Loading...
Certified Payroll Records 6 thru 9_RedactedCalifornia JWR Department of Herbert Walkup Pipeline Replacement t Herbert Walkup Pipeline Industrial Relations PUBLIC WORKS PAYROLL REPORTING FORM Page 1 of 3 I NAME OF CONTRACTOR: Vinciguerra Construction, Inc. CONTRACTOR'S LICENSE NO.: 358838 ADDRESS: P. O. Box 157, Sutter Creek, CA, 95685 j OR SUBCONTRACTOR: SPECIALTY LICENSE NO.: I PAYROLL NO. I FOR WEEK ENDING: -INSURED CERT: PROJECT OR CONTRACT NO.: Herbert Walkup Pipeline JI 6 5/18/2024 (SELF WORKERS' COMP: PROJECT AND LOCATION: I Herbert Walkup Pipeline Replacement, ELD (1) (2) 1 (3) 1 (4) DAY (5) (6) (7) (8) (9) S I M I T I W I T I F I S NAME,ADDRESS AND SOCIAL ?z I ❑o WORK o o E 1 CLASS Date TOTAL HOURL GROSS AMOUNT NET WAGES CHECK SECURITY NUMBER d = 2 Z IFICATION 5/12 15/13 15/14 15115 15/16 15117) 5/18 HOURS Y RATE OF PAY EARNED DEDUCTIONS, CONTRIBUTIONS AND PAYMENTS PAID NO. OF EMPLOYEE 3 FOR Hours Worked Each Day WEEK I S 0.00 0.00 4.00 0.00 8.00 8.00 0.00 20.00 $52.14 THIS ALL Federal PROJECT PROJECTS Tax FICA & Medicare State Tax SDI Vacation Holiday Health & Welfare Pension AREVALO, JOSHUA 155 Hillside Place ' PLUMBER / UNDERGROU $160.00 $150.42 $119.79 $21.63 $0.00 $0.00 $0.00 5642 4 ND UTILITY O 0.00 0.00 1.00 0.00 1.00 1.00 0.00 3.00 $68.79 $1,395.85 D/D PIPEFITTER � $1,249.17 $1,975.42 Training Admin / Dues Travel & Savings Other Total Fringes Sub Deduct. - U U:uu u.UU u:Uu U:OU U:UU 0.00 0:00 _ 0:00 _ $0.00 $9.20 $0.00 $0.00 $0.00 $0.00 _. $127.731 $579.57 Other Deduction Notes: Trainino fee and Cal,Savers contribution I S 0.00 7.00 8.00 8.00 8.00 6.50 0.00 37.50 $52.14 THIS ALL Federal PROJECT PROJECTS Tax FICA & Medicare State Tax SDI Vacation Holiday Health & Welfare Pension GIRARDIN, FLOYD I PLUMBER / $330.00 $169.36 $142.07 $24.35 $0.00 $0.00 $0.00 P. 0. Box 102 River 5 UNDERGROU 1 ND UTILITY O 0.00 0.00 2.00 0.00 1.50 0.00 0.00 3.50 $68.79 $1,548.03 D/D PIPEFITTER $2,196.02 $2,230.41 Training Admin / Dues Travel & Savings Other Total Fringes Sub Deduct. D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $16.40 $0.00 $0.00 $0.00 $0.00 $16.60 $682.38 Other Deduction Notes: Training fee S 0.00 7.50 8.00 8.00 8.00 5.00 0.00 36.50 $52.14 THIS ALL Federal PROJECT PROJECTS Tax FICA & Medicare State Tax SDI Vacation Holiday Health & Welfare Pension MERCIER, ' BRANDON 400 Cragmont Court PLUMBER/ UNDERGROU $264.00 $149.71 $115.79 $21.52 $0.00 $0.00 $0.00 Cameron Park CA 1 ND UTILITY O 0.00 0.00 0.50 0.50 0.00 0.00 0.0 0 1.00 $68.79 $1,405.88 D/D 95 2 PIPEFITTER � $1,971.90 $1,971.90 Training Admin / Dues Travel & Savings Total Other Fringes Sub Deduct. D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 S15.00 $0.00 $0.00 $0.00 $0.00 $15.00 $566.02 Other Deduction Notes: Training fee S = STRAIGHT TIME OTHER - Any other deductions, contributions and/or payments whether or not included or required by prevailing wage determinations must be separately listed. CERTIFICATION MUST be completed O = OVERTIME Use extra sheet(s) if necessary. See reverse side Form A-1-131 New 2-80) ( ) ( D = DOUBLETIME SDI = STATE DISABILITY INSURANCE California JEN Department of Herbert Walkup Pipeline Replacement / Herbert Walkup Pipeline Industrial Relations PUBLIC WORKS PAYROLL REPORTING FORM Page 2 of 3 (1) (2) 1 (3) (4) DAY (5) (6) (7) (8) (9' S I M I T I W I T I F I S NAME,ADDRESS AND SOCIAL oNI �-ao o � � WORK � Date TOTAL HOURL GROSS AMOUNT NET WAGES CHECK SECURITYNUMBER 0 o a z3 CLASS- IFICATION 5/12 15/13 15/14' 5/15 1 5116 1 5/17 15/18 HOURS Y RATE OF PAY EARNED DEDUCTIONS, CONTRIBUTIONS AND PAYMENTS PAID NO. EMPLOYEE O EE i FOR Hours Worked Each Day WEEK I S 0.00 7.50 7.50 8.00 8.00 6.50 0.00 37.50 $52.14 THIS PROJECT ALL Federal PROJECTS Tax FICA & Medicare State Tax SDI Vacation Holiday Health & Pension Welfare REYNOSO, LUIS 8399 Steelhead pLUMBER / UNDERGROU $270.00 $14SA3 $117.13 $21.34 $0.00 $0.00 $0.00 Avenue Kings Beach 0 ND UTILITY O 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $68.79 $1,383.35 D/D PIPEFITTER $1,955.25 $1,955.25 Training Admin / Fringes Dues Travel & Sub Savings Other Total Deduct. I D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $15.00 $0.00 $0.00 $0.00 $0.00 $15.00 $571.90 Other Deduction Notes: Trainina fee _. S 6.00 7.50 7.50 7.50 8.00 7.50 0.00 38.00 $52.14 TWt PROJECT 7oelbrai-FlC-A-Ae=__- PROJECTS Tax Medicare Tax SDI -vacation--Health Pension Holiday Welfare SABIA, MORGAN 1413 Rancho Way pLUMBER / UNDERGROU $298.00 $158.26 $130.27 $22.76 $0.00 $0.00 $0.00 South Lake Tahoe 0 � ND UTILITY O 0.00 0.00 0.00 0.00 1.50 0.00 0.00 1.50 $68.79 $1,459.42 D/D NNE PIPEFITTER � $2,084.51 $2,084.51 Training Admin / Dues Travel & Savings Other Total Fringes Sub Deduct. � D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $15.80 $0.00 $0.00 $0.00 $0.00 $15.80 $625.09 Other Deduction Notes: Training fee S 0.00 8.00 8.00 8.00 8.00 8.00 0.00 40.00 $95.64 THIS PROJECT ALL Federal PROJECTS Tax FICA & Medicare State Tax SDI Vacation Holiday Health & Welfare Pension VINCIGUERRA, Operating Engineer � 9 En $535.00 $288.96 $298.96 $41.55 $0.00 $0.00 $0.00 330 BodTIN 30 odega Court El Dorado Hills CA 2 (Heavy & O 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 $127.0 $2,612.73 D/D Highway work) / Group 3 Area 1 $3,825.60 $3,825.60 Training Admin / Fringes Dues Travel & Sub Savings Other Total Deduct. D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $48.40 $0.00 $0.00 $0,00 $0.00 $48.40 $1,212.8 Other Deduction Notes: Training fee S 0.00 0.00 0.00 0,00 8,00 0.00 0.00 8.00 $95.64 THIS PROJECT ALL Federal PROJECTS Tax FICA & Medicare State Tax SDI Vacation Holiday Health & Welfare Pension VINCIGUERRA, Operating CASEY Engineer $508.00 $291.92 $296.83 $41.98 $0.00 $0.00 $0.00 470 Broadmeadows Court Sutter Creek 4 (Heavy & O 0.00 0.00 0.00 0.00 0.00 0.0o 0.00 0.00 $127.0 0 $2,447.65 DID Highway work) / Group 3 Area 1 $765.12 $3,825.60 Training Admin 1 Dues Travel & Savings Total Other Fringes Sub Deduct. D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $9.66 $0.00 $0.00 $0.00 $0.00 377 ,. $19 $239.22 5 Other Deduction Notes: Training fee S = STRAIGHT TIME "OTHER -Any other deductions, contributions and/or payments whether or not included or required by prevailing wage determinations must be separately listed. CERTIFICATION MUST be completed O = OVERTIME Use extra sheet(s) if necessary. (See reverse side) Form A-1-131 (New 2-80) D = DOUBLETIME SDI = STATE DISABILITY INSURANCE California Department of Industrial Relations TATE OF CALIFORNIA TATEMENT OF COMPLIANCE ONTRACTOR/SUBCONTRACTOR Vinciguerra Construction, Inc. PST DAY AND DATE OF PAY PERIOD 5/12/2024 10 hereby certify under penalty of perjury: Herbert Walkup Pipeline Replacement / Herbert Walkup Pipeline PUBLIC WORKS PAYROLL REPORTING FORM Page 3 of 3 CONTRACT NUMBER Herbert Walkup Pipeline LAST DAY AND DATE OF PAY PERIOD 5/18/2024 (1) That I pay or supervise payment to employees of the above —referenced contractor on the above —referenced contract. All persons employed on said project for the above —referenced time period have been paid their full weekly wages earned, that no rebates have been or will be made either directly or indirectly to or on behalf of said contractor from the full weekly wages earned by any person and that no deductions have been made either directly or indirectly from the full wages earned by any person other than permissible deductions. (2) That this employer has complied with the requirements of the California Labor Code Sections. 1771, 1811, and 1815 for all performed on this public works project, and that the classifications set forth therein for each trade rate conform with the work performed. (3) That any payrolls otherwise under this control required to be submitted for the above period are correct and complete; that the wage rates for laborers or mechanics contained therein are not less that the applicable wages rates: (a) Specified in the applicable wage determination incorporated into the contract; (b) M Determined by the Director of Industrial Relations for the county or counties in which the work is performed; that the classification set forth therein for each laborer or mechanic conform with the work he or she performed. (4) That any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with a State apprenticeship agency. (5) That fringes benefits as listed in the contract: (a) Have been or will be paid to the approved plan(s), funds(s), or program(s) for the benefit of listed employee(s), except as noted below. (b) = Have been paid directly to the listed employee(s), except as noted below. (c) El See exceptions noted below. EXCEPTION CRAFT EXPLANATION EMARKS: Except for Training funds for all crafts paid directly to CAC. AME (PLEASE PRINT.) TITLE ustin Vinciguerra President IGNATURE:I G / DATE 6/10/2024 n federally —funded projects, permissible deductions are defined in title 29, Code of Federal Regulations, part 3, issued by the Secretary of Labor under the Copeland Act, (40 U. S. C. 276c). Also, the willful Isification of any of the above statements may subject the contractor or subcontractor to civil or criminal prosecution (See section 1001 of title 18 and section 3729 of title 31 of the United States Code). DA Notice For individuals with sensory disabilities, this document is available in alternate formats. For information call (916) 654-6410 or TDD (916) 654-3880 or write Records and Forms CEM 2503 Management, 1120 N Street, MS-89, Sacramento, CA 95814. California Department of Herbert Walkup Pipeline Replacement /Herbert Walkup Pipeline Industrial Relations PUBLIC WORKS PAYROLL REPORTING FORM Page 1 of 6 1 NAME OF CONTRACTOR: Vinciguerra Construction, Inc. CONTRACTOR'S LICENSE NO.: 358838 ADDRESS: P. O. Box 157, Sutter Creek, CA, 95685' FOR SUBCONTRACTOR: SPECIALTY LICENSE NO.: 7 O. PAYROLLPROJECT I FOR WEEK ENDING: I OR CONTRACT NO.: Herbert Walkup Pipe (ine 5/25/2024 WORKERS' COMP: IPROJECT AND LOCATION: Herbert Walkup Pipeline Replacement, ELD (1) (2) 1 (3) (4) DAY (5) (6) (7) (8) (9) S I M I T I W( T I F 5 NAME,ADDRESS ?zI 0o WORK Date NET AND SOCIAL SECURITY NUMBER o o a d x - CLASS- Z Y w IFICATION 5/19 5/20 I I TOTAL HOURS HOUTL Y RATE GROSS AMOUNT EARNED DEDUCTIONS, CONTRIBUTIONS WAGES AND PAYMENTS PAID CHECK OF EMPLOYEE �w 5/21 5122 5/23 5/24 I I I I 5/25 OF PAY NO. FOR 3 Hours Worked Each Day WEEK S 0.00 0.00 4.00 4.00 4.00 4.00 0.00 16.00 $52.14 THIS ALL Federal PROJECT PROJECTS Tax FICA & Medicare State Tax SDI Vacation Health & Holiday Welfare Pension AREVALO, JOSHUA 155 Hillside Place PLUMBER / UNDERGROU $412.00 $252.55 $256.37 $36.31 $0.00 $0.00 $0.00 4 ND UTILITY O 0.00 0.00 2.00 1.50 2.00 2.00 0.00 7.50 $68.79 $2,144.27 D/D �642 PIPEFITTER $1,350.17 $3,331.13 Training Admin / Dues Travel & SavingTotal s Other Fringes Sub Deduct. ( 00G.00 - -- - --- -- - -- $9.40 -- $0.00 $0.00 $0.00 - - $1,186.8 $0.00 $229.63 6 Other Deduction Notes: Trainino fee and CalSavers contribution 1 S 0.00 0.00 4.00 4.00 4.00 4.00 0.00 16.00 $90.64 THIS ALL Federal PROJECT PROJECTS Tax FICA & Medicare State Tax SDI Vacation Health & Holiday Welfare Pension AREVALO, JOSHUA 155 Hillside Place Operating Engineer $412.00 $252.55 $256.37 $36.31 $0.00 $0.00 $0.00 642Highway 4 (Heavy & O 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $119.5 0 $2,144.27 D/D � work) / Group 3 Area 1 $1,450.24 $3,331.13 Training Admin / Dues Travel & Total Savings Other Fringes Sub Deduct. D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $19.36 $0.00 $0.00 $0.00 $1,186.8 $0.00 $229.63 6 Other Deduction Notes: Trainino fee and CalSavers contrihution 1 S 0.00 0.00 8.00 8.00 8.00 8.00 0.00 32.00 $52.14 THIS ALL Federal PROJECT PROJECTS Tax FICA & Medicare State Tax SDI Vacation Health & Holiday Welfare Pension CORREA,ERICK PLUMBER/ 1535 Hussman UNDERGROU $19.00 $160.20 $53.85 $21.60 $0.00 $0.00 $0.00 Avenue Gardnerville 0 O ND UTILITY 0.00 0.00 1.50 1.00 2.00 0.00 0.00 4.50 $68.79 $1,718.79 2129 NV 89410 PIPEFITTER $1,978.04 $1,978.04 Training Admin ! Dues Travel & Total Savings Other Fringes Sub Deduct. D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $14.60 $0.00 $0.00 $0.00 $0.00 $14.60 $259.25 Other Deduction Notes: Training fee S = STRAIGHT TIME 'OTHER -Any other deductions, contributions and/or payments whether or not included or required by prevailing wage determinations must be separately listed. CERTIFICATION MUST be completed O = OVERTIME Use extra sheets if necessa Form A-1-131 (New 2-80) D = DOUBLETIME () ry' (See reverse side) SDI = STATE DISABILITY INSURANCE California am 21 Department of Herbert Walkup Pipeline Replacement / Herbert Walkup Pipeline Industrial Relations PUBLIC WORKS PAYROLL REPORTING FORM Page 2 of 6 (1) (2) 1 (3) (4) DAY (5) (6) (7) (8) (9) S I M I T I W I T I F I S NAME,ADDRESS AND SOCIAL LLoo WORK o ,_ Date HOURL GROSS AMOUNT NET WAGES SECURITY NUMBER CLASS -TOTAL_ Z� W I (CATION 5/19 I 5/20 5/21 I 5/22 I I 5/23 5124 5125 I I HOURS of RATE EARNED DEDUCTIONS, CONTRIBUTIONS AND PAYMENTS PAID CHECK NO. OF EMPLOYEE 3 FOR Hours Worked Each Day WEEK I S 0.00 0.00 4.00 4.00 4.00 4.00 0.00 16.00 $52.14 THIS ALL Federal PROJECT PROJECTS Tax FICA & Medicare State Tax SDI l Vacation Heath & Holiday Welfare Pension COWAN, THOMAS 12650 C PLUMBER/ UNDERGROU $471.00 $201.57 $188.19 $28.98 $0.00 $0.00 $0.00 Shenandoah Road 0 ND UTILITY O 0.00 0.00 2.00 1.50 2.00 0.00 0.00 5.50 $68.79 $1,407.29 D/D 95669 PIPEFITTER � $1,212.59 $2,662.83 Training Admin / Dues Travel & Savings Other Total Fringes Sub Deduct. D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $8.60 $0.00 $0.00 $0.00 $1,255.5 $0.00 $365.80 4 Other Deduction Notes: Trainino fee and Garnishment 71 IFS-----94L=L- -Federal-PtG'A-8r U6.c SDI 4aCattan- 9eatiii - Pension S 0.00 0.00 4.00 4.00 4.00 4.00 0.00 16.00 $90.64 PROJECT PROJECTS Tax Medicare Tax Holiday Welfare COWAN, THOMAS Operating 12650 C Engineer $471.00 $201.57 $188.19 $28.98 $0.00 $0.00 $0.00 Shenandoah Road 0 (Heavy & O 0.00 0.00 0.00 0.00 0.00 0.00 0.00 O.OD $119.5 $1,407.29 D/D 669 Highway work) ! � Group 3 Area 1 $1,450.24 $2,662.83 Training Admin / Dues Travel & Total Savings Other Fringes Sub Deduct. D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $19.36 $0.00 $0.00 $0.00 $0.00 $365.80 $1,255.5 4 Other Deduction Notes: Training Fee and Garnishment S 0.00 0.00 8.00 8.00 8.00 8.00 0.00 32.00 $52.14 THIS ALL Federal PROJECT PROJECTS Tax FICA & Medicare State Tax SDI Vacation Health & Holiday Welfare Pension GARIBALDI, ANTHONY PLUMBER / $375.00 $171.13 $147.49 $24.61 $0.00 $0.00 $0.00 P. O. Box 985 Sutter UNDERGROU 0 ND UTILITY O 0.00 0.00 2.00 2.00 2.00 0.50 0.00 6.50 $68.79 $1,518.77 D/D 85 PIPEFITTER $2,115.62 $2,253.20 Training Admin / Fringes Dues Travel & Sub Savings Other Total Deduct, D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $15.40 $0.00 $0.00 $0.00 $0.00 $16.20 $734.43 Other Deduction Notes: Training fee S 0.00 8.00 8.00 8.00 8.00 8,00 0.00 40.00 $52.14 THIS ALL Federal PROJECT PROJECTS Tax FICA & Medicare State Tax SDI Vacation Health & Holiday Welfare Pension GIRARDIN, FLOYD I PLUMBER / $435.00 $202.79 $186.79 $29.16 $0.00 $0.00 $0,00 P. 0. Box 102 River UNDERGROU 1 ND UTILITY O 0.00 0.50 2.00 2.00 2.00 0.50 0.00 7.00 $68.79 $1,797.18 D/D PIPEFITTER $2,567.13 $2,670.32 Training Admin / Dues Travel & Savings Other Total Fringes Sub Deduct. D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $18.80 $0.00 $0.00 $0.00 $0.00 $19.40 $873.14 Other Deduction Notes: Trainino Fee S = STRAIGHT TIME 'OTHER - Any other deductions, contributions and/or payments whether or not included or required by prevailing wage determinations must be separately listed. CERTIFICATION MUST be completed O = OVERTIME Use extra sheet(s) if necessary. See reverse side Form A-1-131 New 2-80) ( ) ( D = DOUBLETIME SDI = STATE DISABILITY INSURANCE California JMN Department of Herbert Walkup Pipeline Replacement / Herbert Walkup Pipeline Industrial Relations PUBLIC WORKS PAYROLL REPORTING FORM Page 3 of 6 (1) (2) 1 (3) (4) DAY (5) (6) (7) (8) (9) S I M I T I W I T I F I S NAME, ADDRESS ?z I moo WORK Date NET AND SOCIAL SECURITY NUMBER o � Z? w CLASS -TOTAL 5l19 I I I HOURS HouRL F P GROSS AMOUNT EARNED DEDUCTIONS, CONTRIBUTIONS WAGES AND PAYMENTS PAID CHECK NO. OF EMPLOYEE 3 I ICAT N 5/20 5/21 5122 I 5/23 I 5124 I 5/25 OAY FOR Hours Worked Each Day WEEK S 0.00 0.00 8.00 8.00 8.00 8.00 0.00 32.00 $52.14 THIS PROJECT ALL Federal PROJECTS Tax FICA & Medicare State Tax SDI Vacation Holiday Health & Welfare pension GRIEGO, DAVID 1730 Rock Springs pLUMBER / UNDERGROU $378.00 $184.71 $165,64 $26.56 $0.00 $0.00 $0.00 Road Escondido CA 0 ND UTILITY O 0.00 0,00 2.00 1.50 2.00 0.50 0.00 6.00 $68.79 $1,659.50 D/D PIPEFITTER $2,081.22 $2,430.01 Training Admin / Fringes Dues Travel & Sub Savings Other Total Deduct. D 0.00 0.00 0.00 0.00 0.00 0.00 0.0o 0.00 $0.00 $15.20 $0.00 $0.00 $0.00 $0.00 $15.60 $770.51 Other Deduction Notes: Training Fee 7� IIS---AL-L -Federate =ReA-&-- a SDI pension vacation-Healthh& S 0.00 0.00 8.00 8.00 8.00 8.00 0.00 32.00 $52.14 PROJECT PROJECTS Tax Medicare Tax Holiday Welfare LIMAS, ABRAHAM PLUMBER/ 1535 Hussman $36.00 $152.82 $50.80 $21,97 $0.00 $0.00 $0.00 Avenue Gardnerville 0 UNDERGROU NO UTILITY O 0.00 0.00 2.00 1.00 2.00 0.00 0.00 5.00 $68.79 $1,736.04 2130 PIPEFITTER $2,012.43 $2,012.43 Training Admin / Fringes Dues Travel & Sub Savings Other Total Deduct. D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $14.80 $0.00 $0.00 $0.00 $0.00 $14.80 $276.39 Other Deduction Notes: Training fee S 0.00 8.00 8.00 8.00 8.00 7.00 0.00 39.00 $52.14 THIS PROJECT ALL Federal PROJECTS Tax FICA & Medicare State Tax SDI Vacation Holiday Health & Welfare Pension MERCIER, I BRANDON PLUMBER/ $413.00 $198.83 $181.49 $28.59 $0.00 $0.00 $0.00 400 Cragmont Court 1 UNDERGROU O 0.00 1,50 2.00 2.00 Cameron Park CA ND UTILITY 2.00 0.00 0.00 7.50 $68.79 $1,777.27 D/D 95682 ' PIPEFITTER $2,549.39 $2,618.18 Training Admin / Dues Travel & Savings Other Total Fringes Sub Deduct. I D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 � $18.60 $0.00 $0.00 $0.00 $0.00 $19.00 $840.91 Other Deduction Notes: Training fee ( S 0.00 0.00 0.00 8.00 8.00 8,00 0.00 24.00 $52.14 THIS PROJECT ALL Federal PROJECTS Tax FICA & Medicare State Tax SDI Vacation Holiday Health & Welfare Pension PEREZ, SERGIO I PLUMBER / $195.00 $116.05 $69.18 $16.69 $0.00 $0.00 $0.00 149 Oak Ridge Drive 1 UNDERGROU ND UTILITY O 0.00 0.00 0.00 1.50 2.00 0.50 0.00 4.00 $68.79 $1,118.40 D/D 00 PIPEFITTER $1,526.52 $1,526.52 Training Admin / Dues Travel & Savings Other Total Fringes Sub Deduct. D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $11.20 $0.00 $0.00 $0.00 $0.00 $11.20 $408.12 Other Deduction Notes: Training fee S = STRAIGHT TIME 'OTHER- Any other deductions, contributions and/or payments whether or not included or required by prevailing wage determinations must be separately listed. CERTIFICATION MUST be completed O = OVERTIME Use extra sheot(s) it necessary. See reverse side Form A-1-131 (New 2-80) D = DOUBLETIME ( ) SDI = STATE DISABILITY INSURANCE 401California Department of Herbert Walkup Pipeline Replacement / Herbert Walkup Pipeline Industrial Relations PUBLIC WORKS PAYROLL REPORTING FORM Page 4 of 6 (1) (2) 1 (3) (4) DAY (5) (6) (7) (8) (9) S I M I T I W I T I F I S NAME, ADDRESS AND SOCIAL �u o o o o a 1 WORK Date TOTAL HOURL GROSS AMOUNT NET WAGES CHECK SECURITY NUMBER o c x IFICAT N 5/19 15/20 15/21 15/22 15/23 15/24 15/25 HOURS Y RATE OF PAY EARNED DEDUCTIONS, CONTRIBUTIONS AID AND PAYMENTS FOR NO. OF EMPLOYEE t W I Hours Worked Each Day WEEK THIS ALL Federal FICA & State SDI Vacation Health & Pension S 0.00 8.00 8.00 8.00 8.00 8.00 0.00 40.00 $52.14 PROJECT PROJECTS Tax Medicare Tax Holiday Welfare REYNOSO, LUIS 8399 Steelhead PLUMBER / $378.00 $184.49 $165.35 $26,53 $0.00 $0.00 $0.00 AvenueUNDERGROU Beach 0 ND UTILITY O 0.00 0.00 2.00 1.00 2.00 0.00 0.00 5.00 $68.79 $1,657.18 D/D PIPEFITTER � $2,429.55 $2,429.55 Training Admin / Fringes Dues Travel & Sub Savings Other Total Deduct. � D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $18.00 $0.00 $0.00 $0.00 $0.00 $18.00 $772.37 Other Deduction Notes: Training fee T'L116- ALL I"13AA Ella« SDI Vacation-H-66.6, -^ Pension S 0.00 8.00 8.00 8.00 8.00 8.00 0.00 40.00 $52.14 PROJECT PROJECTS Tax Medicare Tax Holiday Welfare SABIA,MORGAN 1413 Rancho Way PLUMBER/ $378.00 $184.48 $165.35 $26.52 $0.00 $0.00 $0.00 South Lake Tahoe 0 UNDERGROU ND UTILITY O 0.00 0.00 2.00 1.00 2.00 0.00 0.00 5.00 $68.79 $1,657.20 D/D CA 96150 PIPEFITTER $2,429.55 $2,429.55 Training Admin / Fringes Dues Travel & Sub Savings Other Total Deduct. � � D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $18.00 $0.00 $0.00 $0.00 $0.00 $18.00 $772.35 Other Deduction Notes: Training fee THIS ALL Federal FICA & State SDI Vacation Health & Pension S 0.00 8.00 8.00 8.00 8.00 8.00 0.00 40.00 $95.64 PROJECT PROJECTS Tax Medicare Tax Holiday Welfare VINCIGUERRA, Operating TIN Engineer $735.00 $356.32 $389.04 $51.23 $0.00 $0.00 $0.00 330 Bodega Court El od Dorado Dorado Hills CA 2 work) O 0.00 0.00 2.00 2.00 2.00 0.50 0.00 6.50 $127.0 0 $3,126.14 D/D Highway / Group 3 Area 1 $4,651.10 $4,714.60 Training Admin / Fringes Dues Travel & Sub Savings Total Other Deduct. D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $56.27 $0.00 $0.00 $0.00 $0.00 $1,588.4 $56.87 6 Other Deduction Notes: Training fee THIS ALL Federal FICA & State SDI Vacation Health & Pension S 0.00 8.00 0.00 8.00 8.00 8.00 0.00 32.00 $95.64 PROJECT PROJECTS Tax Medicare Tax Holiday Welfare VINCIGUERRA, Operating CASEY Engineer $556.00 $308.94 $319.59 $44.42 $0.00 $0.00 $0.00 470 Broadmeadows Court Sutter Creek 4 Heavy& O 0.00 0.00 0.00 1.00 1.00 0.00 0.00 2.00 $127.0 0 $2,664.73 D/D CACA 95� Highway work) / Group 3 Area 1 $3,314.48 $4,079.60 Training Admin / Fringes Dues Travel & Sub Savings Total Other Deduct. D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $41.14 $0.00 $0.00 $0.00 $0.00 514 ,. $18 $285.92 7 Other Deduction Notes: Trainino fee and CalSavers contributuion S = STRAIGHT TIME 'OTHER -Any other deductions, contributions and/or payments whether or not included or required by prevailing wage determinations must be separately listed. CERTIFICATION MUST be completed O = OVERTIME Use extra shoot(s) if necessary. (See reverse side) Form A-1-131 (New 2-80) D = DOUBLETIME SDI = STATE DISABILITY INSURANCE California am Department of Herbert Walkup Pipeline eline Replacement /Herbert Walkup P Pi eline P Industrial Relations PUBLIC WORKS PAYROLL REPORTING FORM Page 5 of E (1) (2) 1 (3) (4) DAY (5) (6) (7) (8) (9) S I M I T I W I T I F I S NAME, ADDRESS AND SOCIAL ?z I '0 512, o WORK Date TOTAL HOURL GROSS AMOUNT NET WAGES CHECK SECURITY NUMBER X CLASS- IFICATION 5/19 15120 15/21 15/22 1 5/23 1 5/24 15/25 HOURS Y RATE OF PAY EARNED DEDUCTIONS, CONTRIBUTIONS AND PAYMENTS PAID NO. OF EMPLOYEE '' w 3 FOR Hours Worked Each Day WEEK I THIS ALL Federal FICA & State SDI Vacation Health & Pension S 0.00 8.00 8.00 8.00 8.00 8.00 0.00 40.00 $95.64 PROJECT PROJECTS Tax Medicare Tax Holiday Welfare YOUNG, JIM Operating Engineer $710.00 $341.88 $372.78 $49.16 $0.00 $0.00 $0.00 P. O. Box 58 Fidd etown A 95629 1 O 0.00 0.00 2.00 1.50 2.00 0.00 0.00 5.50 $127 0 0 $2,723,77 D/D Highway work) / Group 3 Area 1 $4,524.10 $4,524.10 Training Admin / Fringes Dues Travel & Sub Savings Other Total Deduct. D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $55.06 $0.00 $0.00 $0.00 $0.00 $326.51 $1,800.3 Other Deduction Notes: Trainina fee and CalSavers contribution _. Ti III ALL 7.:,v,&[ ,SIG -del - SDI VU aS ,- Il�ellhd Pension S 0.00 8.00 8.00 8.00 8.00 8.00 0.00 40.00 $52.14 PROJECT PROJECTS Tax Medicare Tax Holiday Welfare ZELLERS,JEREMY 8194 MAIN ST 1 PLUMBER/ $350.00 $200.18 $180.24 $28.78 $0.00 $0.00 $0.00 MOKELUMNE HILL 0 I UNDERGROU ND UTILITY O 0.00 0.50 2.00 2.00 2.00 0.00 0.00 6.50 $68.79 $1,716.52 D/D CA 95� � PIPEFITTER $2,532.74 $2,635.92 Training Admin / Dues Travel & Savings Other Total Fringes Sub Deduct. D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $18.60 $0.00 $0.00 $0.00 $0.00 $160.20 $919.40 Other Deduction Notes: Trainino fee and Garnishment S = STRAIGHT TIME OTHER -Any other deductions, contributions and/or payments whether or not included or required by prevailing wage determinations must be separately listed. CERTIFICATION MUST be completed O = OVERTIME Use extra sheet(s) if necessary. See reverse side Form A-1-131 (New 2-80) D = DOUBLETIME ( ) SDI = STATE DISABILITY INSURANCE JON California Department of Industrial Relations FATE OF CALIFORNIA rATEMENT OF COMPLIANCE DNTRACTOR/SUBCONTRACTOR Vinciguerra Construction, Inc. RST DAY AND DATE OF PAY PERIOD 5/19/2024 to hereby certify under penalty of perjury: Herbert Walkup Pipeline Replacement / Herbert Walkup Pipeline PUBLIC WORKS PAYROLL REPORTING FORM Page 6of6 CONTRACT NUMBER Herbert Walkup Pipeline LAST DAY AND DATE OF PAY PERIOD 5/25/2024 (1) That I pay or supervise payment to employees of the above —referenced contractor on the above —referenced contract. All persons employed on said project for the above —referenced time period have been paid their full weekly wages earned, that no rebates have been or will be made either directly or indirectly to or on behalf of said contractor from the full weekly wages earned by any person and that no deductions have been made either directly or indirectly from the full wages earned by any person other than permissible deductions. (2) That this employer has complied with the requirements of the California Labor Code Sections. 1771, 1811, and 1815 for all performed on this public works project, and that the classifications set forth therein for each trade rate conform with the work performed. (3) That any payrolls otherwise under this control required to be submitted for the above period are correct and complete; that the wage rates for laborers or mechanics contained therein are not less that the applicable wages rates: (a) Specified in the applicable wage determination incorporated into the contract; (b) ED Determined by the Director of Industrial Relations for the county or counties in which the work is performed; that the classification set forth therein for each laborer or mechanic conform with the work he or she performed. (4) That any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with a State apprenticeship agency. (5) That fringes benefits as listed in the contract: (a) Have been or will be paid to the approved plan(s), funds(s), or program(s) for the benefit of listed employee(s), except as noted below. (b) Have been paid directly to the listed employee(s), except as noted below. (c) See exceptions noted below. EXCEPTION CRAFT EXPLANATION MARKS: Except for Training funds for all crafts paid directly to CAC. 4ME (PLEASE PRINT.) TITLE istin Vinciguerra --- President GNATURE:I G �� DATE 6/10/2024 i federally —funded projects, permissible deductions are defined in title 29, Code of Federal Regulations, part 3, issued by the Secretary of Labor under the Copeland Act, (40 U. S. C. 276c). Also, the willful Isification of any of the above statements may subject the contractor or subcontractor to civil or criminal prosecution (See section 1001 of title 18 and section 3729 of title 31 of the United States Code). )A Notice For individuals with sensory disabilities, this document is available in alternate formats. For information call (916) 654-6410 or TDD (916) 654-3880 or write Records and Forms CEM 2503 Management, 1120 N Street, MS-89, Sacramento, CA 95814. JORCalifornia Department of Herbert Walkup Pipeline Replacement / Herbert Walkup Pipeline Industrial Relations PUBLIC WORKS PAYROLL REPORTING FORM Page of 1 NAME OF CONTRACTOR: Vinciguerra Construction, Inc. CONTRACTOR'S LICENSE NO.: 358838 ADDRESS: P. O. Box 157, Sutter Creek, CA, 95s85j [OR SUBCONTRACTOR: SPECIALTY LICENSE NO.: (PAYROLL NO. ( FOR WEEK ENDING: ISELF-INSURED CERT: OR CONTRACT NO.: Herbert Walkup Pipeline {I 8 6/1/2024 (WORKERS' COMP: (PROJECT PROJECT AND LOCATION: Herbert Walkup Pipeline Replacement, ELD (1) (2) 1 (3) I (4) DAY (5) (6) (7) (8) (9) S I M I T I W I T I F I S NAME,ADDRESS AND SOCIAL ?z1 0o WORK ooa I Date TOTAL HOURL GROSS AMOUNT NET WAGES CHECK SECURITY NUMBER CLASS- °z i w IFICATION 5/26 5/27 5128 5/29 I I I I 5/30 5/31 I I 6/01 HOURS Y RATE OF PAY EARNED DEDUCTIONS, CONTRIBUTIONS AND PAYMENTS PAID NO. OF EMPLOYEE 3W FOR Hours Worked Each Day WEEK I S 0.00 0.00 4.00 4.00 4.00 4.00 0.00 16.00 $90.64 THIS ALL Federal PROJECT PROJECTS Tax FICA & Medicare State Tax SDI Vacation Health & Holiday Welfare Pension AREVALO, JOSHUA Operating Engineer $463.00 $270.15 $279.90 $38.84 $0.00 $0.00 $0.00 155 Hillside Place 642 4 (Heavy & O 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $119 5 p $2,265.60 D!D Highway work) / Group 3 Area 1 $1,450.24 $3,564.31 Training Admin / Fringes Dues Travel & Savings Other Total Sub Deduct. t0--- 0.00 -0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $19.36 $O.00 $0.001 _ $0.00I - $1 298 7 $0.00 $246.82 1 Other Deduction Notes: TRAINING. CAL SAVERS 1 S 0.00 0.00 4.00 4.00 4.00 4.00 0.00 16.00 $52.14 THIS ALL Federal PROJECT PROJECTS Tax FICA & Medicare State Tax SDI Vacation Health & Holiday Welfare Pension AREVALO, JOSHUA I PLUMBER / $463.00 $270.15 $279.90 $38.84 $0.00 $0.00 $0.00 155 Hillside Place 5642 UNDERGROU 4 ND UTILITY O 0.00 0.00 2.00 2.00 2.00 2.00 0.00 8.00 $68.79 $2,265.60 D/D PIPEFITTER $1,384.56 $3,564.31 Training Admin! Dues Travel& Savings Other Total Fringes Sub Deduct. D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $9.60 $0.00 $0.00 $0.00 $1,298.7 $0.00 $246.82 1 Other Deduction Notes: TRAINING. CAL SAVERS 1 S 0.00 0.00 8.00 8.00 8.00 8.00 0.00 32.00 $52.14 THIS ALL Federal PROJECT PROJECTS Tax FICA & Medicare State Tax SDI Vacation Health & Holiday Welfare Pension CORREA, ERICK 1535 Hussman pLUMBER / $72.00 $168.52 $77.88 $24.23 $0.00 $0.00 $0.00 Avenue Gardnerville UNDERGROU 0 ND UTILITY O 0.00 0.00 2.00 2.00 1.50 2.00 0.00 7.50 $68.79 $1,860.17 2335 PIPEFITTER � $2,184.41 $2,218.80 Training Admin/ Dues Travel& Savings Other Total Fringes Sub Deduct. � D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $15.80 $0.00 $0.00 $0.00 $0.00 $16.00 $358.63 Other Deduction Notes: Trainina S = STRAIGHT TIME *OTHER - Any other deductions, contributions and/or payments whether or not included or required by prevailing wage determinations must be separately listed. CERTIFICATION MUST be completed O = OVERTIME Use extra sheet(s) if necessary. See reverse side Form A-1-131 (New 2-80) D = DOUBLETIME ( ) SDI = STATE DISABILITY INSURANCE California Department of Herbert Walkup Pipeline Replacement / Herbert Walkup Pipeline Industrial Relations PUBLIC WORKS PAYROLL REPORTING FORM Page 2 of 7 (1) (2) 1 (3) (4) DAY (5) (6) (7) (8) (9) S I M I T I W I T I F I S NAME, ADDRESS AND SOCIAL ? z LLoo o � 1 WORK I Date GROSS AMOUNT NET WAGES CHECK SECURITY NUMBER °z = w CLASS -TOTAL IFICAT N 5/26 15/27 1 5/28 15129 1 5/30 15/31 16/01 OURS RATE OF PAY EARNED DEDUCTIONS, CONTRIBUTIONS AND PAYMENTS FOR NO. OF EMPLOYEE 3x w Hours Worked Each Day WEEK I S 0.00 0.00 4.00 4.00 4.00 4.00 0.00 16.00 $90.64 THIS PROJECT ALL Federal PROJECTS Tax FICA & Medicare State Tax SDI Vacation Health & Holiday Welfare Pension COWAN, THOMAS Operating 12650 C Engineer $553.00 $227.72 $223.17 $32.75 $0.00 $0.00 $0.00 Shenandoah Road 0 ' (Heavy & O 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $119.50 $1,602.34 D/D 95669 Highway work) / Group 3 Area 1 $1,450.24 $3,006.78 Training Admin / Dues Travel & Savings Other Total Fringes Sub Deduct. ' D 0.00 0.00 0.00 0.00 0.00 0.00 o.00 0.00 $0.00 $19.36 $0.00 $0.00 $0.00 $1,404.4 $0.00 $367.80 4 Other Deduction Notes: Trainina. GARNISHMENT t S 0.00 0.00 4.00 4.00 4.00 4.00 0.00 16.00 $52.14 r1-\; _ PROJECT _ 11LL 1%-J 6 PROJECTS Tax M13 d Medicare 9iattr Tax SDI umcut auattort- ea ... _._ Holiday Welfare Pension COWAN, THOMAS 12650 C PLUMBER/ $553.00 $227.72 $223.17 $32.75 $0.00 $0.00 $0.00 Shenandoah Road 0 ND UTILITY UNDERGROUwow O 0.00 0.00 2.00 2.00 2.00 2.00 0.00 8.00 $68.79 $1,602.34 D/D 5669 PIPEFITTER $1,384.56 $3,006.78 Training Admin / Dues Travel & Total Savings Other Fringes Sub Deduct. D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $9.60 $0.00 $0.00 $0.00 $1,404.4 $0.00 $367.80 4 Other Deduction Notes: Training. GARNISHMENT ( S 0.00 0.00 4.50 0.00 6.00 0.00 0.00 10.50 $52.14 THIS PROJECT ALL Federal PROJECTS Tax FICA & Medicare State Tax SDI Vacation Health & Holiday Welfare Pension GABREE, PAUL 611 PLUMBER / $0.00 $177.03 $0.00 $25.46 $0.00 $0.00 $0.00 Glenbrook Drive 3 UNDERGROU ND UTILITY O 0.00 0.00 2.00 0.00 2.00 0.00 0.00 4.00 $68.79 $2,111.68 D/D �0 PIPEFITTER � $822.63 $2,320.57 Training Admin / Dues Travel & Savings Other Total Fringes Sub Deduct. D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $5.80 $0.00 $0.00 $0.00 $0.00 $6.40 $208.89 Other Deduction Notes: Training S 0.00 0.00 8.00 8.00 8.00 8.00 0.00 32.00 $52.14 THIS PROJECT ALL Federal PROJECTS Tax FICA & Medicare State Tax SDI Vacation Health & Holiday Welfare Pension GARIBALDI, ANTHONY PLUMBER / $433.00 $189.44 $171.98 $27.24 $0.00 $0.00 $0.00 P. O. Box 985 Sutter 0 UNDERGROU ND UTILITY O 0.00 0.00 2.00 2.00 2.00 2.00 0.00 8.00 $68.79 $1,654.70 D/D 85 PIPEFITTER $2,218.80 $2,493.96 Training Admin / Dues Travel & Savings Other Total Fringes Sub Deduct. D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $16.00 $0.00 $0.00 $0.00 $0.00 $17.60 $839.26 Other Deduction Notes: Training fee S = STRAIGHT TIME 'OTHER - Any other deductions, contributions and/or payments whether or not included or required by prevailing wage determinations must be separately listed. CERTIFICATION MUST be completed O = OVERTIME Use extra sheet(s) if necessary. (See reverse side) Form A-1-131 (New 2-80) D = DOUBLETIME SDI = STATE DISABILITY INSURANCE California JON Department of Herbert Walkup Pipeline Replacement Herbert Walkup Pipeline Industrial Relations PUBLIC WORKS PAYROLL REPORTING FORM Page 3 of 7 (1) (2) 1 (3) (4) DAY (5) (6) (7) (8) S I M I T I W I T I F I S NAME,ADDRESS AND SOCIAL 'Co' WORK o f Date TOTAL HOURL GROSS AMOUNT NET WAGES CHECK SECURITYNUMBER oo� CLASS Z IFICATION 5/26 15/27 15/28 15/29 15/30 15/31 16/01 HOURS Y RATE OF PAY EARNED DEDUCTIONS, CONTRIBUTIONS AND PAYMENTS PAID NO, EMPLOYEE 3 i FOR Hours Worked Each Day WEEK I S 0.00 0.00 8.00 8.00 8.00 4,50 0.00 28.50 $52.14 THIS PROJECT ALL Federal PROJECTS Tax FICA & Medicare State Tax SDI Vacation Holiday Health & Welfare pension GIRARDIN, FLOYD P. O. Box PLUMBER / $295.00 $157.28 $125.92 $22.61 $0.00 $0.00 $0.00 102 River 75 1 UNDERGROU ND UTILITY O O.DO 0.00 2.00 2.00 2.00 0.00 0.00 6.00 $68.79 $1,455.10 D/D � PIPEFITTER $1,898.73 $2,070.71 Training Admin / D Dues Travel & Savings Other Total Fringes Sub Deduct. D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 � $13.80 $0.00 $0.00 $0.00 $0.00 $14.80 $615.61 Other Deduction Notes: Tr inin _ Ti X',2 . . _ . " I-: z., ; I PrB State SDI �1��6 ,r I I..Ah rx Pension S 0.00 0.00 8.00 8.00 8.00 8.00 0.00 32.00 $52.14 PROJECT PROJECTS Tax Medicare Tax Holiday Welfare GRIEGO, DAVID 1730 Rock Springs PLUMBER / UNDERGROU $344.00 $173.75 $150.99 $24.99 $0.00 $0.00 $0.00 Road Escondido CA 0 ND UTILITY O 0.00 0.00 2.00 2.00 1.50 2.00 0.00 7.50 $68.79 $1,577.46 D/D 9202= PI I PIPEFITTER $2,184.41 $2,287.59 Training Admin / Dues Travel & Savings Other Total Fringes Sub Deduct. D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $15.80 $0.00 $0.00 $0.00 $0.00 $16.40 $710.13 Other Deduction Notes: Training S 0.00 0.00 8.00 8.00 8.00 8.00 0.00 32.00 $52.14 THIS PROJECT ALL Federal PROJECTS Tax FICA & Medicare State Tax SDI Vacation Holiday Health & Welfare Pension LIMAS, ABRAHAM 1535 Hussman PLUMBER/ UNDERGROU $82.00 $168.51 $71.79 $24.23 $0.00 $0.00 $0.00 Avenue Gardnerville 0 ND UTILITY O 0.00 0.00 2.00 2.00 1.50 2.00 0.00 7.50 $68.79 $1,856.27 2336 PIPEFITTER $2,184.41 $2,218.80 Training Admin / Fringes Dues Travel & Sub Savings Other Total Deduct. D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $15.80 $0.00 $0.00 $0.00 $0.00 $16.00 $362.53 Other Deduction Notes: Trainin❑ S 0.00 0.00 8.00 8.00 8.00 8.00 0.00 32.00 $52.14 THIS PROJECT ALL Federal PROJECTS Tax FICA & Medicare State Tax SDI Vacation Holiday Health & Welfare Pension MERCIER, I BRANDON 400 Cragmont Court PLUMBER / UNDERGROU $392.00 $192.06 $172.43 $27.62 $0.00 $0.00 $0.00 Cameron Park CA 1 ND UTILITY O 0.00 0.00 2.00 2.00 2.00 2.00 0.00 8.00 $68.79 $1,726.45 D/D PIPEFITTER $2,218.80 $2,528.36 Training Admin / Dues Travel & Savings Other Total Fringes Sub Deduct. D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $16.00 $0.00 $0.00 $0.00 $0.00 $17.80 $801.91 Other Deduction Notes: Training S = STRAIGHT TIME "OTHER -Any other deductions, contributions and/or payments whether or not included or required by prevailing wage determinations must be separately listed. CERTIFICATION MUST be completed O = OVERTIME Use extra sheet(s) if necessary. See reverse side Form A-1-131 (New 2-80) D = DOUBLETIME ( ) SDI = STATE DISABILITY INSURANCE California Department of Herbert Walkup Pipeline Replacement / Herbert Walkup Pipeline Industrial Relations PUBLIC WORKS PAYROLL REPORTING FORM Page 4 of 7 (1) (2) 1 (3) ' (4) DAY (5) (6) (7) (8) (9) S I M I T I W I T I F I S NAME,ADDRESS AND SOCIAL LLoo' WORK o 0 0 Date TOTAL HOURL GROSS AMOUNT NET WAGES CHECK SECURITYNUMBER d i , CLASS- Z IFICATION 5/26 15/27 15/28 15/29 15/30 1 5/31 16/01 HOURS Y RATE OF PAY EARNED DEDUCTIONS, CONTRIBUTIONS AND PAYMENTS PAID NO. EMPLOYEE OYEE 3'- i FOR Hours Worked Each Day WEEK I S 0.00 0.00 8.00 8.00 8.00 8.00 0.00 32.00 $52.14 THIS PROJECT ALL Federal PROJECTS Tax FICA & Medicare State Tax SDI Vacation Holiday Health & Welfare Pension PASTEN I VELASQUEZ, ELIBourn PLUMBER/ UNDERGROU $130,00 $168.51 $134.85 $24.23 $0.00 $0.00 $0.00 742 Bo 742 Dr 0 � ND UTILITY O 0.00 0.00 2.00 2.00 1.50 2.00 0.00 7.50 $68 .79 $1,745.21 D/D 95776 I PIPEFITTER $2,184.41 $2,218.80 Training Admin / Dues Travel & Savings Other Total Fringes Sub Deduct. � D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $15.60 $0.00 $0.00 $0.00 $0.00 $16.00 $473.59 Other Deduction Notes: Training fee 1 S 0.00 0.00 8.00 8.00 8.00 8.00 0.00 32.00 $52.14 THIS--= PROJECT ALL -Federal- PROJECTS Tax =FWA & \�t� Medicare Tax SDI 'lacation-+i�a1-1„ « Holiday Welfare Pension PEREZ, SERGIO ' PLUMBER / $394.00 $183.36 $160.81 $26.36 $0.00 $0.00 $0.00 149 Oak Ridge Drive lone C 95 0 1 UNDERGROU ND UTILITY O O.OD 0.00 2.00 2.00 1.50 2.00 0.00 7.50 $68.79 $1,632.47 D/D ' PIPEFITTER $2,184.41 $2,413.20 Training Admin / Dues Travel & Savings Other Total Fringes Sub Deduct. D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $15.80 $0.00 $0.00 $0.00 $0.00 $16.20 $780.73 Other Deduction Notes: Training Fee i S 0.00 0.00 8.00 8.00 8.00 8.00 0.00 32.00 $52.14 THIS PROJECT ALL Federal PROJECTS Tax FICA & Medicare State Tax SDI Vacation Holiday Health & Welfare Pension REYNOSO, LUIS 8399 Steelhead PLUMBER / UNDERGROU $328.00 $168.51 $143.99 $24.23 $0.00 $0.00 $0.00 Avenue Kings Beach 0 ND UTILITY O 0.00 0.00 2.00 2.00 1.50 2.00 0.00 7.50 $68.79 $1,538.07 D/D PIPEFITTER $2,184.41 $2,218.80 Training Admin / Fringes Dues Travel & Sub Savings Other Total Deduct. D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $15.80 $0.00 $0.00 $0.00 $0.00 $16.00 $680.73 Other Deduction Notes: Training 1 S 0.00 0.00 8.00 8.00 8.00 8.00 0.00 32.00 $52.14 THIS PROJECT ALL Federal PROJECTS Tax FICA & Medicare State Tax SDI Vacation Holiday Health & Welfare Pension SABIA, MORGAN 1413 Rancho Way pLUMBER / $328.00 $168.52 $143.99 $24.23 $0.00 $0.00 $0.00 South Lake Tahoe UNDERGROU 0 ND UTILITY O 0.00 0.00 2.00 2.00 1.50 2.00 0.00 7.50 $68.79 $1,538.06 D/D CACA 96� PIPEFITTER $2,184.41 $2,218.80 Training Admin / Dues Travel & Savings Other Total Fringes Sub Deduct. D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $15.80 $0.00 $0.00 $0.00 $0.00 $16.00 $680.74 Other Deduction Notes: Training fee S = STRAIGHT TIME 'OTHER -Any other deductions, contributions and/or payments whether or not included or required by prevailing wage determinations must be separately listed. CERTIFICATION MUST be completed O = OVERTIME Use extra sheet(s) if necessary. See reverse side Form A-1-131 (New 2-80) D = DOUBLETIME ( ) SDI = STATE DISABILITY INSURANCE California am 21 Department of Herbert Walkup Pipeline Replacement Herbert Walkup Pipeline Industrial Relations PUBLIC WORKS PAYROLL REPORTING FORM Page 5 of 7 (1) (2) 1 (3) I (4) DAY (5) (6) (7) (8) (9) S I M I T I W I T I F I S NAME, ADDRESS AND SOCIAL ?zI o o o o WORK a Date TOTAL HouRL GROSS AMOUNT NET WAGES CHECK SECURITY NUMBER o i w IFICAT O 5/26 I 5/27 I 5/28 5/29 I I 5/30 I 5/31 6/01 I HOURS OF PAY EARNED DEDUCTIONS, CONTRIBUTIONS AND PAYMENTS PAID NO. OF EMPLOYEE 3 FOR Hours Worked Each Day WEEK I S 0.00 0.00 8.00 8.00 8.00 8.00 0.00 32.00 $52.14 THIS PROJECT ALL Federal PROJECTS Tax FICA & Medicare State Tax SDI Vacation Holiday Health & Welfare Pension VASQUEZ, LUIS 210 Rosa , PLUMBER/ $101.00 $168.52 $134.85 $24.23 $0.00 $0.00 $0.00 Ave Winters 94 0 UNDERGROU ND UTILITY O 0.00 0.00 2.00 2.00 1.50 2,00 0.00 7.50 $68.79 $1,774.20 DID PIPEFITTER $2,184.41 $2,218.80 Training Admin / Dues Travel & Savings Total Other Fringes Sub Deduct. D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $15.80 $0.00 $0.00 $0.00 $0.00 $16.00 $444.60 Other Deduction Notes: Training fee S 0.00 0.00 8.00 8.00 8.00 8.00 0.00 32.00 $95.64 71 \V PROJECT PROJECTS Tax F13A G Medicare 3 Tax SDI u., J6,;- Holiday 'H;o6J, G Welfare Pension VINCIGUERRA, Operating 330 BodTIN 30 odega Court El Engineer $127.0 $521.00 $284.08 $292.45 $40.85 $0.00 $0.00 $0.00 Dorado Hills CA 2 (Heavy & O 0.00 0.00 2.00 2.00 0.00 0.00 O.DO 4.00 0 $2,575.22 DID 95 Highway work) / Group 3 Area 1 $3,568.48 $3,758.98 Training Admin / Dues Travel & Savings Total Other Fringes Sub Deduct. D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $43.56 $0.00 $0.00 $0.00 $0.00 $1,183.7 $45.38 6 Other Deduction Notes. Training fee S 0.00 0.00 8.00 8.00 8.00 8.00 0.00 32.00 $95.64 THIS PROJECT ALL Federal PROJECTS Tax FICA & Medicare State Tax SDI Vacation Holiday Health & Welfare Pension VINCIGUERRA, Operating CASEY Engineer � 9 $527.00 $298.53 $305.66 $42.93 $0.00 $0.00 $0.00 470 Broadmeadows Court Sutter Creek 4 O 0.00 0.00 1.00 2.00 2.00 2.00 0.00 7.00 $127.0 0 $2,491.20 DID Highway work) / Group 3 Area 1 $3,949.48 $3,949.48 Training Admin / Dues Travel & Savings Total Other Fringes Sub Deduct. D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $47.19 $0.00 $0.00 $0.00 $0.00 $284.16 $1,458.22 Other Deduction Notes: Trainino fee. Cal savers S 0.00 0.00 8.00 8.00 8.00 8.00 0.00 32.00 $52.14 THIS PROJECT ALL Federal PROJECTS Tax FICA & Medicare State Tax SDI Vacation Holiday Health & Welfare Pension WILLSON, SLOAN 3020 Newton Road, PLUMBER / $349.00 $181.60 $152.34 $26.11 $0.00 $0.00 $0.00 Sp. 1 Placerville CA UNDERGR 5 ND UTILITY O 0.00 0.00 2.00 2.00 2.00 2.00 0.00 8.00 $68.79 $1,549.35 DID JI PIPEFITTER $2,218.80 $2,390.78 Training Admin / Fringes Dues Travel & Sub Savings Other Total Deduct. D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $16.00 $0.00 $0.00 $0.00 $0.00 $132.38 $841.43 Other Deduction Notes: Trainina fee. Garnishment S = STRAIGHT TIME *OTHER - Any other deductions, contributions and/or payments whether or not included or required by prevailing wage determinations must be separately listed. CERTIFICATION MUST be completed Form A-1-131 (New 2-80) O = OVERTIME Use extra sheets d necessary. t ) D = DOUBLETIME () ry• See reverse side SDI = STATE DISABILITY INSURANCE California i15 Department of Herbert Walkup Pipeline Replacement / Herbert Walkup Pipeline Industrial Relations PUBLIC WORKS PAYROLL REPORTING FORM Page 6 of 7 (1) (2) 1 (3) (4) DAY (5) (6) (7) (8) (9) 8 I M I T I W I T I F I S NAME, ADDRESS AND SOCIAL (El zI 00 o o a WORK I Date TOTAL GROSS AMOUNT NET WAGES CHECK SECURITY NUMBER o= w CLASS- IFICATION 5/26 15/27 15/28 15/29 15/30 15/31 16/01 HOURS Y RATE RATE OF PAY EARNED DEDUCTIONS, CONTRIBUTIONS AND PAYMENTS PAID NO. OF EMPLOYEE r FOR 3 Hours Worked Each Day WEEK I S 0.00 0.00 8.00 8.00 8.00 8.00 0.00 32.00 $95.64 THIS ALL Federal PROJECT PROJECTS Tax FICA & Medicare State Tax SDI Vacation Health & Holiday Welfare Pension YOUNG, JIM Operating Engineer $650.00 $322.58 $346.97 $46.39 $0.00 $0.00 $0.00 P. O. Box 58 95629 1 (Heavy & O 0.00 0,00 2.00 2.00 2.00 2.00 0.00 8.00 $127.0 0 $2,594.80 D/D Highway work) / Group 3 Area 1 $4,076.48 $4,266.98 Training Admin ! Fringes Dues Travel & Sub Total Savings Other Deduct. D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $48.40 $0.00 $0.00 $0.00 672 ,. $11 $0.00 $306.24 8 Other Deduction Notes Trainino fee. Cal Savers -- - S 0.00 0.00 8.00 8.00 8.00 8.00 0.00 32.00 $52.14 Ti�` - G, PROJECT PROJECTS Tax -'IT Q Medicare JtGtu Tax SDI lU�G,„v. ' I Iooltt1&- Pension _ _ Holiday Welfare ZELLERS,JEREMY 8194 MAIN ST PLUMBER! UNDERGROU $275.00 $176.36 $148.39 $25.36 $0.00 $0.00 $0.00 MOKELUMNE HILL 0 ND UTILITY O 0.00 0.00 2.00 2.00 2.00 2.00 0.00 8.00 $68.79 $1,539.28 D/D CA 95245 PIPEFITTER $2,218.80 $2,321.99 Training Admin / Dues Travel & Total Savings Other - Fringes Sub Deduct, D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $16.00 $0.00 $0.00 $0.00 $0.00 $157.60 $782.71 Other Deduction Notes: Trainino fee. Garnishment S = STRAIGHT TIME ^OTHER- Any other deductions, contributions and/or payments whether or not included or required by prevailing wage determinations must be separately listed. CERTIFICATION MUST be completed O = OVERTIME Use extra sheet(s) if necessary. See reverse side Form A-1-131 (New 2-80) D = DOUBLETIME ( ) SDI = STATE DISABILITY INSURANCE J01 California Department of Industrial Relations FATE OF CALIFORNIA rATEMENT OF COMPLIANCE DNTRACTOR/SUBCONTRACTOR Vinciguerra Construction, Inc. RST DAY AND DATE OF PAY PERIOD 5/26/2024 to hereby certify under penalty of perjury: Herbert Walkup Pipeline Replacement / Herbert Walkup Pipeline PUBLIC WORKS PAYROLL REPORTING FORM Page 7 of 7 CONTRACT NUMBER Herbert Walkup Pipeline LAST DAY AND DATE OF PAY PERIOD 6/1/2024 (1) That I pay or supervise payment to employees of the above —referenced contractor on the above —referenced contract. All persons employed on said project for the above —referenced time period have been paid their full weekly wages earned, that no rebates have been or will be made either directly or indirectly to or on behalf of said contractor from the full weekly wages earned by any person and that no deductions have been made either directly or indirectly from the full wages earned by any person other than permissible deductions. (2) That this employer has complied with the requirements of the California Labor Code Sections. 1771, 1811, and 1815 for all performed on this public works project, and that the classifications set forth therein for each trade rate conform with the work performed. (3) That any payrolls otherwise under this control required to be submitted for the above period are correct and complete; that the wage rates for laborers or mechanics contained therein are not less that the applicable wages rates: (a) Specified in the applicable wage determination incorporated into the contract; (b) ❑X Determined by the Director of Industrial Relations for the county or counties in which the work is performed; that the classification set forth therein for each laporer or mechanic conform with the work he or she performed. (4) That any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with a State apprenticeship agency. (5) That fringes benefits as listed in the contract: (a) Have been or will be paid to the approved plan(s), funds(s), or program(s) for the benefit of listed employee(s), except as noted below. (b) ❑X Have been paid directly to the listed employee(s), except as noted below. (c) See exceptions noted below. EXCEPTION CRAFT EXPLANATION MARKS: Except for Training funds for all crafts paid directly to CAC. NME (PLEASE PRINT.) TITLE istin Vinciguerra �_------ President GNATURE:) DATE 6/26/2024 i federally —funded projects, permissible deductions are defined in title 29, Code of Federal Regulations, part 3, issued by the Secretary of Labor under the Copeland Act, (40 U. S. ,'276c). Also, the willful Isification of any of the above statements may subject the contractor or subcontractor to civil or criminal prosecution (See section 1001 of title 18 and section 3729 of title 31 of the Y91ted States Code). OA Notice For individuals with sensory disabilities, this document is available in alternate formats. For information call (916) 654-6410 or TDD (916) 654-3880 or write Records �pd Forms CEM 2503 Management, 1120 N Street, MS-89, Sacramento, CA 95814. in California Department of Herbert Walkup Pipeline Replacement /Herbert Walkup Pipeline 21 Industrial Relations PUBLIC WORKS PAYROLL REPORTING FORM Page 1 of 7 1 NAME OF CONTRACTOR: Vinciguerra Construction, Inc. CONTRACTOR'S LICENSE NO.: 358838 ADDRESS: P. O. Box 157, Sutter Creek, CA, 95685j OR SUBCONTRACTOR: SPECIALTY LICENSE NO.: 1 t PAYROLL NO. FOR WEEK ENDING: SELF -INSURED CERT: PROJECT OR CONTRACT NO.: Herbert Walkup Pipeline 9 I 6/8/2024 (WORKERS' COMP: IPROJECT AND LOCATION: Herbert Walkup Pipeline Replacement, ELD (1) (2) 1 (3) (4) DAY (5) (6) (7) (8) (9) I 9 I M I T I W I T I F I S NAME, ADDRESS ?zI NET 0 o WORK Date HOURL WAGES CHECK AND SOCIAL o � 7 I TOTAL GROSS AMOUNT o a CLASS- Y RATE DEDUCTIONS, CONTRIBUTIONS AND PAYMENTS PAID NO. SECURITY NUMBER oz=2 IFICATION 6/02I6l03I6/04I6105I6/06I6/07I6/08 HOURS OF PAY EARNED OF EMPLOYEE �x FOR 3 Hours Worked Each Day WEEK ' THIS ALL Federal FICA & State SDI Vacation Health & Pension S 0.00 4.00 4.00 4.00 4.00 4.00 0.00 20.00 $90.64 PROJECT PROJECTS Tax Medicare Tax Holiday Welfare AREVALO, JOSHUA Operating 155 Hillside Place Engineer $550.00 $300.34 $320.27 $43.19 $0.00 $0.00 $0.00 � 4 (Heavy & 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $119.5 642 p $2,358.92 D/D Highway work) / Admin / Travel & Total Group 3 Area 1 $1,812.80 $3,964.57 Training Fringes Dues Sub Savings Other Deduct. _u- _0.00 0.00 U 00 0.00 ..0.00 0 00 0.00 0.00 $0.00 _ ' I I $1 605 5 $24.20 $0.00 $0.00 $0.00 $0.00 $391.85 Other Deduction Notes: Trainina fee. Garnishment. and CalSavers Contrib, THIS ALL Federal FICA & State Vacation Health & S 0.00 4.00 4.00 4.00 4.00 4.00 0.00 20.00 $52.14 PROJECT PROJECTS Tax Medicare Tax SDI Holiday Welfare Pension AREVALO, JOSHUA I PLUMBER / $550.00 $300.34 $320.27 $43.19 $0.00 $0.00 $0.00 155 Hillside Place UNDERGROU Jackson CA 95642 4 NO UTILITY O 0.00 2.00 2.00 2.00 2.00 2.00 0.00 10.00 $68.79 $2,358.92 D/D _ PIPEFITTER $1,730.70 $3,964.57 Training Admin / Dues Travel & Savings Other Total Fringes Sub Deduct. D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $12.00 $0.00 $0.00 $0.00 $0.00 $391.85 $1,605.6 Other Deduction Notes: Training Fee. Garnishment. and CalSavers Contrih. 1 THIS ALL Federal FICA & State SDI Vacation Health & pension S 0.00 8.00 8.00 8.00 8.00 0.00 0.00 32.00 $52.14 PROJECT PROJECTS Tax Medicare Tax Holiday Welfare CORREA, ERICK PLUMBER / 1535 Hussman $64.00 $165.90 $74.39 $23.85 $0.00 $0.00 $0.00 UNDERGROU Avenue Gardnerville 0 NO UTILITY O 0.00 2.00 2.00 1.50 0.50 0.00 0.00 6.00 $68.79 $1,840.47 2340 PIPEFITTER $2,081.22 $2,184.41 Training Admin / Dues Travel & SavingTotal Fringes s Other Sub Deduct. D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $15.20 $0.00 $0.00 $0.00 $0.00 $15.80 $343.94 Other Deduction Notes: Training fee S = STRAIGHT TIME 'OTHER- Any other deductions, contributions and/or payments whether or not included or required by prevailing wage determinations must be separately listed. CERTIFICATION MUST be completed O = OVERTIME Use extra sheet(s) if necessary. See reverse side Farm A-1-131 (New 2-80) D = DOUBLETIME ( ) SDI = STATE DISABILITY INSURANCE Department of Herbert Walkup Pipeline Replacement / Herbert Walkup Pipeline rJORCalifornia Industrial Relations PUBLIC WORKS PAYROLL REPORTING FORM Page 2 of 7 (1) (2) 1 (3) (4) DAY (5) (6) (7) (8) (9) S I M I T I W I T I F I S NAME, ADDRESS AND SOCIAL LL a o 1 o o a WORK Date TOTAL HouRL GROSS AMOUNT NET WAGES CHECK SECURITY NUMBER Z= CLASS- IFICATION 6/02I6l03I6/04I6/05I6I06I6/07I6/08 HOURS Y RATE OF PAY EARNED DEDUCTIONS, CONTRIBUTIONS AND PAYMENTS PAID NO. OF EMPLOYEE 3 FOR ( Hours Worked Each Day WEEK I S 0.00 4.00 4.00 4.00 4.00 0.00 0.00 16.00 $90.64 THIS PROJECT ALL Federal PROJECTS Tax FICA & Medicare State Tax SDI Vacation Holiday Health & Welfare Pension COWAN, THOMAS Operating 12650 C Engineer $537.00 $222.50 $216.18 $31,99 $0.00 $0.00 $0.00 Shenandoah Road 0 (Heavy & O 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $119.55 $1,562.92 D/D 669 Highway work) / Group 3 $1,450.24 $2,937.99 Training Admin / Dues Travel & Savings Other Total Area 1 Fringes Sub Deduct. D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $19.36 $0.00 $0.00 $0.00 $0.00 375 ,. $10 $367.40 7 Other Deduction Notes: Training Fee and Garnishment t Ti ALL 7�J: l Ff3A& -P�,I. SDI V.d;i r ;Ieal:)r&. Pension S 0.00 4.00 4.00 4.00 4.00 0.00 0.00 16.00 $52.14 PROJECT PROJECTS Tax Medicare Tax Holiday Welfare COWAN, THOMAS 12650 C PLUMBER/ $537.00 $222.50 $216.18 $31.99 $0.00 $0.00 $0.00 Shenandoah Road 0 UNDERGROU ND UTILITY O 0.00 2.00 2.00 2.00 1.00 0.00 0.00 7.00 $68.79 $1,562.92 D/D 669 PIPEFITTER $1,315.77 $2,937.99 Training Admin / Fringes Dues Travel & Sub Savings Total Other Deduct. � D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $9.20 $0.00 $0.00 $0.00 $0.00 $1375.0 , $367.40 7 Other Deduction Notes: Trainina Fee and Garnishment THIS ALL Federal FICA & State SDI Vacation Health & Pension S 0.00 6.00 0.00 8.00 8.00 8.00 0.00 30.00 $52.14 PROJECT PROJECTS Tax Medicare Tax Holiday Welfare GABREE, PAUL ' PLUMBER / $0.00 $217.68 $0.00 $31.30 $0.00 $0.00 $0.00 611 Glenbrook Drive 3 UNDERGROU ND UTILITY O 0.00 2.00 0.00 2.00 2.00 0.00 0.00 6.00 $68.79 $2,596.55 D/D � PIPEFITTER $1,976.94 $2,861.13 Training Admin / Dues Travel & Savings Other Total Fringes Sub Deduct. ' D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $14.40 $0.00 $0.00 $0.00 $0.00 $15.60 $264.58 Other Deduction Notes: Trainina Fee THIS ALL Federal FICA & State SDI Vacation Health & Pension S 0.00 0.00 8.00 8.00 8.00 0.00 0.00 24.00 $52.14 PROJECT PROJECTS Tax Medicare Tax Holiday Welfare GARIBALDI, ANTHONY PLUMBER / $220.00 $118.54 $77.16 $17.04 $0.00 $0.00 $0.00 P. O. Box 985 Sutter 0 UNDERGROU ND UTILITY O 0.00 0.00 2.00 1.00 1.00 0.00 0.00 4.00 $68.79 $1,116.78 D/D 5 � PIPEFITTER $1,526.52 $1,560.92 Training Admin / Dues Travel & Savings Total Other Fringes Sub Deduct. D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $11.20 $0.00 $0.00 $0.00 $0.00 $11.40 $444.14 Other Deduction Notes: Trainina Fee S = STRAIGHT TIME "OTHER - Any other deductions, contributions and/or payments whether or not included or required by prevailing wage determinations must be separately listed. CERTIFICATION MUST be completed O = OVERTIME Use extra shoot(s) if necessary. (See reverse side) Form A-1-131 (New 2--80) D = DOUBLETIME SDI = STATE DISABILITY INSURANCE JWNCalifornia Department of Herbert Walkup Pipeline Replacement / Herbert Walkup Pipeline Industrial Relations PUBLIC WORKS PAYROLL REPORTING FORM Page 3 of 7 (1) (2) 1 (3) (4) DAY (5) (6) (7) (8) (9) S I M I T I W I T I F I S NAME,ADDRESS AND SOCIAL ?zI LLao o � WORK Date TOTAL GROSS AMOUNT NET WAGES CHECK SECURITY NUMBER o = z CLASS IFICATION 6/02 16/03 16/04 16/05 16/06 16/07 16/08 HOURS RATE Y RATE OF PAY EARNED DEDUCTIONS, CONTRIBUTIONS AND PAYMENTS PAID NO. OF EMPLOYEE 3 FOR Hours Worked Each Day WEEK I THIS ALL Federal FICA & State SDI Vacation Health & S 0.00 8.00 8.00 8.00 8.00 0.00 0.00 32.00 $52.14 PROJECT PROJECTS Tax Medicare Tax Holiday Welfare Pension GIRARDIN, FLOYD P. O. Box 102 River I PLUMBER / UNDERGROU $369.00 $181.60 $158.44 $26.12 $0.00 $0.00 $0.00 75 1 ND UTILITY O 0.00 2.00 2.00 2.00 1.50 0.00 0.00 7.50 $68.79 $1,638.62 D/D � PIPEFITTER $2,184.41 $2,390.78 Training Admin / Dues Travel & Savings Other Total Fringes Sub Deduct. D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $15.80 $0.00 $0.00 $0.00 $0.00 $17.00 $752.16 Other Deduction Notes: Training Fee S 0.00 8.00 8.00 8.00 8.00 0.00 0.00 32.00 $52.14 TI IIC- -.. PROJECT _ _- A F.J.,ol PROJECTS Tax FICA G Medicare G,d'e Tax SDI vacation Holiday Flea :n Welfare Pension GRIEGO, DAVID 1730 Rock Springs PLUMBER / $369.00 $181.60 $161.48 $26.11 $0.00 $0.00 $0.00 Road Escondido CA 0 UNDERGROU ND UTILITY O 0.00 2.00 2.00 2.00 1.50 0.00 0.00 7.50 $68.79 $1,635.59 D/D 9 PIPEFITTER $2,184.41 $2,390.78 Training Admin ! Dues Travel & Savings Other Total Fringes Sub Deduct. D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $15.80 $0.00 $0.00 $0.00 $0.00 $17.00 $755.19 Other Deduction Notes: Training Fee S 0.00 8.00 8.00 8.00 8.00 0.00 0.00 32.00 $52.14 THIS PROJECT ALL Federal PROJECTS Tax FICA & Medicare State Tax SDI Vacation Holiday Health & Welfare Pension LIMAS, ABRAHAM PLUMBER / 1535 Hussman � $74.00 $165.90 $68.29 $23.86 $0.00 $0.00 $0.00 Avenue Gardnerville 0 UNDERGROU ND UTILITY O 0.00 2.00 2.00 1.50 0.50 0.00 0.00 6.00 $68.79 $1,836.56 2341 NV 89410 - � PIPEFITTER $2,081.22 $2,184.41 Training Admin / Dues Travel & Savings Other Total Fringes Sub Deduct. D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $15.20 $0.00 $0.00 $0.00 $0.00 $15.80 $347.85 Other Deduction Notes: Trainina Fee S 0.00 8.00 8.00 8.00 8.00 2.00 0.00 34.00 $52.14 THIS PROJECT ALL Federal PROJECTS Tax FICA & Medicare State Tax SDI Vacation Holiday Heath & l Welfare Pension MERCIER, I BRANDON PLUMBER/ $0.00 $209.73 $0.00 $30.16 $0.00 $0.00 $0.00 400 Cragmont Court Cameron Park CA 1 UNDERGROU ND UTILITY O 0.00 1.50 2.00 2.00 2.00 0.00 0.00 7.50 $68.79 $2,501.70 D/D � PIPEFITTER $2,288.69 $2,760.79 Training Admin / Dues Travel & Savings Other Total Fringes Sub Deduct. D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $16.60 $0.00 $0.00 $0.00 $0.00 $19.20 $259.09 Other Deduction Notes: Training Fee S = STRAIGHT TIME 'OTHER - Any other deductions, contributions and/or payments whether or not included or required by prevailing wage determinations must be separately listed. CERTIFICATION MUST be completed O = OVERTIME Use extra sheet(s) if necessary. See reverse side Form A-1-131 (New 2-80) D = DOUBLETIME ( i SDI = STATE DISABILITY INSURANCE aO California Department of Herbert Walkup Pipeline Replacement / Herbert Walkup Pipeline Industrial Relations PUBLIC WORKS PAYROLL REPORTING FORM Page 4 of 7 (1) (2) 1 (3) (4) DAY (5) (6) (7) (8) (9> 1 I S I M I T I W I T I F I S NAME, ADDRESS ?z I NET WAGES LLoo WORK CHECK AND SOCIAL o' Date TOTAL HOA E GROSS AMOUNT o a CLASS- Y RATE DEDUCTIONS, CONTRIBUTIONS AND PAYMENTS PAID NO. SECURITY NUMBER °= W IFICATION 6/02 16/03 16/04 16I05 16/06 16/07 16/08 HouRS of PAY EARNED OF EMPLOYEE 3 FOR Hours Worked Each Day WEEK I THIS ALL Federal FICA & State Vacation Health & S 0.00 8.00 8.00 8.00 8.00 0.00 0.00 32.00 $52.14 PROJECT PROJECTS Tax Medicare Tax SDI Holiday Welfare Pension PASTEN VELASQUEZ, PLUMBER / $126.00 $165.89 $131.35 $23.85 $0.00 $0.00 $0.00 ELISIO 1 UNDERGROU 742 Bourn Dr 0 1 ND UTILITY O 0.00 2.00 2.00 1.50 0.50 0.00 0.00 6.00 $68.79 $1,721.52 DID 95776 PIPEFITTER $2,081.22 $2,184.41 Training Admin / Dues Travel & Savings Other Total Fringes Sub Deduct. � D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $15.20 $0.00 $0.00 $0.00 $0.00 $15,80 $462.89 Other Deduction Notes: Training Fee S 0.00 0.00 0.00 8.00 0.00 0.00 0.00 8.00 $60.00 PROJECT PRO,L F: Jt...�l- -MOA A - 3,.io tfaoaiiorr JECTS Tax Medicare Tax SDI Holiday Welfare Pension PEREZ,SERGIO PLUMBER/ $293.00 $150.16 $116.39 $21.59 $0.00 $0.00 $0.00 149 Oak Ridge Drive 1 UNDERGROU O 0.00 0.00 O.DO 0.00 0.00 0.00 0.00 0.00 $80.58 lone CA 95640 ND UTILITY $1,381.65 DID Admin / Travel & Total PIPEFITTER $480.00 $1,965.99 Training Fringes Dues Sub Savings Other Deduct. ( D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $3.20 $0.00 $0.00 $0.00 $0.00 $3.20 $584.34 Other Deduction Notes: Trainina Fee 1 THIS ALL Federal FICA & State Vacation Health & S 0.00 8.00 8.00 8.00 8.00 0.00 0.00 32.00 $52.14 PROJECT PROJECTS Tax Medicare Tax SDI Holiday Welfare pension REYNOSO, LUIS pLUMBER / 8399 Steelhead UNDERGR $320.00 $165.89 $140.49 $23.86 $0.00 $0.00 $0.00 Avenue Kings Beach 0 ND UTILITY O 0.00 2.00 2.00 1.50 0.50 0.00 0.00 6.00 $68.79 $1,518.37 DID PIPEFITTER $2,081.22 $2,184.41 Training Admin / Dues Travel & Savings Other Total Fringes Sub Deduct. D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $15.20 $0.00 $0,00 $0.00 $0.00 $15.80 $666.04 Other Deduction Notes: Trainino Fee i THIS ALL Federal FICA & State Vacation Health & S 0.00 8.00 8.00 8.00 8.00 0.00 0.00 32.00 $52.14 PROJECT PROJECTS Tax Medicare Tax SDI Holiday Welfare Pension SABIA, MORGAN pLUMBER / 1413 Rancho Way UNDERGR $328.00 $168.51 $143.99 $24.23 $0.00 $0.00 $0.00 South Lake Tahoe 0 ND UTILITY O 0,00 2.00 2.00 2.00 0.50 0.00 0.00 6.50 $68.79 $1,538.07 DID PIPEFITTER $2,115.62 $2,218.80 Training Admin / Dues Travel & Savings Other Total � Fringes Sub Deduct. D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $15.40 $0.00 $0.00 $0.00 $0.00 $16.D0 $680.73 Other Deduction Notes: Trainina Fee S = STRAIGHT TIME ^OTHER- Any other deductions, contributions and/or payments whether or not included or required by prevailing wage determinations must be separately listed. CERTIFICATION MUST be completed O = OVERTIME Use extra sheet(s) if necessary. See reverse side Form A-1-131 (New 2-80) D = DOUBLETIME ( ) SDI = STATE DISABILITY INSURANCE California Department of Herbert Walkup Pipeline Replacement / Herbert Walkup Pipeline Industrial Relations PUBLIC WORKS PAYROLL REPORTING FORM Page 5 of 7 (1) (2) 1 (3) I (4) DAY (5) (6) (7) (8) (9) S I M I T I W I T I F I S NAME, ADDRESS AND SOCIAL z z 1 moo WORK ooa I Date TOTAL GROSS AMOUNT NET WAGES CHECK SECURITY NUMBER CLASS- �T' IFICATION 6/02 16/03 16/04 16/05 i 6/06 16/07 16/OS HOURS RATE OF PAY EARNED DEDUCTIONS, CONTRIBUTIONS AND PAYMENTS PAID NO. OF EMPLOYEE 3 w FOR Hours Worked Each Day WEEK I S 0.00 8.00 8.00 8.00 8.00 0.00 0.00 32.00 $52.14 THIS PROJECT ALL Federal PROJECTS Tax FICA & Medicare State Tax SDI Vacation Holiday Health & pension Welfare VASQUEZ, LUIS 210 Rosa Ave PLUMBER/ UNDERGROU $97.00 $165.89 $131.35 $23.85 $0.00 $0.00 $0.00 694 0 ND UTILITY O 0.00 2.00 2.00 1.50 0.50 0.00 0.00 6.00 $68.79 $1,750.52 D/D PIPEFITTER $2,081.22 $2,184.41 Training Admin! Dues Travel& Savings Other Total Fringes Sub Deduct. � D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $15,20 $0.00 $0.00 $0.00 $0.00 $15.80 $433.89 Other Deduction Notes: Training Fee 1 S 0.00 8.00 8.00 8.00 8.00 0.00 0.00 32.00 $95.64 TIJICv PROJECT ALL : ✓ ,6- PROJECTS Tax -; IG1, d Medicare J;atc Tax SDI 4aeatiorrHeaNii & Holiday Welfare Pension VINCIGUERRA, Operating 330 BodTIN odega Court El Engineer $127.0 $549.00 $293.71 $305.32 $42.23 $0.00 $0.00 $0.00 Dorado Dorado Hills CA 2 (Heavy & O 0.00 2.00 2.00 0.00 0.00 0.00 0.00 4.00 0 $2,649.13 D/D Highway work) / Group 3 Area 1 $3,568.48 $3,885.98 Training Admin / Fringes Dues Travel & Savings Total Other Sub Deduct. D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $43.56 $0.00 $0.00 $0.00 $0.00 236 ,. $18 $46.59 5 Other Deduction Notes: Training Fee 1 S 0.00 8.00 8.00 8.00 8.00 2.00 0.00 34.00 $95.64 THIS PROJECT ALL Federal PROJECTS Tax FICA & Medicare State Tax SDI Vacation Holiday Health & Welfare Pension VINCIGUERRA, Operating CASEY Engineer 9 $485.00 $284.10 $286.38 $40.85 $0.00 $0.00 $0.00 470 Broadmeadows Court Sutter Creek 4 I (Heavy & O 0.00 0.00 0.00 2.00 2.00 0.00 0.00 4.00 $127.0 0 $2,391.86 D/D Highway work) / Group 3 Area 1 $3,759.76 $3,759.76 Training Admin / Dues Travel & Savings Other Total Fringes Sub Deduct. D 0.00 0,00 0.00 0.00 0.00 0.00 0.00 0,00 $0.00 $45.98 $0.00 $0.00 $0.00 $0.00 367 ,. $19 $271.57 0 Other Deduction Notes: Trainino Fee and CalSavers Contrib. 1 S 0.00 8.00 8.00 8.00 5.50 0.00 0.00 29.50 $52.14 THIS PROJECT ALL Federal PROJECTS Tax FICA & Medicare State Tax SDI Vacation Holiday Health & pension Welfare WILLSON, SLOAN 3020 Newton Road, PLUMBER / � UNDERGROU $289.00 $161.23 $125.12 $23.18 $0.00 $0.00 $0.00 Sp, 1 Placerville CA 5 ND UTILITY O 0.00 2.00 2.00 2.00 0.00 0.00 0.00 6.00 $68.79 $1,393.74 D/D PIPEFITTER $1,950.87 $2,122.85 Training Admin / Fringes Dues Travel & Sub Savings Other Total Deduct. � D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $14.20 $0.00 $0.00 $0.00 $0.00 $130.58 $729.11 Other Deduction Notes: Trainina Fee and Garnishment S = STRAIGHT TIME °OTHER- Any other deductions, contributions and/or payments whether or not included or required by prevailing wage determinations must be separately listed. CERTIFICATION MUST be completed O = OVERTIME Use extra sheet(s) if necessary. See reverse side) Form A-1-131 (New 2-80) D = DOUBLETIME ( SDI = STATE DISABILITY INSURANCE MOM California Department of Herbert Walkup Pipeline Replacement Herbert Walkup Pipeline Industrial Relations PUBLIC WORKS PAYROLL REPORTING FORM Page 6 of 7 (1) (2) I (3) (4) DAY (5) (6) (7) (8) (9) S I M I T I W I T I F I S NAME, ADDRESS AND SOCIAL u o o 1 ooa WORK CLASS -TOTAL Date HOURL GROSSAMOUNT NET WAGES CHECK SECURITY NUMBER °= W I ICAT O 6/02 6/03 6/04 6/05 I I I I 6/06 I 6/07 6/08 I HouRs Y RATE OF AY EARNED DEDUCTIONS, CONTRIBUTIONS AND PAYMENTS PAID NO. OF EMPLOYEE 3 FOR Hours Worked Each Day WEEK I S 0.00 8.00 0.00 0.00 8.00 0.00 0.00 16.00 $95.64 THIS ALL Federal PROJECT PROJECTS Tax FICA & Medicare State Tax SDI Vacation Health & Holiday Welfare Pension YOUNG, JIM Operating Engineer $185.00 $154.08 $121.63 $22.15 $0.00 $0.00 $0.00 P. O. Box 58 95629 1 I (Heavy & O 0.00 2.00 0.00 0.00 2.00 0.00 0.00 4.00 $127 0 0 $1,408.89 D/D Highway work) / Group 3 Area 1 $2,038.24 $2,038.24 Training Admin / Fringes Dues Travel & Sub Savings Other Total Deduct. D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $24.20 $0.00 $0.00 $0.00 $0.00 $146.49 $629.35 Other Deduction Notes: Training Fee and CalSavers Contrib. ;.=HIS --A ram - -Federal---F e*-8r°3tal. SDI acatit7n�fiiealth 8 Pension � S 0.00 8.00 8.00 8.00 7.00 0.00 0.00 31.00 $52.14 PROJECT PROJECTS Tax Medicare Tax Holiday Welfare ZELLERS,JEREMY 8194 MAIN ST 1 PLUMBER/ $255.00 $169.79 $139.60 $24.42 $0.00 $0.00 $0.00 MNE HILL 0 UNDERGROU ND UTILITY O 0.00 2.00 2.00 2.00 0.00 0.00 0.00 6.00 $68.79 $1,489.64 D/D CA 9524 CA 95245 I PIPEFITTER $2,029.08 $2,235.45 Training Admin / Fringes Dues Travel & Savings Other Total Sub Deduct. � D 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 $14.80 $0.00 $0.00 $0.00 $0.00 $157.00 $745.81 Other Deduction Notes: Training Fee and Garnishment S = STRAIGHT TIME *OTHER - Any other deductions, contributions and/or payments whether or not included or required by prevailing wage determinations must be separately listed. CERTIFICATION MUST be completed O = OVERTIME Use extra sheet(s) if necessary. See reverse side Form A-1-131 New 2-80) ( ) ( D = DOUBLETIME SDI = STATE DISABILITY INSURANCE California Department of Industrial Relations FATE OF CALIFORNIA rATEMENT OF COMPLIANCE DNTRACTOR/SUBCONTRACTOR Vinciguerra Construction, Inc. RST DAY AND DATE OF PAY PERIOD 6/2/2024 to hereby certify under penalty of perjury: Herbert Walkup Pipeline Replacement / Herbert Walkup Pipeline PUBLIC WORKS PAYROLL REPORTING FORM Page 7 of 7 CONTRACT NUMBER Herbert Walkup Pipeline LAST DAY AND DATE OF PAY PERIOD 6/8/2024 (1) That I pay or supervise payment to employees of the above —referenced contractor on the above —referenced contract. All persons employed on said project for the above —referenced time period have been paid their full weekly wages earned, that no rebates have been or will be made either directly or indirectly to or on behalf of said contractor from the full weekly wages earned by any person and that no deductions have been made either directly or indirectly from the full wages earned by any person other than permissible deductions. (2) That this employer has complied with the requirements of the California Labor Code Sections. 1771, 1811, and 1815 for all performed on this public works project, and that the classifications set forth therein for each trade rate conform with the work performed. (3) That any payrolls otherwise under this control required to be submitted for the above period are correct and complete; that the wage rates for laborers or mechanics contained therein are not less that the applicable wages rates: (a) M Specified in the applicable wage determination incorporated into the contract; (b) �X Determined by the Director of Industrial Relations for the county or counties in which the work is performed; that the classification set forth therein for each laborer or mechanic conform with the work he or she performed. (4) That any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with a State apprenticeship agency. (5) That fringes benefits as listed in the contract: (a) Have been or will be paid to the approved plan(s), funds(s), or program(s) for the benefit of listed employee(s), except as noted below. (b) FX1 Have been paid directly to the listed employee(s), except as noted below. (c) See exceptions noted below. EXCEPTION CRAFT EXPLANATION MARKS: Except for Training funds for all crafts paid directly to CAC. 4ME (PLEASE PRINT.) TITLE istin Vinciguerra president GNATURE:I DATE G 6/27/2024 i federally —funded projects, permissible deductions are defined in title 29, Code of Federal Regulations, part 3, issued by the Secretary of Labor under the Copeland Act, (40 U. S. C. 276c). Also, the willful Isification of any of the above statements may subject the contractor or subcontractor to civil or criminal prosecution (See section 1001 of title 18 and section 3729 of title 31 of the United States Code). )A Notice For individuals with sensory disabilities, this document is available in alternate formats. For information call (916) 654-6410 or TDD (916) 654-3880 or write Records and Forms OEM 2503 Management, 1120 N Street, MS-89, Sacramento, CA 95814.