Signed ContractFORMAL CONTRACT
THIS Contract, is made and entered into this -3 1_JL day of January 2023, by and between
Vinciguerra Construction, Inc., hereinafter referred to as "Contractor," and South Tahoe Public
Utility District, El Dorado County, California, hereinafter referred to as "District".
WITNESSETH
That for and in consideration of the promises and agreements hereinafter made and exchanged,
the District and the Contractor agree as follows:
1. That the Contractor will furnish all labor, materials, equipment, tools, transportation,
services, appliances, and appurtenances for the construction of 2024 Herbert Walkup
Pipeline Replacement Project in accordance with the Contract Documents therefore,
adopted by the Board of Directors of the above District, as prepared in part by District.
2. That the District will pay the Contractor progress payments and the final payment in
accordance with the method set forth in the Contract Documents with warrants drawn on
the appropriate fund or funds as required, according to the prices as bid and accepted,
based upon the Plans, Specifications, and Addenda, as follows:
Total Bid - $5,565,630.00. Five Million Five Hundred Sixty -Five Thousand Six Hundred
Thirty Dollars and Zero Cents.
3. Contractor agrees to complete said work within Three Hundred (300) calendar days,
following the issuance of the Notice to Proceed (or approved extensions thereof) and to
the entire satisfaction of the District before final payment is made. Contractor also
agrees that all construction activities requiring excavation, earthwork or soil material
removal shall occur between May 1, 2024, and October 15, 2024 (167 calendar days) in
accordance with requirements of the Tahoe Regional Planning Agency (TRPA) and to
the entire satisfaction of the DISTRICT before final payment is made.
4. Time is of the essence of this Contract.
5. That pursuant to the provisions under Part 2.04, Contract Time and Liquidated
Damages, of Section 00 72 00, General Conditions, of these Contract Documents, under
this Contract, the Contractor will incur fixed and liquidated damages for delays in
completion of the Work.
6. That the Contractor will pay, and will require all Subcontractors to pay, all employees on
said work a salary or wage at least equal to the prevailing salary or wage established for
such work as set forth in the wage determinations and wage standards applicable to this
work, as contained in or referenced by the Contract Documents for this work.
7. That the Contractor shall forfeit to the District a daily penalty, as defined in Section 00 73
00, Part 2.09 of this Contract, for underpayment of prevailing wages.
8. That the Contractor shall keep accurate certified payroll records, and produce them as
required by Part 2.09 of Section 00 73 00 of these Contract Documents.
9. That in the performance of this Contract, a day's work has been defined in Section 00 73
00, Part 2.11, and a daily penalty shall be paid if Contractor violates the terms of the
Labor Code with respect to such definition, as described in Section 00 73 00, Part 2.11.
10. That the Contractor shall carry California Worker's Compensation Insurance and require
all Subcontractors to carry California Worker's Compensation Insurance as required by
the Labor Code of the State of California.
11, The Contractor shall, prior to the execution of the Contract, furnish all insurance policies
as required in Section 00 73 00, Supplemental Conditions, Part 2.01, and furnish two
bonds approved by the DISTRICT, one in the amount of One Hundred (100) Percent of
the Contract price to guarantee payment of all claims for labor and materials furnished.,
one in the amount of One Hundred (100) Percent of the Contract price to guarantee
performance. This Contract shall not become effective until such bonds and policies are
supplied to and approved by the DISTRICT.
12. This Formal Contract reference includes the Contract Documents, which includes the
following:
Solicitation — Notice Inviting Bids
2
Instructions to Bidders
Information Available to Bidders
Electronic Bid Schedule
Bid Form
Formal Contract
Bond Forms
Project Definitions
General Conditions
Supplementary Conditions
General Requirements
Technical Specifications
Grant Conditions and Forms
Addenda
Plans and Drawings
Approved and fully executed Change Orders
Any other documents contained in or incorporated into the Contract, except as otherwise
indicated.
The Contractor shall complete the Work in strict accordance with all of the Contract Documents,
following the intent and coordination of said documents set forth in Section 00 72 00, General
Conditions. Each and every provision of law required to be included in these Contract
Documents shall be deemed to be included in these Contract Documents.
IN WITNESS WHEREOF, the said CONTRACTOR and the South Tahoe Public Utility District,
have caused the names of said parties to be affixed hereto, each in duplicate, the day and year
first above written.
\ n'a Vj&rrV— �d,►.str� criort x'na.
Contractor
By C. ✓�
Title fmskie , r
Address for Giving Notice:
P.O. Box Is7
5 v+r+&' ar e-&< CA q S 6 $ s.
CONTRACTOR'S LICENSE NO:
3SN30
CONTRACTOR'S LICENSE EXPIRATION
DATE: a. I m/ %X S
CONTRACTOR'S FEDERAL I.D.#:
83 - 39 6 3965
SOUTH TAHOE PUBLIC UTILITY DISTRICT
By 7
Address for Giving Notice:
SOUTH TAHOE PUBLIC UTILITY DISTRICT
1275 MEADOW CREST DRIVE
SOUTH LAKE TAHOE, CA 96150
ATTEST:
"-
Melonie Guttry, Clerk of Board
South Tahoe Public Utility District
4
WORKER'S COMPENSATION CERTIFICATE
(AS REQUIRED BY SECTION 1861 OF THE CALIFORNIA LABOR CODE)
I am aware of the provisions of Section 3700 of the Labor Code which require every employer to
be insured against liability for workers' compensation or to undertake self-insurance in
accordance with the provisions of that code, and I will comply with such provisions before
commencing the performance of the work of this contract.
CONTRACTOR: Vi nc�_ vcry7� C.��son���W Z�+G•
BY:
TITLE:
5