with detailed information on location, lateral size/type, type of failure or deficiency, and CCTV photo. • Complete site visit to evaluate manhole conditions, evaluate site access, and identify limitations for CIPP lining and manhole rehabilitation. PACP rating system for sewer manholes will not be used for this effort. Condition of manholes will be documented by photos and inspection notes to assist with recommendations for rehabilitation. • Provide CCTV inspection for laterals within project limits. It is assumed that 1-2 laterals within each main segment will be videoed to provide a general condition assessment of laterals within South Tahoe PUD Cured-in-Place Pipe Standards and 2025 Keys CIPP Design A-3 July 2024 Exhibit A – Scope of Work project limits. PACP rating system for laterals will not be used for this effort. Condition of laterals will be based on CCTV inspection to assist with recommendations for lateral lining. • Prepare technical memorandum that includes recommendations for technical specifications and details for general CIPP lining and manhole rehabilitation and construction recommendations specific to the 2025 CIPP Keys design. • Prepare preliminary engineer’s opinion of probable costs. An alternative for lining of private laterals will be included. • Attend review meetings with the District staff via MS Teams. Deliverables The following will be delivered under this task: • Electronic transmittal of the technical memorandum including recommendations for technical specification and details and a map exhibit and spreadsheet summary of identified pipes and laterals recommended for CIPP lining, manhole rehabilitation, and spot repair in pdf format. • Preliminary engineer’s opinion of probable cost in pdf format. Assumptions The following assumptions apply: • The District will provide GIS data and CCTV videos for sewer mains upon request. • A subcontractor will provide CCTV videos for laterals within the project limits. It is assumed CCTV inspection will be limited to 1-2 laterals within each main segment. CCTV will be provided for mains 8” and larger. Push camera for laterals on 6” mains will be used through cleanouts for 1- 2 laterals per main segment. • All mains will be clean and not require flushing prior to CCTV inspection. If cleaning is needed, this service can be provided at an additional expense through the owner directed services task. • The District will evaluate cleanout access to ensure they are accessible for camera inspection. Task 3 – Design Objective To develop a design and related construction contract documents that are suitable for bidding and construction purposes. Approach The following approach applies: • Coordinate with utility owners to obtain existing utility information within the project area selected by the District. • Develop a base map showing the existing utility information surrounding the sanitary sewer main and manholes to be rehabilitated. Aerial imagery will be utilized. • Input the existing sanitary sewer data onto the base map. South Tahoe PUD Cured-in-Place Pipe Standards and 2025 Keys CIPP Design A-4 July 2024 Exhibit A – Scope of Work • Prepare 90% design drawings, technical specifications and engineer’s opinion of probable cost for client review and comment. The intent of this milestone is to ensure the design includes the necessary detail that is sufficient for bidding and construction. The submittal will include: o 3 general sheets, which include the title sheet; general notes, legend and abbreviations; and key map. o 12 plan sheets depicting the sanitary sewer rehabilitation limits and service reconnections. Drawings will be at 1=40 scale. o 4 general detail sheets, which include traffic control plan sheets depicting typical traffic control setup per the Manual of Uniform Traffic Control Devices (MUTCD). o Technical specifications. o Opinion of probable construction costs. o One (1) 90% Submittal review meeting with the District. o Quality assurance and quality control of deliverables to the District. • Prepare 100% design drawings, technical specifications and engineer’s opinion of probable costs for permitting and bidding. This milestone will incorporate the client’s comments from the 90% review and is considered the final submittal. • Attend review meetings with the District staff via MS Teams. Deliverables The following will be delivered under this task: • 90% design drawings, technical specifications and engineer’s opinion of probable costs in pdf format. • 100% design drawings, technical specifications and engineer’s opinion of probable costs in pdf format. Digitally signed copies of the design drawings and technical specifications will be provided for bidding. • An AutoCAD electronic transmittal that contains supporting files, including plot files, shape files, fonts, and reference files; an electronic Word file of Specifications. Assumptions The following assumptions apply: • All permitting, advertisement and bidding will be handled by the District. • Technical specifications will be based on CSI format. • The District will provide the Division 0 sections of the project manual for bidding and construction. • The District will provide review comments for the 90% submittal to DOWL within 2 weeks of submission. • No profiles of the sanitary sewer are required. • Preparation of temporary easements that may be required for construction are not required. South Tahoe PUD Cured-in-Place Pipe Standards and 2025 Keys CIPP Design A-5 July 2024 Exhibit A – Scope of Work Task 4 – Bidding Assistance Objective To assist the District with responding to bidder questions and issuing responses and addendums. Approach This task will include the following activities: • Responding to bidder questions and RFIs. • Issue addendums as required to address bidder questions and RFIs. Deliverables The following deliverables will be submitted under this task: • Addendums as required. Assumptions The following assumptions apply: • All advertisement and bidding activities will be handled by the District, except as noted herein. • DOWL will attend a pre-bid meeting (if held). Task 5 – Owner Directed Services To cover the costs of project work items that are unforeseen by the District, a task budget of $15,000 is incorporated into this Contract. Labor effort will not be charged to this task unless authorized in writing by the District. South Tahoe PUD Cured-in-Place Pipe Standards and 2025 Keys CIPP Design B-1 July 2024 Exhibit B – Schedule EXHIBIT B SCHEDULE 2024 2025 A S O N D J F M A M J NTP Data Collection Kickoff Meeting Technical Memorandum Standards and Specifications 90% Design Bid Set Bid Award Construction Milestone PROJECT SCHEDULE Cured-in-Place Pipe Standards and 2024 Keys CIPP Design | Schedule South Tahoe PUD Cured-in-Place Pipe Standards and 2025 Keys CIPP Design C-1 July 2024 Exhibit C – Schedule EXHIBIT C BUDGET Task 1 Project Management $11,800 Task 2 Review and Evaluation $82,835 Task 3 Design $57,160 Task 4 Bidding Assistance $7,032 Task 5 Owner Directed Services $15,000 TOTAL: $173,827 South Tahoe PUD Cured-in-Place Pipe Standards and 2025 Keys CIPP Design D-1 July 2024 Exhibit D – Engineer’s Rate Schedule EXHIBIT D ENGINEER’S RATE SCHEDULE Nevada Fee Schedule Effective June 30, 2024 Until Further Notice 1 | Page NEVADA FEE SCHEDULE Personnel Billing Rates Personnel are identified on our invoices by name and/or labor category. Description Rate Description Rate Accounting Manager $185 Accounting Technician $120 Administrative Assistant $95 Administrative Manager $125 Biologist I $130 Biologist II $140 Biologist III $150 Biologist IV $160 Biologist V $205 CAD Drafter I $105 CAD Drafter II $120 CAD Drafter III $130 CAD Drafter IV $140 CAD Drafter V $150 Senior CAD Drafter $170 Civil and Transportation Designer $135 Senior Civil and Transportation Designer $170 Contract Administrator I $160 Contract Administrator II $185 Corporate Development Manager $230 Cultural Resources Specialist I $120 Cultural Resources Specialist II $140 Cultural Resources Specialist III $145 Cultural Resources Specialist IV $180 Cultural Resources Specialist V $195 Document Production Supervisor $150 Engineer I $130 Engineer II $140 Engineer III $155 Engineer IV $175 Engineer V $195 Engineer VI $205 Engineer VII $215 Engineer VIII $225 Engineer IX $250 Engineer X $265 Engineering Technician I $100 Engineering Technician II $115 Engineering Technician III $125 Engineering Technician IV $140 Engineering Technician V $155 Engineering Technician VI $175 Environmental Specialist I $120 Environmental Specialist II $135 Environmental Specialist III $140 Environmental Specialist IV $150 Environmental Specialist V $155 Environmental Specialist VI $190 Environmental Specialist VII $210 Environmental Specialist VIII $225 Environmental Specialist IX $245 Environmental Specialist X $265 Field Project Representative I $130 Field Project Representative II $145 Field Project Representative III $155 Field Project Representative IV $170 Field Project Representative V $210 Geologist I $135 Geologist II $145 Geologist III $155 Geologist IV $175 Geologist V $205 GIS Coordinator $175 GIS Manager $185 GIS Specialist $145 GIS Technician $110 Graphics Designer $130 Senior Graphics Designer $165 Nevada Fee Schedule Effective June 30, 2024 Until Further Notice Description Rate Description Rate 2 | Page Hydrogeologist I $140 Hydrogeologist II $165 Hydrogeologist III $195 Sr. Hydrogeologist $225 Intern I $85 Intern II $105 Laboratory Manager $125 Laboratory Supervisor $105 Landscape Architect I $130 Landscape Architect II $145 Landscape Architect III $160 Landscape Architect IV $175 Landscape Architect V $190 Landscape Architect VI $200 Landscape Architect VII $210 Landscape Designer I $95 Landscape Designer II $115 Marketing Assistant $105 Marketing Coordinator $135 Marketing & Administrative Manager $225 Materials Technician I $95 Materials Technician II $105 Lead Materials Technician $115 Senior Materials Technician $125 Materials Manager $130 Planner I $120 Planner II $145 Planner III $160 Planner IV $175 Planner V $190 Planner VI $200 Planner VII $210 Planner VIII $225 Planner IX $240 Planner X $280 Planning Technician $110 Professional Land Surveyor I $120 Professional Land Surveyor II $130 Professional Land Surveyor III $140 Professional Land Surveyor IV $150 Professional Land Surveyor V $160 Professional Land Surveyor VI $165 Professional Land Surveyor VII $175 Professional Land Surveyor VIII $185 Professional Land Surveyor IX $210 Professional Land Surveyor X $220 Professional Land Surveyor XI $255 Project Administrator $135 Project Assistant I $115 Project Assistant II $130 Project Controller $165 Senior Project Controller $185 Project Manager I $160 Project Manager II $175 Project Manager III $190 Project Manager IV $205 Project Manager V $220 Project Manager VI $235 Project Manager VII $250 Proposal Manager $140 Senior Proposal Manager $210 Public Involvement Assistant $115 Public Involvement Coordinator $155 Public Involvement Planner $135 Public Involvement Program Manager $200 Real Estate Services Manager $180 Right of Way Agent I $125 Right of Way Agent II $140 Right of Way Agent III $155 Right of Way Agent IV $170 Right of Way Agent V $185 Right of Way Agent VI $215 Right of Way Assistant $115 Risk Manager $200 Senior Manager I $240 Senior Manager II $260 Senior Manager III $270 Senior Manager IV $295 Nevada Fee Schedule Effective June 30, 2024 Until Further Notice Description Rate Description Rate 3 | Page Senior Manager V $315 Senior Manager VI $335 Survey Technician I $90 Survey Technician II $95 Survey Technician III $100 Survey Technician IV $115 Survey Technician IX $170 Survey Technician V $120 Survey Technician VI $130 Survey Technician VII $145 Survey Technician VIII $160 Survey Technician -- Supervisor $155 Systems Administrator $155 Technical Coordinator $180 Utility Operator $145 Water Resource Specialist $195 Water Rights Specialist I $160 Water Rights Specialist II $190 Water Rights Specialist III $220 Water Rights Technician I $105 Water Rights Technician II $115 Water Rights Technician III $125 Survey Crews One-Person Survey Crew = $160 / hour One-Person Survey Crew GPS/Robotics = $180 / hour Two-Person Survey Crew = $240 / hour Two-Person Survey Crew (PLS + LSIT) = $280 / hour Two-Person Survey Crew GPS/Robotics = $255 / hour Three-Person Survey Crew = $350 / hour Travel, Mileage, and Miscellaneous Lodging = Cost per night Airfare = Cost Vehicle Usage – Passenger Cars = $1.10/mile Vehicle Usage – Trucks & SUV’s = $1.30/mile Printing/Supplies/Phone/Fax/Postage = Note 3 In-House Usage Charges = Note 4 Per Diem Unless otherwise specified contractually, per diem will be billed when travel is more than 50 miles from the office during a meal allowance period of three or more consecutive hours or involves an overnight stay. The three meal allowance periods are breakfast (midnight to 10:00 a.m.), lunch (10:00 a.m.-3:00 p.m.), and dinner (3:00 p.m. to midnight). Breakfast Lunch Dinner Incidentals 1st and Last Day Per Diem Rate Elko $13.00 $15.00 $26.00 $5.00 $44.25 $59.00 Reno $16.00 $17.00 $31.00 $5.00 $51.75 $69.00 For all other cities not listed above and meal breakdown, use the following link: https://www.gsa.gov/travel/plan-book/per-diem-rates Nevada Fee Schedule Effective June 30, 2024 Until Further Notice 4 | Page Notes 1. DOWL’s Professional Services Fee Schedule is subject to adjustment each year or at the end of a contract period, whichever is appropriate. Should adjustments be anticipated or required, such adjustments will not affect existing contracts without prior agreement between Client and DOWL. 2. Straight-time rates are given. Multiply by 1.5 for overtime rates. Overtime rates will be applied at the rate prescribed by applicable state law. 3. Direct reimbursable expenses such as travel, freight, subcontractors, and request beyond those requests considered reasonable by the project manager for phone/fax/postage, office supplies, reproduction and photography, and laboratory analysis will be billed at cost plus the negotiated markup. 4. In-house equipment usage charges or specialized software/equipment that are not separately stated on the fee schedule will be negotiated at rates deemed fair and reasonable. 5. Late charges will be assessed on the unpaid balance of all accounts not paid within 30 days of the billing date, at a rate of 1.0 percent per month (12% per year). Prepared By: M. Van Dyne Reviewed By: Summary K. Karpstein 1 Project Coordination and Management 32 7,180.00$ -$ -$ 7,180.00$ 2 Monthly Reports 12 2,760.00$ -$ -$ 2,760.00$ 3 Kickoff Meeting with Client 8 1,860.00$ -$ -$ 1,860.00$ 4 52 11,800.00$ -$ -$ 11,800.00$ 1 Site Visit and MH evaluation 32 5,920.00$ 264.00$ -$ 6,184.00$ 2 Lateral evaluation 76 13,720.00$ 660.00$ 19,400.50$ 33,780.50$ 3 GIS Data and Sewer Video Evaluation and Summary 76 13,820.00$ -$ -$ 13,820.00$ 4 Review Selected Project Area 23 4,405.00$ -$ -$ 4,405.00$ 5 Technical Memorandum 76 14,560.00$ -$ -$ 14,560.00$ 6 Preliminary Opinion of Probable Cost and Map Exhibit 43 7,545.00$ -$ -$ 7,545.00$ 7 Review Meetings with Client 12 2,540.00$ -$ -$ 2,540.00$ 8 338 62,510.00$ 924.00$ 19,400.50$ 82,834.50$ 1 Utility Company Coordination and Base Map Preparation 22 4,030.00$ -$ -$ 4,030.00$ 2 90% Design Drawings 114 18,970.00$ -$ -$ 18,970.00$ 3 90% Technical Specifications 28 5,160.00$ -$ -$ 5,160.00$ 4 90% Opinion of Probable Cost 24 4,640.00$ -$ -$ 4,640.00$ 5 100% Design Drawings 52 8,740.00$ -$ -$ 8,740.00$ 6 100% Technical Specifications 12 2,140.00$ -$ -$ 2,140.00$ 7 100% Opinion of Probable Cost 12 2,320.00$ -$ -$ 2,320.00$ 8 Review Meetings with Client 12 2,540.00$ -$ -$ 2,540.00$ 9 Quality Assurance/Quality Control 36 8,620.00$ -$ -$ 8,620.00$ 10 -$ -$ -$ 312 57,160.00$ -$ -$ 57,160.00$ 1 RFIs, Questions During Bidding, Addendum 30 5,840.00$ -$ -$ 5,840.00$ 2 Attend Pre-Bid Meeting 4 1,060.00$ 132.00$ -$ 1,192.00$ 3 34 6,900.00$ 132.00$ -$ 7,032.00$ 1 Owner Directed Services 15,000.00$ --$ -$ -$ 15,000.00$ 736 138,370.00$ 1,056.00$ 19,400.50$ 173,826.50$ Phase Name Project: CIPP Standards and 2025 Keys CIPP Design Client: South Tahoe PUD Project or Contract #: 30257 7/30/2024 Project Totals Direct Expenses SubtotalCostHours Subtotal Subtotal Subtotal SubconsultantsLabor SubtotalTask Phase 5 - Owner Directed Services Subtotal Phase 1 - Project Management Phase 2 - Review and Evaluation TOTAL Phase 4 - Bidding Assistance Subtotal Phase 3 - Design T&M Lump Sum Other ______________________ T&M Lump Sum Other _________________________ T&M Lump Sum Other ________________________ T&M Lump Sum Other ________________________T&M Lump Sum Other ________________________ T&M Lump Sum Other ________________________ \\dowl.com\j\Projects\63\30257-00\02Proposal\Narrative\SOW and Fee Estimate\STPUD CIPP_Schedule&Hour&Fee_July 2024.xlsx Summary PAYMENT OF CLAIMS Payroll 681,189.79 Total Payroll 681,189.79 AFLAC/WageWorks claims and fees 258.10 CalPERS UAL 1,285,295.00 Ameritas - Insurance Payments 2,755.70 Total Vendor EFT 1,288,308.80 Weekly Approved Check Batches Water Sewer Total 117,983.62 408,583.35 526,566.97 Wednesday, July 31, 2024 328,176.87 305,921.15 634,098.02 Wednesday, August 7, 2024 202,937.73 252,384.61 455,322.34 Checks, Voids and Reissues 0.00 6,765.78 6,765.78 Total Accounts Payable Checks 1,622,753.11 Utility Management Refunds 2,510.45 Total Utility Management Checks 2,510.45 Grand Total $3,594,762.15 Payroll EFTs & Checks 8/6/2024 EFT CA Employment Taxes & W/H 31,596.23 EFT Federal Employment Taxes & W/H 147,408.86 EFT CalPERS Contributions 95,614.80 EFT Empower Retirement-Deferred Comp 29,062.66 EFT Stationary Engineers Union Dues 3,136.04 EFT CDHP Health Savings (HSA) 8,168.98 EFT Retirement Health Savings 18,510.54 EFT Employee Direct Deposits 346,910.87 CHK Employee Garnishments 780.81 Total 681,189.79 FOR APPROVAL August 15, 2024 8/6/24 Thursday, July 25, 2024 Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount Vendor 50223 - CAETANO ABRAMSONWARD ABRAMSONWARD0724 Safety Equipment - Physicals Paid by EFT #1689 07/01/2024 07/24/2024 07/31/2024 07/25/2024 100.00 Vendor 50223 - CAETANO ABRAMSONWARD Totals Invoices 1 $100.00 Vendor 43721 - ACWA/JPIA O-0001000227 Insurance Prepaids Paid by EFT #1690 07/05/2024 07/24/2024 07/31/2024 07/25/2024 18,454.16 240 Insurance Prepaid Paid by EFT #1761 07/16/2024 07/31/2024 07/31/2024 07/31/2024 475,256.35 Vendor 43721 - ACWA/JPIA Totals Invoices 2 $493,710.51 Vendor 44039 - AFLAC 791279 Insurance Supplement Payable Paid by EFT #1762 07/01/2024 07/31/2024 07/31/2024 07/31/2024 892.88 Vendor 44039 - AFLAC Totals Invoices 1 $892.88 Vendor 48605 - AIRGAS USA LLC 9151647809 Field, Shop & Safety Supplies Inventory Paid by EFT #1763 07/10/2024 07/31/2024 07/31/2024 07/31/2024 1,217.49 9151913149 Field, Shop & Safety Supplies Inventory Paid by EFT #1812 07/18/2024 08/07/2024 07/31/2024 08/07/2024 318.99 Vendor 48605 - AIRGAS USA LLC Totals Invoices 2 $1,536.48 Vendor 43949 - ALPEN SIERRA COFFEE ROASTING CO 239912 Office Supply Issues Paid by EFT #1691 07/02/2024 07/24/2024 07/31/2024 07/25/2024 114.00 239913 Office Supply Issues Paid by EFT #1691 07/02/2024 07/24/2024 07/31/2024 07/25/2024 67.50 240077 Office Supply Issues Paid by EFT #1691 07/09/2024 07/24/2024 07/31/2024 07/25/2024 67.50 240078 Office Supply Issues Paid by EFT #1691 07/09/2024 07/24/2024 07/31/2024 07/25/2024 114.00 240226 Office Supply Issues Paid by EFT #1691 07/16/2024 07/24/2024 07/31/2024 07/25/2024 114.00 240233 Office Supply Issues Paid by EFT #1691 07/16/2024 07/24/2024 07/31/2024 07/25/2024 67.50 240481 Office Supply Issues Paid by EFT #1764 07/23/2024 07/31/2024 07/31/2024 07/31/2024 67.50 240482 Office Supply Issues Paid by EFT #1764 07/23/2024 07/31/2024 07/31/2024 07/31/2024 114.00 240608 Office Supply Issues Paid by EFT #1813 07/30/2024 08/07/2024 07/31/2024 08/07/2024 114.00 240609 Office Supply Issues Paid by EFT #1813 07/30/2024 08/07/2024 07/31/2024 08/07/2024 67.50 Vendor 43949 - ALPEN SIERRA COFFEE ROASTING CO Totals Invoices 10 $907.50 Vendor 49337 - AMAZON CAPITAL SERVICES INC. 1HD7-N7HX-76CP Buildings & Small Tools Paid by EFT #1814 07/05/2024 08/07/2024 07/31/2024 08/07/2024 156.08 11KG-CP94-HFQD Office Supplies Paid by EFT #1692 07/07/2024 07/24/2024 07/31/2024 07/25/2024 166.31 1D9Q-9DNL-6HCW Safety Equipment - Physicals Paid by EFT #1765 07/10/2024 07/31/2024 07/31/2024 07/31/2024 206.54 1CJL-KWKV-Q1QM Buildings Paid by EFT #1765 07/14/2024 07/31/2024 07/31/2024 07/31/2024 234.01 Vendor 49337 - AMAZON CAPITAL SERVICES INC. Totals Invoices 4 $762.94 Vendor 49625 - AMERICAN AVK COMPANY SI-166359 Fire Hydrants & Parts Paid by EFT #1766 07/22/2024 07/31/2024 07/31/2024 07/31/2024 3,900.32 SI-166374 Fire Hydrants & Parts Paid by EFT #1815 07/23/2024 08/07/2024 07/31/2024 08/07/2024 5,200.43 Vendor 49625 - AMERICAN AVK COMPANY Totals Invoices 2 $9,100.75 Vendor 48173 - APPLIED INDUSTRIAL TECH INC 7030083636 Pipe - Covers & Manholes Paid by EFT #1767 07/17/2024 07/31/2024 07/31/2024 07/31/2024 4,547.44 Vendor 48173 - APPLIED INDUSTRIAL TECH INC Totals Invoices 1 $4,547.44 Vendor 50225 - EDUARDO ARTEAGA Run by Erika Franco on 08/07/2024 02:27:55 PM Page 1 of 19 Payment of Claims Payment Date Range 07/25/24 - 08/07/24 Report By Vendor - Invoice Summary Listing Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount 2714204 Clothes Washer Rebate Program Paid by EFT #1693 07/19/2024 07/24/2024 07/31/2024 07/25/2024 200.00 2714204-2 Toilet Rebate Program Paid by EFT #1693 07/19/2024 07/24/2024 07/31/2024 07/25/2024 94.50 Vendor 50225 - EDUARDO ARTEAGA Totals Invoices 2 $294.50 Vendor 40521 - AT&T 088 080-5493 824 Telephone Paid by EFT #1816 07/28/2024 08/07/2024 08/31/2024 08/07/2024 200.00 Vendor 40521 - AT&T Totals Invoices 1 $200.00 Vendor 45202 - AT&T MOBILITY 287257798939 724 Telephone Paid by EFT #1768 07/19/2024 07/31/2024 07/31/2024 07/31/2024 227.56 Vendor 45202 - AT&T MOBILITY Totals Invoices 1 $227.56 Vendor 50114 - AT&T MOBILITY SEI PROCESSING 697352637 Computer Purchases Paid by EFT #1694 07/02/2024 07/24/2024 07/31/2024 07/25/2024 7,839.99 Vendor 50114 - AT&T MOBILITY SEI PROCESSING Totals Invoices 1 $7,839.99 Vendor 48000 - AT&T/CALNET 3 000022011916 Telephone Paid by EFT #1695 07/15/2024 07/24/2024 07/31/2024 07/25/2024 29.71 000022011917 Telephone Paid by EFT #1695 07/15/2024 07/24/2024 07/31/2024 07/25/2024 29.71 000022032714 Telephone Paid by EFT #1695 07/20/2024 07/25/2024 07/31/2024 07/25/2024 29.93 000022032716 Telephone Paid by EFT #1695 07/20/2024 07/25/2024 07/31/2024 07/25/2024 1,486.19 000022032717 Telephone Paid by EFT #1695 07/20/2024 07/25/2024 07/31/2024 07/25/2024 107.79 000022032923 Telephone Paid by EFT #1695 07/20/2024 07/25/2024 07/31/2024 07/25/2024 159.18 000022032970 Telephone Paid by EFT #1695 07/20/2024 07/25/2024 07/31/2024 07/25/2024 31.57 Vendor 48000 - AT&T/CALNET 3 Totals Invoices 7 $1,874.08 Vendor 48612 - AUTOMATION DIRECT 16753407 Buildings Paid by EFT #1817 07/23/2024 08/07/2024 07/31/2024 08/07/2024 213.15 Vendor 48612 - AUTOMATION DIRECT Totals Invoices 1 $213.15 Vendor 50103 - AZUL ELECTRIC SUPPLY LLC 004335 Small Tools Paid by EFT #1818 07/12/2024 08/07/2024 07/31/2024 08/07/2024 87.55 004340 Buildings Paid by EFT #1818 07/12/2024 08/07/2024 07/31/2024 08/07/2024 254.21 004569 Buildings Paid by EFT #1818 07/25/2024 08/07/2024 07/31/2024 08/07/2024 219.18 004653 Buildings Paid by EFT #1818 07/30/2024 08/07/2024 07/31/2024 08/07/2024 388.77 004672 Buildings Paid by EFT #1818 07/31/2024 08/07/2024 07/31/2024 08/07/2024 116.96 Vendor 50103 - AZUL ELECTRIC SUPPLY LLC Totals Invoices 5 $1,066.67 Vendor 50226 - MARION BACON 2225113 Toilet Rebate Program Paid by EFT #1696 07/15/2024 07/24/2024 07/31/2024 07/25/2024 100.00 Vendor 50226 - MARION BACON Totals Invoices 1 $100.00 Vendor 11800 - BARTON HEALTHCARE SYSTEM 15982716 Safety Equipment - Physicals Paid by EFT #1697 07/18/2024 07/22/2024 06/30/2024 07/25/2024 881.00 Vendor 11800 - BARTON HEALTHCARE SYSTEM Totals Invoices 1 $881.00 Vendor 44591 - BAY AREA COATING CONSULTANTS E08274 Luther Pass PS Tanks Rehab Paid by EFT #1698 06/26/2024 07/19/2024 06/30/2024 06/30/2024 07/25/2024 6,608.10 E08312 Tank Coatings - Cold Creek Paid by EFT #1819 07/24/2024 08/07/2024 07/31/2024 08/07/2024 9,062.46 Vendor 44591 - BAY AREA COATING CONSULTANTS Totals Invoices 2 $15,670.56 Vendor 50243 - THERESA E BEGGS Run by Erika Franco on 08/07/2024 02:27:55 PM Page 2 of 19 Payment of Claims Payment Date Range 07/25/24 - 08/07/24 Report By Vendor - Invoice Summary Listing Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount 3647101 Water Use Reduction Rebates Paid by EFT #1820 07/30/2024 08/07/2024 07/31/2024 08/07/2024 750.00 Vendor 50243 - THERESA E BEGGS Totals Invoices 1 $750.00 Vendor 49419 - BEND GENETICS LLC ST2407 Monitoring Paid by EFT #1699 07/03/2024 07/24/2024 07/31/2024 07/25/2024 275.00 Vendor 49419 - BEND GENETICS LLC Totals Invoices 1 $275.00 Vendor 49773 - LAUREN BENEFIELD BENEFIELD080624 Travel - Meetings - Education Paid by EFT #1821 07/18/2024 08/06/2024 08/31/2024 08/07/2024 204.00 Vendor 49773 - LAUREN BENEFIELD Totals Invoices 1 $204.00 Vendor 45009 - BENTLY RANCH 211826 Biosolid Disposal Costs Paid by EFT #1769 07/11/2024 07/31/2024 07/31/2024 07/31/2024 1,476.60 211864 Biosolid Disposal Costs Paid by EFT #1769 07/18/2024 07/31/2024 07/31/2024 07/31/2024 1,674.00 Vendor 45009 - BENTLY RANCH Totals Invoices 2 $3,150.60 Vendor 50214 - COLIN BLACKMAN 3354409-1 Clothes Washer Rebate Program Paid by EFT #1700 07/15/2024 07/24/2024 07/31/2024 07/25/2024 200.00 Vendor 50214 - COLIN BLACKMAN Totals Invoices 1 $200.00 Vendor 50227 - SUSANNE BROWN 3470430 Water Use Reduction Rebates Paid by EFT #1701 07/19/2024 07/24/2024 07/31/2024 07/25/2024 100.00 Vendor 50227 - SUSANNE BROWN Totals Invoices 1 $100.00 Vendor 44730 - BSK ASSOCIATES AH17840 Monitoring Paid by EFT #1770 07/24/2024 07/31/2024 07/31/2024 07/31/2024 3,210.00 Vendor 44730 - BSK ASSOCIATES Totals Invoices 1 $3,210.00 Vendor 49861 - AARON BUCKMAN BUCKMAN073024 Travel - Meetings - Education Paid by EFT #1702 06/20/2024 07/24/2024 07/31/2024 07/25/2024 191.00 Vendor 49861 - AARON BUCKMAN Totals Invoices 1 $191.00 Vendor 50090 - CAD DESIGNING SOLUTIONS 108 Contractual Services Paid by EFT #1822 08/01/2024 08/07/2024 07/31/2024 08/07/2024 22,875.00 Vendor 50090 - CAD DESIGNING SOLUTIONS Totals Invoices 1 $22,875.00 Vendor 48681 - CADENCE TEAM INC 4322 Service Contracts Paid by EFT #1823 07/01/2024 08/07/2024 08/31/2024 08/07/2024 1,610.00 4291 Service Contracts Paid by EFT #1771 07/03/2024 07/31/2024 07/31/2024 07/31/2024 7,054.74 4355 Service Contracts Paid by EFT #1823 07/29/2024 08/07/2024 07/31/2024 08/07/2024 10,260.00 4356 Service Contracts Paid by EFT #1823 07/30/2024 08/07/2024 07/31/2024 08/07/2024 41,456.45 Vendor 48681 - CADENCE TEAM INC Totals Invoices 4 $60,381.19 Vendor 48767 - CALIFORNIA LAB SERVICE 4070600 Monitoring Paid by EFT #1772 07/15/2024 07/31/2024 07/31/2024 07/31/2024 82.00 Vendor 48767 - CALIFORNIA LAB SERVICE Totals Invoices 1 $82.00 Vendor 48933 - KIRK CARLSON 2713123 Toilet Rebate Program Paid by EFT #1703 07/23/2024 07/24/2024 07/31/2024 07/25/2024 95.00 Vendor 48933 - KIRK CARLSON Totals Invoices 1 $95.00 Vendor 13230 - CAROLLO ENGINEERS FB47557 Blower System Upgrades Paid by EFT #1704 02/12/2024 07/19/2024 06/30/2024 06/30/2024 07/25/2024 18,834.75 FB47677 Upper Truckee Sewer PS Rehab Paid by EFT #1704 02/13/2024 07/19/2024 06/30/2024 06/30/2024 07/25/2024 1,492.50 Run by Erika Franco on 08/07/2024 02:27:55 PM Page 3 of 19 Payment of Claims Payment Date Range 07/25/24 - 08/07/24 Report By Vendor - Invoice Summary Listing Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount FB48573 Upper Truckee Sewer PS Rehab Paid by EFT #1704 03/11/2024 07/19/2024 06/30/2024 06/30/2024 07/25/2024 2,487.25 FB48879 Blower System Upgrades Paid by EFT #1704 03/13/2024 07/19/2024 06/30/2024 06/30/2024 07/25/2024 28,903.00 FB49648 Blower System Upgrades Paid by EFT #1704 04/09/2024 07/19/2024 06/30/2024 06/30/2024 07/25/2024 41,902.00 FB50686 Blower System Upgrades Paid by EFT #1704 05/08/2024 07/19/2024 06/30/2024 06/30/2024 07/25/2024 68,452.50 FB50986 Upper Truckee Sewer PS Rehab Paid by EFT #1704 05/10/2024 07/19/2024 06/30/2024 06/30/2024 07/25/2024 3,174.50 FB52187 Blower System Upgrades Paid by EFT #1704 06/11/2024 07/19/2024 06/30/2024 06/30/2024 07/25/2024 29,788.29 FB52521 Upper Truckee Sewer PS Rehab Paid by EFT #1704 06/19/2024 07/19/2024 06/30/2024 06/30/2024 07/25/2024 1,169.25 FB53100 SCADA Historian Upgrades Paid by EFT #1704 07/08/2024 07/23/2024 06/30/2024 06/30/2024 07/25/2024 915.00 FB53528 Blower System Upgrades Paid by EFT #1704 07/11/2024 07/19/2024 06/30/2024 06/30/2024 07/25/2024 72,828.50 FB53641 Contractual Services Paid by EFT #1704 07/12/2024 07/23/2024 06/30/2024 06/30/2024 07/25/2024 50,847.37 Vendor 13230 - CAROLLO ENGINEERS Totals Invoices 12 $320,794.91 Vendor 42328 - CDW-G CORP SH01813 Computer Purchases Paid by EFT #1773 07/11/2024 07/31/2024 07/31/2024 07/31/2024 1,162.28 SJ52319 Computer Purchases Paid by EFT #1773 07/16/2024 07/31/2024 07/31/2024 07/31/2024 742.75 Vendor 42328 - CDW-G CORP Totals Invoices 2 $1,905.03 Vendor 49016 - MICHAEL CHIEFFO REIMB 072824 Travel - Meetings - Education Paid by EFT #1824 07/28/2024 08/07/2024 07/31/2024 08/07/2024 37.52 Vendor 49016 - MICHAEL CHIEFFO Totals Invoices 1 $37.52 Vendor 49756 - CINDERLITE TRUCKING CORP 439618 Pipe - Covers & Manholes Paid by EFT #1825 07/02/2024 08/07/2024 07/31/2024 08/07/2024 793.04 439742 Pipe - Covers & Manholes Paid by EFT #1825 07/03/2024 08/07/2024 07/31/2024 08/07/2024 1,572.06 441356 Pipe - Covers & Manholes Paid by EFT #1825 07/22/2024 08/07/2024 07/31/2024 08/07/2024 800.14 441547 Pipe - Covers & Manholes Paid by EFT #1825 07/24/2024 08/07/2024 07/31/2024 08/07/2024 267.61 441985 Pipe - Covers & Manholes Paid by EFT #1825 07/29/2024 08/07/2024 07/31/2024 08/07/2024 1,049.30 442211 Pipe - Covers & Manholes Paid by EFT #1825 07/31/2024 08/07/2024 07/31/2024 08/07/2024 264.02 442223 Grounds & Maintenance Paid by EFT #1825 07/31/2024 08/07/2024 07/31/2024 08/07/2024 126.39 Vendor 49756 - CINDERLITE TRUCKING CORP Totals Invoices 7 $4,872.56 Vendor 48672 - CINTAS CORP 5220112173 Safety Equipment - Physicals Paid by EFT #1705 07/11/2024 07/24/2024 07/31/2024 07/25/2024 533.66 Vendor 48672 - CINTAS CORP Totals Invoices 1 $533.66 Vendor 40512 - CODALE ELECTRIC SUPPLY S008562666.001 Wells Paid by EFT #1774 07/01/2024 07/31/2024 07/31/2024 07/31/2024 1,111.84 S008593406.001 Wells Paid by EFT #1826 07/22/2024 08/07/2024 07/31/2024 08/07/2024 111.96 Vendor 40512 - CODALE ELECTRIC SUPPLY Totals Invoices 2 $1,223.80 Vendor 49778 - COLUMN SOFTWARE PBC B41A7C18-0031 Hydrant Project - County Paid by EFT #1706 05/28/2024 07/23/2024 06/30/2024 06/30/2024 07/25/2024 92.58 B41A7C18-0032 Keller BS Generator/Paloma Well Generator Paid by EFT #1706 07/02/2024 07/24/2024 07/31/2024 07/25/2024 417.34 Vendor 49778 - COLUMN SOFTWARE PBC Totals Invoices 2 $509.92 Vendor 48181 - CONSTRUCTION MATERIALS ENG INC 16009 Luther Pass PS Tanks Rehab Paid by EFT #1707 06/30/2024 07/19/2024 06/30/2024 06/30/2024 07/25/2024 6,437.00 16010 Tahoe Keys Sewer PS Rehab Paid by EFT #1707 06/30/2024 07/19/2024 06/30/2024 06/30/2024 07/25/2024 320.00 Run by Erika Franco on 08/07/2024 02:27:55 PM Page 4 of 19 Payment of Claims Payment Date Range 07/25/24 - 08/07/24 Report By Vendor - Invoice Summary Listing Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount Vendor 48181 - CONSTRUCTION MATERIALS ENG INC Totals Invoices 2 $6,757.00 Vendor 50042 - RICHARD CROFT 2522417-1 Water Use Reduction Rebates Paid by EFT #1708 07/19/2024 07/24/2024 07/31/2024 07/25/2024 175.00 Vendor 50042 - RICHARD CROFT Totals Invoices 1 $175.00 Vendor 42897 - CWEA 396384 070324 Dues - Memberships - Certification Paid by Check #114666 07/03/2024 07/24/2024 07/31/2024 07/25/2024 116.00 CHATHAM070324 Dues - Memberships - Certification Paid by EFT #1775 07/03/2024 07/31/2024 07/31/2024 07/31/2024 111.00 LEW070324 Dues - Memberships - Certification Paid by EFT #1775 07/03/2024 07/31/2024 07/31/2024 07/31/2024 111.00 Vendor 42897 - CWEA Totals Invoices 3 $338.00 Vendor 50245 - DAVID DE BELLA 3119121 Water Use Reduction Rebates Paid by EFT #1827 07/22/2024 08/07/2024 07/31/2024 08/07/2024 40.23 Vendor 50245 - DAVID DE BELLA Totals Invoices 1 $40.23 Vendor 49790 - DIGI-KEY ELECTRONICS 106086938 Pump Stations Paid by EFT #1828 07/23/2024 08/07/2024 07/31/2024 08/07/2024 99.65 Vendor 49790 - DIGI-KEY ELECTRONICS Totals Invoices 1 $99.65 Vendor 48852 - ANDREW DORMAN DORMAN070824 Dues - Memberships - Certification Paid by EFT #1709 07/08/2024 07/24/2024 07/31/2024 07/25/2024 116.35 Vendor 48852 - ANDREW DORMAN Totals Invoices 1 $116.35 Vendor 49959 - DUDEK 202405310 Vegetation Management Plan Paid by EFT #1710 07/12/2024 07/22/2024 06/30/2024 06/30/2024 07/25/2024 1,413.75 Vendor 49959 - DUDEK Totals Invoices 1 $1,413.75 Vendor 48819 - PAULA DURAN 3453104-1 Water Use Reduction Rebates Paid by EFT #1829 07/31/2024 08/07/2024 07/31/2024 08/07/2024 750.00 Vendor 48819 - PAULA DURAN Totals Invoices 1 $750.00 Vendor 43753 - ED COOK TREE SERVICE 061024 Grounds & Maintenance Paid by EFT #1711 06/10/2024 07/19/2024 06/30/2024 06/30/2024 07/25/2024 400.00 Vendor 43753 - ED COOK TREE SERVICE Totals Invoices 1 $400.00 Vendor 14683 - EL DORADO COUNTY TRANSPORTATION DEPT 24-3 Meyers SEZ Erosion Control Paid by EFT #3 06/30/2024 07/24/2024 06/30/2024 06/30/2024 07/25/2024 31,540.00 Vendor 14683 - EL DORADO COUNTY TRANSPORTATION DEPT Totals Invoices 1 $31,540.00 Vendor 44303 - EMPIRE EQUIPMENT CO INPS4063300 Automotive Paid by EFT #1776 07/15/2024 07/31/2024 07/31/2024 07/31/2024 233.29 Vendor 44303 - EMPIRE EQUIPMENT CO Totals Invoices 1 $233.29 Vendor 48224 - ERA 082315 Laboratory Supplies Paid by EFT #1712 07/02/2024 07/24/2024 07/31/2024 07/25/2024 479.30 Vendor 48224 - ERA Totals Invoices 1 $479.30 Vendor 47898 - ETS 9721 Monitoring Paid by EFT #1777 07/15/2024 07/31/2024 07/31/2024 07/31/2024 1,385.00 Run by Erika Franco on 08/07/2024 02:27:55 PM Page 5 of 19 Payment of Claims Payment Date Range 07/25/24 - 08/07/24 Report By Vendor - Invoice Summary Listing Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount Vendor 47898 - ETS Totals Invoices 1 $1,385.00 Vendor 18550 - EUROFINS EATON ANALYTICAL LLC 3800057036 Monitoring Paid by EFT #1713 07/10/2024 07/24/2024 07/31/2024 07/25/2024 70.00 3800057132 Monitoring Paid by EFT #1713 07/11/2024 07/24/2024 07/31/2024 07/25/2024 45.00 3800057347 Monitoring Paid by EFT #1778 07/15/2024 07/31/2024 07/31/2024 07/31/2024 480.00 3800057462 Monitoring Paid by EFT #1778 07/17/2024 07/31/2024 07/31/2024 07/31/2024 70.00 3800057729 Monitoring Paid by EFT #1778 07/19/2024 07/31/2024 07/31/2024 07/31/2024 295.00 3800057922 Monitoring Paid by EFT #1778 07/22/2024 07/31/2024 07/31/2024 07/31/2024 1,530.00 3800057923 Monitoring Paid by EFT #1778 07/22/2024 07/31/2024 07/31/2024 07/31/2024 245.00 3800058249 Monitoring Paid by EFT #1830 07/25/2024 08/07/2024 07/31/2024 08/07/2024 30.00 3800058250 Monitoring Paid by EFT #1830 07/25/2024 08/07/2024 07/31/2024 08/07/2024 60.00 3800058320 Monitoring Paid by EFT #1830 07/26/2024 08/07/2024 07/31/2024 08/07/2024 1,225.00 Vendor 18550 - EUROFINS EATON ANALYTICAL LLC Totals Invoices 10 $4,050.00 Vendor 47836 - EVOQUA WATER TECHNOLOGIES LLC 906539459 Service Contracts Paid by EFT #1714 07/01/2024 07/24/2024 07/31/2024 07/25/2024 157.00 Vendor 47836 - EVOQUA WATER TECHNOLOGIES LLC Totals Invoices 1 $157.00 Vendor 48782 - EXTRON ELECTRONICS 3968980/REVISED Replace Presentation Equipment Paid by EFT #1715 10/13/2023 07/23/2024 06/30/2024 06/30/2024 07/25/2024 1,964.27 Vendor 48782 - EXTRON ELECTRONICS Totals Invoices 1 $1,964.27 Vendor 14890 - FEDEX 8-550-96779 Postage Expenses Paid by EFT #1716 07/05/2024 07/24/2024 07/31/2024 07/25/2024 124.83 8-557-26824 Postage Expenses Paid by EFT #1716 07/12/2024 07/24/2024 07/31/2024 07/25/2024 28.88 8-564-43367 Postage Expenses Paid by EFT #1779 07/19/2024 07/31/2024 07/31/2024 07/31/2024 25.33 8-570-49366 Postage Expenses Paid by EFT #1779 07/26/2024 07/31/2024 07/31/2024 07/31/2024 128.54 Vendor 14890 - FEDEX Totals Invoices 4 $307.58 Vendor 48402 - FLYERS ENERGY LLC 24-129611 Gasoline/Diesel Expense Paid by EFT #1717 07/02/2024 07/24/2024 07/31/2024 07/25/2024 2,606.09 24128701 Oil & Lubricants Paid by EFT #1717 07/02/2024 07/22/2024 06/30/2024 06/30/2024 07/25/2024 891.64 24-129745 Oil & Lubricants Paid by EFT #1717 07/03/2024 07/24/2024 07/31/2024 07/25/2024 656.11 24-130580 Fuel Inventory Paid by EFT #1717 07/04/2024 07/24/2024 07/31/2024 07/25/2024 5,133.82 24-137628 Fuel Inventory Paid by EFT #1717 07/11/2024 07/24/2024 07/31/2024 07/25/2024 4,068.34 24-141528 Gasoline Fuel Inventory Paid by EFT #1780 07/19/2024 07/31/2024 07/31/2024 07/31/2024 2,772.35 24-141589 Diesel Fuel Inventory Paid by EFT #1780 07/20/2024 07/31/2024 07/31/2024 07/31/2024 3,592.45 24-145731 Diesel Fuel Inventory Paid by EFT #1780 07/25/2024 07/31/2024 07/31/2024 07/31/2024 3,508.08 24-149771 Gasoline Fuel Inventory Paid by EFT #1831 07/30/2024 08/07/2024 07/31/2024 08/07/2024 2,782.39 Vendor 48402 - FLYERS ENERGY LLC Totals Invoices 9 $26,011.27 Vendor 48260 - GEO-LOGIC ASSOCIATES INC 0270059 Wells Paid by EFT #1718 07/01/2024 07/24/2024 07/31/2024 07/25/2024 3,500.00 Vendor 48260 - GEO-LOGIC ASSOCIATES INC Totals Invoices 1 $3,500.00 Vendor 43111 - GFS CHEMICALS INC CINV-143982 Laboratory Supplies Paid by EFT #1832 07/15/2024 08/07/2024 07/31/2024 08/07/2024 277.66 CINV-144461 Laboratory Supplies Paid by EFT #1832 07/19/2024 08/07/2024 07/31/2024 08/07/2024 135.84 Run by Erika Franco on 08/07/2024 02:27:55 PM Page 6 of 19 Payment of Claims Payment Date Range 07/25/24 - 08/07/24 Report By Vendor - Invoice Summary Listing Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount Vendor 43111 - GFS CHEMICALS INC Totals Invoices 2 $413.50 Vendor 49771 - KATHRYN GOODRIDGE 2315114-1 Toilet Rebate Program Paid by EFT #1719 07/15/2024 07/24/2024 07/31/2024 07/25/2024 100.00 Vendor 49771 - KATHRYN GOODRIDGE Totals Invoices 1 $100.00 Vendor 49114 - DUSTIN GORALSKI CEU070924 Travel - Meetings - Education Paid by EFT #1720 07/09/2024 07/24/2024 07/31/2024 07/25/2024 45.00 DGORALSKI072424 Travel - Meetings - Education Paid by EFT #1781 07/24/2024 07/31/2024 07/31/2024 07/31/2024 85.76 Vendor 49114 - DUSTIN GORALSKI Totals Invoices 2 $130.76 Vendor 44860 - GoTo TECHNOLOGIES USA INC 1209231623 Service Contracts Paid by EFT #1782 07/21/2024 07/31/2024 07/31/2024 07/31/2024 2,160.00 Vendor 44860 - GoTo TECHNOLOGIES USA INC Totals Invoices 1 $2,160.00 Vendor 15600 - GRAINGER 9170659651 Buildings Paid by EFT #1783 07/02/2024 07/31/2024 07/31/2024 07/31/2024 798.91 9171810428 Buildings Paid by EFT #1783 07/03/2024 07/31/2024 07/31/2024 07/31/2024 37.50 9171968366 Safety Equipment - Physicals Paid by EFT #1833 07/03/2024 08/07/2024 07/31/2024 08/07/2024 416.12 9174638685 Pump Stations Paid by EFT #1783 07/08/2024 07/31/2024 07/31/2024 07/31/2024 715.57 9179083242 Buildings Paid by EFT #1783 07/11/2024 07/31/2024 07/31/2024 07/31/2024 275.73 9183234310 Pump Stations Paid by EFT #1783 07/16/2024 07/31/2024 07/31/2024 07/31/2024 158.23 9183737999 Buildings Paid by EFT #1833 07/16/2024 08/07/2024 07/31/2024 08/07/2024 791.52 9185672194 Buildings Paid by EFT #1833 07/17/2024 08/07/2024 07/31/2024 08/07/2024 781.56 9186834934 Biosolids Equipment - Building Paid by EFT #1833 07/18/2024 08/07/2024 07/31/2024 08/07/2024 93.29 9189693113 Buildings Paid by EFT #1833 07/22/2024 08/07/2024 07/31/2024 08/07/2024 256.86 9189693121 Buildings Paid by EFT #1833 07/22/2024 08/07/2024 07/31/2024 08/07/2024 493.25 9191408195 Field, Shop & Safety Supplies Inventory Paid by EFT #1833 07/23/2024 08/07/2024 07/31/2024 08/07/2024 587.11 9193609410 Secondary Equipment Paid by EFT #1833 07/24/2024 08/07/2024 07/31/2024 08/07/2024 734.02 9193628857 Secondary Equipment Paid by EFT #1833 07/25/2024 08/07/2024 07/31/2024 08/07/2024 77.43 9195332391 Biosolids Equipment - Building Paid by EFT #1833 07/25/2024 08/07/2024 07/31/2024 08/07/2024 3,873.88 9195433744 Filter Equipment - Building Paid by EFT #1833 07/26/2024 08/07/2024 07/31/2024 08/07/2024 175.24 9195789053 Wells Paid by EFT #1833 07/26/2024 08/07/2024 07/31/2024 08/07/2024 439.43 Vendor 15600 - GRAINGER Totals Invoices 17 $10,705.65 Vendor 15800 - HACH CO 14115528 Laboratory Supplies Paid by EFT #1834 07/22/2024 08/07/2024 07/31/2024 08/07/2024 708.89 Vendor 15800 - HACH CO Totals Invoices 1 $708.89 Vendor 50246 - MARISA HANSON 3411206 Toilet Rebate Program Paid by EFT #1835 07/24/2024 08/07/2024 07/31/2024 08/07/2024 192.00 3411206-1 Water Use Reduction Rebates Paid by EFT #1835 07/24/2024 08/07/2024 07/31/2024 08/07/2024 750.00 Vendor 50246 - MARISA HANSON Totals Invoices 2 $942.00 Vendor 48332 - HDR ENGINEERING INC 1200610836 Contractual Services Paid by EFT #1721 04/10/2024 07/23/2024 06/30/2024 06/30/2024 07/25/2024 335.73 Vendor 48332 - HDR ENGINEERING INC Totals Invoices 1 $335.73 Vendor 44430 - HIGH SIERRA BUSINESS SYSTEMS Run by Erika Franco on 08/07/2024 02:27:55 PM Page 7 of 19 Payment of Claims Payment Date Range 07/25/24 - 08/07/24 Report By Vendor - Invoice Summary Listing Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount 140047 Service Contracts Paid by EFT #1722 07/02/2024 07/19/2024 06/30/2024 06/30/2024 07/25/2024 100.39 Vendor 44430 - HIGH SIERRA BUSINESS SYSTEMS Totals Invoices 1 $100.39 Vendor 49604 - HOUSTON MAGNANI AND ASSOCIATES 7308 Contractual Services Paid by EFT #1836 07/31/2024 08/07/2024 07/31/2024 08/07/2024 800.00 Vendor 49604 - HOUSTON MAGNANI AND ASSOCIATES Totals Invoices 1 $800.00 Vendor 50229 - ANGELA HOWELL 2573211 Turf Buy-Back Program Paid by EFT #1723 07/10/2024 07/24/2024 07/31/2024 07/25/2024 513.00 Vendor 50229 - ANGELA HOWELL Totals Invoices 1 $513.00 Vendor 48832 - NANCY HUSSMANN Aug 2024 Personnel Expense Paid by EFT #1784 08/01/2024 08/06/2024 08/01/2024 07/31/2024 451.15 Vendor 48832 - NANCY HUSSMANN Totals Invoices 1 $451.15 Vendor 50217 - KEATON HUTCHISON 3453213-2 Water Use Reduction Rebates Paid by EFT #1724 07/09/2024 07/24/2024 07/31/2024 07/25/2024 750.00 Vendor 50217 - KEATON HUTCHISON Totals Invoices 1 $750.00 Vendor 10103 - IDEXX DISTRIBUTION CORP 3156782331 Laboratory Supplies Paid by EFT #1837 07/25/2024 08/07/2024 07/31/2024 08/07/2024 4,130.18 Vendor 10103 - IDEXX DISTRIBUTION CORP Totals Invoices 1 $4,130.18 Vendor 48056 - INFOSEND INC 266969 Printing & Postage Expenses Paid by EFT #1785 07/13/2024 07/30/2024 07/30/2024 07/31/2024 10,990.43 Vendor 48056 - INFOSEND INC Totals Invoices 1 $10,990.43 Vendor 50123 - INLAND SUPPLY CO INC 1091642 Janitorial Supplies Inventory Paid by EFT #1786 07/03/2024 07/30/2024 07/30/2024 07/31/2024 589.65 Vendor 50123 - INLAND SUPPLY CO INC Totals Invoices 1 $589.65 Vendor 48140 - INTEGRITY LOCKSMITH i40781 Wells Paid by EFT #1838 05/06/2024 08/07/2024 07/31/2024 06/30/2024 08/07/2024 21.01 i41464 Buildings Paid by EFT #1787 07/12/2024 07/31/2024 07/31/2024 07/31/2024 65.20 i41501 Shop Supplies Paid by EFT #1787 07/30/2024 07/31/2024 07/31/2024 07/31/2024 130.17 i41505 Tanks Backup Power Paid by EFT #1838 07/30/2024 08/07/2024 07/31/2024 08/07/2024 208.31 Vendor 48140 - INTEGRITY LOCKSMITH Totals Invoices 4 $424.69 Vendor 44110 - J&L PRO KLEEN INC 29886 Janitorial Services Paid by EFT #1788 07/16/2024 07/31/2024 07/31/2024 07/31/2024 4,992.83 29893 Janitorial Services Paid by EFT #1788 07/17/2024 07/31/2024 07/31/2024 07/31/2024 225.00 Vendor 44110 - J&L PRO KLEEN INC Totals Invoices 2 $5,217.83 Vendor 47947 - JACK HENRY & ASSOC. INC 4681665 Contractual Services Paid by EFT #1725 06/30/2024 07/23/2024 06/30/2024 06/30/2024 07/25/2024 5,500.00 Vendor 47947 - JACK HENRY & ASSOC. INC Totals Invoices 1 $5,500.00 Vendor 50230 - MARISSA JACOBUS 2364411 Clothes Washer Rebate Program Paid by EFT #1726 07/19/2024 07/24/2024 07/31/2024 07/25/2024 200.00 Vendor 50230 - MARISSA JACOBUS Totals Invoices 1 $200.00 Vendor 49777 - NICOLE H JANOSCHEK 3379224-1 Turf Buy-Back Program Paid by EFT #1727 07/16/2024 07/24/2024 07/31/2024 07/25/2024 1,800.00 Vendor 49777 - NICOLE H JANOSCHEK Totals Invoices 1 $1,800.00 Run by Erika Franco on 08/07/2024 02:27:55 PM Page 8 of 19 Payment of Claims Payment Date Range 07/25/24 - 08/07/24 Report By Vendor - Invoice Summary Listing Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount Vendor 50224 - MATTHEW KALLAS MKALLAS071124 Safety Equipment - Physicals Paid by EFT #1728 07/11/2024 07/24/2024 07/31/2024 07/25/2024 100.00 Vendor 50224 - MATTHEW KALLAS Totals Invoices 1 $100.00 Vendor 50070 - RACHEL KALLAS 071024 Incentive & Recognition Program Paid by EFT #1729 07/10/2024 07/24/2024 07/31/2024 07/25/2024 40.28 Vendor 50070 - RACHEL KALLAS Totals Invoices 1 $40.28 Vendor 43694 - KIMBALL MIDWEST 102221942 Shop Supplies Paid by EFT #1730 05/14/2024 07/19/2024 06/30/2024 06/30/2024 07/25/2024 344.04 102439899 Shop Supplies Paid by EFT #1789 07/24/2024 07/31/2024 07/31/2024 07/31/2024 548.86 102440142 Shop Supplies Paid by EFT #1839 07/24/2024 08/07/2024 07/31/2024 08/07/2024 193.12 Vendor 43694 - KIMBALL MIDWEST Totals Invoices 3 $1,086.02 Vendor 49210 - L N CURTIS & SONS INV845001 Safety Equipment - Physicals Paid by EFT #1790 07/16/2024 07/31/2024 07/31/2024 07/31/2024 4,011.99 Vendor 49210 - L N CURTIS & SONS Totals Invoices 1 $4,011.99 Vendor 49725 - LAKESIDE TERMITE & PEST CONTROL 013771387 Buildings Paid by EFT #1791 07/23/2024 07/30/2024 07/30/2024 07/31/2024 150.00 016239919 Buildings Paid by EFT #1791 07/29/2024 07/31/2024 07/31/2024 07/31/2024 95.00 Vendor 49725 - LAKESIDE TERMITE & PEST CONTROL Totals Invoices 2 $245.00 Vendor 17352 - LANDAUER INC 101229841 Contractual Services Paid by EFT #1792 06/17/2024 07/30/2024 07/30/2024 07/31/2024 1,926.75 Vendor 17352 - LANDAUER INC Totals Invoices 1 $1,926.75 Vendor 22200 - LANGENFELD ACE HARDWARE Jul 24 Stmt Shop Supplies & Small Tools Paid by EFT #1840 07/31/2024 08/07/2024 07/31/2024 08/07/2024 1,403.37 Vendor 22200 - LANGENFELD ACE HARDWARE Totals Invoices 1 $1,403.37 Vendor 49591 - JUDY LEONG LEONG071824 Travel - Meetings - Education Paid by EFT #1793 07/18/2024 07/31/2024 07/31/2024 07/31/2024 7.84 Aug 2024 Contractual Services Paid by EFT #1793 08/01/2024 08/06/2024 08/01/2024 07/31/2024 20.00 Vendor 49591 - JUDY LEONG Totals Invoices 2 $27.84 Vendor 50161 - MICAH LEW REIM 061924 Travel - Meetings - Education Paid by EFT #1841 07/01/2024 08/07/2024 07/31/2024 08/07/2024 155.44 Vendor 50161 - MICAH LEW Totals Invoices 1 $155.44 Vendor 22550 - LIBERTY UTILITIES 200008904415 524 Electricity Paid by EFT #1731 07/08/2024 07/19/2024 06/30/2024 06/30/2024 07/25/2024 6,948.35 200008909877 624 Electricity Paid by EFT #1731 07/08/2024 07/19/2024 06/30/2024 06/30/2024 07/25/2024 89.38 200008909950 624 Electricity Paid by EFT #1731 07/08/2024 07/19/2024 06/30/2024 06/30/2024 07/25/2024 256.14 200008913051 624 Electricity Paid by EFT #1731 07/08/2024 07/19/2024 06/30/2024 06/30/2024 07/25/2024 265.21 200008913150 624 Electricity Paid by EFT #1731 07/08/2024 07/19/2024 06/30/2024 06/30/2024 07/25/2024 329.41 200008913333 624 Electricity Paid by EFT #1731 07/08/2024 07/19/2024 06/30/2024 06/30/2024 07/25/2024 261.52 200008913713 624 Electricity Paid by EFT #1731 07/08/2024 07/23/2024 06/30/2024 06/30/2024 07/25/2024 232.30 200008899078 624 Electricity Paid by EFT #1731 07/09/2024 07/19/2024 06/30/2024 06/30/2024 07/25/2024 88.76 200008899169 624 Electricity Paid by EFT #1731 07/09/2024 07/19/2024 06/30/2024 06/30/2024 07/25/2024 36.79 200008899391 624 Electricity Paid by EFT #1731 07/09/2024 07/19/2024 06/30/2024 06/30/2024 07/25/2024 624.07 Run by Erika Franco on 08/07/2024 02:27:55 PM Page 9 of 19 Payment of Claims Payment Date Range 07/25/24 - 08/07/24 Report By Vendor - Invoice Summary Listing Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount 200008899649 624 Electricity Paid by EFT #1731 07/09/2024 07/19/2024 06/30/2024 06/30/2024 07/25/2024 206.16 200008913424 624 Electricity Paid by EFT #1731 07/09/2024 07/19/2024 06/30/2024 06/30/2024 07/25/2024 839.80 200008913887 624 Electricity Paid by EFT #1731 07/09/2024 07/19/2024 06/30/2024 06/30/2024 07/25/2024 128.38 200008919025 624 Electricity Paid by EFT #1731 07/09/2024 07/19/2024 06/30/2024 06/30/2024 07/25/2024 461.16 200008904860 624 Electricity Paid by EFT #1731 07/10/2024 07/25/2024 06/30/2024 06/30/2024 07/25/2024 423.12 200008919215 624 Electricity Paid by EFT #1731 07/10/2024 07/25/2024 06/30/2024 06/30/2024 07/25/2024 101.69 200008919769 624 Electricity Paid by EFT #1731 07/10/2024 07/25/2024 06/30/2024 06/30/2024 07/25/2024 804.17 200008928034 624 Electricity Paid by EFT #1731 07/10/2024 07/25/2024 06/30/2024 06/30/2024 07/25/2024 8,649.63 200008913952 624 Electricity Paid by EFT #1731 07/11/2024 07/25/2024 06/30/2024 06/30/2024 07/25/2024 35.37 200008919124 624 Electricity Paid by EFT #1731 07/11/2024 07/25/2024 06/30/2024 06/30/2024 07/25/2024 371.19 200008919298 624 Electricity Paid by EFT #1731 07/11/2024 07/25/2024 06/30/2024 06/30/2024 07/25/2024 196.21 200008923183 624 Electricity Paid by EFT #1731 07/11/2024 07/25/2024 06/30/2024 06/30/2024 07/25/2024 240.09 200008919389 624 Electricity Paid by EFT #1731 07/12/2024 07/23/2024 06/30/2024 06/30/2024 07/25/2024 351.97 200008904753 624 Electricity Paid by EFT #1731 07/15/2024 07/23/2024 06/30/2024 06/30/2024 07/25/2024 1,929.27 200008937159 624 Electricity Paid by EFT #1731 07/16/2024 07/23/2024 06/30/2024 06/30/2024 07/25/2024 29.35 200008895860 624 Electricity Paid by EFT #1731 07/17/2024 07/24/2024 06/30/2024 06/30/2024 07/25/2024 123.90 200008919454 624 Electricity Paid by EFT #1731 07/17/2024 07/24/2024 06/30/2024 06/30/2024 07/25/2024 55.30 200008923498 624 Electricity Paid by EFT #1731 07/18/2024 07/24/2024 06/30/2024 06/30/2024 07/25/2024 3,079.99 200008904043 724 Electricity Paid by EFT #1794 07/19/2024 07/31/2024 07/31/2024 07/31/2024 72.89 200008919538 724 Electricity Paid by EFT #1794 07/19/2024 07/31/2024 07/31/2024 07/31/2024 51.82 200008919603 724 Electricity Paid by EFT #1794 07/19/2024 07/31/2024 07/31/2024 07/31/2024 191.25 200008895654 724 Electricity Paid by EFT #1842 07/24/2024 08/07/2024 07/31/2024 08/07/2024 451.88 200008923282 624 Electricity Paid by EFT #1842 07/24/2024 08/07/2024 07/31/2024 06/30/2024 08/07/2024 11,095.56 200008923639 524 Electricity Paid by EFT #1842 07/24/2024 08/07/2024 07/31/2024 06/30/2024 08/07/2024 131,574.21 200008923795 724 Electricity Paid by EFT #1842 07/24/2024 08/07/2024 07/31/2024 08/07/2024 563.68 200008928927 724 Electricity Paid by EFT #1842 07/24/2024 08/07/2024 07/31/2024 08/07/2024 41.92 200008932457 724 Electricity Paid by EFT #1842 07/24/2024 08/07/2024 07/31/2024 08/07/2024 27.18 200008932648 724 Electricity Paid by EFT #1842 07/24/2024 08/07/2024 07/31/2024 08/07/2024 125.98 200008932747 724 Electricity Paid by EFT #1842 07/24/2024 08/07/2024 07/31/2024 08/07/2024 75.42 200008895761 724 Electricity Paid by EFT #1842 07/26/2024 08/07/2024 07/31/2024 08/07/2024 862.18 Vendor 22550 - LIBERTY UTILITIES Totals Invoices 40 $172,292.65 Vendor 47903 - LINDE GAS & EQUIPMENT INC 43887209 Grounds & Maintenance Paid by EFT #1732 07/03/2024 07/24/2024 07/31/2024 07/25/2024 19.46 43943397 Shop Supplies Paid by EFT #1732 07/09/2024 07/24/2024 07/31/2024 07/25/2024 15.86 43943398 Shop Supplies Paid by EFT #1732 07/09/2024 07/24/2024 07/31/2024 07/25/2024 25.45 43956093 Shop Supplies Paid by EFT #1732 07/10/2024 07/24/2024 07/31/2024 07/25/2024 (15.86) 44041097 Shop Supplies Paid by EFT #1795 07/17/2024 07/31/2024 07/31/2024 07/31/2024 97.14 44223176 Shop Supplies Paid by EFT #1795 07/24/2024 07/31/2024 07/31/2024 07/31/2024 211.30 44275800 Shop Supplies Paid by EFT #1843 07/27/2024 08/07/2024 07/31/2024 08/07/2024 13.66 Vendor 47903 - LINDE GAS & EQUIPMENT INC Totals Invoices 7 $367.01 Vendor 19248 - MALLORY SAFETY & SUPPLY LLC Run by Erika Franco on 08/07/2024 02:27:55 PM Page 10 of 19 Payment of Claims Payment Date Range 07/25/24 - 08/07/24 Report By Vendor - Invoice Summary Listing Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount 5930009 Field, Shop & Safety Supplies Inventory Paid by EFT #1733 06/25/2024 07/24/2024 07/31/2024 07/25/2024 228.29 Vendor 19248 - MALLORY SAFETY & SUPPLY LLC Totals Invoices 1 $228.29 Vendor 50231 - AARON MARKHAM 3128309 Turf Buy-Back Program Paid by EFT #1734 07/15/2024 07/24/2024 07/31/2024 07/25/2024 1,008.00 Vendor 50231 - AARON MARKHAM Totals Invoices 1 $1,008.00 Vendor 48821 - MCC CONTROLS LLC CD99530925 SCADA Paid by EFT #1844 06/24/2024 08/07/2024 07/31/2024 06/30/2024 08/07/2024 17,840.30 CD99535568 SCADA Paid by EFT #1844 07/29/2024 08/07/2024 07/31/2024 08/07/2024 2,146.40 Vendor 48821 - MCC CONTROLS LLC Totals Invoices 2 $19,986.70 Vendor 50244 - JOSEPH MCDANIEL 2529207 Turf Buy-Back Program Paid by EFT #1845 07/26/2024 08/07/2024 07/31/2024 08/07/2024 3,000.00 Vendor 50244 - JOSEPH MCDANIEL Totals Invoices 1 $3,000.00 Vendor 50232 - JOSEPH MCKENNA 2554132 Clothes Washer Rebate Program Paid by EFT #1735 07/11/2024 07/24/2024 07/31/2024 07/25/2024 200.00 Vendor 50232 - JOSEPH MCKENNA Totals Invoices 1 $200.00 Vendor 17900 - MCMASTER CARR SUPPLY CO 30297708 Pump Stations Paid by EFT #1796 07/18/2024 07/30/2024 07/30/2024 07/31/2024 305.71 30304190 Primary Equipment Paid by EFT #1796 07/18/2024 07/30/2024 07/30/2024 07/31/2024 424.29 Vendor 17900 - MCMASTER CARR SUPPLY CO Totals Invoices 2 $730.00 Vendor 49957 - ME SIMPSON CO INC 42605 Water Meters & Parts Paid by EFT #1736 06/30/2024 07/23/2024 06/30/2024 06/30/2024 07/25/2024 28,790.60 Vendor 49957 - ME SIMPSON CO INC Totals Invoices 1 $28,790.60 Vendor 50198 - MICHAEL BAKER INTERN'L INC 1218846 Contractual Services Paid by EFT #1737 07/18/2024 07/23/2024 06/30/2024 06/30/2024 07/25/2024 11,044.26 Vendor 50198 - MICHAEL BAKER INTERN'L INC Totals Invoices 1 $11,044.26 Vendor 43889 - MME MUNICIPAL MAINTENANCE 024046 Automotive Paid by EFT #1797 06/28/2024 07/30/2024 07/30/2024 07/31/2024 1,143.96 Vendor 43889 - MME MUNICIPAL MAINTENANCE Totals Invoices 1 $1,143.96 Vendor 50233 - KERRY S MORRIS 3472708 Water Use Reduction Rebates Paid by EFT #1738 07/19/2024 07/24/2024 07/31/2024 07/25/2024 649.15 Vendor 50233 - KERRY S MORRIS Totals Invoices 1 $649.15 Vendor 48731 - NEENAH FOUNDRY COMPANY 155602 Boxes-Lids-Extensions Inventory Paid by EFT #1846 06/28/2024 08/07/2024 07/31/2024 08/07/2024 44,348.93 Vendor 48731 - NEENAH FOUNDRY COMPANY Totals Invoices 1 $44,348.93 Vendor 44872 - NEW RESOURCES GROUP INC 00045971 Water Conservation Supplies Paid by EFT #1739 07/11/2024 07/24/2024 07/31/2024 07/25/2024 296.72 Vendor 44872 - NEW RESOURCES GROUP INC Totals Invoices 1 $296.72 Vendor 48315 - O'REILLY AUTO PARTS Jul 24 Stmt Automotive Paid by EFT #1847 07/28/2024 08/07/2024 07/31/2024 08/07/2024 35.43 Vendor 48315 - O'REILLY AUTO PARTS Totals Invoices 1 $35.43 Vendor 50247 - ANA ORUBEONDO Run by Erika Franco on 08/07/2024 02:27:55 PM Page 11 of 19 Payment of Claims Payment Date Range 07/25/24 - 08/07/24 Report By Vendor - Invoice Summary Listing Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount 3388108 Clothes Washer Rebate Program Paid by EFT #1848 07/30/2024 08/07/2024 07/31/2024 08/07/2024 200.00 Vendor 50247 - ANA ORUBEONDO Totals Invoices 1 $200.00 Vendor 49997 - PACIFIC STEEL & RECYCLING 8772374 Grounds & Maintenance Paid by EFT #1849 07/17/2024 08/07/2024 07/31/2024 08/07/2024 956.76 Vendor 49997 - PACIFIC STEEL & RECYCLING Totals Invoices 1 $956.76 Vendor 48565 - PLANETBIDS INC 1023562 Service Contracts Paid by EFT #1740 07/05/2024 07/24/2024 07/31/2024 07/25/2024 1,857.53 Vendor 48565 - PLANETBIDS INC Totals Invoices 1 $1,857.53 Vendor 49961 - PLATINUM ADVISORS LLC 36959 Contractual Services Paid by EFT #1741 07/01/2024 07/24/2024 07/31/2024 07/25/2024 1,000.00 37128 Contractual Services Paid by EFT #1850 08/01/2024 08/07/2024 08/31/2024 08/07/2024 1,000.00 Vendor 49961 - PLATINUM ADVISORS LLC Totals Invoices 2 $2,000.00 Vendor 50248 - JOHN POELL 2391214 Turf Buy-Back Program Paid by EFT #1851 07/31/2024 08/07/2024 07/31/2024 08/07/2024 3,000.00 Vendor 50248 - JOHN POELL Totals Invoices 1 $3,000.00 Vendor 49550 - PRISM 25400034 Contractual Services Paid by EFT #1742 07/03/2024 07/24/2024 07/31/2024 07/25/2024 1,110.90 Vendor 49550 - PRISM Totals Invoices 1 $1,110.90 Vendor 49881 - QCS LLC 4178 Buildings Paid by EFT #1743 06/25/2024 07/24/2024 07/31/2024 07/25/2024 330.45 Vendor 49881 - QCS LLC Totals Invoices 1 $330.45 Vendor 49826 - QUADIENT LEASING USA INC Q1382752 Equipment Rental- Lease Paid by EFT #1744 06/16/2024 07/24/2024 07/31/2024 07/25/2024 1,061.83 Vendor 49826 - QUADIENT LEASING USA INC Totals Invoices 1 $1,061.83 Vendor 50182 - RDO EQUIPMENT CO 0782321 Replace Mole Paid by EFT #1760 06/03/2024 07/25/2024 06/30/2024 06/30/2024 07/25/2024 6,765.78 Vendor 50182 - RDO EQUIPMENT CO Totals Invoices 1 $6,765.78 Vendor 47803 - REDWOOD PRINTING 35456 Office Supplies Paid by EFT #1798 07/26/2024 07/31/2024 07/31/2024 07/31/2024 65.25 Vendor 47803 - REDWOOD PRINTING Totals Invoices 1 $65.25 Vendor 49497 - REGULATORY INTELLIGENCE LLC STPUD724 Advisory Paid by EFT #1852 07/15/2024 08/07/2024 07/31/2024 08/07/2024 1,469.56 Vendor 49497 - REGULATORY INTELLIGENCE LLC Totals Invoices 1 $1,469.56 Vendor 49819 - JEFFREY SHANE ROMSOS ROMSOS073024 Travel - Meetings - Education Paid by EFT #1745 05/29/2024 07/24/2024 07/31/2024 07/25/2024 191.00 Vendor 49819 - JEFFREY SHANE ROMSOS Totals Invoices 1 $191.00 Vendor 48684 - RS AMERICAS INC 9019522053 Buildings Paid by EFT #1799 06/24/2024 07/30/2024 07/30/2024 07/31/2024 33.64 Vendor 48684 - RS AMERICAS INC Totals Invoices 1 $33.64 Vendor 48812 - JULIE H RYAN MILEAGE 062724 Travel - Meetings - Education Paid by EFT #1746 07/01/2024 07/19/2024 06/30/2024 06/30/2024 07/25/2024 254.60 Vendor 48812 - JULIE H RYAN Totals Invoices 1 $254.60 Run by Erika Franco on 08/07/2024 02:27:55 PM Page 12 of 19 Payment of Claims Payment Date Range 07/25/24 - 08/07/24 Report By Vendor - Invoice Summary Listing Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount Vendor 49911 - SEARCHPROS STAFFING LLC 24070926 Contractual Services Paid by EFT #1800 07/09/2024 07/30/2024 07/30/2024 07/31/2024 1,377.18 24071623 Contractual Services Paid by EFT #1800 07/16/2024 07/30/2024 07/30/2024 07/31/2024 1,539.85 24072325 Contractual Services Paid by EFT #1800 07/23/2024 07/30/2024 07/30/2024 07/31/2024 1,898.38 Vendor 49911 - SEARCHPROS STAFFING LLC Totals Invoices 3 $4,815.41 Vendor 48971 - SEWER EQUIPMENT CO 0000222244 Automotive Paid by EFT #1853 07/18/2024 08/07/2024 07/31/2024 08/07/2024 1,962.16 Vendor 48971 - SEWER EQUIPMENT CO Totals Invoices 1 $1,962.16 Vendor 22300 - SHAPE INCORPORATED 36208B24523 New Scum Pump Paid by EFT #1854 07/23/2024 08/07/2024 07/31/2024 08/07/2024 6,231.38 Vendor 22300 - SHAPE INCORPORATED Totals Invoices 1 $6,231.38 Vendor 22620 - SIERRA SPRINGS 5152426 072724 Supplies Paid by EFT #1801 07/27/2024 07/31/2024 07/31/2024 07/31/2024 15.03 Vendor 22620 - SIERRA SPRINGS Totals Invoices 1 $15.03 Vendor 50234 - RICHARD SILBERMAN 3379225 Turf Buy-Back Program Paid by EFT #1747 07/16/2024 07/24/2024 07/31/2024 07/25/2024 3,000.00 Vendor 50234 - RICHARD SILBERMAN Totals Invoices 1 $3,000.00 Vendor 50203 - SMARTSIGN SMT-730578 Pipe - Covers & Manholes Paid by EFT #1855 06/18/2024 08/07/2024 07/31/2024 08/07/2024 3,290.63 Vendor 50203 - SMARTSIGN Totals Invoices 1 $3,290.63 Vendor 44577 - SOUNDPROS INC 240622-45 Public Relations Expense Paid by EFT #1748 06/22/2024 07/24/2024 07/31/2024 07/25/2024 49.00 240722-45 Public Relations Expense Paid by EFT #1856 07/22/2024 08/07/2024 08/31/2024 08/07/2024 49.00 Vendor 44577 - SOUNDPROS INC Totals Invoices 2 $98.00 Vendor 48628 - SOUTH LAKE TAHOE ACE HARDWARE 073665 Wells Paid by EFT #1857 07/18/2024 08/07/2024 07/31/2024 08/07/2024 70.02 Vendor 48628 - SOUTH LAKE TAHOE ACE HARDWARE Totals Invoices 1 $70.02 Vendor 50228 - SOUTH TAHOE BREWING COMPANY 3229130 Turf Buy-Back Program Paid by EFT #1749 07/10/2024 07/24/2024 07/31/2024 07/25/2024 4,731.00 Vendor 50228 - SOUTH TAHOE BREWING COMPANY Totals Invoices 1 $4,731.00 Vendor 23450 - SOUTH TAHOE REFUSE 2903136 Refuse Disposal Paid by EFT #1858 08/01/2024 08/07/2024 07/31/2024 08/07/2024 3,902.96 2903186 Refuse Disposal Paid by EFT #1858 08/01/2024 08/07/2024 07/31/2024 08/07/2024 188.80 2903203 Refuse Disposal Paid by EFT #1858 08/01/2024 08/07/2024 07/31/2024 08/07/2024 188.80 2903204 Refuse Disposal Paid by EFT #1858 08/01/2024 08/07/2024 07/31/2024 08/07/2024 566.40 2903221 Refuse Disposal Paid by EFT #1858 08/01/2024 08/07/2024 07/31/2024 08/07/2024 850.00 2903302 Refuse Disposal Paid by EFT #1858 08/01/2024 08/07/2024 07/31/2024 08/07/2024 566.40 2903600 Refuse Disposal Paid by EFT #1858 08/01/2024 08/07/2024 07/31/2024 08/07/2024 1,132.80 Vendor 23450 - SOUTH TAHOE REFUSE Totals Invoices 7 $7,396.16 Vendor 45168 - SOUTHWEST GAS 910000183539 724 Natural Gas Paid by EFT #1750 07/17/2024 07/25/2024 07/31/2024 07/25/2024 11.00 910000426082 724 Natural Gas Paid by EFT #1750 07/18/2024 07/25/2024 07/31/2024 07/25/2024 12.15 Run by Erika Franco on 08/07/2024 02:27:55 PM Page 13 of 19 Payment of Claims Payment Date Range 07/25/24 - 08/07/24 Report By Vendor - Invoice Summary Listing Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount 910000175915 724 Natural Gas Paid by EFT #1802 07/22/2024 07/31/2024 07/31/2024 07/31/2024 11.00 910000639911 724 Natural Gas Paid by EFT #1802 07/22/2024 07/31/2024 07/31/2024 07/31/2024 11.00 910000416139 724 Natural Gas Paid by EFT #1802 07/23/2024 07/31/2024 07/31/2024 07/31/2024 11.00 910000192416 724 Natural Gas Paid by EFT #1802 07/24/2024 07/31/2024 07/31/2024 07/31/2024 11.00 910000421501 724 Natural Gas Paid by EFT #1802 07/25/2024 07/31/2024 07/31/2024 07/31/2024 121.43 910000421502 724 Natural Gas Paid by EFT #1802 07/25/2024 07/31/2024 07/31/2024 07/31/2024 266.17 910000429959 724 Natural Gas Paid by EFT #1802 07/25/2024 07/31/2024 07/31/2024 07/31/2024 11.00 910000429960 724 Natural Gas Paid by EFT #1802 07/25/2024 07/31/2024 07/31/2024 07/31/2024 1,454.93 910000175574 724 Natural Gas Paid by EFT #1859 07/29/2024 08/07/2024 07/31/2024 08/07/2024 11.00 910000175902 724 Natural Gas Paid by EFT #1859 07/29/2024 08/07/2024 07/31/2024 08/07/2024 11.00 910000865770 724 Natural Gas Paid by EFT #1859 07/29/2024 08/07/2024 07/31/2024 08/07/2024 11.00 Vendor 45168 - SOUTHWEST GAS Totals Invoices 13 $1,953.68 Vendor 49064 - STAPLES BUSINESS ADVANTAGE 6008146000 Office Supplies Paid by EFT #1860 07/31/2024 08/07/2024 07/31/2024 08/07/2024 108.11 Vendor 49064 - STAPLES BUSINESS ADVANTAGE Totals Invoices 1 $108.11 Vendor 48617 - STEEL-TOE-SHOES.COM STP070924 Safety Equipment - Physicals Paid by EFT #1751 07/09/2024 07/24/2024 07/31/2024 07/25/2024 135.88 Vendor 48617 - STEEL-TOE-SHOES.COM Totals Invoices 1 $135.88 Vendor 50051 - THOMAS SUK 2382140-1 Water Use Reduction Rebates Paid by EFT #1861 07/30/2024 08/07/2024 07/31/2024 08/07/2024 198.92 Vendor 50051 - THOMAS SUK Totals Invoices 1 $198.92 Vendor 50018 - SUMMIT FIRE & SECURITY LLC 1800194 Buildings Paid by EFT #1752 06/19/2024 07/23/2024 06/30/2024 06/30/2024 07/25/2024 4,895.37 2132445 Luther Pass Pump Station Paid by EFT #1803 07/24/2024 07/30/2024 07/30/2024 07/31/2024 840.00 Vendor 50018 - SUMMIT FIRE & SECURITY LLC Totals Invoices 2 $5,735.37 Vendor 48511 - SWRCB/DWOCP PHILLIPS EXM 24 Dues - Memberships - Certification Paid by Check #114667 07/10/2024 07/24/2024 07/31/2024 07/25/2024 365.00 Vendor 48511 - SWRCB/DWOCP Totals Invoices 1 $365.00 Vendor 24050 - TAHOE BASIN CONTAINER SERVICE 2904479 Biosolid Disposal Costs Paid by EFT #1862 08/01/2024 08/07/2024 07/31/2024 08/07/2024 19,853.64 2904480 Refuse Disposal Paid by EFT #1862 08/01/2024 08/07/2024 07/31/2024 08/07/2024 260.00 2904496 Refuse Disposal Paid by EFT #1862 08/01/2024 08/07/2024 07/31/2024 08/07/2024 32.50 2904513 Refuse Disposal Paid by EFT #1862 08/01/2024 08/07/2024 07/31/2024 08/07/2024 30.00 2904645 Refuse Disposal Paid by EFT #1862 08/01/2024 08/07/2024 07/31/2024 08/07/2024 38.00 Vendor 24050 - TAHOE BASIN CONTAINER SERVICE Totals Invoices 5 $20,214.14 Vendor 50040 - TAHOE FLEET SERVICE 1014 Automotive Paid by EFT #1804 07/14/2024 07/30/2024 07/30/2024 07/31/2024 4,076.40 Vendor 50040 - TAHOE FLEET SERVICE Totals Invoices 1 $4,076.40 Vendor 24325 - TAHOE SAND & GRAVEL Jul 24 Stmt Pipe - Covers & Manholes Paid by EFT #1863 08/01/2024 08/07/2024 07/31/2024 08/07/2024 31,734.56 Vendor 24325 - TAHOE SAND & GRAVEL Totals Invoices 1 $31,734.56 Run by Erika Franco on 08/07/2024 02:27:55 PM Page 14 of 19 Payment of Claims Payment Date Range 07/25/24 - 08/07/24 Report By Vendor - Invoice Summary Listing Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount Vendor 49420 - THATCHER COMPANY OF NEVADA INC 2024400103764 Sodium Hydroxide Paid by EFT #1864 07/17/2024 08/07/2024 07/31/2024 08/07/2024 2,220.00 Vendor 49420 - THATCHER COMPANY OF NEVADA INC Totals Invoices 1 $2,220.00 Vendor 50179 - THE FERGUSON GROUP INV2148 Contractual Services Paid by EFT #1805 07/01/2024 07/30/2024 07/30/2024 07/31/2024 3,750.00 INV2149 Contractual Services Paid by EFT #1865 08/01/2024 08/07/2024 08/31/2024 08/07/2024 3,750.00 Vendor 50179 - THE FERGUSON GROUP Totals Invoices 2 $7,500.00 Vendor 48477 - THOMAS SCIENTIFIC 3336182 Laboratory Supplies Paid by EFT #1866 06/28/2024 08/07/2024 07/31/2024 08/07/2024 24.03 Vendor 48477 - THOMAS SCIENTIFIC Totals Invoices 1 $24.03 Vendor 50235 - FLORENT THOUMIE 2575519 Water Use Reduction Rebates Paid by EFT #1753 07/15/2024 07/24/2024 07/31/2024 07/25/2024 100.00 Vendor 50235 - FLORENT THOUMIE Totals Invoices 1 $100.00 Vendor 47839 - TRI SIGNAL INTEGRATION INC C161016 Buildings Paid by EFT #1867 07/01/2024 08/07/2024 07/31/2024 08/07/2024 1,176.25 Vendor 47839 - TRI SIGNAL INTEGRATION INC Totals Invoices 1 $1,176.25 Vendor 48085 - ULINE 179951588 Wells Paid by EFT #1806 06/27/2024 07/30/2024 07/30/2024 07/31/2024 2,030.45 180442493 Wells Paid by EFT #1806 07/11/2024 07/30/2024 07/30/2024 07/31/2024 3,530.90 180689291 Wells Paid by EFT #1806 07/17/2024 07/30/2024 07/30/2024 07/31/2024 368.44 180718321 Laboratory Supplies Paid by EFT #1868 07/18/2024 08/07/2024 07/31/2024 08/07/2024 199.48 Vendor 48085 - ULINE Totals Invoices 4 $6,129.27 Vendor 44334 - UNDERGROUND SERVICE ALERT 170100USB24 Dues - Memberships - Certification Paid by EFT #1807 07/26/2024 07/31/2024 07/31/2024 07/31/2024 3,404.87 Vendor 44334 - UNDERGROUND SERVICE ALERT Totals Invoices 1 $3,404.87 Vendor 49947 - CUST#593278 USABLUEBOOK INV00415964 Wells Paid by EFT #1808 07/09/2024 07/31/2024 07/31/2024 07/31/2024 370.21 INV00416693 Pipe - Covers & Manholes Paid by EFT #1808 07/09/2024 07/31/2024 07/31/2024 07/31/2024 2,171.38 INV00423604 Pump Stations Paid by EFT #1808 07/16/2024 07/31/2024 07/31/2024 07/31/2024 346.14 INV00423610 Pump Stations Paid by EFT #1869 07/16/2024 08/07/2024 07/31/2024 08/07/2024 6.47 INV00423662 Pump Stations Paid by EFT #1869 07/16/2024 08/07/2024 07/31/2024 08/07/2024 6.47 INV00423803 Pump Stations Paid by EFT #1808 07/16/2024 07/31/2024 07/31/2024 07/31/2024 1,522.50 Vendor 49947 - CUST#593278 USABLUEBOOK Totals Invoices 6 $4,423.17 Vendor 49296 - VERIZON WIRELESS 9968675402 Telephone Paid by EFT #1754 07/09/2024 07/23/2024 06/30/2024 06/30/2024 07/25/2024 553.30 Vendor 49296 - VERIZON WIRELESS Totals Invoices 1 $553.30 Vendor 50236 - LEE ALLYN VESTAL 3525212 Turf Buy-Back Program Paid by EFT #1755 07/11/2024 07/24/2024 07/31/2024 07/25/2024 1,758.00 Vendor 50236 - LEE ALLYN VESTAL Totals Invoices 1 $1,758.00 Vendor 44580 - VESTIS SERVICES LLC 5980212319 Uniform Payable Paid by EFT #1870 07/03/2024 08/07/2024 07/31/2024 08/07/2024 69.27 Run by Erika Franco on 08/07/2024 02:27:55 PM Page 15 of 19 Payment of Claims Payment Date Range 07/25/24 - 08/07/24 Report By Vendor - Invoice Summary Listing Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount 5980212320 Uniform Payable Paid by EFT #1870 07/03/2024 08/07/2024 07/31/2024 08/07/2024 38.41 5980212321 Uniform Payable Paid by EFT #1870 07/03/2024 08/07/2024 07/31/2024 08/07/2024 24.33 5980212322 Uniform Payable Paid by EFT #1870 07/03/2024 08/07/2024 07/31/2024 08/07/2024 13.03 5980212323 Uniform Payable Paid by EFT #1870 07/03/2024 08/07/2024 07/31/2024 08/07/2024 10.17 5980212324 Uniform Payable Paid by EFT #1870 07/03/2024 08/07/2024 07/31/2024 08/07/2024 15.14 5980212325 Uniform Payable Paid by EFT #1870 07/03/2024 08/07/2024 07/31/2024 08/07/2024 84.55 5980212326 Uniform Payable Paid by EFT #1870 07/03/2024 08/07/2024 07/31/2024 08/07/2024 58.15 5980212327 Uniform Payable Paid by EFT #1870 07/03/2024 08/07/2024 07/31/2024 08/07/2024 24.90 5980212328 Uniform Payable Paid by EFT #1870 07/03/2024 08/07/2024 07/31/2024 08/07/2024 4.64 5980212329 Uniform Payable Paid by EFT #1870 07/03/2024 08/07/2024 07/31/2024 08/07/2024 74.30 5980212330 Uniform Payable Paid by EFT #1870 07/03/2024 08/07/2024 07/31/2024 08/07/2024 87.81 5980212331 Uniform Payable Paid by EFT #1870 07/03/2024 08/07/2024 07/31/2024 08/07/2024 94.98 5980214122 Uniform Payable Paid by EFT #1870 07/10/2024 08/07/2024 07/31/2024 08/07/2024 69.27 5980214123 Uniform Payable Paid by EFT #1870 07/10/2024 08/07/2024 07/31/2024 08/07/2024 38.41 5980214124 Uniform Payable Paid by EFT #1870 07/10/2024 08/07/2024 07/31/2024 08/07/2024 24.33 5980214125 Uniform Payable Paid by EFT #1870 07/10/2024 08/07/2024 07/31/2024 08/07/2024 13.03 5980214126 Uniform Payable Paid by EFT #1870 07/10/2024 08/07/2024 07/31/2024 08/07/2024 10.17 5980214127 Uniform Payable Paid by EFT #1870 07/10/2024 08/07/2024 07/31/2024 08/07/2024 15.14 5980214128 Uniform Payable Paid by EFT #1870 07/10/2024 08/07/2024 07/31/2024 08/07/2024 84.55 5980214129 Uniform Payable Paid by EFT #1870 07/10/2024 08/07/2024 07/31/2024 08/07/2024 58.15 5980214130 Uniform Payable Paid by EFT #1870 07/10/2024 08/07/2024 07/31/2024 08/07/2024 24.90 5980214131 Uniform Payable Paid by EFT #1870 07/10/2024 08/07/2024 07/31/2024 08/07/2024 4.64 5980214132 Uniform Payable Paid by EFT #1870 07/10/2024 08/07/2024 07/31/2024 08/07/2024 84.30 5980214133 Uniform Payable Paid by EFT #1870 07/10/2024 08/07/2024 07/31/2024 08/07/2024 87.82 5980214134 Uniform Payable Paid by EFT #1870 07/10/2024 08/07/2024 07/31/2024 08/07/2024 94.98 5980215983 Uniform Payable Paid by EFT #1870 07/17/2024 08/07/2024 07/31/2024 08/07/2024 69.27 5980215984 Uniform Payable Paid by EFT #1870 07/17/2024 08/07/2024 07/31/2024 08/07/2024 38.41 5980215985 Uniform Payable Paid by EFT #1870 07/17/2024 08/07/2024 07/31/2024 08/07/2024 24.33 5980215986 Uniform Payable Paid by EFT #1870 07/17/2024 08/07/2024 07/31/2024 08/07/2024 13.03 5980215987 Uniform Payable Paid by EFT #1870 07/17/2024 08/07/2024 07/31/2024 08/07/2024 10.17 5980215988 Uniform Payable Paid by EFT #1870 07/17/2024 08/07/2024 07/31/2024 08/07/2024 15.14 5980215989 Uniform Payable Paid by EFT #1870 07/17/2024 08/07/2024 07/31/2024 08/07/2024 84.55 5980215990 Uniform Payable Paid by EFT #1870 07/17/2024 08/07/2024 07/31/2024 08/07/2024 58.15 5980215991 Uniform Payable Paid by EFT #1870 07/17/2024 08/07/2024 07/31/2024 08/07/2024 24.90 5980215992 Uniform Payable Paid by EFT #1870 07/17/2024 08/07/2024 07/31/2024 08/07/2024 4.64 5980215993 Uniform Payable Paid by EFT #1870 07/17/2024 08/07/2024 07/31/2024 08/07/2024 74.30 5980215994 Uniform Payable Paid by EFT #1870 07/17/2024 08/07/2024 07/31/2024 08/07/2024 87.82 5980215995 Uniform Payable Paid by EFT #1870 07/17/2024 08/07/2024 07/31/2024 08/07/2024 97.33 5980217909 Uniform Payable Paid by EFT #1870 07/24/2024 08/07/2024 07/31/2024 08/07/2024 59.27 5980217910 Uniform Payable Paid by EFT #1870 07/24/2024 08/07/2024 07/31/2024 08/07/2024 38.41 5980217913 Uniform Payable Paid by EFT #1870 07/24/2024 08/07/2024 07/31/2024 08/07/2024 24.33 5980217915 Uniform Payable Paid by EFT #1870 07/24/2024 08/07/2024 07/31/2024 08/07/2024 13.03 Run by Erika Franco on 08/07/2024 02:27:55 PM Page 16 of 19 Payment of Claims Payment Date Range 07/25/24 - 08/07/24 Report By Vendor - Invoice Summary Listing Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount 5980217916 Uniform Payable Paid by EFT #1870 07/24/2024 08/07/2024 07/31/2024 08/07/2024 10.17 5980217918 Uniform Payable Paid by EFT #1870 07/24/2024 08/07/2024 07/31/2024 08/07/2024 15.14 5980217922 Uniform Payable Paid by EFT #1870 07/24/2024 08/07/2024 07/31/2024 08/07/2024 74.55 5980217925 Uniform Payable Paid by EFT #1870 07/24/2024 08/07/2024 07/31/2024 08/07/2024 58.15 5980217927 Uniform Payable Paid by EFT #1870 07/24/2024 08/07/2024 07/31/2024 08/07/2024 24.90 5980217928 Uniform Payable Paid by EFT #1870 07/24/2024 08/07/2024 07/31/2024 08/07/2024 4.64 5980217930 Uniform Payable Paid by EFT #1870 07/24/2024 08/07/2024 07/31/2024 08/07/2024 64.30 5980217932 Uniform Payable Paid by EFT #1870 07/24/2024 08/07/2024 07/31/2024 08/07/2024 77.82 5980217937 Uniform Payable Paid by EFT #1870 07/24/2024 08/07/2024 07/31/2024 08/07/2024 99.34 5980219632 Uniform Payable Paid by EFT #1870 07/31/2024 08/07/2024 07/31/2024 08/07/2024 75.88 5980219633 Uniform Payable Paid by EFT #1870 07/31/2024 08/07/2024 07/31/2024 08/07/2024 38.41 5980219634 Uniform Payable Paid by EFT #1870 07/31/2024 08/07/2024 07/31/2024 08/07/2024 24.33 5980219635 Uniform Payable Paid by EFT #1870 07/31/2024 08/07/2024 07/31/2024 08/07/2024 13.03 5980219636 Uniform Payable Paid by EFT #1870 07/31/2024 08/07/2024 07/31/2024 08/07/2024 10.17 5980219637 Uniform Payable Paid by EFT #1870 07/31/2024 08/07/2024 07/31/2024 08/07/2024 15.14 5980219638 Uniform Payable Paid by EFT #1870 07/31/2024 08/07/2024 07/31/2024 08/07/2024 85.64 5980219639 Uniform Payable Paid by EFT #1870 07/31/2024 08/07/2024 07/31/2024 08/07/2024 61.42 5980219640 Uniform Payable Paid by EFT #1870 07/31/2024 08/07/2024 07/31/2024 08/07/2024 24.90 5980219641 Uniform Payable Paid by EFT #1870 07/31/2024 08/07/2024 07/31/2024 08/07/2024 4.64 5980219642 Uniform Payable Paid by EFT #1870 07/31/2024 08/07/2024 07/31/2024 08/07/2024 74.30 5980219643 Uniform Payable Paid by EFT #1870 07/31/2024 08/07/2024 07/31/2024 08/07/2024 95.56 5980219644 Uniform Payable Paid by EFT #1870 07/31/2024 08/07/2024 07/31/2024 08/07/2024 104.02 Vendor 44580 - VESTIS SERVICES LLC Totals Invoices 65 $3,002.90 Vendor 48405 - WAXIE SANITARY SUPPLY 82602423 Janitorial Supplies Inventory Paid by EFT #1809 07/16/2024 07/31/2024 07/31/2024 07/31/2024 2,153.47 82631569 Office Supply Issues Paid by EFT #1871 07/30/2024 08/07/2024 07/31/2024 08/07/2024 752.55 Vendor 48405 - WAXIE SANITARY SUPPLY Totals Invoices 2 $2,906.02 Vendor 25700 - WEDCO INC S100088868.002 Buildings Paid by EFT #1810 07/08/2024 07/31/2024 07/31/2024 07/31/2024 208.15 Vendor 25700 - WEDCO INC Totals Invoices 1 $208.15 Vendor 50237 - JAMES WEIR 2211113 Water Use Reduction Rebates Paid by EFT #1756 07/15/2024 07/24/2024 07/31/2024 07/25/2024 100.00 Vendor 50237 - JAMES WEIR Totals Invoices 1 $100.00 Vendor 44489 - WESTCOAST ROTOR INC 31268 Rebuild Biosolids Sludge Pump Paid by EFT #1872 07/23/2024 08/07/2024 07/31/2024 08/07/2024 10,002.83 Vendor 44489 - WESTCOAST ROTOR INC Totals Invoices 1 $10,002.83 Vendor 25850 - WESTERN NEVADA SUPPLY 31322175 Shop Supplies Paid by EFT #1757 07/01/2024 07/24/2024 07/31/2024 07/25/2024 43.54 31322216 Shop Supplies Paid by EFT #1757 07/01/2024 07/24/2024 07/31/2024 07/25/2024 395.52 11306347 Repair Clamps Inventory Paid by EFT #1811 07/02/2024 07/31/2024 07/31/2024 07/31/2024 2,544.42 11324946 Small Brass Parts Inventory Paid by EFT #1811 07/02/2024 07/31/2024 07/31/2024 07/31/2024 839.12 31309922 Pipe - Covers & Manholes Paid by EFT #1757 07/02/2024 07/24/2024 07/31/2024 07/25/2024 14.70 Run by Erika Franco on 08/07/2024 02:27:55 PM Page 17 of 19 Payment of Claims Payment Date Range 07/25/24 - 08/07/24 Report By Vendor - Invoice Summary Listing Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount 31322227 Shop Supplies Paid by EFT #1757 07/02/2024 07/24/2024 07/31/2024 07/25/2024 40.61 31327615 Pipe - Covers & Manholes Paid by EFT #1757 07/02/2024 07/24/2024 07/31/2024 07/25/2024 35.43 11328008 Saddles & Fittings Inventory Paid by EFT #1811 07/03/2024 07/31/2024 07/31/2024 07/31/2024 4,111.51 31328377 Pipe - Covers & Manholes Paid by EFT #1757 07/03/2024 07/24/2024 07/31/2024 07/25/2024 137.33 11330092 Meters & Parts Inventory Paid by EFT #1811 07/08/2024 07/31/2024 07/31/2024 07/31/2024 13,522.45 11334892 Sewerworks Inventory Paid by EFT #1811 07/10/2024 07/31/2024 07/31/2024 07/31/2024 1,603.80 31327898 Pipe - Covers & Manholes Paid by EFT #1757 07/10/2024 07/24/2024 07/31/2024 07/25/2024 136.16 31333130 Pipe - Covers & Manholes Paid by EFT #1757 07/10/2024 07/24/2024 07/31/2024 07/25/2024 139.83 11318036 Pipe - Covers & Manholes Paid by EFT #1811 07/11/2024 07/31/2024 07/31/2024 07/31/2024 3,290.59 31338211 Buildings Paid by EFT #1757 07/11/2024 07/24/2024 07/31/2024 07/25/2024 171.22 11339590 Manhole Frames - Lids - Other Parts Inventory Paid by EFT #1811 07/15/2024 07/31/2024 07/31/2024 07/31/2024 2,609.13 11339591 Small Brass Parts Inventory Paid by EFT #1873 07/15/2024 08/07/2024 07/31/2024 08/07/2024 173.43 11339656 Shop Supplies Paid by EFT #1811 07/15/2024 07/31/2024 07/31/2024 07/31/2024 977.45 11339659 Shop Supplies Paid by EFT #1757 07/15/2024 07/24/2024 07/31/2024 07/25/2024 729.67 11339662 Shop Supplies Paid by EFT #1757 07/15/2024 07/24/2024 07/31/2024 07/25/2024 982.58 11339720 Pump Stations Paid by EFT #1757 07/15/2024 07/24/2024 07/31/2024 07/25/2024 809.84 11340521 Pipe Inventory Paid by EFT #1873 07/15/2024 08/07/2024 07/31/2024 08/07/2024 6,534.79 11340522 Valves Elbows Ts Flanges Inventory Paid by EFT #1811 07/15/2024 07/31/2024 07/31/2024 07/31/2024 3,533.05 11340813 Boxes-Lids-Extensions Inventory Paid by EFT #1811 07/15/2024 07/31/2024 07/31/2024 07/31/2024 3,662.00 11339639 Pump Stations Paid by EFT #1811 07/16/2024 07/31/2024 07/31/2024 07/31/2024 1,988.23 11339812 Boxes-Lids-Extensions Inventory Paid by EFT #1811 07/16/2024 07/31/2024 07/31/2024 07/31/2024 2,744.74 11345307 Grounds & Maintenance Paid by EFT #1873 07/17/2024 08/07/2024 07/31/2024 08/07/2024 1,200.34 11346510 Saddles & Fittings Inventory Paid by EFT #1873 07/17/2024 08/07/2024 07/31/2024 08/07/2024 708.48 11346517 Saddles & Fittings Inventory Paid by EFT #1811 07/17/2024 07/31/2024 07/31/2024 07/31/2024 1,806.07 11348522 Pump Stations Paid by EFT #1811 07/18/2024 07/31/2024 07/31/2024 07/31/2024 640.34 31346302 Primary Equipment Paid by EFT #1811 07/18/2024 07/31/2024 07/31/2024 07/31/2024 420.84 31350584 Biosolids Equipment - Building Paid by EFT #1811 07/22/2024 07/31/2024 07/31/2024 07/31/2024 37.41 11325474 Pipe - Covers & Manholes Paid by EFT #1811 07/23/2024 07/31/2024 07/31/2024 07/31/2024 9,059.69 11357330 Saddles & Fittings Inventory Paid by EFT #1873 07/24/2024 08/07/2024 07/31/2024 08/07/2024 926.42 31337960 Mobile Equipment Paid by EFT #1811 07/25/2024 07/31/2024 07/31/2024 07/31/2024 250.53 31359317 Primary Equipment Paid by EFT #1811 07/25/2024 07/31/2024 07/31/2024 07/31/2024 256.61 11327998 Fire Hydrants & Parts Paid by EFT #1873 07/29/2024 08/07/2024 07/31/2024 08/07/2024 1,011.38 11361226 Pipe - Covers & Manholes Paid by EFT #1873 07/29/2024 08/07/2024 07/31/2024 08/07/2024 602.48 11339602 Repair Clamps Inventory Paid by EFT #1873 07/31/2024 08/07/2024 07/31/2024 08/07/2024 1,348.68 11362275 Valves Elbows Ts Flanges Inventory Paid by EFT #1873 07/31/2024 08/07/2024 07/31/2024 08/07/2024 2,680.19 31369228 Pump Stations Paid by EFT #1873 07/31/2024 08/07/2024 07/31/2024 08/07/2024 5.86 11318029 Pipe - Covers & Manholes Paid by EFT #1873 08/01/2024 08/07/2024 08/31/2024 08/07/2024 794.96 11318038 Couplings Omni Parts Inventory Paid by EFT #1873 08/01/2024 08/07/2024 08/31/2024 08/07/2024 1,844.23 11318045 Repair Clamps Inventory Paid by EFT #1873 08/01/2024 08/07/2024 08/31/2024 08/07/2024 1,720.81 Run by Erika Franco on 08/07/2024 02:27:55 PM Page 18 of 19 Payment of Claims Payment Date Range 07/25/24 - 08/07/24 Report By Vendor - Invoice Summary Listing Invoice Number Invoice Description Status Held Reason Invoice Date Due Date G/L Date Received Date Payment Date Invoice Net Amount Vendor 25850 - WESTERN NEVADA SUPPLY Totals Invoices 44 $77,086.46 Vendor 49738 - WEX BANK 98436217 Diesel Expense Paid by EFT #1874 07/23/2024 08/07/2024 07/31/2024 08/07/2024 152.61 Vendor 49738 - WEX BANK Totals Invoices 1 $152.61 Vendor 50249 - ROGER WILLIAMS 2528216 Turf Buy-Back Program Paid by EFT #1875 07/31/2024 08/07/2024 07/31/2024 08/07/2024 3,000.00 Vendor 50249 - ROGER WILLIAMS Totals Invoices 1 $3,000.00 Vendor 40298 - WILLIAMS INDUSTRIAL SALES CO 2024-321218-00 Shop Supplies Paid by EFT #1758 07/03/2024 07/24/2024 07/31/2024 07/25/2024 1,458.97 Vendor 40298 - WILLIAMS INDUSTRIAL SALES CO Totals Invoices 1 $1,458.97 Vendor 48781 - WORLD OIL REFINING I500-01099284 Service Contracts Paid by EFT #1876 07/30/2024 08/07/2024 07/31/2024 08/07/2024 100.00 Vendor 48781 - WORLD OIL REFINING Totals Invoices 1 $100.00 Vendor 50238 - SEYIL YOON 8106416 Turf Buy-Back Program Paid by EFT #1759 07/11/2024 07/24/2024 07/31/2024 07/25/2024 900.00 Vendor 50238 - SEYIL YOON Totals Invoices 1 $900.00 Grand Totals Invoices 447 $1,622,753.11 Run by Erika Franco on 08/07/2024 02:27:55 PM Page 19 of 19 Payment of Claims Payment Date Range 07/25/24 - 08/07/24 Report By Vendor - Invoice Summary Listing SOUTH TAHOE PUBLIC UTILITY DISTRICT David Peterson, President BOARD MEMBERS Kelly Sheehan, Director Nick Haven, Director Shane Romsos, Vice President Nick Exline, Director Paul Hughes, General Manager Andrea Salazar, Chief Financial Officer REGULAR MEETING OF THE BOARD OF DIRECTORS SOUTH TAHOE PUBLIC UTILITY DISTRICT August 1, 2024 MINUTES The South Tahoe Public Utility District Board of Directors met in a regular session, 2:02 p.m., at the District Office, located at 1275 Meadow Crest Drive, South Lake Tahoe, California. ROLL CALL: Board of Directors: Directors Haven, Sheehan, Exline Absent: President Peterson Excused: Director Romsos Staff: Paul Hughes, Andrea Salazar, Keith Collins, Melonie Guttry, Shannon Chandler, Julie Ryan, Chris Stanley, Trevor Coolidge, Donielle Morse, Dana Lincoln, Sarah Nelson, Abbi Lloyd, Emilie Comer, Chris Skelly, Lauren Benefield, Jeremy Rutherdale, Adrian Combes, Jennifer Marshall, Megan Colvey, Judy Leon, Greg Dupree, Star Glaze, IV Jones Guests: Emmie Fiel, Student 1. PLEDGE OF ALLEGIANCE: 2. COMMENTS FROM THE PUBLIC: None 3. CORRECTIONS TO THE AGENDA OR CONSENT CALENDAR: None 4. ADOPTION OF CONSENT CALENDAR: Moved Exline/Second Haven/Peterson Absent/Haven Yes/Romsos Excused/Sheehan Yes/Exline Yes to approve the Consent Calendar as presented. a. WINTER STORMS EMERGENCY RESPONSE (Paul Hughes, General Manager) Pursuant to Public Contract Code Section 22050(c), continued the emergency action to respond to the Winter Storms Emergency pursuant to Resolution No. 3242-23. b. EL DORADO COUNTY WATER AGENCY BOARD OF DIRECTORS PURVEYOR REPRESENTATIVES (Melonie Guttry, Executive Services Manager/Board Clerk) Adopted Resolution No. 3284-24 supporting the appointments of Director Haven to serve as Purveyor Representative and Director Sheehan to serve as alternate. REGULAR BOARD MEETING MINUTES: August 1, 2024 PAGE – 2 c. 2024 TANKS COATING TOUCHUPS PROJECT (Megan Colvey, Senior Engineer and Heidi Baugh, Purchasing Agent) Authorized the General Manager to execute Change Order No. 1 to Olympus and Associates, Inc. in the amount of $54,456.54. d. EMERGENCY PUMP STATION SUBMERSIBLE PUMPS AND VARIABLE FREQUENCY DRIVES (Adrian Combes, Director of Operations and Aaron Buckman, Manager of Plant Operations). Authorized staff to advertise for bids to purchase two submersible pumps and two portable variable frequency drives for the Emergency Pump Station. e. WATER MAIN CONDITION MONITORING SOFTWARE CONTRACT (Jim Kelly, GIS Analyst and Julie Ryan, Engineering Department Manager) Approved of a three-year contract with Baseform for water main condition monitoring software in the amount of $93,055.20. f. RECEIVE AND FILE PAYMENT OF CLAIMS (Greg Dupree, Accounting Manager) Received and filed Payment of Claims in the amount of $3,668,929.30. g. REGULAR BOARD MEETING MINUTES: July 18, 2024 (Melonie Guttry, Executive Services Manager/Clerk of the Board) Approved July 18, 2024, Minutes 5. CONSENT ITEMS BROUGHT FORWARD FOR SEPARATE DISCUSSION/ACTION: None 6. PRESENTATION: Emmie Fiel provided a PowerPoint presentation regarding her senior project titled Engineering and Designing a 3-D Model. Her project mentors were District engineers Adrian Combes and Megan Colvey. Her future plans are to attend Santa Clara University to study Engineering in the fall. 7. ITEMS FOR BOARD ACTION: a. Ordinance Amending the Terms of the Low-income Customer Assistance Program(Andrea Salazar, Chief Financial Officer) – Andrea Salazar provided details regarding the Ordinance amending the terms of the low-income Customer Assistance Program. Moved Exline/Second Haven/Peterson Absent/Haven Yes/Romsos Excused/Sheehan Yes/Exline Yes to adopt Ordinance No. 591-24, an Ordinance of the South Tahoe Public Utility District, amending Administrative Code Section 6.1.9 regarding the Low-income Customer Assistance Program. 8. STANDING AND AD-HOC COMMITTEES AND LIAISON REPORTS: Nothing to report 9. BOARD MEMBER REPORTS: The Board expressed their appreciation for staffs’ efforts regarding the Fallen Leaf Lake spill. 10. STAFF/ATTORNEY REPORTS: Abi Lloyd and Emilie Comer, AmeriCorps Fellows, presented a PowerPoint presentation regarding their internships at the District outlining the work they have done during their service term and addressed questions from the Board. The Board wished both all the best in their future endeavors. REGULAR BOARD MEETING MINUTES: August 1, 2024 PAGE – 3 Melonie Guttry provided an update regarding the general elections for November 5, 2024. There are currently four candidates registered including Chris Cefalu, Joel Henderson, Seth Dallob and Kelly Sheehan. The Filing deadline is Friday, August 9, unless President Peterson does not file. In that case, the deadline is extended to Wednesday, August 14th, only for non-incumbents. Adrian Combes provided an update regarding the July 28, 2024, Fallen Leaf Lake spill. He thanked the District crew members who came out at midnight on Saturday night, including Mike Chieffo from Gardnerville to perform a confined space entry. Specifically, he thanked Jeremy Rutherdale, Mike Chieffo, Corey Corbin, Ron Goralski, Steve Kallas, Joe Stumph, IV Jones, Cavin Ross, Juan Marquez, Dan Diridoni, Chris Siano, Dan Arce, Sinead Carney, Brian Chernago, Aneta Czapla, Jamie Lynch, Kevin Uribe, Chris Stanley, Adrian Combes, and Shelly Thomsen. Everyone helped each other and supported one another. The Board expressed their appreciation for all the efforts. 11. GENERAL MANAGER REPORT: Nothing to report 12. NOTICE OF PAST AND FUTURE MEETINGS/EVENTS 13. BREAK AND ADJOURN TO CLOSED SESSION: 2:34 p.m. RECONVENE TO OPEN SESSION: 2:42 p.m. a. Conference with Legal Counsel--Existing Litigation Pursuant to Paragraph (1) of Subdivision (d) of Gov. Code Section 54956.9. Two cases potentially involving the District filed: Aqueous Film- Forming Foams Product Liability Litigation, Master Docket No. 2:18-mn-2873-RMG; City of Camden, et al. v. BASF Corporation, Civil Action No.: 2:24-cv-03174-RMG; City of Camden et. al. v. Tyco Fire Products LP, Civil Action No.: 2-24-cv-02321-RMG. No reportable Board Action ADJOURNMENT: 2:43 p.m. _______________________________________ Kelly Sheehan, Board Member South Tahoe Public Utility District ___________________________________________ Melonie Guttry, Executive Services Manager/ Clerk of the Board South Tahoe Public Utility District BOARD AGENDA ITEM 7a TO: Board of Directors FROM: Mark Seelos, Water Resources Manager MEETING DATE: August 15, 2024 ITEM – PROJECT NAME: Water Supply Master Plan REQUESTED BOARD ACTION: (1) Approve the proposed Scope of Work for Carollo Consultants to develop the District’s Water Supply Master Plan; and (2) Authorize the General Manager to execute Task Order No. 33 with Carollo Consultants for Tasks 1 and 2, totaling $229,983. DISCUSSION: At the regular meeting held on April 18, 2024, in conjunction with its application for surface water rights from Lake Tahoe, the Board emphasized the need for a comprehensive master planning initiative to identify and assess future water supply alternatives. On May 14, 2024, the District advertised a request for proposals (RFP) to provide consulting services for the Water Supply Master Plan (WSMP). The requested Scope of Work included: 1. Development of water demand projections over a 50-year planning horizon; 2. Development and evaluation of water supply, treatment, and distribution alternatives to meet the projected demands; 3. Production of the WSMP document including schedules for planning, permitting, and construction of the preferred alternative(s); and 4. Environmental documentation for the WSMP and any associated water rights applications. The RFP was advertised until June 28, 2024. The District received two proposals. A panel consisting of three District Engineering Staff, the Director of Operations, and the General Manager reviewed and scored the proposals. Interviews were conducted for both proposers. The team unanimously identified Carollo Consultants (Carollo) as the preferred consulting firm based on their scores for both the proposal review and interview. General Manager Paul Hughes Directors Nick Haven Shane Romsos David Peterson Kelly Sheehan Nick Exline Mark Seelos August 15, 2024 Page 2 The Scope of Services from Carollo is included as Attachment A. The proposed work will be completed in three phases over 30-36 months, with each phase aligned to key decision-making points from the Board. Phase 1 of this work, being authorized by this request, includes Task 1 (Data Review and Analysis) and Task 2 (Development of Water Supply Alternatives). Phase 1 will be completed by June 2025. At that time, staff will present the results and request authorization for Phase 2, an Amendment to the Task Order. Phase 2 includes Tasks 3 to 4.4: evaluating water supply alternatives, selecting preferred options, drafting the WSMP, and engaging with the public and stakeholders. Phase 3 includes Tasks 4.5 to 5.8: finalizing the WSMP and completing the necessary environmental documentation based on the preferred alternative(s). SCHEDULE: August 2024-June 2025 COSTS: $229,983 ACCOUNT NO: 20.30.4405 BUDGETED AMOUNT AVAILABLE: $263,219 ATTACHMENTS: Scope of Services; Fee Estimate by Task Order ___________________________________________________________________________________ CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO Water Supply Master Plan Mark Seelos Water Resources Manager August 15, 2024 Outline 2 1. RFP and Consultant Selection 2. Scope of Work 3. Project Phases 4. Project Timeline and Budget Purpose 3 •April 18: Board approved GM to notify SWRCB of District’s intent to move forward with SW Rights Application. •Next Step – long and costly CEQA review process. •Board Sentiment: First, a comprehensive water supply planning effort is needed. Request for Proposals 4 Scope of Work: 1.Develop realistic water demand projections for a 50-year planning period. 2.Develop and Evaluate Alternatives 3.Select a preferred alternative and develop a plan for permitting and implementation. 6 Week Advertisement (May-June) Consultant Selection 5 •Received 2 proposals •Convened panel of 5 staff •Proposal evaluation and interviews •Selection: Carollo Consultants Water Treatment Environmental Documentation Water Resource Planning Project Phases 6 Task 1: Data Review and Analysis •50-year demand projections •Identify existing and future supply and distribution deficits. •Regulatory review analysis. •Convene SAG Task 2: Develop Supply Alternatives BOARD UPDATE Task 3: Evaluate Supply Alternatives •Develop evaluation criteria. •Stakeholder Input •Implementation plan for preferred alternative(s) Task 4.1: Draft WSMP BOARD UPDATE Task 4 (remaining): Finalize WSMP Task 5: Environmental Strategy and Documentation Phase 1: Assess Phase 2: Evaluate Phase 3: Finalize Project Timeline and Budget 7 June 2025 August 2024 October 2025 June 2026 Task Order 1: $229,983 Task Order 2: $263,132 Task Order 3: $290,131 FY 2025: $229,983 FY 2026: $553,263 Project Total: $783,246 Project Complete Questions? 8 Requested Action (1)Approve the proposed Scope of Work for Carollo Consultants to develop the District’s Water Supply Master Plan; and (2) Authorize the General Manager to execute Task Order No. 33 with Carollo Consultants for Tasks 1 and 2, totaling $229,983. PAGE 1 of 3 pw:\\IO-PW-INT.carollo.local:Carollo\Documents\Client\CA\STPUD\_Proposals\Water Supply MP\Docs\STPUD Water Supply Master Plan SOW.docx WATER SYSTEM MASTER PLAN South Tahoe Public Utility District Project Task Order No. 1 Scope of Services Task 1 – Data Review and Analysis Task 1.1 – Kickoff Meeting Carollo will conduct a kickoff meeting to discuss project objectives, scope, schedule, budget, and requested data. All critical Carollo team staff and key District staff will attend. The meeting is intended to be in person with virtual options. Task 1.2 – Review Existing Water Demand Assessments Carollo will review the existing project background data, reports, and other pertinent information relative to water demands. Task 1.3 – Establish Water Demands In conjunction with the existing reports and background information, Carollo will summarize the existing and projected demand conditions. Demand scenarios such as average day demand (ADD), maximum day demand (MDD), and peak hour demands (PHD) for existing and projected growth scenarios will be documented. Peaking factors for ADD to MDD and PHD scenarios will be summarized. If desired by the District and available, Carollo could also use geocoded water meter billing data, including advanced metering infrastructure (AMI) data, to develop customized diurnal patterns and calculate customer base demands that could be used in a model update. Task 1.4 – Review and Prioritize Existing Distribution System Deficits Based on discussions with District staff, and existing knowledge, Carollo will summarize the existing supply and distribution systems, identifying known deficiencies and establishing prioritization of the deficits to be addressed. Task 1.5 – Deficiency Review and Prioritization Workshop Carollo will conduct a workshop with District staff to review the system deficiencies and finalize the prioritization. The meeting is intended to be in person with virtual options. Task 1.6 – Regulatory Review Analysis Carollo will compile and review the existing and anticipated water quality regulations and how they may impact the District’s system. Carollo will provide a summary memo to document the findings. Task 1.7 – Existing System Summary and Demands Technical Memorandum Carollo will develop a TM that summarizes the existing system and water demands. PAGE 2 of 3 Task 1.8 – Convene Stakeholder Advisory Group Carollo will assist the District in identifying and reaching out to members of the Stakeholder Advisory Group (SAG). Task 1.9 –Bi‑weekly Progress Meetings Carollo will conduct bi-weekly progress meetings via Microsoft Teams. The progress meetings will discuss project issues, schedule, and any other relevant and pressing issues. TASK 1 DELIVERABLES ■ Meeting Agenda, Minutes, Action Items, and Decision Logs ■ Regulatory Review Memo ■ Existing System Summary and Demands TM TASK 1 ASSUMPTIONS ■ District will provide all relevant water demand assessments ■ Development of customized diurnal patterns is a potential scope enhancement and is not included in the hours estimate. ■ District review period of 3 weeks on each deliverable. ■ In-person workshop ■ In-person kickoff meeting ■ Virtual bi-weekly meetings Task 2 – Develop Water Supply Alternatives Task 2.1 – Develop Evaluation Criteria Based on previous reports, District standards, and collaboration with District staff, Carollo will develop hydraulic, operational, and water quality evaluation criteria. The criteria will include, but not be limited to, system pressure, head loss, storage volumes, peaking factors, chlorine residual, and others yet to be defined. Carollo will work closely with District staff to develop a comprehensive list of evaluation criteria to be used in the system evaluation and capital improvement programming. Task 2.2 – Develop Overall Supply Alternatives Carollo will summarize all of the water supply alternatives. Task 2.2.1 – Groundwater Supply Options In collaboration with District staff, Carollo will identify up to four groundwater supply options. At a minimum, the options will consist of new wells, upsizing existing wells, wellhead treatment, and centralized treatment. Task 2.2.2 – Surface Water Supply Options The District’s pending surface water rights application has four potential locations identified for surface water diversion from Lake Tahoe. Carollo will use these four locations to develop the improvements needed to incorporate surface water into the District’s system. Task 2.3 - Alternatives Identification Workshop PAGE 3 of 3 Carollo will conduct a workshop with District staff to review the evaluation criteria and the identified alternatives. The meeting is intended to be in person with virtual options. Task 2.4 – Evaluation Criteria and Alternatives Technical Memorandum Carollo will develop a TM that summarizes the evaluation criteria and the identified water supply alternatives. Task 2.5 - SAG Workshop Carollo will conduct a workshop with District staff and the SAG to review the evaluation criteria and the identified alternatives. The meeting is intended to be in person with virtual options. Task 2.6 –Bi‑weekly Progress Meetings Carollo will conduct bi-weekly progress meetings via Microsoft Teams. The progress meetings will discuss project issues, schedule, and any other relevant and pressing issues. TASK 2 DELIVERABLES ■ Meeting Agenda, Minutes, Action Items, and Decision Logs ■ Evaluation Criteria and Alternatives Identification TM TASK 2 ASSUMPTIONS ■ Up to 4 groundwater options will be evaluated. ■ Up to 4 potential surface water diversion locations will be evaluated. ■ District review period of 3 weeks on each deliverable. ■ In-person workshop ■ Virtual bi-weekly meetings South Tahoe Public Utility District Water Supply Master Plan Fee Estimate Task Description Je f f Ri l e y (C o s t Es t i m a t i n g ) Te c h n i c i a n (G I S ) Wo r d Pr o c e s s i n g To t a l Ca r o l l o Ho u r s Hydrogeology Environmental Be v e r l y Ha n n (P r i n c i p a l - I n - Ch a r g e ) St e p h e n Ca s w e l l (P r o j e c t Ma n a g e r ) Co r a l Ta y l o r (P r o j e c t En g i n e e r ) Ry a n Or g i l l (C o n v e y a n c e an d Tr a n s m i s s i o n ) ) Mi k e Dr u c k e r (G r o u n d w a t e r We l l s ) Ti m Lo p e r (Q A / Q C ) To m Gi l l o g l y (W a t e r Tr e a t m e n t ) St a f f En g i n e e r (E n g i n e e r i n g Su p p o r t ) Carollo Labor PECE La b o r + PE C E To t a l UE S Ho u r s To t a l UE S Fe e To t a l As c e n t Ho u r s To t a l As c e n t Fe e Total Subs Total ODCs Estimated Fee $337 $337 $232 $285 $232 $337 $374 $232 $232 $175 $155 $15.60 Task 1 - Data Review and Analysis 13 34 60 36 10 2 4 148 0 12 6 325 $81,900 $5,070 $86,970 8 $1,600 $-$-$1,600 $2,600 $89,830 Task 1.1 - Kickoff Meeting 4 4 4 4 0 0 0 0 0 0 0 16 $4,800 $250 $5,050 8 $1,600 0 $-$1,600 $2,100 $7,360 Task 1.2 - Review Existing Water Demand Assessments 1 4 8 2 2 0 2 24 0 0 0 43 $10,900 $671 $11,571 0 $-0 $-$-$-$11,571 Task 1.3 - Establish Water Demands 1 2 8 8 0 0 0 32 0 0 0 51 $12,600 $796 $13,396 0 $-0 $-$-$-$13,396 Task 1.4 - Review and Prioritize Existing Distribution System Deficits 0 2 8 8 4 0 0 24 0 0 0 46 $11,300 $718 $12,018 0 $-0 $-$-$-$12,018 task 1.5 - Deficiency Review and Prioritization Workshop 4 4 4 4 0 0 0 8 0 0 0 24 $6,600 $374 $6,974 0 $-0 $-$-$500 $7,524 Task 1.6 - Regulatory Review and Analysis 1 2 8 0 2 0 2 24 0 0 0 39 $9,600 $608 $10,208 0 $-0 $-$-$-$10,208 Task 1.7 - Existing System Summary and Demands Technical Memorandum 2 4 8 2 2 2 0 24 0 12 6 62 $14,200 $967 $15,167 0 $-0 $-$-$-$15,167 Task 1.8 - Convene Stakeholder Advisory Group 0 4 4 0 0 0 0 4 0 0 0 12 $3,200 $187 $3,387 0 $-0 $-$-$-$3,387 Task 1.9 - Bi-weekly meetings 0 8 8 8 0 0 0 8 0 0 0 32 $8,700 $499 $9,199 0 $-0 $-$-$-$9,199 Task 2 - Develop Water Supply Alternatives 14 38 62 46 35 2 39 144 8 44 6 438 $112,200 $6,833 $119,033 110 $18,200 $-$-$18,200 $19,200 $140,153 Task 2.1 - Develop Evaluation Criteria 2 4 6 4 4 0 4 8 0 4 0 36 $9,500 $562 $10,062 0 $-0 $-$-$-$10,062 Task 2.2 - Develop Overall Supply Alternatives 2 8 18 12 8 0 8 40 0 20 0 116 $28,600 $1,810 $30,410 0 $-0 $-$-$-$30,410 Task 2.2.1 - Groundwater Supply Options 0 2 6 6 8 0 4 24 4 4 0 58 $14,300 $905 $15,205 54 $8,900 0 $-$8,900 $8,900 $24,995 Task 2.2.2 - Surface Water Supply Options 0 2 6 6 0 0 8 24 4 4 0 54 $14,000 $842 $14,842 20 $3,400 0 $-$3,400 $3,400 $18,582 Task 2.3 - Alternatives Identification Workshop 4 4 4 4 4 0 4 8 0 0 0 32 $9,000 $499 $9,499 12 $2,200 0 $-$2,200 $3,200 $13,019 Task 2.4 - Evaluation Criteria and Alternatives Technical Memorandum 2 4 8 2 2 2 2 24 0 12 6 64 $14,900 $998 $15,898 24 $3,700 0 $-$3,700 $3,700 $19,968 Task 2.5 - SAG Workshop 4 4 4 4 4 0 4 8 0 0 0 32 $9,000 $499 $9,499 0 $-0 $-$-$-$9,499 Task 2.6 - Bi-weekly meetings 0 10 10 8 5 0 5 8 0 0 0 46 $12,900 $718 $13,618 0 $-0 $-$-$-$13,618 Task 3 - Evaluate Water Supply Alternatives 18 38 108 80 35 10 21 164 32 24 8 538 $136,900 $8,393 $145,293 68 $11,700 27 $5,700 $17,400 $38,850 $165,643 Task 3.1 - Evaluate Existing System 2 4 16 24 4 2 0 40 0 4 0 96 $24,100 $1,498 $25,598 0 $-0 $-$-$-$25,598 Task 3.1.2 - Distribution System Analysis of New Supply Alternatives 2 2 8 16 2 2 0 24 0 4 0 60 $15,200 $936 $16,136 0 $-0 $-$-$-$16,136 Task 3.2 - Evaluate Future System & Develop System Improvements 2 4 24 16 8 2 2 32 4 8 0 102 $25,200 $1,591 $26,791 40 $6,800 27 $5,700 $12,500 $12,500 $40,541 Task 3.3 - Develop Capital Project Cost Estimates 2 4 24 8 4 2 4 24 24 0 0 96 $24,100 $1,498 $25,598 20 $3,400 0 $-$3,400 $3,400 $29,338 Task 3.4 - Develop CIP Implementation Plan 2 4 16 4 4 2 2 24 4 8 8 78 $18,400 $1,217 $19,617 0 $-0 $-$-$-$19,617 Task 3.5 - Alternatives Evaluation Workshop 4 4 4 4 4 0 4 8 0 0 0 32 $9,000 $499 $9,499 8 $1,600 0 $-$1,600 $2,600 $12,359 Task 3.6 - SAG Workshop 4 4 4 4 4 0 4 8 0 0 0 32 $9,000 $499 $9,499 0 $-0 $-$-$-$9,499 Task 3.7 - Bi-weekly meetings 0 12 12 4 5 0 5 4 0 0 0 42 $11,900 $655 $12,555 0 $-0 $-$-$-$12,555 Task 4 - Develop Master Plan Report 22 60 72 34 34 14 22 96 12 32 32 430 $110,300 $6,708 $117,008 96 $16,300 0 $-$16,300 $36,330 $136,038 Task 4.1 - Draft Master Plan 4 16 24 16 16 8 8 40 8 16 16 172 $42,700 $2,683 $45,383 41 $6,800 0 $-$6,800 $6,800 $52,863 Task 4.2 - Master Plan Workshop 4 4 4 4 4 0 4 8 0 0 0 32 $9,000 $499 $9,499 4 $900 0 $-$900 $1,900 $11,589 Task 4.3 - SAG Workshop 4 4 4 4 4 0 4 8 0 0 0 32 $9,000 $499 $9,499 0 $-0 $-$-$-$9,499 Task 4.4 - Develop Board Presentation 6 16 16 2 2 2 2 16 0 8 8 78 $19,900 $1,217 $21,117 12 $2,200 0 $-$2,200 $2,200 $23,537 Task 4.5 - Final Master Plan 4 8 12 8 8 4 4 24 4 8 8 92 $22,900 $1,435 $24,335 39 $6,400 0 $-$6,400 $6,400 $31,375 Task 4.6 - Bi-weekly meetings 0 12 12 0 0 0 0 0 0 0 0 24 $6,800 $374 $7,174 0 $-0 $-$-$-$7,174 Task 5 - Environmental Documentation 0 32 44 4 4 0 4 16 0 0 0 104 $28,200 $1,622 $29,822 0 $-1009 $201,600 $201,600 $201,600 $251,582 Task 5.1 - Develop CEQA Strategy 0 2 4 0 0 0 0 4 0 0 0 10 $2,500 $156 $2,656 0 $-21 $5,100 $5,100 $5,100 $8,266 Task 5.2 - Administrative Draft Initial Study 0 2 4 0 0 0 0 0 0 0 0 6 $1,600 $94 $1,694 0 $-490 $90,600 $90,600 $90,600 $101,354 Task 5.3 - Screencheck Initial Study and Draft Notice of Intent 0 2 4 0 0 0 0 0 0 0 0 6 $1,600 $94 $1,694 0 $-127 $24,800 $24,800 $24,800 $28,974 Task 5.4 - Public Initial Study and Notice of Intent 0 0 0 0 0 0 0 0 0 0 0 0 $-$-$-0 $-66 $12,800 $12,800 $12,800 $14,080 Task 5.5 - Public Meetings 0 4 4 0 0 0 0 0 0 0 0 8 $2,300 $125 $2,425 0 $-44 $8,800 $8,800 $8,800 $12,105 Task 5.6 - Mitigation Monitoring and Reporting Program 0 4 8 2 2 0 2 8 0 0 0 26 $6,800 $406 $7,206 0 $-30 $5,600 $5,600 $5,600 $13,366 Task 5.7 - Response to Comments Memo and Notice of Determination 0 2 4 0 0 0 0 4 0 0 0 10 $2,500 $156 $2,656 0 $-67 $13,600 $13,600 $13,600 $17,616 Task 5.8 - Meetings, Management, and Coordination 0 16 16 2 2 0 2 0 0 0 0 38 $10,900 $593 $11,493 0 $-164 $40,300 $40,300 $40,300 $55,823 Total Hours and Fee 67 202 346 200 118 28 90 568 52 112 52 1835 $469,500 $28,626 $498,126 282 $47,800 1036 $207,300 $255,100 $298,580 $783,246 Notes: (1) Direct expenses include mileage travelling to/from meetings at IRS Federal Rate, travel costs, and Project Equipment and Communication Expense billed at $15.00 per hour. BOARD AGENDA ITEM 7b TO: Board of Directors FROM: Mark Seelos, Water Resources Manager Trevor Coolidge, Senior Engineer MEETING DATE: August 15, 2024 ITEM – PROJECT NAME: Paloma Well and Keller Booster Station Backup Power Project REQUESTED BOARD ACTION: (1) Find minor irregularities in the bid from White Rock Construction, Inc. to be immaterial, and waive minor irregularities; and (2) Award the project to the lowest responsive, responsible bidder, White Rock Construction, Inc., in the amount of $228,700. DISCUSSION: On June 20, 2024, the Board authorized staff to advertise for construction bids for the Paloma Well and Keller Booster Station Backup Power Project (Project). The Scope of Work is as follows: 1) Construct concrete pads for the installation of stationary, diesel generators at Paloma Well and Keller Booster Station, 2) Install the underground conduit and wiring required for the generators and automatic transfer switches at both stations. 3) Install best management practices and site drainage. The Project is budgeted at $394,000. In April 2023, the District received an award from the Federal Emergency Management Agency (FEMA) Hazard Mitigation Grant Program in the amount of $236,551.75, with the remaining project balance to be covered by the District. The District has procured 150 kW and 350 kW diesel generators for installation at Keller Booster Station and Paloma Well (respectively) and automatic transfer switches, which will be provided as owner-furnished to the successful bidder. The Project was advertised on PlanetBids on July 5, 2024. An optional pre-bid conference was held on July 19, 2024, with one general contractor in attendance. Bids were opened on July 30, 2024, at 1:00 p.m. (Pacific Daylight Time). Two bids were received, at $228,700 and $348,000. The engineer’s estimate for the construction of the project was $185,000. A summary of all bids, along with staff findings for each bid, is attached. General Manager Paul Hughes Directors Nick Haven Shane Romsos David Peterson Kelly Sheehan Nick Exline Mark Seelos August 15, 2024 Page 2 White Rock Construction, Inc.'s low bid contained two minor contractual irregularities; however, the relevant information was verified and confirmed to meet the District’s requirements. Staff recommends that the Board: (1) Find minor irregularities in the bid from White Rock Construction, Inc. to be immaterial, and waive minor irregularities; and (2) Award the project to the lowest responsive, responsible bidder, White Rock Construction, Inc., in the amount of $228,700. SCHEDULE: Upon Board Approval COSTS: $228,700 ACCOUNT NO: 20.30.8369: $124,890 – FY 2023/24 Carryover; 20.30.8370: $61,900 – FY 2023-24 Carryover BUDGETED AMOUNT AVAILABLE: ATTACHMENTS: Bid Summary ___________________________________________________________________________________ CONCURRENCE WITH REQUESTED ACTION: CATEGORY: Water GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO South Tahoe Public Utility District ● 1275 Meadow Crest Drive, South Lake Tahoe, CA 96150 Phone 530.544.6474 ● Facsimile 530.541.0614 South Tahoe Public Utility District 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Telephone: (530)544-6474 Fax: (530)541-4319 Memorandum Date: August 2, 2024 To: Board Members, Paul Hughes From: Starlet Glaze, Contracts Specialist Subject: Paloma Well and Keller Booster Station Backup Power Project At 1:00 o’clock on the afternoon of July 30, 2024, we received two (2) electronic bids via PlanetBids for the above-referenced project. Staff performed a careful review and analysis of the bids received. See attached spreadsheet and list of deviations for a full breakdown of each bid. White Rock Construction, Inc. is the apparent low bidder. White Rock Construction, Inc., had only two minor deviations. I contacted the Contractors License Board and was given the following information: License Number 640958 is current and active and expires on 07/21/2026. The company is a Corporation. White Rock Construction, Inc. holds a Class A – General Engineering license as required by the Contract. I also contacted the California Department of Industrial Relations Contractor Registration site and verified that White Rock Construction, Inc. is registered under PWCR Number 1000011381. Advertised on 07/05/2024 Bid Opening on July 30, 2024 at 1:00 PM (PDT) Item Description Unit of Measure Quantity White Rock Construction, Inc. The Design Build, Inc. Engineer's Estimate 1 Mobilization and Demobilization (not to exceed ten percent (10%) of Bid Schedule A)LS 1 $16,000.00 $25,000.00 $15,000.00 2 Erosion Control LS 1 $5,500.00 $15,000.00 $5,000.00 3 Traffic Control LS 1 $6,000.00 $45,000.00 $5,000.00 4 Paloma - Electrical Improvements LS 1 $58,500.00 $81,000.00 $40,000.00 5 Paloma - Generator Foundation EA 1 $70,500.00 $61,000.00 $70,000.00 6 Keller - Generator Foundation EA 1 $40,200.00 $48,000.00 $35,000.00 7 Keller - Electrical Improvements LS 1 $32,000.00 $73,000.00 $15,000.00 Total $228,700.00 $348,000.00 $185,000.00 Paloma Well and Keller Booster Station Backup Power Project Paloma Well and Keller Booster Station Backup Power Project Bid Opening: Tuesday, July 30, 2024, at 1:00 o’clock p.m. Deviations and information gathered during bid analysis of the two responsive responsible bids submitted: White Rock Construction, Inc. • Bidder’s General Information, Item 6 o The insurance agent’s name and address were provided but not the phone number. The surety broker’s name and phone number were provided but not the name, address or phone number of the surety company. We were, however, able to obtain and validate the surety’s name and that it meets District requirements. • Certification by Contractor’s Insurance Broker o The underwriting company name, not the insurance company name, was listed on the Bid form. We were, however, able to obtain the information directly from the insurance agent and verify that it meets District requirements. The Design Build, Inc. • List of Subcontractors o Staff was unable to verify that the subcontractor listed on the Bid form was currently registered with the Department of Industrial Relations (DIR). • Bid Bond o The Original Bid Bond was not provided prior to the Bid opening as required. • Certification by Contractors’ Insurance Broker o The Bid form listed the agent and brokerage company’s name; however, no information was provided for the insurance company. Upon further investigation we were unable to verify that the insurance company was licensed in the State of California through the California Department of Insurance website (CDI). o The Certification was not notarized. • Forms Required with Original Bid Documents o The Contractor failed to submit Grant Forms 4500-3 and 4500-4 with regards to the Disadvantaged Business Enterprise (DBE) effort. • Original Bid Forms were not provided by the deadline as specified in the Bid package. 1 White Rock Construction, Inc. Description of Work Subcontractors Name & Address Electrical 18.76% Sierra Valley Electric, Inc. P.O. Box 5188 Stateline, NV 89449 CA#391090; CA DIR(PWC)#1000010535 Named Equipment/Material Supplier List: Equipment/Material Supplier / Manufacturer 1. Concrete and Reinforcement Concrete – Sierra Tahoe Ready Mix Rebar – White Cap / Concrete – Sierra Tahoe Ready Mix Rebar – Nucor Steel 2. Electrical Switches, Wiring, and Conduits Sierra Valley Electric, Inc. / Conduit – Plasti-bond Wire – Southwire, no switches The Design Build, Inc. Description of Work Subcontractors Name & Address Electrical Works 11% East Electrical Service, Inc. 3105 Key Largo Ct. Antelope, CA 95843 CA#1095906; CA DIR(PWC)#1000973026 Named Equipment/Material Supplier List: Equipment/Material Supplier / Manufacturer 1. Concrete and Reinforcement AA Concrete / AA Concrete 2. Electrical Switches, Wiring, and Conduits Tahoe Valley Electric Supply / Tahoe Valley Electric Supply