Loading...
Ordinance No. 339 - RetiredJHHW:SRC:cp 6/30/82 2238C ORDINANCE NO. 3 3 9 AN ORDINANCE OF AWARD OF CONSTRUCTION CONTRACT ASSESSMENT DISTRICT 1982-1 (SOUTH TAHOE "Y" WATER IMPROVEMENTS) BE IT ENACTED, by the Board of Directors of the South Tahoe Public Utility District, County of E1 Dorado, California, that WHEREAS, on the 3rd day of ~ 1982, the Clerk and ex-officio Secretary of the South Tahoe Public Utility District publicly opened, examined and declared all sealed proposals or bids for the work to be done and improvements to be made, as described and specified in Resolution of Intention No. 2245, adopted by this Board on May 6, 1982, to which resolution and the plans and specifications reference is hereby made for a description of said work and improvements to be done and the materials, supplies and equipment to be furnished therefor; and WHEREAS, said bids were referred to and considered by this Board at its meeting on J~¥ 29 , 1982; NOW, THEREFORE, IT IS ORDERED, as follows: 1. This Board hereby rejects all of said proposals or bids except that hereinafter mentioned, and hereby awards the contract for doing said work and improvements and furnishing the supplies, materials and equipment necessary therefor, to the lowest responsible bidder, to wit: SOUTH LAKE TAHOE, CALIFORNIA at the unit prices specified in the bid of said low bidder. 2. The PRESIDENT of this District is hereby authorized to make and enter into a written contract with said successful bidder, and to receive and approve all bonds in connection therewith, and the Clerk and ex-officio Secretary of this District is hereby directed to attest the signature of said PRESIDENT and affix thereto the official seal of this District. 3. The District Engineer shall, within five (5) days of the adoption of this resolution, transmit an Extract of Public Works Contract Award to the Department of Industrial Relations, Division of Apprenticeship Standards, P.O. Box 603, San Francisco, California 94101. Should a finding of any discrepancy regarding the ratio of apprentices to journeymen be .made, the Division of Apprenticeship Standards shall be notified of such findings. , ~DLLfH~ TDROE P~LIC ~mTI~I~f DISTI2gC~f ATTEST: ' t-Ci~l~ }and-ex off{cio' Secretary I hereby certify that the foregoing is a full, true and correct copy of Ordinance No. ~ duly and regularly adopted by the Board of Directors of the South Tah~vPublic Utility District, E1 Dorado County, California, at a meeting thereof duly held on th( 29_~h day of ,~y , 1982, by the following vote: AYES, and in favor thereof, Directors: JONES, OLSON, KASHUBA, WYNN NOES, Directors: MADDEN ABSENT, Directors: NONE ~"-C1F~ 'and-ex offic'io~ ~ecr~tary South~Tahoe Public Utility District 2 CONTRACT AGREEMENT THIS AGREEMENT, made and entered into this 30thday of July , 1982, by and between Thomas Haen, doing business as Thomas Haen Company hereinafter called "Contractor", and the South TaHoe Public Utility District, hereinafter called "District". WHEREAS, District has awarded to Contractor a contract for performing the work hereinafter mentioned, in accordance with the sealed proposal of said Contractor; NOW, THEREFORE, IT IS AGREED, as follows: 1. Scope of Work. Contractor shall perform all the work, and furnish all the labor, materials, equipment and all utility and transportation services required to complete all of the work and construction and installation of the improvements, the items and quantities of which are more particularly set forth in the Contractor's Bid therefor on file in the office of District, exceDt work done or to be done by others, and attached hereto as part of tSis agreement. 2. Time of Performance and Liquidated Damages. Contractor shall begin work within ten (10) days after official notice by District to proceed with the work and shall diligently prosecute the same to completion before the expiration of seventy-five (75) days, or before October 15, 1982, whichever comes first, from the date of issuance of said notice. District has determined, by Resolution No. 2247 duly adopted on May 6, 1982, that in the event Contractor does not complete the work within the time limit so specified or within such further time as District shall have authorized, Contractor shall pay to District liquidated damages in the amount of One Hundred Dollars ($100.00) per calendar day for each and every day's delay in finishing the work beyond the completion date so specified. Additional provisions with regard to said time of completion and liquidated damages are set forth in the specifications, which provisions are hereby referred to and incorporated herein by reference. 3. ~. Payments will be made by District to Contractor for said work performed at the times and in the manner provided in the specifications and at the unit prices stated in Contractor's bid. 4. Component Parts. This contract shall consist of the following documents, each of which is on file in the office of District and all of which are incorporated herein and made a part hereof by reference thereto: a) This Agreement b) Notice Inviting Sealed Proposals c) Instruction and Information to Bidders d) Accepted Proposal e) Faithful Performance Bond f) Labor and Material Bond g) Special Provisions h) Standard Specifications i) Design Standards j) Plans and Detailed Drawings k) Resolution of Intention and Related Proceedings 5. ~_~. Pursuant to Section 1773 of the Labor Code of the State of California, District has obtained from the Director of the Department of Industrial Relations the general prevailing rate of per diem wages and the general prevailing rate for holidays and overtime work for each craft, classification, or type of worker required to execute the contract. Copies of said prevailing rate of per diem wages are on file in the principal office of District, which shall be made available to any interested party on request, and a copy thereof will be posted at the job site. The provisions of Article 2, Chapter 1, Part 7, Division 2 (commencing with Section 1770) of the Labor Code, and particularly Section 1775 thereof, shall be complied with. 6. Hours of Work. Contractor shall forfeit, as penalty to District, Twenty-Five Dollars ($25.00) for each worker employed in the execution of the contract by Contractor or by any subcontractor, for each calendar day during which any worker is required or permitted to work more than eight (8) hours in any one calendar day and forty (40) hours in any one calendar week, in violation of the provisions of Article 3, Chapter 1, Part 7, Division 2 (commencing with Section 1810) of the Labor Code of the State of California. 7. Apprentices. In accordance with the provisions of Section 1777.5 of the Labor Code, and in accordance with the rules and procedures of the California Apprenticeship Council, properly registered apprentices shall be employed in the prosecution of the work. The ratio of apprentices to journeymen who shall be employed in the respective crafts or trades may be the ratio stipulated in the apprenticeship standards under which the appropriate joint apprenticeship committee operates. In no event shall the ratio be less than one apprentice for each five journeymen unless a certificate of exemption has been issued by the Division of Apprenticeship Standards. Willful failure by Contractor to comply with said Section 1777.5 shall result in its being denied the right to bid on any public works contract for a period of one year from the date the determination of noncompliance is made and its forfeiting as a civil penalty the sum of Fifty Dollars ($50.00) for each calendar day of noncompliance. Information relative to number of apprentices, identifications, wages, hours of employment and standards of working conditions shall be obtained from the Administrator of Apprenticeship. The responsibility of compliance with said Section 1777.5 shall be with the prime contractor. 8. Labor Discrimination- Attention is directed to Section 1735 of the Labor Code, which reads as follows: "No discrimination shall be made in the employment of persons upon public works because of the race, religious creed, color, national origin, ancestry, physical handicap, medical condition, marital status or sex of such persons, except as provided in Section 12940 (of the Government Code), and every contractor for public works violating this section is subject to all the penalties imposed for a violation of this chapter." 9. Worker's Compensation Insurance. In accordance with the provisions of Article 5, Chapter 1, Part 7, Division 2 (commencing with Section 1860) and Chapter 4, Part 1, Division 4 (commencing with Section 3700) of the Labor Code of the State of California, Contractor is required to secure the payment, of compensation to his employees and shall for that purpose obtain and keep in effect adequate Worker's Compensation Insurance. Contractor is aware of the provisions of Section 3700 of the Labor Code, which requires every employer to be insured against liability for worker's compensation or to undertake self-insurance in accordance with the provisions of that Code, and will comply with such provisions before commencing the performance of the work on this contract. 10. Substitution of Securities. Pursuant to Section 4590 of the California Govenment Code, Contractor is permitted to substitute securities for any moneys withheld by District to ensure performance under a contract. At the request and expense of Contractor, securities equivalent to the amount withheld shall be deposited with District, or with a state or federally chartered bank as the escrow agent, who shall pay such moneys to Contractor upon satisfactory completion of the contract. Securites eligible for investment shall include those listed in Section 16430 of the California Government Code, or bank or savings and loan certificates of deposit. Contractor shall be the beneficial owner of any securities substituted for moneys withheld and shall receive any interest thereon. IN WITNESS WHEREOF, District has caused these presents to b~ executed by its officers, thereunto duly authorized, and Contractor has subscribed same, all on the day and year first above written. ATTEST: ATTEST: THOMAS HAEN COMPANY (CONTRACTOR) Title APPROVED AS TO FORM: THIS FORM MUST NOT BE REMOVED FROM THESE CONTRACT DOCUMENTS SOUTH TAHOE PUBLIC UTILITY DISTRICT SOUTH TAHOE "Y" WATER IMPROV~iENTS AND U. S. HIGHWAY 50 BRIDGE CROSSING BID PROPOSAL AND SCHEDULE BID NO. 81-82-32 TO THE GENERAL MANAGER SOUTH TAHOE PUBLIC UTILITY DISTRICT THE UNDERSIGNED BIDDER, having examined the Bidding Requirements, Contract Forms, General Conditions, specifications, and other proposed contract documents, and all addenda thereto; and being acquainted with and fully understanding (a) the extent and character of the work covered by this Bid Form; (b) the location, arrangement, and specified requirements of the proposed work; (c) the location, character, and condition of existing streets, roads, highways, pavements, surfacings, walks, driveways, curbs , gutters, trees, sewers, utilities, drainage courses and structures, and other installations, both surface and underground, which may affect or be affected by the proposed work; (d) the condition and nature of existing structures and facilities affected by the work; (e) local conditions relative to labor, transportation, hauling, and delivery facilities; and (f) all other factors and conditions affecting or which may be affected by ~he work, ~'HEREBY PROPOSES to furnish all materials, equipment, supplies, and appurtenances; to provide all construction plant, equipment, and tools, to perform all necessary labor and supervision; and to construct, install, erect, equip, and complete all work stipulated in, required by, and in accordance with the proposed contract documents and the specifications,' and other documents referred to therein (as altered, amended, or modified by addenda), and to do all the work and furnish all the material specified in the contract and annexed plans and specifications. It being Understood and agreed that the quantities shov~ herein are approximate only and are subject to increase or decrease, and that he will accept in full payment therefor, the unit prices shown in Bid Schedules A, B, C, and D. The bidder shall be required to bid all items of Schedules A, B, C. and D. The South Tahoe Public Utility District will make the final decision and selection between the two types of pipe material prior to selecting the successful bidder. Pipe Material No. 1 - PVC Water Pipe Pipe Material No. 2 - Glass-fiber-Re-inforced Thermosetting- Resin Water Pipe (Bids shall include all sales tax and all other applicable taxes and fees). Ail work under Bid Schedule "A" will be paid for from a separate special fund administered by S.T.P.U.D. Monies received from property owners on or from the ale of bonds for Assessment District 1982-1 will be deposited in this special fund. ,~11 items under Bid Schedule "B", "C", and "D" will be paid for from S.T.P.U.D. funds. The undersigned bidder agrees to furnish the required bonds and to enter into a contract within ten (10) days after acceptance of this bid, and further agrees to complete all work in accordance with specified requirements by October 15, 1982, or within 75 days whichever comes first. Enclosed with this bid is a hid deposit in the form of a certified cashiers check for ....~,</ ~.~,.n./ ~I.~ /~ ~ ~' ~' ~o,-,, 7~ .~',nl Dollars ($ 27,389~ which it is agreed shall be collected and retained by the South Tahoe Public Utility District as liquidated damages in the event this bid is accepted by the Owner and the undersigned fails to execute the conditions thereof; otherwise said check or bond shall be returned to the undersigned. In submitting this bid it is understood that the right is reserved by the Owner to reject any and all bids, and it is understood that this bid may not be withdrawn during a period of s~xty (60) days after the schedule time for the receipt of bids. The undersigned bidder hereby certifies (a) that this bid is genuine and is not made in the interest of, or in the behalf of any undisclosed person, firm, or corporation, and is not submitted in conformity with any agreement of rules of any group, association, organization, or corporation; (b) that he has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid; (c) that he has not solicited or induced any persons, firm, or corporation to refrain from bidding; and (d) that he has not sought by collusion to obtain for himself any advantage over any other bidder or over the Owner. 3.3 The undersigned bidder acknowledges receipt of the following addenda: No. / Dated_ ~ No. Dated No. Dated Dated in~/O~ ~//J~,' ~1/~ this day of _~j6!~<~._ , 1982. SIGNATURE OF BIDDER: If an Individual: If a Partnership: , partner by Business Address Telephone NAME OF ALL MEMBERS OF FIRM If a Corporation: by Title Business Address Telephone (SEAL) NAME OF OFFICERS__ President Secretary (Corporate Seal) Treasurer 3.4 BID SCHEDULE A ASSESSMENT DISTRICT 1982-1 Item A1 /m2 A3 Z A4 J A6 J A7 J A8 Item with Unit Price Written in Words Approximate __Q_u_antity 8" PVC Water Line, Complete in Place_~. ~t ~ ~ e ¢ ~ "B" Line 8" PVC Water Line, Complete in Place (Includes A.C. Pave. Rep]acement within Hwy. 50 8" Glass-Fiber-Reinforced Thermosetting-Resin Water Line Complete in Place_M~Zr/¢ ez~ _d. ll~,'~ ~,,J f~'~/~ ~<?~ ~- 5384 723 5384 723 "B" Line 8" Glass-Fiber-Rein- forced-Thermosetting-Resin Water Line, Complete in Place (Includes A.C. Pave. Replacement within Hwy. 50 R/W) /~rZY_ , 8" Gate Valves w/Box, Complete 14 ' 6" Ga.te Vdves w/Box, Complete in Place 8" u,~,-~ Valves w/Box, Blind Flange and Tee~, Comp?ete/in ~Place Fire Hydrant w/Gate Valve, Lateral, Connection to Water Main (Either modified existing or new,~ complete in place)~? 2 7 12 Unit L.F. L.F. t. Fo LoFo Each Each Each Each Unit Price $/W./7_ Amount 13-5/,P ~ ~ ~_Z2/~f ~ .oc $ ~10 7. ..;-o $ . ._3__~L_~. _o_ 3.5 Item/~ A9 Al0 All BID SCHEDULE A ASSESSMENT DISTRICT 1982-1 Item with Unit Price Written in Words Connection of New Water Mains into existing, Complete in Place Approximate Quantity _ 6 Unit Each Unit Price $? ¢/. ~ '7 Asphaltic Concrete Pav.ement 'l 3393 toFo Erosion Control Temporary and rmanent, Complete in Place L,S, Total Bid Items A1,A2,A5 - Ail: (Based on Pipe material No. 1) Total Bid Items A3 - Ail : (Based on Pipe Material No. 2) 3.6 Amount $ 2, yI6', oo ! si ?P.. 6~. oo I I Item Bi BID SCHEDULE B HIGHWAY 50 CROSSING Item with Unit Price Written in Words U.S. Highway 50 Crossing, including Jack and Bore, Encasement pipe, New 8" water line, 8" Gate Valves w/Box Connection to existing 8" Water Main, Pavement Replacement related to this work, Complete in Place Approximate Unit Quantity Unit Price ~ount Total Bid Schedule B $/~. (Based on Pi?iM,a. terial N~. 1) Total Bid Schedule B (~Based on Pipe Material No.2) $1g,,.,. ?,;..7 .oo 3.7 Item C1 C2 C3 C4 C5 C6 BID SCHEDULE C (THIRD STREET, ELOISE TO RUTH) Item with Unit Price Written in Words Approximate Quantity 8" PVC Water Line, Complete in 4 448 Unit L.F. 8" Glass-Fiber-Reinforced 448 Thermosetting-Resin Water Line, Complete ~in Place ! 8" Gate Valve w/Box, Complete in 4 Place .fCue~ n , ~ ~ ,¥o llo ~ .< .:..,1 ,~ o 8" Gate Valve w/Bo~, lateral ~rossing St., and 8" Blind Flange, complete in place Connection New Water Main to Existing, Complete in Place ~ ~ ~ ~'~. Zl~ r ~ q ~ l ~ ~ - Asphaltic Concrete Pavement Replacement, Complete in Place 326 Unit Price $ W. o7 L.F. $:j~O ,~27 _ Each $..~70 ?. Od) Amount Each Each $ L.F. $. ~' '9 9 / C7 Erosion Control, Temporary and Permanent, Complete in Place Total Bid Items C1, C3-C7: (Based on Pipe Material No. 1) ~,o~/~¢ n ~ot/ ~qndi Total Bid Items C2'- C7: (Based on Pipe ~terial No. 2) 3.8 Item D1 D2 D3 D4 D6 BID SCHEDULE D (UPPER TRUCKEE RIVER CROSSING) Item with Unit Price Written in Words Approximate Unit 0uantity Unit PriCe 8" PVC Water Line, Complete in / ' , c~;;c ~v Fy' -/J,'~:c -~.n~/~' 8" Glass-Fiber-Reinforced Thermosetting-Resin Water L~i~&,__, jC°mplete in Place / lO28 L.F. $ Connection of New 8" Water Line to Existing, gate valves w/boxes, Complete in place (~ ~_ 7~:eue~I-! 4o/Ior~ c~.~/ no Asphaltic Concrete Pavement Replacement, Complete in Place 2 Each $ //70 836 L.F. $ Bridge Crossing (Hwy. 50 Bridge R/W Line to Bridge R/W Line)-8" welded'.steel Water Line, Complete in Placeff/y 7Ze e~ f~,/~(~,/ Erosion Control, Temporary and Permanent, Complete in Place Amount $ :~ ?,. .CVc, $ 3 ~;,~P Yo o. $ ?, ?VD.O: s/._~. L.S. $ /,2'08 $/,, 2o.~. oq Total Bid Items D1,D3 - D6 (Based on PiDe Material No. 1) Total Bid Items D2 - D6 (Based ~n Pipe M~terial No. 2) ,J i, ll (, " ~ /;, ,, d ~ ~ c $ ~ .?02'. o q 3.9 BID SCHEDULE BID SCHEDULE SUMMARY TOTALS USING PIPE MATERIAL NO. 1 TOTALS USING PIPE MATERIAL NO. 2 CONTRACT TOTAL: ROCK EXCAVATION: Item R Rock excavation is not expected, but in the event it is necessary, the rock excavation will be paid for based on the following unit price which includes all work complete with regard to excavation of the rock. Rock excavation measurement for payment will be based on cubic yardage per design width and depth of trench. Item with Unit Price Written in Words Approximate Unit ~uantities Unit' Price Rock Excavation __ Base Unit Price on 500 C.Y.(To be adjusted if this amount is exceeded) c.¥. $/Co. Total $ 75/7 ~)00-0, (Rock Excavation Unit Price and Total are not to be included in Contract Totals) 3.10 SOUTH TAHOE PUBLIC UTILITY DISTRICT PRESIDENT JAMES R JONES Sewer. 1950. Water P.O. Box AU South Lake Tahoe, California 95705 1275 Meadow Crest Drive A PUBLIC AGENCY Phone (916) 544-6474 DIRECTORS WALTER"NEAL"OLSON LORRENE KASHUBA MICKEY MADDEN JOHN WYNN Tahoe Daily Tribune PO BOX 1359 So. Lake Tahoe, C.A ~K7n~ Attention: nonna Gentlemen: Please mublis% the at%ache~. Or~.nance ~o. on Auaust ~, 1~92, anS sen~. us of PubLication. ~hank vou. mda Attachment (1) JHHW:SRC:cp 6/30/82 2239C CERTIFICATE OF POSTING ORDINANCE OF AWARD CONSTRUCTION CONTRACT ASSESSMENT DISTRICT 1982-1 (SOUTH TAHOE "Y" WATER IMPROVEMENTS) I, BOB ~.. EPPT,~.R , do hereby certify, under penalty of perjury, that for and on behalf of the Clerk and ex-officio Secretary of the Board of Directors I posted copies of Ordinance No. 33?..., An Ordinance of Award Construction Contract, a copy of which is attached hereto, marked Exhibit "A" and made a part hereof, at three public places within the District, to wit: 1. City of South Lake Tahoe Administration Bldg. South Lake Tahoe, CA e Bijou Post Office Station South Lake Tahoe, CA Tahoe Valley Post Office Station South Lake Tahoe, CA and that said posting was completed on ~//j/~.~,, ~ , 1982, being at least one week before expiration of 30 days ol ing the date of passage of said ordinance by the Board of Directors of the District. Bob E. ~ler DATED: STATE OF CALIFORNIA ) )ss COUNTY OF EL DORADO ) On ~~ -_ _~_ ~ before me, the undersigned,~a Notary Public in and for said State, personally appeared~ known to me to be the person(~ whose name~s~ subscribed to the within instrument and acknowledged that~ executed the same. WITNESS my hand and official seal. N6~ary//~ublic in And for-th StateV~of California, County of E1 Dorado