Loading...
AP 05-04-06SOUTH TAHOE PUBLIC UTILITY DISTRICT "Basic Services for a Complex World" REGULAR, BOARD MEETING AGENDA Thursday, May 4, 2006 2:00 P.M. District Office 1275 Meadow Crest Drive, South Lake Tahoe, California Eric W. Schafer, President BOARD MEMBERS Duane Wallace, Vice President Ja~es.~;.~ne~. P!r~tor M~:.L~u~M~s~r,~!re. ct~[ To~C0mte, Director 1. CALL TO ORDER REGULAR MEETING - PLEDGE OF ALLEGIANCE COMMENTS FROM THE AUDIENCE (Short non-agenda items that are within the subject matter jurisdiction of the District. Five-minute limit. No action will betaken.) CORRECTIONS TO THE AGENDA OR CONSENT CALENDAR ADOPTION OF,,C, ONSENT ,CALENDAR (Any item can be discussed and considered separately upon request.) S. ,C, ONSE,NT, ITEMS BROUGHT FORWARD FOR ACTION I DISCUSSION 6. ITEMS FOR I~OARD ACTION. ....... RE,(~UE[$TEO BOARD ACTION Pg. 53 Economic Analysis, Proposition 50 IRWMP Grant (Paul Sciuto) Approve Proposal from Kennedy/ Jenks Consultants to Prepare the District's Economic Analysis that is Required for the Proposition 50 Integrated Regional Water Manage- ment Plan (IRWMP) Grant, in the Amount of $30,000 REGULAR BOARD MEETING AGENDA - MAY 4, 2006 ' PAGE - 2 - Pg. 65 2006 Asphalt Patching Services (Randy Curtis) Award Bid to the Lowest Respon- sive, Responsible Bidder (Bid results will be presented at the Board meeting) Pg. 69 Pg, 71 Indian Creek Reservoir (Request to Appear Before the Board Received from Ed James, Carson Water Subconservancy District) Payment of Claims Consider Subconservany's Request to Use Spdng Runoff to Increase Water Storage Approve Payment in the Amount of $1,157,900.32 ¸7. BOARD MEMBER STANDING CQMMITTEE REP,O, ,R,,T.~ (Discussions may take place; however, no action will be taken) a. Water & Wastewater Operations Committee (Jones / Comte) b. Finance Committee (Wallace / Schafer) c. Executive Committee (Schafer I Wallace) d. Planning Committee (Mosbacher / Schafer) BOARD MEMBER AD HOC COMMITTEE REPORTS (Discussions may take place; however, no action will be taken) a. Union Negotiations Ad Hoc Committee (Wallace / Comte) b. Lukins Water Company Purchase Ad Hoc Committee (Wallace / Comte) c. Building Ad Hoc Committee (Mosbacher / Jones) d. Indian Creek Reservoir Water Storage Ad Hoc Committee (Mosbacher / Jones) 9. BOARD MEMBER REPORTS (Discussions may take place; however, no action will be taken) 10. EL ~RADO COUNTY WATER AGENCY REPRES NTATIVE REPORT (Discussions may take place; however, no action will be taken) 1t¸. 12. GENERAL ~AGER REPORTS (Discussion may be held on these items; however, no action will be taken) a. Meetings re: Fire Protection Requirements b. Update on Waterline Projects TRPA Permits STAFF REPORTS (Discussions may take place; however, no action will be taken) 13. NOTICE OF PAST AND FUT,URE MEETINGS ! EVENTS Past Meetings I Events 04/25106 - ECC (Employee Communications Committee) Meeting 04125106 - Health Care Options Subcommittee Meeting 04126/06 - 04/28106 - CASA Spring Conference 05101/06 - Building Ad Hoc Committee Meeting 05101/06 - Operations Committee Meeting 'REGULAR BOARD MEETING AGENDA - MAY 4, 2006 ' ' ' PAGE - 3 Future Meetings ,/Events 05/04/06 - 6:00 p.m. - STPUD Public Meeting re: 2006/07 Budget and Ten-Year Financial Plan at Barton Memorial Hospital's Board Room (Located at 2170 South Ave., South Lake Tahoe, CA) 05/05106 - 10:00 a.m.- Lake Tahoe Executives Quarterly Meeting at TRPA Office 05/08/06- 05/12/06- ACWA Spdng Conference in Monterey 05/16/06 - 9:00 a.m.- Alpine County Supervisors Regular Board Meeting in Markleeville 05/16/06 - 4:00 p.m.- Operations Committee Meeting at Distdct Office 05/18/06 - 2:00 p.m. - STPUD Regular Board Meeting at District Office 14. CLOSED SESSION Pg. 85 Pursuant to Govemment Code Section 54956.8/Real Estate Negotiations Negotiating Parties: Board Ad Hoc Committee, General Manager, Assistant General Manager/Engineer, Chief Financial Officer Under Negotiation: Terms and Price Property Identification: Lukins Water Company, 2031 West Way, South Lake Tahoe, CA 96150 bo Pg. 87 Pursuant to Government Code Section 54956.9(a)/Conference with Legal Counsel- Existing Litigation re: Beth Jett, Kendall Pearce, and Pearce Family Trust dated 1-20-88 vs. South Lake Tahoe Public Utility District, Cox & Cox Construction, Inc., a California Corporation, Nimbus Engineers, a Nevada Corporation and Does 1-100, inclusive, Civil Action No. PC 20050567, Superior Court, County of El Dorado, State of California. Pg. 89 Pursuant to Government Code Section 54956.9(a)/Conference with Legal Counsel- Existing Litigation: STPUD vs. 1442.92 Acres of Land in Alpine County, California; et al., United States District Court for the Eastern District of Ca., Sacramento Division, Case No. CIV S-02-0238 MCE JFM Pg. 91 Pursuant to Government Code Section 54956.9(a)/Conference with Legal Counsel- Existing Litigation re: Meyers Landfill Site: United States of America vs. El Dorado County and City of South Lake Tahoe and Third Party Defendants, Civil Action No. S-01-1520 LKK GGH, United States District Court for the Eastern Distdct of Ca. e. Pursuant to Government Code Section 54956.9(b)/Conference with Legal Counsel- Pg. 93 Anticipated Litigation (Two Cases) 15. ACTION ! ,REPORT ON, ITEMS D!SCUSS~D,,DURING CLOSED SESSION 16. ADJOUR, ..... NMENT~ ....... (To the next regular meeting, May 18, 2006, 2:00 p.m.) Note: At 6:00 p.m., after the May 4 Regular Board Meeting, the Board of Directors will hold a Public Meeting to gather public input on the 2006/07 Proposed Budget and Ten-Year Financial Plan. The Public ~ng will be held at the Barton Memorial Hospital's Board Room, located at 2170 South Avenue, South Lake Tahoe, CA. No Board action will be taken at this meeting. The final budget is expected to be adopted at the May 18, 2006, Regular Board Meeting. REGULAR BOARD MEETING AGENDA - MAY 4, 2006 ...... PAGE - 4 The South Tahoe Public Utility District BOard of Directors regularly meets the first and third Thursday of each month. A complete agenda packet, including all backup information is available for review at the meeting and at the District office during the hours of 8:00 a.m. - 5:00 p.m., Monday through Friday. Items on this agenda are numbered for identification purposes only and will not necessarily be considered in the order in which they appear on the agenda. Designated times are for particular items only. Public Hearings will not be called to order prior to the time specified. Public participation is encouraged. Public comments on items appearing on the agenda will be taken at the same time the agenda items are heard; comments should be bdef and directed to the specifics of the item being considered. Comments on items not on the agenda can be heard during ~Comments from the Audience;" however, action cannot be taken on items not on the agenda. Please provide the Clerk of the Board with a copy of all wdtten matedal presented at the meeting. The meeting location is accessible to people with disabilities. Every reasonable effort will be made to accommodate participation of the disabled in all of the District's public meetings. If particular accommodations for the disabled are needed (i.e., disability-related aids, or other services), please contact the Clerk of the Board at 530.544.6474, extension 6203, at least 24 hours in advance of the meeting. CONSENT CALENDAR MAY 4, 2006 ITEMS REQUESTED ACTION a. Office Furniture Pg. 1 (Linda Brown) Authorize Purchase of Hon Office Furniture and Services from Kahl Commercial Interiors, Inc., from the State of Nevada's Competitively Negotiated Contract, in the Estimated Amount of $40,000 b. Bayview Waterline Pg. 7 (John Thiel) Approve Task Order No. 3 to Auerbach Engineering in an Amount Not to Exceed $20,000 Pg. 17 Collection System Master Plan (CSMP) (Paul Sciuto) Authorize Staff to Request Proposals from Consulting Engineering Firms to Conduct a CSMP Pg. 19 Urban Water Management Plan (UWMP) (Paul Sciuto) Approve Proposal from Kennedy/ Jenks Consultants to Prepare the District's 2005 UWMP, in an Amount Not to Exceed to $27,000 South Tahoe Public Utility Distdct · 1275 Meadow Crest Ddve · South Lake Tahoe, CA 96150 Phone 530.544.6474 · Facsimile 530.541.0614 · www.stpud.us South Tahoe Public Utility District General Manager Richard H, Solbrig James P~ Jones Mary Lou Mosbach~r Duan¢ Wallace Edt 5chafer 1275 Meadow Crest Drive · South Lake Tahoe · CA 96150-7401 Phone 530 544-6474 · Fax 530 541-0614 · www. stpud.us BOARD AGENDA ITEM 4a TO: Board of Directors FROM: Linda Brown, Purchasing Agent MEETING DATE: May 4, 2006 ITEM - PROJECT: Office Furniture REQUESTED BOARD ACTION: Authorize purchase of Hon office furniture and services from Kahl Commercial Interiors, Inc., from the State of Nevada's competitively negotiated contract, in the estimated amount of $40,000. DISCUSSION: A committee of four employees researched numerous public agency contracts for office furniture required for our new buildings. Those contracts included four contracts with the U.S. Communities Government Purchasing Alliance and multiple contracts with both the State of California and the State of Nevada. Staff considered styles of furniture, prices, responsiveness, reputation of vendors, and decided on the Hon furniture line through Kahl Commercial Interiors Inc., located in Reno. The contract offers a 48% discount off list prices. Cost projections include sales tax and estimated set-up charges. Staff expects to negotiate an additional discount based on the volume of the purchase. SCHEDULE: Order as soon as possible, take delivery of furniture at move-in time COSTS: Estimated $40,000 ACCOUNT NO: 1000/2000-4820 BUDGETED AMOUNT REMAINING: $125,000 ATTACHMENTS: State of Nevada letter & contract page, Furniture Order/Budget List CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES ,~ NO CHIEF FINANCIAL OFFICER: YES ~(~1'~~- NO CATEGORY: General -1- KENNY C. GUINN Governor July 6, 2005 STATE OF NEVADA DEPARTMENT OF ADMINISTRATION PURCHASING DIVISION 515 East Musser Street, Suite 300 Carson City, Nevada 89701 Phone (775) 684-0170 · Fax (775) 684-0188 JOHN R COMEAUX Director GREG SMITH Purchasing Administrator Dan Kahl Kahl Commerci'al Interiors, Inc. 201 W Liberty Street Reno, NV 89501 Fax: (775) 284-3601~, The State of Nevada, Purchasing Division has completed the evaluation process of RFP No. 1465: Systems Furniture, Furniture Case Goods, Seating & Refurbished Furniture. This letter is to inform you of the intent to award multiple contracts to Haworth, Inc., Kahl Commercial Interiors, Inc 'and Machabee Office Environments pending successful negotiation of contract terms and specifications. I will be contacting you within the next few days to further discuss the details of your contract. As soon as any changes are agreed upon, contract documents will be forwarded for your consideration. Once signatures have been obtained from all parties, I will issue a Notification of Award. Note: Any contract resulting from this RFP shall not be effective unless and until approved by the Nevada State Board of Examiners (NRS 284.173). Submitted proposals are confidential until the contract is awarded; following contract award, in accordance with NRS 333.333, the State will maintain confidentiality of appropriately labeled proprietary information regarding a trade secret as defined in NRS 600A.030. Please do not hesitate to call me at (775) 684-0172 if you have any questions. Thank you. Sincerely, Gaff Burchett, Purchasing Officer Services Procurement Section Approved 10/16/02 Please visit our website 'at http://purchasing, stamnv, us For Purchasing Use Only: RFP/CONTRACT # 1465 CONTRACT FOR SERVICES OF INDEPENDENT CONTRACTOR A Contract Between the State of Nevada Acting By and Through Its Various State Agencies Monitored By:. Department of Administration Purchasing Division 515 E Musser Street, Room 300 Carson CityNV 89701 Contact: Gail Burchett, Purchasing Officer Phone: (775) 684-0172 Fax: (775) 684-0188 And ~-~'~ Kahl Commercial Interiors, Inc. Contact Person: Dan Kahl, CEO 201 West Liberty Street, Reno, Nevada 89501 Tel. (775) 284-3600 Fax (775) 284-3602 Tax ID #88-0498941 WHEREAS, NRS 284.173 authorizes elective officers, heads of departments, boards, commissions or institutions to engage, subject to the approval of the Board of Examiners, services of persons as independent contractors; and WHEREAS, it is deemed that the service of Contractor is both necessary and in the best interests of the State of Nevada; NOW, THEREFORE, in consideration of the aforesaid premises, the parties mutually agree as follows: 1. REQUIRED APPROVAL. This Contract shall not become effective until and unless approved by the Nevada State Board of Examiners. 2. DEFINITIONS. "State" means the State of Nevada and any state agency identified herein, its officers, employees and immune contractors as defined in NRS §41.0307. "Independent Contractor" means a person or entity that performs services and/or provides goods for the State under the terms and conditions set forth in this Contract. "Fiscal Year" is defined as the period beginning July 1 and ending June 30 of the following year. 3. CONTRACT TERM. This Contract shall be effective subject to Board of Examiners' approval (anticipated to be August 9, 2005) to August 31, 2007, unless sooner terminated by either party as specified in paragraph (9). 4. NOTICE. Unless otherwise specified, termination shall not be effective until 30 calendar days after a party has served written notice of default, or without cause upon the other party. All notices or other communications required or permitted to be given under this Contract shall be in writing and shall be deemed to have been duly given if delivered personally in hand, by telephonic facsimile with simultaneous regular mail, or mailed certified mail, return receipt requested, postage prepaid on the date posted, and addressed to the other party at the address SPecified above. 5. INCORPORATED DOCUMENTS. The parties agree that the scope of work shall be specifically descnl0ed; this Contract incorporates the following attachments in descending order of constructive precedence; a Contractor's Attachment shall not contradict or supersede any State specifications, terms or conditions without written evidence of mutual assent to such change appearing in this Contract: ATTACHMENT AA: ATrA~ BB: STATE SOLICITATION (RFP #1465} and Amendments SCOPE OF WORK CONTRACTOR'S RESPONSE 6. CONSIDERATION. The parties agree that Contractor will provide goods and services as SPecified in the cost proposal for various state agencies on an as needed basis as stated within attachment BB, Contractors reSPonse. BeCause of the unique nature of these services, most will require the state agency to contact the contracted vendor for a quote; total contract payable not to exceed $2.000.000.00 for the term of the contract. The State does not agree to reimburse Contractor for expenses unless otherwise specified in the incorporated attachments. The contractual authority_, as identified by the not to exceed amount, .4pproved 05/08/02 Revised 08/03 Page 1 of 8 inc install. Room # Employ~ Title Fum List Price Tot Cost Budget Tbl 223 Acct Payroll Valido 11586L 72" desk -HH bourbon cherry 859 w/brushed brass cresent pulls 11534 stack on 72" - HH 719 105856 back enclosure for 11534 142 11511R right return 42" w/lock 609 90056 tackboard - W-05 165 1566.64 1,500 221 Acct Tech Valido 11585R desk -HH bourbon chemj 859 115327 stack on shelv - HH 799 11512L return 42" - HH 609 E4022 keyboard platform 30"- HH 199 90053 tackboard -SG, 54 139 105853 enc for tackboard 126 1699.36 i,500 232 ^dmin Asst 10647R cred w/36" lateral -MM reed oak 914 10660 bridge 42" - MM 215 10680 comer unit 24x42 - MM 644 10616L return 2/0 - MM 524 HKB200 keyboard w/mouse tray 211 1574.4~ 2,000 200'AGM 115899 dblped desk,bow top .NN Mahogany 1379 Y w/satin nickle cresent pulls E4022 keyboard Platform 30" - NN 199 11541 credenza shell -NN 499 115492 credenza w/lat storage -NN 1269 115324 stack on storage for cred 60" -NN 669 2- 11555 bookcases - NN ~$559ea 1118 115520 end cap/bookshelf/organ -NN 379 LB3672F boat shape laminate top -NN 336 BLS01 laminate slab base -NN 313 11530 pets storage cabinet - NN 1459 4437.2 4,500 ~ 163 Chief Plant Op 1 1585R 3/4 single ped desk - HH bout che~ 859 90150 keyboard Platform for desk_ HH 199 11516L 3/4 left return - HH 619 1522 angled center drawer for return - HH 120 w/bushed brass crescent pulls for all 2-F23B removable lock core kits (~$17, blac 34 11563 2-drawer lateral file - HH 699 1586.8 1,500 140 Comp Tech 38294L desk left ped 2/0 - P & H 921 4028 keybd platform mounted to desk 98 I 38215R right return 012 -P & H 555 1051.44 1,500 2021Const Mgr 115890 dbl ped desk 3/2 - MM Med Oak 1299 y 115906L left return 2/0 - MM 749 E4022 Keyboard platform (laminate)- MM 199 2-11554 Bookcase 36w- MM (~$479 ea 958 LD 48" conference table - MM 293 BLX02 X base for table - MM 239 2262.72 3,300 229 DIO 115899 dbl ped desk 3/2 -JP HennaCh,BIk 1379 Y E40~ keybd platform (laminate) - PP black 199 115491 credenza w/2 36" lat files - JP 1399 11554 bookcase - JJ Henna Cherry 479 DT2436C Conf end table w/casters - JJ 464 11534 stackon storage for 72"cred - JJ 719 2767.84 3,300 226 Fin Admin 10688L left ped desk - JJ Henna Cherry 849 Y 1522 angled center drawer for desk - JJ 120 10611R right retum- JJ 599 E4022 30x10 keyboard platform for retum-J~ 199 -5- 10650 credenza w/doors 2/0/2 - JJ 1099 115523 end cap bookshelf- JJ 319 LVPM1 vertical paper manager- JJ 242. 2089.12 2,300 214 Hydrol 115896L single ped desk, left 3/0 72" - JP 1019 4022 desk keybd platfrm veneer -PP blk 147 115905R right return 0/2, 48" - JP Ch,BIk 749 1242.4' 2,500 151 Lab Dir 38950L 42" left return - P Black 396 38241N stackon storage 48" - P 361 38929 comer unit - P 678 2- 18720K mobile pedestels- P (~$422 844 38943R right return - P 425 38961 48" modesty panel - P 82 38246 Flipper doors 144 38FRBRK stackon mounting bracket 47 1522 Center drawer 22" - JJ Henna Cherry 120 4029 metal keyboard 24" - P black 88 1953.6 2,5001 153 Lab Office (4) - SlB $ 5-38929 comer unit - P black (~$678 3390 5-4029 metal keyboard (comer units) (~ $88 440~ 5-38950L left retums- P ~$396 1980 5-38949R right returns P ~$396 1980 5-1522 drawers - J Henna Cherry (~120 600 10-18720 pedestel (box,box,file) -P (~ $422 4220 7911.6 7,500 109 Network 38292L left ped desk 2/0 - P & H 848 38853 credenza w/doors 2/0/2 - P&H 974 38244N stackon storage - P&H 451 T72 tackboard - P & GN13 223 4028 metal keyboard platform 98 1622.64 1,650 108 PC Support 38294L left ped desk 2/0 - HP B.Ch, BIk St 921 38217R right return 0/2 - HP 555 4028 metal keyboard platform - desk rant 98 1051.44 1,350 216 Purch Agent 92788L 72" left ped desk - MM Med Oak 1900 Y E4022 keybd drwr (laminate) - MM 199 92711R return (file/file) - MM 1294 92735 stack on storage w/back- MM 1637 90034 tackboard 165 92755 5 shelf bookcase - MM 1266 92762 2 drawer lateral 1130 4420.96 4,200 218 Purch Assistant 92741 Credenza w/space 2/0/2 -MM Med O9 1844 E4022 keybd drwr (laminate) - MM 199 1144.08 1,100 Total 62573 38382.32 42,200 -6- South Tahoe Public Ut!lity District General Manager Richard H. 5olbHg Torn Jam~ P~ Jone~ Mary Lou Mosbacher Puane Wallace E~e 1275 Meadow Crest Drive · South Lake Tahoe. CA 96150-7401 Phone 530 544-6474. Fax 530 541-0614 · www. stpud.us BOARD AGENDA ITEM 4b TO: Board of Directors FROM: John Thiel, Principal Engineer MEETING DATE: May 4, 2006 ITEM - PROJECT: Bayview Waterline REQUESTED BOARD ACTION: Approve Task Order No. 3 to Auerbach Engineering in an amount not to exceed $20,000. DISCUSSION: The Bayview Waterline Project includes the installation of approximately 4,000 feet of 18-inch diameter pipe to link the new Bayview Well with existing watermains on Sacramento Street, Nevada Street, and Highway 50. T&S Construction has been contracted to construct this project. Auerbach Engineering prepared the construction drawings and specifications under Task Order No. 1. This Task Order No. 3 includes construction related activities including review of contractor submittals, site visits, and responses to project changes or contractor questions. While the entire amount may not be used, funds should be available in case additional engineering help is needed. The Engineering Department will be short an engineer for at least the next two or three months. Staff recommends approval of this Task Order No. 3i SCHEDULE: Begin construction May 22, 2006. Complete by October 15, 2006. COSTS: Not to exceed $20,000 ACCOUNT NO: 2029-8574/BAYWEL BUDGETED AMOUNT REMAINING: <$942,777> ATTACHMENTS: Task Order No, 3, Budget Analysis CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES ,~ NO CHIEF FINANCIAL OFFICER: YES ~'~YY¥:--. NO CATEGORY: Water -?- TASK ORDER NO. 002 South Tahoe Public Utility District (CLIENT) AND Auerbach Engineering Corporation (CONSULTANT) This Task Order is issued by the CLIENT and accepted by CONSULTANT pursuant to the provisions of agreement contained in the Agreement between the above named parties dated the 21st day of March, 2005, in connection with: PURPOSE Bayview Waterline Project (Project) The purpose of this Task Order No. 002 is to provide professional services during the construction of the proposed Bayview Waterline project consisting of a 18-inch water transmission pipeline from the well pump station located on Lot 701 along San Francisco Avenue to a connection point at the intersection of Modesto Avenue and Highway 50. This Task Order No..002 ehcompasses the office construction services for the Project. Based on the above information, the following scope of services was developed by the STPUD and Auerbach Engineering Corporation (AEC) project team. CONSULTANT'S SERVICES PROJECT ASSUMPTIONS · This task assumes that the CLIENT will be providing field inspections services. · Construction staking will be completed'by the Contractor. · "Record Drawings" will be completed by the CLIENT. J:~0071.00~docs~Contracts\Task_Order_002\Task_Order 002 DRAFT.doc FINAL EXHIBIT i Page I of 3 SCOPE OF SERVICES Task 9.0 Services Durinq Construction {TH-2 Facilities) coNSULTANT will provide the following assistance to the CLIENT during the construction period for the Project. 9.1 Attend Pre-construction Conference. CONSULTANT will attend one pre-construction conference, answer questions as directed by the CLIENT. CONSULTANT will prepare minutes for this meeting. 9.2 Review Contrac~'urs Submittals. CONSULTANT will review and comment on'acceptability of Contractor submittals for the CLIENT. All comments shall be logged and returned to the submitter through the CLIENT to maintain continuity and lines of communication. 9.3 Prepare Design Clarifications and RFI's. As part of the submittal review process, CONSULTANT will respond to contractor RFI's or requests for clarifications as requested by the CLIENT. 9.4 Attend Progress Meetings and Make Site Visits. CONSULTANT will attend progress meetings and conduct periodic site visits to monitor construction and to be available to expedite resolutions to construction issues. It is assumed that four (4) progress meetings and four (4) site visits will be required. 9.5 Review Proposed Change Orders. CONSULTANT will assist the CLIENT with the evaluation of change order requests. TIME OF PERFORMANCE The 'estimated time of completion for this Task Order is one hundred twenty (120) days. PAYMENT Per Exhibit "A". J:\0071.00~ocs\ContraCtsITask..Order_002\Task_Order 002 DRAFT.doc FINAL EXHIBIT 1 Page 2 of 3 EFFECTIVE DATE This Task Order NO. 002 is effective as of the ~ day of IN WITNESS WHEREOF, duly authorized representative.s of the CLIENT and of the CONSULTANT have executed this Task Order No. 002 evidencing its issuance by CLIENT and acceptance by CONSULTANT. . Auerbach Engineering Corporation, South Tahoe Public Utility District Accepted this __ day of 20 By: By: CONSULTANT · CLIENT J:~0071.00~docs~Conlracts~Task_Order_002~Task_Order 002 DRAFT.doc FINAL EXHIBIT 1 -11- Page 3 of 3 Task Description Exhibit "A# Labor Hour Estimate Total Prin. PM PE/PLS Tech Planner Crew Draft WP Hours TASK 9.0 Services During Constzuctlon 9.1 Attend Pre-construct;ion Conference 9.2 Revery Contractors Submittals 9.3 Prepare Design Clsrificalions and RFrs 9.4 Attend Progress Meetings and Make Site Visits - 9.5 Review Proposed Change Orders Tolal Hours 0 4 4 0 0 0 0 4 12 2 8 40 0 0 0 0 0 50 2 ~ 16 0 0 0 8 4 34 2 32 32 0 0 0 0 4 70 2 4 16 0 0 0 4 4 30 Task Sublotat 8 52 108 0 0 0 12 16 196 ;, 52 108 0 0 0 12 16 196 4.1% 26.5% 55.1% 0.0% 0.0% 0.0% 6.1% 8,2% 100.0% J:~OO71.00'~locs~Contracts~Tl~k.O~_ 002~TI~<_O~'~'_No..2 A-1 EXHIBIT 1 Hours -:1.2- Task Description Exhibit "A" Labor COSt Estimate Prin. PM PE/PLS Tech Planner Crew TASK 9.0 Services During Construction 9.1 Attend P~-construc~io~ Co~fe~ence 9.2 Review Conb'actors Submittals 9.3 Prepare Design Clarifications and RFI's 9,4 Attend Progress MeeUngs and Make Site Visits 9.5 Review proposed Change Orders Total Hours $ $ 520 $ 380 $. 300 $ 1,040 $ 3.800 $ 300 $ 520 $ 1.520 S 300 $ 4,160 $ 3,040 $ 300 $ 520 $ 1.520 Task Subtotal $ 1,200 $ 6,760 $ 10,260$ $ $ 1.200 S 6.760 $ 10.260$ S $ 6.0% 34.0% 51.7% 0.0% $ 184 $ 1,084 $ $ 5.140 600 $ 184 $ 3,124 $ 184 $ 7,684 300 $ 1~4 $ 2.824 $ 900 $ 736 $ 19.856 $ 900 S 736 $ 19.856 4,5% 3.7% 100.0% ~2 EXHIBIT I -13- Exhibit "A" Summary of Costs for Professional Services Labor Description Rate Total Total Hours Cost Principal Project Manager Project Engineer/Surveyor Eng/Survey Technician Planner Field Crew CAD Drafter Word Processor Sub-Total 8 $1,200 52 $6,760 108 $10,260 0 $0 0 $0 0 $0 12 $9OO 16 $736 196 $ 19,856 Other Direct Costs (ODC's) b.) Travel (8trips @ $50/trip) c.) Printing (Estimated) $ 400 $ 500 Subtotal $ 900 Total $ 20,756 J:\0071.00\docs~Contracts\Task_Order_002~Task_Order No 2 A-3 EXHIBIT I Summary Costs BAYVIEW WELL Account: 2029-8574 BUDGET REMAINING ANALysIs: 2005/06 All Years Spent to date 159,814 857,104 Outstanding Purchase Orders- KG Walters Construction 1,782,963 1,782,963 0 0 Total Encumbered 1,782,963 1,782,963 Total Spent & Encumbered 1,942,777 2,640,067 Budget 2006 - 1,000,000 1,495,000 -942,777 -1,145,067 -250,000 1,289,790 Under (Over) Budget/Estimate Financial Plan 2007 Under (Over) Financial Plan -1,192,777 144,723 Note: The KG Walters purchase order is a multi-year contract, whereas the · budget is for one year. As such, this is causing the over budget amount. For that reason I am also showing the amount earmarked in the Long-term Financial Plan for 2007. -15- South .Tahoe Public Utility District I~icha nd H. -~olbrig Oir~or s Tom Comt~ Jamae ~. Ma~ ~u Mosbacher Ouane Wallace ~c 5ch~r 1275 Meadow Crest Drive · South Lake Tahoe, CA 96150-7401 Phone 530 544-6474, Fax 530 541-0614, www. stpud.us BOARD AGENDA ITEM 4c TO: FROM: Board of Directors Paul A. Sciuto, Assistant General ManagedEngineer MEETING DATE: May 4,2006 ITEM - PROJECT NAME: Collection System Master Plan (CSMP) REQUESTED BOARD ACTION: Authorize staff to request proposals from consulting engineering firms to conduct a CSMP. DISCUSSION: Collection System Master Plans are a guiding document for the management, operation, and maintenance of sanitary sewer collection systems. The District last completed a CSMP in 1986, and implemented many of the recommenda- tions presented in the plan. However, the District's sanitary sewers, pump stations, and forcemains are 20 years older and the community has changed substantially. In addition, the State Water Quality Control Board is possibly initiating Waste Discharge Requirements (WDR) on May 3, 2006, that will require a formal plan and submittal for sanitary sewer collection systems. One of the elements of the WDR is a CSMP. Staff intends to solicit proposals from engineering consultants to prepare a CSMP, which will include flow monitoring, condition assessment, hydraulic modeling, CIP recommendations, and a final report. SCHEDULE: Select consultant by June 2006, start the project in July 2006, complete by the end of 2007. COSTS: Estimate- $446,700 ACCOUNT NO: 1029-8721 BUDGETED AMOUNT REMAINING:. $160,500 (2006 budget) $286,200 (2007 proposed budget ATTACHMENTS: None CONCURRENCE WITH REQUESTED ACTION: GE.ERAL M AGER: , d+2.o CHIEF FINANCIAL OFFICER: YES RKY'~,. NO CATEGORY: Sewer -17- South Tahoe public Utility District General Manager I~ichard H. ~3olbrig D/rec~'or5 Tom Comte Jame~ I~ Jonee Ma r-,j Lou Moebacher Puan¢ Wallace EHe $cha~er 1275 Meadow Crest Drive · South Lake Tahoe* CA 96150-7401 Phone 530 544-6474. Fax 530 541-0614. www. stpud.us BOARD AGENDAITEM4d TO: Board of Directors FROM: Paul A. Sciuto, Assistant General Manager/Engineer MEETING DATE: May 4, 2006 ITEM - PROJECT NAME: Urban Water Management Plan (UWMP) REQUESTED BOARD ACTION: Approve proposal from Kennedy/Jenks Consultants to prepare the District's 2005 Urban Water Management Plan, in an amount not to exceed $27,200. DISCUSSION: The District prepared and submitted a UWMP in 2002 to the Department of Water Resources (DWR). In late 2005 we submitted the same report with a cover letter stating that no substantial changes occurred to the plan. The DWR did not accept the 2002 report because the regulations and reporting requirements have changed, and have required the District to complete a new UWMP. In addition, the Proposition 50 grant that the District is currently submitting, is contingent upon having an accepted UWMP. SCHEDULE: Select consultant by May 4, 2006, start the project immediately, and complete by July 2006. COSTS: Not to exceed $27,200 ACCOUNT NO: Unbudgeted BUDGETED AMOUNT REMAINING: ATTACHMENTS: Proposals from Kennedy/Jenks Consultants and Brown and Caldwell CONCURRENCE WITH REQUESTED ACTION: GE.ERAL,, AGER: .O CHIEF FINANCIAL OFFICER: YES ~)"Y~" NO CATEGORY: Water -:1.9- 26 APril 20O6 Mr. Paul Sciuto, P.E. Assistant General Manager / Engineer South Tahoe Public Utility District 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Subject: Proposal for Professional Services to prepare an update to the Urban Water Management Plan for South Tahoe Public Utility District K/J R06006 Dear Mr. Sciuto: Attached is the scope of work to prepare a 2005 update of the South Tahoe Public Utili[y District Urban Water Management Plan (UWMP) as required by the California Water Code for all water purveyors serving more than 3000 customers. The UWMP is required to be adopted by the District Board and submitted to the State of California Department of Water Resources prior to December 31, 2005 or as soon as possible after the deadline. Compensation will be on a time and materials basis, with a budget of $27,200, not to be exceeded without approval by the District. We will begin work upon receipt of the District-provided data listed in the scope, and will submit a draft plan within 10 weeks. Please contact me at 775-827-7900 or Brad Milner at 805-658-0607 if you have any questions. We look forward to assisting the District in this project. c:~documents arid seffJngs~chds whale n~ocal se~nga~temporar~, internet ~iles",olk 118¥o~osal te~er.d0c -21- Very truly yours, KENNEDY/JENKS CONSULTANTS Lynn H. Orphan, P.E. Senior Engineer LHO/pkh Enclosures cc: File - Reno Brad Milner- Ventura c:~docurnents and se~ngs'~chris wha e ntJo-c, al setti~gs',tempor ary internet liles~,olk 118',~roF3$al letter.doc -2.2- ATTACHMENT A Introduction California Water Code (Water Code) requires the preparation of an Urban Water Management Plan and periodic updates. The Water Code (Section 10610 to 10656) requires water suppliers to prepare an UWMP to promote water conservation and efficient water use. The Water Code also specifies the contents and procedures for adoption of the Plan. The Plan must be adopted and submitted to the California Department of Water Resources (DWR) before December 31 for years ending in 5 or 0. Consequently, the District's Update must be adopted and submitted to DWR prior to 31 December 2005, or as soon as possible after the deadline. Objectives of this UWMP include the following: · Accomplishes water supply planning over a 20-year period in 5-year increments · Identifies and quantifies adequate water supplies, including recycled water, for existing and future demands, in normal, dry, and multiple dry years · Identifies actions to prepare for and implement during a catastrophic interruption of water supplies · Implements conservation and efficient use of urban water supplies. Recent Changes to Urban Water Management Planning Act In 2000, legislation (AB 2552) was approved that requires urban water suppliers to submit their UWMPs to cities and counties where the water supplier provides water. The intent of this new requirement is to help ensure that city and county planning agencies have reliable water supply information on which to make growth decisions. Additional changes approved in 2001 include AB 901, SB 221, SB 610, and SB 672. AB 901 requires UWMP to include information, relating to the water quality of source supplies and the manner in which the water quality affects water management strategies and supply reliability. This bill requires the plan to describe plans to supplement a water source that may not be available at a consistent level of use. SB 221 prohibits a city or county from approving a residential subdivision of more than 500 units unless the city council or the board of supervisors provides written verification from the area's water service provider that a sufficient water supply is available for the development. SB 610.requires additional information to be included as part of the UWMP for urban water supplies whose water supply includes groundwater. It requires a city or county that determines that a development project is subject to the California Environmental Quality Act to identify any public water system that may supply water for the project and to request that system to prepare a specific water supply assessment. It requires urban water suppliers to include in the UWMP a description of all water supply projects and programs that may be undertaken to meet total projected water use. This bill requires the DWR to take into consideration whether an urban water supplier has -23- submitted an updated UWMP in determining eligibility for funds made available pursuant to any program administered by DWR. SB 672 requires urban water suppliers to describe in the UWMP water management tools and other options used by that agency to maximize resources and minimize the need to import water from other regions. It is recommended that the District consider extending the assessment window of the UWMP to 2030 (25 years) in order to comply with AB 610 and SB 220 requirements. The DWR developed two sets of worksheets to aid water suppliers preparing UWMPs. These worksheets include the "2005 UWMP Review for Completeness Form" which covers the general provisions of the Urban Water Management Planning Act, and includes 57 tables. In addition, the DWR released the "2005 UWMP Review of DMMs for Completeness Form," a series of 14 tables which focuses solely on the 14 demand management measures from Section 10631 (f) of the Urban Water Management Planning Act. The worksheets are useful organization tools to ensure that Various provisions of the law have been addressed in the plan. The Urban Water Management Planning Act does not require a Water supplier to use either of the worksheets. The use of these tools is option. However, all of the information from the DWR tables must be presented in the UWMP, either via text or use of the 71 tables or a combination of text and tables. Scope of Services The Work Plan defined below is based on our understanding of the project requirements, our familiarity with the District's facilities, our experience with the applicable regulations and guidance documents, and our experience on similar projects. Task 1 - Collect and Review Background Information Kennedy/Jenks will review background information collected for the District's service area, water supply and demand, and water policies. The objective of this task is to gather available data necessary to prepare the UWMP update. It is recommended that the District consider extending the assessment window of the UWMP to 2030 (25 years) in order to comply with AB 610 and SB 220 requirements. Information to be collected and reviewed includes the following: · 2002 Urban Water Management Plan · Local General Plans · District Master Plans · District Water ConservatiOn Plan · Groundwater Management Plans · Recycled Water Master Plans · Water Supply Assessments 2 -2~,- · Reports to the California Urban Water Conservation Council · Current and proposed land uses (to the year 2025/2030) · Population estimates and projections (to the year 2025/2030) · Historical, current, and projected (to the year 2025/2030) water consumption by user class, including recycled water consumption, if applicable · Water resources, including reliability (to the year 2025/2030) · Water quality issues, including known contaminants (to the year 2025;2030) · Current water rate structure · Accomplishments of the water demand management programs of the last five years · Water C°nservation-related ordinances currently or previously adopted by the District · Planned modifications to the District water system and available supply (such as addition of new wells and/or water treatment facilities). When available, Kennedy/Jenks would prefer to receive the information in electronic (MS Word, MS Excel, etc.) format. Task 2 - Update Service Area Description Kennedy/Jenks will update the existing description of the District's service area to satisfy the requirements of the Urban Water Management Planning Act and subsequent amendments. Land use and population estimates will be updated based on District- provided information. Population and water demand projections will be presented in 5-year increments for a 20-year period, through the year 2025. It is recommended that the District consider extending the assessment window of the UWMP to 2030 (25 years) in order to comply with AB 610 and SB 220 requirements. Task 3 - Update Water Resources and Quality Kennedy/Jenks will update the quantity and quality of the water sources existing within the Study Area based on District-provided information. These sources will include local water supplies, imported water supplies, potential for exchanges or transfers, and other potential water supplies. Kennedy/Jenks will update the description of water quality, including any known contamination that may impact water resources. It is recommended that the District consider extending the assessment window of the UWMP to 2030 (25 years) in order to comply with AB 610 and SB 220 requirements. For each source, Kennedy/Jenks will define the following: · Production volumes and water quality for the past five years 3 -25- · Current production trends and water quality · Projected production and water quality for 2005-2030 in five-year increments · Availability and water quality for normal, single-dry year, and four-year dry periods for 2005-2030 in five-year increments · Management practices implemented to preserve the sources. Task 4 - Determine Water Demand Projections Kennedy/Jenks will use the Districts most recent water use data and projections to define current water demands and historical trends for the last five-years. Kennedy/Jenks will also determine the water demand projections in five-year increments from 2005 to 2030 for a normal water year, single-dry water year, and four- year dry water years based on District-provided information. Water demand projections based on per-capita water use, service connections, and land-use changes will be determined and evaluated. Projections will be presented by water use sector. It is recommended that the District consider extending the assessment window of the UWMP to 2030 (25 years)in order to comply with AB 610 and SB 220 requirements. Task 5 - Evaluate Water Supply Reliability Based on District-provided information, Kennedy/Jenks Will evaluate the overall reliability of the water sources existing within the Study Area. Kennedy/Jenks will evaluate the adequacy of the existing supply to meet the projected water demands as well as assess the frequency and magnitude of supply deficiencies. The reliability analysis will include the average water year, single-dry water year, and four-year dry water years. It is recommended that the District consider extending the assessment window of the UWMP to 2030 (25 years) in order to comply with AB 610 and SB 220 requirements. Task 6 - EValuate Water Recycling Kennedy/Jenks will describe the availability of recycled water and its potential for use as a water source within the Service Area based on the draft Recycled Water Master Plan (Kennedy/Jenks). Kennedy/Jenks will define the following: · Current recycled water production trends · Projected recycled water production for 2005-2030 in five-year increments. Task 7 - Update Water Shortage Contingency Plan Kennedy/Jenks will review the District's existing water shortage contingency plan in compliance with the provisions identified in the Water Code. Kennedy/Jenks will provide the District with applicable revisions to the existing Water Shortage Contingency Plan. The plan will include the following elements. 4 -:36- · Description of plan coordination with local and regional suppliers. · Highest historic total annual water demand and predicted highest water demand at the end of 12, 24, and 36 months. · Estimate of worst-case water supply at the end of 12, 24, and 36 months. · Description of stages of rationing and associated triggers. · Description of mandatory prohibitions and consumption limits. · Description of adopted penalties and charges for excessive use. · Revenue and expenditure analysis. · Implementation resolution or ordinance. · Description of monitoring mechanisms. · Description of public noticing and plan adoption. Revisions to the District's existing water shortage contingency plan must be easily adopted and incorporated into District code. Task 8 - Summarize Existing Water Demand Management Measures and Accomplishments Based on the District's previous UWMP and discussions with District personnel Kennedy/Jenks will summarize the water demand management goals and current program as well as the overall progress and effectiveness of the program. Programs implemented to date will be summarized. Task 9 - Evaluate Alternative Water Demand Management Measures Kennedy/Jenks will evaluate alternative water demand management measures including potential water savings based on District-provided information. Kennedy/Jenks will recommend selected measures to be implemented, program budget, and proposed implementation schedules. Kennedy/Jenks will summarize applicable water demand measures, identified in the Water Code, which are not currently being implemented or scheduled for implementation including potential water savings. Task 10 - Prepare Draft and Final UWMP Kennedy/Jenks will document the findings in a Draft UWMP Update for the District. Five (5) copies of the draft UWMP will be submitted to the District. Kennedy/Jenks will incorporate written District comments and submit ten (10) copies of the Final UWMP Update to the District. Kennedy/Jenks will provide the District with the Final UWMP on 5 -27- compact disk (CD) also. Additional deliverables and copies may require a budget augmentation. Task 11 - Attend Public Hearing Kennedy/Jenks will attend one required public hearing, if requested, and support the District's staff providing conclusions and recommendations of the plan. Task 12 - Respond to Public Comments The District may receive comment~ from the public during the report preparation and public hearing. Kennedy/Jenks will assist the District with responding to applicable questions and preparation of responses to comments as directed by the District. These responses will be submitted to the District for final review and distribution. Task 13 - Project Management Kennedy/Jenks' project manager will assure that proper resources and staff are dedicated to this project to assure a timely completion of the UWMP. Kennedy/Jenks' Project Manager will also implement and enforce internal Quality Assurance and Quality Control programs. Kennedy/Jenks anticipates a minimum of bi-weekly communication with the District's Project Manager. Kennedy/Jenks will meet with District staff for two meetings, including a project kickoff meeting and progress meeting. Compensation Based on our understanding of the project and our scope of services provided herein, Kennedy/Jenks will prepare the UWMP on a time and materials basis with a not-to- exceed budget of $27,200, using the January 1,2006 standard rate of charges. We will not exceed this budget .without prior written authorization by the District. Schedule Kennedy/Jenks anticipates completion of the Draft UWMP within ten (10) weeks after authorization and receipt of the initial District-provided data. It is anticipated that the District would provide written comments on the Draft UWMP within four (4) weeks of receipt of the Draft UWMP. Kennedy/Jenks Consultants anticipates completion of the Final UWMP within four (4) weeks following receipt of written comments from the District. Project completion will be delayed equivalent to any delaYs in receiving District data and comments. Because the updated UWMP is 'a requirement for PropOsition 50 grant funding, Kennedy/Jenks Will prepare a letter to California Department of Water Resources presenting a schedule for completion of the plan. 6 -28- Client/Address: South Tahoe Public Utility District Contract/Proposal Date: 11 April 2006 Schedule of Charges January 1, 2006 Personnel Compensation Classification Hourly Rate CAD~T. echnician ................................................................................................. $84 Designer-Senior Technician ............................................................................... $103 Engineer-Scientist-S )ecialist 1 ........................................................................... $90 Engineer-Scientist-S Engineer-Scientist-S Engineer-Scientist-S Engineer-Scientist-S Engineer-Scientist-S Engineer-Scientist-S Engineer-Scientist-S )ecialist )ecialist )ecialist )ecialist )ecialist )ecialist )ecialist 3 .......................................................................... $114 4 .......................................................................... $125 5 .......................................................................... $140 6 .......................................................................... $160 7 ............................. ; ............................................ $175 8 .......................................................................... $190 Engineer-Scientist-S )ecialist 9 .......................................................................... $200 Project Administrator .......................................................................................... $79 Administrative Assistant ..................................................................................... $65 Aide .................................................................................................................... $53 In addition to the above Hourly Rates, a three percent Communications Charge will be added to Personnel Compensation for normal and incidental copies, communications and postage. Direct Expenses Reimbursement for direct expenses, as listed below, incurred in connection with the work, will be at cost plus ten pement for items such as: a. Maps, photographs, reproductions, printing, equipment rental, and special supplies related to the work. b. Consultants, soils engineers, surveyors, contractors, and other outside services. c. Rented vehicles, local public transportation and taxis, travel and subsistence. d. Specific telecommunications and delivery charges. e. Special fees, insurance, permits, and licenses applicable to the work. f. Outside computer processing, computation, and proprietary programs purchased for the work. Reimbursement for vehicles used in connection with the work will be at the rate of 44 cents per mile or at a negotiated monthly rate. Reimbursement for use of computerized drafting systems (CAD), geographical information systems (GIS), and other specialized software and hardware will be at the rate of $12 per hour. Rates for professional staff for legal proceedings or as expert witnesses will be at rates one and one-half times the Houdy Rates specified above. Other in-house charges for prints and reproductions, equipment usage, laboratory analyses, etc. will be at standard company rates. Excise and gross receipts taxes, if any, will be added as a direct expense. The foregoing Schedule of Charges is incorporated into the agreement for the services provided, effective January 1,2006 through December 31, 2006. After December 31, 2006, invoices will reflect the Schedule of Charges currently in effect. 29 10540 White Rock Road, Suite 180 Rancho Cordova, California 95670 Tel: (916) 444-0123 Fax: (916) 635-8805 wx*~v, broxvnandcaldxvcll.com April 25, 2006 Mr. Paul Sciuto, P.E. South Tahoe Public Utility District 1275 Meadow Crest Drive South Lake Tahoe, California 96150 1017-06-061051-003-001.7 Subject: Proposal for Preparation of 2005 Urban water Management Plan Dear Mr. Sciuto: Thank you for the opportunity to prepare South Tahoe Public Utility District's (STPUD) 2005 Urban Water Management Plan (UWMP). This letter proposal presents the scope ofwo'rk, project team, fee estimate, and schedule for your review. QUALIFICATIONS Brown and Caldwell understands this LFWMP must be completed quickly and according to the Department of Water Resources (DWR) guidelines in order to support the ongoing Integrated Regional Water Planning effort and grant applications. We are highly, familiar with the new DWR UXVMP guidelines. We have just recently completed nearly 20 2005 UWMPs for entities in the state, and over 60 LcWMPs since the requirement became law. The proposed project manager, Jim Crowley, was the project manager for two of these recent plans and completed both on schedule and under budget. Mr. Crowley also provided review and other input for many of the other 2005 UWMPs. The proposed project team all has participated in preparing multiple UXVMPs and will use this experience to meet the unique schedule requirements for this project. SCOPE OF WORK The scope of work consists of five tasks. These tasks are described as follows: Task 1- Project Management We will provide oversight of project staff and budget, and update STPUD staff regarding project status. P:\h~trkefng\Proposals_06\071003-004 grater Resources\003 Small Proposals SOQs\STPUD\061051-003-001 UWMP 2005~STPUD UWMP letter proposal.doc E n v i r o n m e n t a l E n g i n e e r s ~ C o n s u It a n t s -31- Mr. Paul Sciuto April 25, 2006 Page 2 Task 2 - Data Collection and Review Brown and Caldwell will provide a request for information on data, maps, reports, and other records necessary to update the information in the 2000 plan with current data. We will collect, utilize, and coordinate appropriate and available information for use in development of the 2005 UWMP Update. Task 3 - Prepare 2005 Urban Water Management Plan Brown and Caldwell will prepare the 2005 UXVMP Update in accordance with the Urban Water Management Planning Act of 1983, as amended, by updating STPUD's 2000 plan according to the requirements of the Urban Water Management Planning Act. We will coordinate development of the 2005 UWMP Update with other water agencies and other organizations, as appropriate. Below is a list of the items that will either be updated or added to the 2000 plan. 1. Present climate information by month including standard average evapotranspirafion, average rainfall, and average temperature. 2. Update facilities information including capacities and water facilities map. 3. Present demographic and water demand projections based on information developed in other studies or STPUD provided information. 4. Update number of connections by customer classification. 5. Update historical water production data through 2004. 6. Describe plan to eliminate groundwater overdraft, if any, and analysis of location, amount, and sufficiency of groundwater pumped over hst five years and projected to be pumped every five years for the next 20 years. 7. Provide discussion and table of water quality impacts upon water management strategies and supply for the next 20 years at five year intervals. 8. Update recycled water discussion to include comparison of year 2000 UWMP · projected recycled water use to actual use. Update recycled water discussion to include information on plan coordination with other agencies. Provide a table of methods used to encourage reCYcled water use. 9. Update water conservation section with description of current program. Discuss plans for cost-benefit analysis of non-implemented DMMs/Best management practices (BMPs). P:\Maxketing\Proposals_06\071003-004 ~/ater Resources\003 Small Proposals SOQs\STPUD\061051-003-001 U~(/~'IP 2005\STPUD UWMP letter proposal.doc E n v i r o n m e n t a l E n g i n e e r s ~v' C o n s u I t a n t s -39.- Mr. Paul Sciuto April 25, 2006 Page 3 10. Update projected water supply and demand comparison through 2030 and for multiple dry years. Provide reliability of supply through year four of a multiple dry year drought. 11. Provide tables of projected normal and multiple dry year scenario supply, demand, and supply to demand comparison during the 2006-2010, 2011-2015, 2016-2020, and 2021-2025 periods. 12. Update discussion of water supply projects, inconsistent sources, and exchange oppornmities. Provide additional information on future water supply projects, if any, including project start date, project completion date, normal year water supply to agency, single dry year water supply to agency, and years one, two, and three of multiple dry years water supply to agency. Provide table summarizing legal, environmental, water quality, and climatic factors resulting in inconsistency of supplies. Describe additional water uses and losses from 2000 through 2025 for uses such as saline barriers, groundwater recharge, and conjunctive use. .13. Present descriptions of opportunities for development of desalinated water, including ocean water, brackish water, and groundwater. 14. Summarize the water shortage contingency plan. 15. Provide Water Service Reliability section of UWMP to cities and counties within which it provides water supplies within 60 days of LIWMP submission to Department of Water Resources (DWR). Provide 2005 UWMP to DWR, and cities and counties within 30 days of adoption. Describe coordination of the plan preparation. Provide proof of public hearing. Task 4 - Prepare Two Drafts and a Final Report Brown and Caldwell will prepare a working draft for STPUD's internal review. 'We will incorporate STPUD's internal review comments and submit a final draft to STPUD. Brown and Caldwell will then prepare a final report incorporating comments, including one electronic copy. Brown and Caldwell will also address comments (if provided) by DWR. Task 5 - Meetings and Presentation Brown and Caldwell will attend up to four project meetings to discuss data and internal review comments. We will assist, as requested by STPUD, in adoption of the 2005 UWMP Update, including coordination of the Notice of Public Hearing, Resolution of Plan Adoption, and circulation of copies of the Draft UWMP Update. P:\Marke~ing\Proposals_06\071003-004 Wate~ Resources\003 Small Proposals SOQs\STPUD\061051-003-001 UWMP ~005\STPUD UWMP letter proposal.doc E n v i r o n m e n t a l E n g i n e e r s ~v' C o n s u I t a n t s -33- Mr. Paul Sciuto April 25, 2OO6 Page 4 We will attend one STPUD Board presentation if necessary to present the final UWMP report and address any comments or questions. Task 6 - Additional Work Contingency STPUD is not a member of the California Urban Water Conservation Council (CUWCC), which creates additional efforts in the UWMP to meet the Best Management Practices (BMPs) requirements. This task provides extra budget should STPUD's conservation program information require additional analysis and review than is currently estimated to meet the UWMP requirements. This task also is intended to cover other additional work that may be necessary such as extra public or Board meetings, coordination with the IRWMP project, and others. This task will not be initiated without prior approval from STPUD. PROJECT TEAM Mr. Jim Crowley will take the lead as Project Manager for this project. He will be assisted by Mr. Paul Selsky as Project Officer, Ms. Melanie Holton, Ms. Carol Lazzaroto, Ms. Jenny Gain, and other staff as necessary. Resumes for each individual are attached. FEE ESTIMATE AND SCHEDULE Brown and Cald~ell proposes to conduct the scope of work on a time-and-material basis as presented in Table 1. We will not exceed the fee of $34,000 without your prior authorization, including efforts covered under Task 6 - Additional Work Contingency. Labor will be billed based on a 3.2 salary labor multiplier. Internal charges for phone, fax, copies, and computers will be billed at a charge of $8 per labor hour. Other direct charges (ODCs) will be billed at cost plus 10 percent service charge. These costs are included in the fee est/mate. Task 1. Project Management Task 2. Data Collection and Review Task 3. Prepare Working Draft Task 4, Prepare Draft/Final Report Task 5, Meetings Total Task 6. Additional Work Contingency Total with Contingency 24 40 120 100 40 324 50 374 $2,000 $4,000 $14,000 $10,000 $4,000 $34,000 $5,000 $39,000 The Task 2 data request letter will be provided within one week of project authorization. The working draft report will be submitted by May 26, 2006. P:\Marketing\Proposals_06\0710034)04 Water Resources\003 Small Proposals SOQs\STPUD\061051-003-001 UWMP 2005\STPUD UX'f~:IP letter proposal.doc E n viro n m e n tal E ngin e e rs ~ Co n suit an ts -34- Mr. Pard Sciuto April 25, 2006 Page 5 TERMS AND CONDITIONS We propose to conduct the project under Brown and Caldwell's existing master services agreement with STPUD. Once approved, we will convert this proposal into a task order for contract authorization. We look forward to Working with you on this interesting project. If you have any questions, please do not hesitate to call Jim Crowley at (916) 853-5322. Sincerely, BROWN AND CALDWELL SOUTH TAHOE PUBLIC UTILITIES DISTRICT j. David Zuber, P.G. Office Manager Signature Printed Name Title JC:mp Date Enclosure P:\Marketing\Proposals 06\071003-004 Water Resources\003 Small Proposals SOQs\STPUD\061051-003-O01 UWMP 2005\STPUD U~IP letter proposal.doc E n viro n m e n tal Engineers ~ Co n sultan ts PRINCIPAL ENGINEER JAMES P. CROWLEY, P.E. Experience Summar~ James Crowley has 16 years of experience working in all aspects of water, wastewater, and stormwater projects. These projects include master plans, capacity evaluations, renovations, expansions, and operations support to assist utilities in developing and implementing capital improvement projects. Most recently, Mr. Crowley is involved in water resources planning efforts including integrated water regional plans, drought plans, water and recycled water master plans, UWMPs, and USBR water management plans. The following is an abbreviated list of projects completed throughout Jim's 16-year career. Urban Water Management Plans Project Manager. Prepared urban water management plan that describes water system, develops demand projections, evaluates water conservation measures, describes existing and planned sources of water available, presents water supply reliability data for normal and dry years, and quantifies current and projected amounts of wastewater collected and treated in service area and potential use for recycled water. Plans were prepared for the City of Roseville, the San Juan Water District, the Sacramento Suburban Water District, the Placer County Water Agency, and the City of Merced. Groundwater Management Plan Grant Application, City of Davis, California Project Engineer. Developed project description, scope, and implementation plan for California Groundwater Management Plan grant application. Developed application according to guidelines, working with DWR staff to ensure proper submittal requirements. Grant application scored well and Davis will receive requested funding. Water System Evaluation, PG&E, Vacaville, California Project Engineer. Evaluated existing supply well and distribution system for existing conditions and developed alternatives to renovate system, construct new well, or abandon groundwater system and connect to local public supply. Groundwater Master Plan, Arden Park Water System, Sacramento County Water Agency, Sacramento, California - Ongoing 5/2004 Project Engineer. Evaluated existing groundwater supply system for supply reliability, well and asset conditions, distribution system conditions. Modeled the system using H20 Net for response to peak demands and developed alternative improvement projects to meet future system needs. Alternatives included include evaluation of relocated backyard mains, and incorporation of meters and automated meter reading options. Assignment Project Manager Education M.S., Environmental Engineering, San Jose State Universe, 1993 B.S., Civil Engineerfng, Santa Clara University, 1990 Registrations Professional Engineer No. 52181, California Experience 16 years Joined Firm 1990 Relevant Expertise m Water resources planning. ~= Capital improvement project design, construction, and operations operations support · Strategic planning, competitive reengineering, and privatization evaluations -36- JAMES P. CROWLEY, P.E. Water Efficiency BMP Strategic Plan, Arden-Cordova System, Southern California Water Company, Sacramento, California Project Manager. Evaluated existing performance in meeting Water Forum BMP goals. Performed cost benefit analysis for continued BMP implementation and developed strategic plan for use by SCWC in negotiating next BMP agreement with Water Forum. Water Efficiency BMP Strategic Plan, Regional Water Authority, Sacramento, California Project Engineer. Provided technical support to RWA in assisting member agencies in evaluating BMP performance and developing strategies for entering negotiations with Wat~;z Forum for next BMP agreement. Intake Pumping Station, Charlotte-Mecklenburg Utilities, Charlotte, North Carolina Project Engineer. Evaluated existing intake pumps and ancillary equipment, developed renovation recommendations and design. Assisted in design and construction engineering of surge relief structure and backup power diesel generation facility. US Bureau of Reclamation Water Management Plan Update, San Juan Water District, Fair Oaks Water District, City of Folsom, Citrus Heights Water District, City of Roseville, California Project Manager. Created water planning report and update for US Bureau requirements. Report included review of contract rights, supply sources, transfer contracts, conservation practices, and water production. Coordinated report with Bureau requirements, coordinated draft submittals and comments with Bureau, provided final report that meets all Bureau requirements. Stormwater Collection System, Palo Alto,. California Design storm drain improvements including drawings and specifications and provide engineering support during construction. Master Planning, Cities and Counties of Maui and Honolulu, Hawaii; Santa Rosa, California; and Benicia, California Projected future flows based on land use predictions and I/I calculations and evaluated existing collection system to meet future flows. Provided alternatives for relief structures and alternative alignments. I/I Studies, City and County of Oahu, Hawaii Developed flow monitoring plan to evaluate extent of I/I in collection system. Evaluated I/I volumes through Hydra and determined relief requirements. Rehabilitation and Design, Ojai, California Evaluated existing collection system condition, projected future flows, designed replacement of new sewers, prepared contract drawings and specifications, and applied for SRF loans. -3?- JAMES P. CROWLEY, P.E. Master Plan, City of santa Rosa, California Project Engineer. Developed a comprehensive stormwater master plan for the City of Santa Rosa. The project consisted of computer-based mapping of more than one million feet of storm drain facilities and modeling of more than 32 miles of the major storm drain system. Innovative approaches used in this project included an electric'based mapping system with storm drain overlays and the use of satellite imagery to estimate stormwater coefficients. Memberships American Water Works Association California Water Environment Assodation WateReuse Sacramento Area Water Works Association Water Environment Federation 3 38 VICE PRESIDENT PAUL SELSKY, P.E. Experience Summary Paul Selsky, manager of the Sacramento/Davis water resources group, an elected member of the Board of Directors of the Carmichael Water District, and 29 year veteran of the water industry, provides water supply and treatment planning and design to western water agencies with a regional and policy-level focus. He has directed or written numerous water master plans involving water needs assessment and has prepared capital improvement programs for U.S. and international clients. He serves on policy making committees for the American Water Works Association and the Sacramento Regional Water Authority. Assignment Project Officer Education B.S., Civil Engineering, Universily of Virginia, 1976 Registration Professional Civil Engineer 3495, Wyoming, 1981 Civil Engineer 43544, California, 1987 Experience 29 years Joined Firm 1986' Prior Employment Nelson Engineering, Jackson, WY 1976-86 National Park Service, Yellowstone NP, WY, 1975 Virginia Highway Research Council, Charlottesville, VA, 1974 Relevant Expertise · Regional water resource policy development · Water resources planning and drinking water studies [] Watertreatment planning and design · Water use efficiency [] Groundwater supply and treatment ;, Grant application strategy development and preparation · ' Multi-entity planning group formation Urban Water Management Plans, t990, 1995, 2000, and 2005 These plans are required to be subm/tted to the California Department of Water Resources every five years by all California water purveyors that serve more than 3,000 ac-ft/yr or 3,000 connections. Mr. Selsky has prepared many of these plans over four cycles of ever increasing requirements. Ail of these plans describe the water system, develop demand projections, evaluate water conservation measures, describe existing and planned sources of water, evaluate water recycling opportunities, and present water supply reliability data for normal and dry years. He has prepared these plans for the following water agencies: Sonoma County Water Agency, Santa Rosa, California, 2004-2006 Project Manager. Plans prepared for City of Santa Rosa, City of Petaluma, City of Sonoma, Valley of the Moon Water District, Forestville Water District, City of Rohnert Park, North Marin Water District, Town of Windsor, and Sonoma County Water Agency. Placer County Water Agency, Auburn, California, 2005 Project Manager. Sacramento Suburban Water District~ Sacramento County, California, 2005 and 2003 Project Officer. City of Roseville, California, 2005 Project Officer. San Juan Water District, Granite Bay, California, 2005 Project Officer. El Dorado Irrigation District, Placerville, California, 2005 Project Officer. City of Davis, California, 2005 and 1990 Project Officer and Project Manager. City of Merced, California, 2005 and 2001 Project Officer. Trabuco Canyon Water District, Orange County, California, 2005 Senior Advisor. -39- PAUL SELSKY, P.E. City of Newport Beach, California, 2005 Senior Advisor. Valley Center Municipal Water District, California, 2005 Senior Advisor. City of Vallejo, California, 2002 Senior Advisor. California Water Service Company, San Jose, California, 2000 Project Manager. Reviewed water recycling opportunities and evaluated water conservation measures for all 21 water systems throughout California, including compiling and analyzing demographic data, developing water savings and cost assumptions for each water conservation Best Management Practice (BMP). Conducted economic analysis on BMPs. Citizens Utilities Company of California, Sacramento, California, 1995 and 2000 Project Manager. Prepared the urban water management plans for four water districts totaling 12 separate water systems (Sacramento County, Felton [Santa Cruz County], Larkfield [Sonoma County], and Montara [San Mateo County]). Orange Vale Mutual Water Company, Sacramento County, 'California, 2000 Project Officer. City'of Lodi, California, 2000 Project Manager. Northridge Water District, Sacramento County, California, 2000 Project Manager. Arcade Water District, Sacramento County, California, 2000 Project Officer. City of Folsom, California, 1996 and 2000 Project Manager~ Fair Oaks Water District, Sacramento County, California, 2000 Project Manager. Southern California Water Company, San Dimas, California, 1995 and 2000 Project Manager. Prepared plans for 20 Region I and Region II water systems located in northern and southern California. City of Sacramento, California, 199t and 1996 Project Manager. Included a water conservation study in 1991. City of Davis, California, 1989 Project Manager. -40- 2 PAUL SELSKY, P.E. Drinking Water Supply Program, Turlock Irrigation District, Turlock, California, 1987-2006 Project Manager. The project commenced in the late 80s with a series of studies that examined the feasibility of a regional water supply system utilizing Tuolumne River water. Several reports were prepared through 1992 that evaluated current water supply conditions, alternatives, and provided a recommended project. The project was revisited in 1995 and 2003 with additional studies that developed a smaller project. In hte 2005, the dties of Turlock, Ceres, Hughson, Keyes, and Modesto decided to parficpate in the ~egional system. The project will consist of a 42 mgd surface water treatment plant and approximately 12 miles of pipelines. A project definition study that will de£me project description details is currently being prepared. The project is scheduled for construction bidding in 2008, with completion of construction by 2011. Water Conservation Master Plan,·Cities of Roseville, Sacramento, and Folsom, San Juan Water District, Sacramento Suburban Water District, and Placer County Water Agency, California, 2005-2006 Project Officer. A water conservation technical analysis was prepared for a group of the large water purveyors in the Sacramento region. The water purveyors needed the technical analysis to help provide guidance for possible revisions to water conservation commitments made to the Sacramento Water Forum. An economic benefit-cost analysis was performed using both the California Urban Water Conservation Council Best Management Practices (BMPs) and each purveyor's specific water conservation agreement. The analysis was conducted using the computer model developed by Maddaus Water Management. Presentations were made to clients, Water Forum staff, and stakeholders. Drought Analysis of the Western Slope of El Dorado County, El · Dorado County Water Agency and El Dorado Irrigation District, California, Shingle Springs, California, 2004-2006 Project Officer. M~. Selsky helped develop strategy and approach to the project, presented at client meetings, conducted a technical review, and helped develop the project scope. The source of water for the western slope of E1 Dorado County is primarily surface water from the American River watershed. Drought planning and preparation is vital for E1 Dorado County because of the increased risk of water shortages due to a combination of limits on water supplies from water demand growth and drought. The drought analysis consisted of obtaining public input, de£ming drought mitigation actions, and developing a drought management strategy. A strategic visioning computer model was developed to simulate virtual droughts and mitigation measures. Integrated Water Resources Plan, Placer County Water Agency, Auburn, California, 2004-2006 Project Manager. To develop a clear understanding of future water demands and how they would be supplied, Placer County Water Agency (PCWA) contracted with Brown and Caldwell to prepare an Integrated -41- PAUL SELSKY, P.E. Water Resources Plan (IWRP). The study area focuses on west Placer County, one of the fastest growing areas in California. Cities in the study area include Roseville, Loomis, Lincoln, Rocklin, and Aubum. The projected demographics and land use from the respective general plans provided the basis for developing future build-out of water demand projections under several growth scenarios. The preliminary results for the demand projections show that the existing surface water supplies combined with recycled water and groundwater supply, and additional water conservation efforts, will provide adequate supply to meet future demand at buildout. The project represents the first time PCWA used an integrated, regional planning approach and coordinated ultimate total demand with the various general Plans within the service area. Professional Activities/Memberships American Water Works Association Surface Water Committee Chair 199849 M22 Manual "Water Meter and Service Line Sizing" Revision 2004 Subcommittee, member/coauthor CNNV Section, Water Management Committee, Vice Chair 2002-2003; Chair 2004- 2006 Association of California Water Agencies Elected to three 4-yr. terms on Board of Directors of Carmichael Water District, November 1996-2006 Elected to three 1-yr. terms on Sacramento Regional Water Authority Executive Committee, 2004-2006 Stormwater Advisory Committee, Town of Jackson, Wyoming, 1982 -42- ENGINEER MELANIE HOLTON, P.E. Experience Summary Melanie Holton has prepared urban water management plans for several water systems throughout California, and she has assisted in the design and permitting for a number of water and wastewater pipeline projects. She served as a student assistant at the California Department of Water Resources for three years prior to joining Brown and Caldwell. Her work with the Planning and Flood Management divisions involved field surveys, data collection and database maintenance, and management of various flood control projects and staff work for the Reclamation Board. Education B.S., Civil Engineering, California State University, Sacramento, 1998 Registration Professional Civil Engineer, No. 64983, California, 2003 Experience 5 years Joined Firm 1999 Relevant Expertise m Water resources engineering = Pipeline design m Perm~ing ~ Water planning m Storage tank design. Urban Water Management Plans, California Water Service Company Project Engineer. Evaluated water conservation measures for all 21 water systems throughout California, including compiling and analyzing demographic data, developing water savings and cost assumptions for each water conservation Best Management Practice (BMP). Conducted extensive economic analysis on BMPs. Urban Water Management Plans, Citizens Utilities Company of California Project Engineer. Evaluated water conservation measures for four water districts (Sacramento, Felton [Santa Cruz County], Larkfield [Sonoma County], and Montara [San Mateo County]), including compiling and analyzing demographic data, developing water savings and cost assumptions for each water conservation Best Management Practice (BMP). Conducted extensive economic analysis on BMPs. Urban Water Management Plans, City of Lodi, California Project Engineer. Evaluated water consercation measures, including compiling and analyzing demographic data, developing water savings and cost assumptions for each water conservation Best Management Practice (BMP). Conducted extensive economic analysis on BMPs. Urban Water Management Plans, Southern California Water Company Assistant Engineer. Collected demographic data and developed projected water demands for 21 water systems in Regions I and II located in Northern and Southern California. Plans describe water systems, develop demand projections, and evaluate water conservation measures. Estimated future water demand for residential, commercial and industrial customers. Urban Water Management Plan, Northridge Water DiStrict, Sacramento, California Project Manager. Prepared urban water management plan that describes water system, develops demand projections, evaluates water conservation measures, describes existing and planned sources of water available, presents water supply reliability data for normal and dry years, and quantifies current and projected amounts of wastewater collected and treated in service area and potential use for recycled water. MELANIE HOLTON, P.E. Urban Water Management Plan, Arcade Water District, Sacramento, California Project Engineer. Prepared urban xvater management plan that describes water system, develops demand projections, evaluates water conservation measures, describes existing and planned sources of water available, presents water supply reliability data for normal and dry years, and quantifies current and projected amounts of wastewater collected and treated in service area and potential use for recycled water. Urban Water Management Plan, City of Folsom, California Project Engineer. Prepared urban water management plan that describes water system, develops demand projections, evaluates water conservation measures, describes existing and planned sources of water available, presents water supply reliability data for normal and dry years, and quantifies current and projected amounts of wastewater collected and treated in service area and potential use for recycled water. Urban Water Management Plan, Orange Vale Water 'Company, Orangevale, California Project Engineer. Prepared urban water management plan that describes water system, develops demand projections, evaluates water conservation measures, describes existing and planned sources of water available, presents water supply reliability data for normal and dry years, and quantifies current and projected amounts of wastewater collected and treated in service area and potential use for recycled water. Water Treatment Plant Permitting and Storage Tank Design, Diablo Grande Limited Partnership/Western Hills Water District~ Stanislaus County, California Project Engineer. Permitted and provided utility coordination with Department of Health Services for the design of a new water treatment plant for the Diablo Grande resort development. Designed 1.25 million gallon storage tank. Groundwater Resources Plan, United States Agency for International Development (USAID), Honduras, Central America Project Engineer. Assisted with report preparation and geologic mapping for a comprehensive hydrogeologic study to assess the available water supply in five cities affected by Hurricane Mitch~ The results of these studies will be used to determine if groundwater resources can adequately meet current and future municipal demands and to develop a comprehensive water resource plan for each municipality. The project involves installing more than 15 wells, aquifer tests, geologic mapping, and comprehensive reports. Water Supply Improvements and Pipeline Design, Confidential Client, Sacramento County, California Project Engineer. Researched and assisted in design of a 4,500 foot~ 24 inch pipeline into a water treatment plant as part of a replacement water Supply facilities plan. Coordinated with utilities affected by project alignment and managed all regulatory permitting issues. -44- MELANIE HOLTON, P.E. Wellhead and Transmission Main Design, Confidential Client, Rancho Cordova, California Project Engineer. Provided permitting and utility coordination in the design of a wellhead pump and piping to connect a well to the existing distribution main. Coordinated with utilities affected by project alignment and managed all regulatory permitting issues, including the Department of Health Services Drinking Water Source Assessment Program (DWSAP) well site assessment. Replacement Water Supply Facilities Plan, Southern California Water Company, Rancho Cordova, California Project Engineer. Analyzed loss of water supply occurring in Cordova System. Defined water rights holders on American River and Water Forum diveriions and compared to Hodge minimum flow requirements. Developed implementation schedule for additional water supplies for Cordova System. Cordova System Water Management Plan, Southern California Water Company, Sacramento County, California Assistant Engineer. Participated in preparation of the future water supply report and water management plan for the Cordova Water System to fulfill the requirements of the California Urban Water Management Planning Act and the reporting requirements of the California Urban Water Conservation Council. Prepared report sections on historical and projected water use and water shortage contingency plans. CalFed Bay/Delta Grant and Proposition 13 Funding Applications, Various Clients, California Project Engineer. Submitted successful applications for more than $1.7 million in federal funding grants through the CalFed Bay/Delta grant program for California municipalities. California Department of Water Resources, Division of Flood Management, Sacramento, California Engineer. Planned, organized, and supported flood control project and study activities. Represented The Reclamation Board and the Department of Water Resources while acting as a liaison to the Corps of Engineers, local government agencies and Department Divisions. Performed quality control reviews of project work to assure conformance with contract plans and specifications before State acceptance of projects. Memberships American Society of Civil Engineers Sacramento Professional Section, Outstanding Academic Achievement Award, 1998 California State University, Sacramento, Student Chapter, Outstanding Service Award, 1998 Golden Key National Honor Society Tau Beta Pi Engineering Honor Society Upsilon Chapter, Secretary, Fall 1997 American Water Works Association WATER RESOURCES CAROL LAZZAROTTO Experience Summary ! III IIIII Education M.S. Public Policy, Universify of California, Berkeley, 1984 B.A. Political Science, Univers~ of California, Berkeley, 1981 Experience 22 years Joined Firm 2005 Urban Water Management Plans Project Scientist. Assisted on preparing UWMPs for several entities, including: City of Folsom, City of Sacramento, City of Daly City, City of Antioch, Citizens Utilities service areas, Southern California Water Company service areas; and the seven retail agencies served by Sonoma County Water AgenCy. Water Management Plan, Southern California Water Company Staff Scientist. Prepared water supply portion of the Clear Lake District water management plan. Plan described water systems, developed demand projections, evaluated water conservation measures, and evaluated water supply alternatives. Environmental Assessment/initial Study (EA/IS) for Folsom Outlet Modifications, U.S. Army Corps of Engineers (Corps) Project Manager Managed preparation of the EA/IS and Biological Assessment to construct a redundant outlet works for the cities of Roseville and Folsom, and San Juan Water District. Project required coordination with the purveyors as stakeholders, with the U.S. Bureau of Reclamation, which operates the dam, the engineering consulting firm that is designing the modifications, and the three fisheries agencies via Section 7 consultation under the ESA. Participated in a VELB survey at the dam site, which required coordination and participation with the Corps, Reclamation, SAFCA, and UC Davis VELB experts. Sacramento Municipal Utility District (SMUD), Water Assignment Final Environmental Impact Report (FEIR), SMUD Project Manager Managed completion of FEIR to support the assignment of 30,000 acre-feet per year of SMUD's Central Valley Project water to Sacramento County Water Agency for use in the county's Zone 40 Service Area (south-central Sacramento County). Responding to comments requires re-analysis of hydrologic modeling output with regard to downstream water supply and water quality impacts. U.S. Bureau of Reclamation/Department of Water ResourceslCDM Federal Programs~ Environmental Water Account (EWA) Environmental Impact Statement/Environmental impact Report Managed four staff in the preparation of the environmental documentation required to implement the EWA. Oversaw the initial preparation of the Action Specific Implementation Plan (ASIP) which, tiering off the CALFED Multi-Species Conservation Strategy, evaluated the EWA Proposed Action's effects on evaluated species and habitats. This work included coordinating frequent meetings and consultations with USFWS, NOAA Fisheries, and CDFG, as well as the USBR and DWR. Sacramento Area Flood Control Agency (SAFCA), Long-Term Agreement for Reoperation of Folsom Dam and Reservoir Environmental Assessment (EA) -46- CAROL LAZZAROTTO Project Manager. Coordinated the preparation of an EA for indefinitely extending the Folsom Dam and Reservoir Reoperafion Agreement with Reclamation to support the various flood control alternatives identified by SAFCA. Assisted in the preparation of the aesthetics, biological, water quality, population and housing, and hydropower impact analyses for the EA. Placer County Water Agency/U.S. Bureau of Reclamation (USBR), American River Pump Station Project EIS/EIR Project Planner. Assisted in the preparation of the EIS/EIR for the American River Pump Station Project. The project involved construction and operation of a year-round pumping facility for PCWA that will divert water from the North Fork American River in the vicinity of the Auburn Dam construction site, dose the Auburn Dam bypass tunnel, and restore the three-quarter mile reach of the river that was dewatered and impacted by activities associated with Auburn Dam construction. Prepared the impact analyses for water supply, water quality, noise, and visual resources for the EIS/EIR. USBR, American River Basin Cumulative Impact Report Project Planner. Assisted in the evaluation of cumulative impacts within the American River Basin due to increased diversions from federal actions involving the USBR Central Valley Project. Key resource issues included direct and indkect cumulative effects of reasonably foreseeable American River-related projects on endangered, threatened, and other special-status aquatic and terrestrial species and habitats along components of the Central Valley Project and within over 20 water service areas in Sacramento, Placer, and El Dorado counties. City of Sacramento, Fish Screen Replacement Project Environmental Assessment/Initial Study Project Planner. Assisted in the preparation of an EA/IS for the replacement of fish screens at the Sacramento River Water Treatment Plant and the Fairbairn Water Treatment Plant on the American River. Prepared impact analyses for the following issues: water quality, flood control, noise and public safety. This project involved potential impacts on listed and proposed anadromous and resident fish species, as well as agency- interrelated water diversion issues on the lower American and Sacramento rivers. City of Sacramento, Water Treatment Plant Expansion Project Environmental Assessment/Initial Study Project Planner. Assisted in the preparation of an EA/IS for the expansion of the Sacramento River and E.A. Fairbaim water supply intake structures on the American River. Prepared analyses of the impact of the increased diversion for the following issues: water supply, water quality, cultural and recreation. This project required close coordination with the Reclamation, NOB_& Fisheries, and the USFWS in addressing issues dealing with listed and proposed anadromous and resident fish species. Initial Study for River Pumping Station Expansion and Installation of New Raw Water Pipeline~ City of Antioch Project Scientist. Prepared Initial Study and Negative Declaration, which 2 CAROL LAZZAROTTO included obtaining a permit modification from the Corps and a water quality certification from the California Regional Water Quality Control Board, Central Valley Region. Initial Study for Storm Drain Detention Pond, City of Dixon Project Manager. Managed preparation of an Initial Study and Mitigated Negative Declaration for a storm drain detention pond and outfall. District Services Plan EIR, Fresno Metropolitan Flood Control District Staff Scientist. Assisted in preparation of EIR for updated District Services Plan. Prepared land use, air quality, cultural resources, transportation, public health, and recreation sections of EIR. Water Forum (City/County Office of Metropolitan Water Planning), Fisheries and Aquatic Habitat Management Plan for the Lower American River (Part of the River Corridor Management Plan) Assistant Project Manager. Assisted in the preparation of the Fisheries and Aquatic Habitat Management Plan for the lower American River, which includes an ecological and biological monitoring plan that will establish the baseline for assessing the health of the river. Played a key role in developing a graphic tool for identifying the temporal and geographic use of habitat along the lower American River for fish species of management concern. This graphic tool received a commendation from the lead CALFED scientist, and has since been used and re£med for other large watershed projects. Playa Capitol Company, Ballona Wetlands Restoration Project Operations and Maintenance Manual, Phase 1 Project Manager. Managed the preparation of an operations and maintenance manual for a created freshwater wetland. The wetland includes a freshwater marsh and riparian corridor, and will include restoration of a salt marsh in a future phase. Assisted in identifying water quality resources issues, including coordinating water quality monitoring programs, integrating water quality requirements with biological resources and flood control objectives, and evaluating opporttmities for efficient conduct of operation and maintenance activities. Stanislaus River and Calaveras River Watershed Sanitary Surveys, Stockton East Water DiStrict, Calaveras County Water District~ and Tuolumne Utilities District Project Manager. Managed the preparation of watershed sanita~ surveys, which required coordinating the interests of several agencies which draw water from the river, as well as working with the California Department of Health Services to ensure approval of the report and recommendations. Investigated potential sources of contamination in the watershed from point and nonpoint sources, and evaluated and made recommendations regarding watershed management practices. ASSOCIATE ENGINEER JENNIFER GAIN, E.I.T. Experience Summary Jennifer Gain is an environmental engineer in the water resources practice. Her Master's thesis was focused on evaluating the efficiency of recharge operations with a particular emphasis on the development of field techniques for quantifying spatial and temporal variations of infiltration rates, thereby targeting key controlling mechanisms related to recharge efficiency. She has performed a variety of fieldwork at lakes, rivers, sludge ponds, and wastewater treatment facilities. She has assisted with resyoration projects, watershed assessments, development of an Urban Water Management Plan, and development of a Storm Water Management Plan to meet Phase II NPDES requirements. Education M.S., Environmental Engineering, University of Arizona, 2003 B.S., Civil & Environmental Engineering, West Virginia Universily, 2001, Graduated Cum Laude Registrations Engineer-In-Training, No. 7743, West Virginia, 2001 Safety Training 40-hour HAZWOPER Experience 3 years Joined Firm 2003 Urban Water Management Plan, Sonoma County Water Agency, Sonoma County, California Project Engineer. Researching, writing, and preparing the water supply chapter of the 2005 Urban Water Management Plans for eight cities and water districts in Sonoma County, as well as the Sonoma County Water Agency. This plan is requLted by the California Department of Water Resources for all water suppliers to forecast the water supply and demand for its area until the year 2030. Chapters in the plan include descriptions of the water distribution system, historical and projected water use, water supply, water conservation, and recycled water for the service areas covered by the plan. The plans are being written for the following service areas: Santa Rosa, Petaluma, City of Sonoma, Valley of the Moon, Forestville, Rohnert Park, North Matin, Windsor, and Sonoma County Water Agency. South Bay Salt Pond Restoration Project, California State Coastal Conservancy, California Project Manager. Working with the California State Coastal Conservancy as part of the Philip Williams & Associates team. Developing a plan for the restoration of 15,000 acres of area historically operated by Cargill Salt into natural systems of tidal marsh and managed ponds. Focusing particularly on water and sediment quality issues, including mercuq~ methyladon. Working to coordinate with the U.S. Army Corps of Engineers and integrate the Corps' South San Francisco Bay Shoreline Study and the Salt Pond project through the Corps' reconnaissance milestone to provide long- ten-n project funding for restoration and flood management. Moffett Field Tidal Restoration Feasibility Study, U.S. National Aeronautics and Space Administration (NASA), Moffett Field, California Project Manager. As an area adjacent to the South Bay Salt Pond Restoration project,.NASA has been pressured to restore a stormwater retention pond in Moffett Field to tidal salt marsh. The project team evaluated the technical and fiscal feasibility of such restoration. The project team developed and evaluated three main alternatives - a no action alternative, full tidal restoration, and partial tidal restoration - focusing on stormwater retention, physical processes, biological habitat, and applicable regulations. The team evaluated the existing stormwater conditions and JENNIFER GAIN, E.I.T. examined the impacts of removing existing stormwater storage facilities. A hydrologic model was created in order to determine if tidal action could absorb the stormwater without causing flooding. Water Quality Monitoring and Watershed Assessment, Turlock Irrigation District, California Project Manager. The Turlock Irrigation District (TID) system discharges agricultural and urban runoff to the Harding Drain, the Tuolumne River, the Merced River, and the San Joaquin River, all of which are included on California's 303(d) list, which requires TMDLs. Performed QA/QC for results of water quality monitoring laboratory tests to ensure reliable results were being provided to the client. Evaluated technical and fiscal feasibility of potential treatment facility to reuse agricultural and urban flows and eliminate discharges to rivers by creating a closed-loop system. Prepared and submitted comments to the State Water Resources Control Board to present an analysis of recent data and information supporting the delisting of a waterbody from the revised 2006 303(d) list. Constituents analyzed included ammonia, chlorpyrifos, diazinon, and mercury. Managing project funded through CALFED grant for evaluation of Harding Drain Watershed agricultural and urban impacts. Developing and implementing a monitoring plan to collect water quality data in target locations. Working with TID staff to implement a watershed assessment and water quality monitoring program for the Harding Drain to determine sources of unknown toxicity impairment 003(d) listing). The grant also provides for education of growers and support to help implement agricultural BMPs. Storm Water Management Program, City of Rio Vista, California Projec.t Manager. The City of Rio Vista, an NPDES Phase II designated municipality, required the development of a Storm Water Management Program (SWMP). The components of the program were centered on the six Minimum Control Measures, as outlined by the EPA, and focused on meeting regulatory compliance, as well as promoting beneficial water quality pracuces. Served as project manager with other responsibilities, including the assisted development of the program and draft, as well as client interactions. Flow Meter Outfali Calibration, Orange County Sanitation District, Fountain Valley, California Project Engineer. The Orange County Sanitation District sought to evaluate the accuracy of a new effluent outfall flow meter. The request was met by conducting a dye calibration study for which fluorometric analyses were performed to trace the flow ofwastewater between two points. Responsibilities included assisting in field work consisting of wastewater sample collection and analytical testing. -50- 2 JENNIFER GAIN, E.I,T, Solids Lagoon Characterization Surveys, Naps Sanitation District, Naps, California Project Engineer. Performed field survey at the Soscol Wastewater Recycling Facility to quantify the volume and solids mass in a 108-acre solids lagoon. Assisted in use of custom vacuum-assist coring system and pressure core sample extraction from a custom portable sampling barge. Also assisted in the collection of core samples to evaluate the depth, volume, and physical characteristics of sludge layers in ponds. Assessment of Quarry Mining Potential Impacts to Groundwater Quality, Vulcan Materials Company, Sanger, California Project Engineer. Assisted in the evaluation of potential impacts to groundwater quality as a result of gravel quarry mining. Prepared work plan and health and safety plan for field sampling of pond water to evaluate potential impacts of blasting on surface water quality of exposed groundwater. Collected water quality samples at mine. Water Supply Assessment, Confidential Property Owner, Mariposa County, California Project Engineer. The property was desired to become a site of agricultural activxty. However, with extremely limited surface water supplies the need for a hydrogeologic assessment was evident. Conducted fracture trace/lineament analyses and a field survey to assist in the geologic mapping of the property. Automated Measurement of Surface Infiltration Rates, Tucson Water, Tucson, Arizona University of Arizona Graduate Student Researcher. Performed two- year study examining the automated measurement of surface infiltration rates at a secondary effluent recharge basin. The research focused'on the development and perfection of a field design and an automated method for measurement of surface infiltration rates. Analysis of collected data on temporal and spatial scales was also a key component. Specific controlling mechanisms that dixectly influenced recharge efficiency were evaluated and identified. Recommendations for improvements of recharge basin design, operation, and maintenance schedules were addressed. Memberships American Society of Civil Engineers (ASCE) Chi Epsilon Publications and Presentations 1. "The Measurement and Analysis of Surface Infiltration Rates at a Secondary Effluent Recharge Basin," Thesis, University of Adzona, 2003. 2. "Measuring Localized Surface Infiltration Rates in Secondary Effluent Recharge Basins.' Paper presented at the 11th Biennial Symposium on Groundwater Recharge, Phoenix, Adzona, June 5-L 2003. 3. "Measuring Localized Surface Infiltration Rates in Secondary Effluent Recharge Basins." Paper presented at the Wodd Water and Environmental Resources Congress and Related Symposia, Philadelphia, Pennsylvania, June 23-26, 2003. -51- South Tahoe Public Utility District General Manager Richard H. Solbrig Difecco[s Tom Comt,~ Mary Lou Mosbacher Duane Wallace EHc 5chafer 1275 Meadow Crest Drive, South Lake Tahoe · CA 96150-7401 Phone 530 544-6474. Fax 530 541-0614, www. stpud.us BOARD AGENDAITEM6a TO: · Board of Directors FROM: Paul Sciuto, Assistant General Manager MEETING DATE: May 4, 2006 ITEM - PROJECT NAME: Economic Analysis, Proposition 50 IRWMP Grant REQUESTED BOARD ACTION: Approve proposal from Kennedy/Jenks Consultants to prepare the District's Economic Analysis that is required for the Proposition 50 Integrated Regional Water Management Plan (IRWMP) grant, in the amount of $30,000. DISCUSSION: The District is a partner in the Proposition 50 IRWMP grant with three pending projects, (1)waterline replacement, (2)water conservation program and (3) Indian Creek Reservoir TMDL. A requirement of the grant is that an economic analysis of these projects, along with the nine other projects that comprise the grant, be completed. This economic analysis is weighted heavily in determining whether the grant will be awarded. As it requires an extensive evaluation of each project, a consultant is needed with the expertise to perform the analysis, and return the results by the grant deadline. Partners within the grant will be sharing the costs of the economic analysis. In the interest of completing the work in a timely manner and ensuring the economic analysis is performed .competitively, staff requests the District act as the lead in contracting for these services. Proposals were requested from two consulting firms. One declined due to the tight time frame. Due to this grant deadline, staff recommends acceptance of the proposal received from Kennedy/Jenks Consultants. SCHEDULE: Select consultant by May 4, 2006, start the project immediately, and complete by the grant deadline of June 8, 2006 COSTS: $30,000 ACCOUNT NO: Unbudgeted BUDGETED AMOUNT REMAINING: ATTACHMENTS: Scope of work from Kennedy/Jenks -53- CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES //~ CHIEF FINANCIAL oFFICER: YES NO NO CATEGORY: Water -54- 26 April 2006 Mr. Paul Sciuto, P.E. Assistant General Manager/Engineer South Tahoe Public Utility District 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Subject: Proposal for Professional Services to Assist in Preparation of Proposition 50, Chapter 8 for South Tahoe Public Utility District K/J R06005 Dear Mr. Sciuto: Attached is 'the scope and budget for assisting South Tahoe Public Utility District (District) in the preparation of a grant application for the Proposition 50, Chapter 8 Integrated Regional Water Management Program (IRWMP) Implementation, Step 2 program administered by the State of California Department of Water Resources and State Water Resources Control Board. The lump sum fee is $30,000. We will begin upon approval by the District on May 4, 2006 and complete the work on the June 8, 2006 deadline for the grant application. Please contact me if you have any questions. We look forward to assisting the District in this project. Very truly yours, KENNEDY/JENKS CONSULTANTS Lynn H. Orphan, P.E. Senior Engineer LHO/Id Enclosures cc: file - Reno Sachi Itagaki, K/J- Palo Alto w:\proposals\lttr-pro\2OOS",rO6OOS~stpud prop 50~6005 - stpud prop 50doc 55 Scope of Work - South Tahoe Public Utility District Assistance in Preparation of Proposition 50 Chapter 8, Integrated Regional Water Management Plan, Implementation Grants, Step 2 Background: The South Tahoe Public Utility District (DiStrict) has been a key stakeholder in the Tahoe Sierra Integrated Regional Water Management Plan (IRWMP). A number of projects have been identified that are critical to improving water quality and water supply reliability. The District lead an effort to coordinate a Step I Implementation Grant Application under Proposition 50 Chapter 8 Integrated Regional Water Management (IRWM) Plan to implement these projects and was called back to submit Step 2 of the grant process. Preparation of the Step 2 grant application will require an economic analysis of water supply and water quality benefits as described in the draft Proposal Solicitation Package (PSP) issued by the California Department of Water Resources, the administrator of the grant program. Task 1: Grant Application Cost and Benefits Questionnaire This task is for Kennedy/Jenks to prepare a list of questions and request for information from all of the fifteen project sponsors. Kennedy/Jenks will distribute the questionnaire and follow up with the sponsors to Obtain information and discuss the projects as the economic analysis is being conducted. The district will assist by providing the names and contact information for individuals at each sponsor entity. Kennedy/Jenks may conduct a workshop meeting if necessary. Task 2: Kennedy/Jenks Preparation of Attachments This task is for Kennedy/Jenks to prepare attachments to the application identified in the IRWMP part 2, Implementation Grant Application. Deliverables for each sub-task include three double sided hard-copies, an electronic file in a Microsoft program compatible format or an Adobe portable document format (PDF) format uploaded to the State Water Resources Control Board's (SWRCB) on-line Financial Assistance Application Submittal Tool (FAAST) system, one hard copy of all plans and specs, and a CD containing all supporting documents and files over 10 MBs. Kennedy/Jenks will participate in meetings and/or conference calls with the project proponents to clarify the project intent. These meetings and/or conference calls are accounted for in Task 4. Sub-task 2-A: Attachment 6. Budget This sub-task is to prepare summary budget for each project as broken down into the following cost components as required in Exhibit B of the PSP. 1 56 (a) Direct Project Administration Costs (b) Land Purchase/Easement (c) Planning/Design/Engineering/Environmental Documentation (d) Construction/Implementation (e) Environmental Compliance/Mitigation/Enhancement (f) Construction Administration (g) Other (h) Construction/Implementation Contingency (i) Grant Total (j) Calculation of Funding Match (k) List of the soume of funds for Non-State Share It is assumed that each member agency will provide an estimate that has been broken down for the individual projects with appropriate descriptions of the work from Sub-task 2-5 above into the cost components above. The costs for the individual projects, as provided by the agencies, will also be provided in the grant application. The summary cost estimate will be used for Table 1 - FAAST Checklist, Total Budget. It is anticipated that Kennedy/Jenks will prepare the summary budget concurrently with the District preparing the Attachment 5. Work Plan under Sub-task 3-E Sub-task 2-B: Attachment 7. Schedule This sub-task is to prepare a Project schedule that shows the sequence and timing of implementation of the individual projects in the proposal. As required in the PSP, the schedule will show May 1,2007, as the assumed effective date of the grant agreement. The schedule will show the start and end dates for each milestone and will be in a horizontal bar Or Gantt chart format. The schedule is intended to demonstrate that related elements of the IRWM Plan will be completed even though they are not proposed for grant funding in this application. As described in the PSP, the following work items, as applicable, will be included in the schedule for each project, as well as for the proposal itself: · California Environmental Quality Act (CEQA)/National Environmental Policy Act (NEPA) preparation and completion; · Project design and bid solicitation process; · Acquisition of land, or rights of way, if required; · Identification and acquisition of all necessary permits; · Construction start and end dates; · Environmental mitigation or enhancement efforts; · Post implementation, construction, and monitoring efforts; and · Any other work items that may be required but are not listed above. 2 -57- Sub-task 2-C: Attachment 10. Economic Analysis- Water Supply and Water Quality Benefits This sub-task is to prepare a detailed economic analysis of the costs and benefits due to the water supply and water quality aspects of the proposal. This attachment will be developed in accordance with Exhibit C of the PSP in a manner consistent with other Proposition 50 applications. Kennedy/Jenks will provide assistance from its subconsultant, Stratus Consulting, a specialty firm in the field of resource economics that is currently preparing similar economic analyses for Proposition 50 grant applications. Sub-task 2-D: Attachment 11, Other Expected Benefits This sub-task is similar to Attachment 10 but considers benefits other than water supply and water quality. This attachment will also be developed in accordance with Exhibit C of the PSP. Task 3'- District Preparation of Grant Application District staff will prepare all of the grant application, attachments and exhibits, except those specifically assigned to Kennedy/Jenks in Task 2. Kennedy/Jenks will provide reasonable technical and graphic support to District staff to help complete these application elements. The application elements to be prepared 'by the District include those described in Task 3. Sub-task '3-A: Attachment 1. Authorizing Documentation/Eligible Applicant Prepare the authorizing resolution for adoption by the District board and eligible applicant documentation. The District will provide the documentation necessary to substantiate the District's eligibility to apply for the grant. Documentation includes a copy of the letter to DWR indicating a 2002 UWMP has been completed and approved as well as a discussion and copy of all applicable Groundwater Management Plans. Legal agreements between the District and partner agencies to ensure grant proposal and tracking of funds will need to be described. Sub-task 3-B: Attachment 2. Consistency with Minimum IRWM Plan Standards Document how the Plan meets the minimum IRWM Plan Standards as described in Appendix A of the Guidelines and identified below. This will include use of a summary checklist or table identifying the plan standards and where in the IRWM plan the information is located. The plan standards are provided below: A. Regional Agency or RegiOnal Water Management Group B. Region Description 3 -58- C. Objectives D. Water Management Strategies E. Integration F. Regional Priorities G. Implementation H. Impacts and Benefits I. Technical Analysis and Plan Performance J. Data Management K. Financing L. Statewide Priorities M. Relation to Local Planning N. Stakeholder Involvement O. Coordination Sub-task 3-C: Attachment 3. Adopted IRWM Plan or Functionally Equivalent Plan, and proof of formal adoption As described in the PSP, evidence of formal adoption of the foundational and additional documents linking the alternate documents into a functionally equivalent plan must be provided (or a schedule for adoption) by 1 January 2007. Preparation of a combined IRWM Plan which includes both the District and Ventura County wide regions is currently under development by Ventura County and is assumed to be adopted prior to January 2007. However, a schedule for adoption will need to be prepared to include with this attachment. Sub-task 3-D: Attachment 4. Consistency with IRWM Plan Standards Document further how the plan meets the IRWM Plan requirements listed above. It is anticipated that this attachment will build on Attachment 2 above and include sub- sections that address each standard and the requirements stated in the Guidelines for that standard. Sub.task 3-E'. Attachment 5. Work Plan Document specific projects within the proposal. It will include an introduction section and a Work Items section, a table and a map that summarizes the group of projects. In accordance with the Proposal Solicitation Package (PSP), the introduction will include: A presentation of the Goals and Objective of the Proposal. A description of how the Proposal is consistent with the adopted IRWM Plan. A table of specific projects in the Proposal, including, an abstract of each project, the current status of each project in terms of percent completion of design, the priority of those projects, and implementing agencies. 4 59 · A description of synergies or linkages between projects that result in added value, or require coordinated implementation or operation. · A map showing the location of project(s) contained in the Proposal and also showing the regional boundaries. · A description of the work that has been completed or is expected to be completed prior to May 1, 2007, the assumed contract execution date. For example, if CEQA/NEPA and other environmental compliance efforts have been completed discuss the environmental determination made by the lead agency and the documents that were filed. · Procedures by which the applicant will coordinate with its partner agencies and organizations that may receive funding from the grant including any contracts, MOUs, and other formal agreements. · A discussion of standards, such as construction standards, health and safety standards, laboratory analysis, or accepted classifications methods that will be used in implementation.. · Development of PAEPs, MPs, and QAPPs for the Proposal. · A discussion of the status of acquisition of land or rights-of-way, if applicable. · A discussion of the merits of the building materials or computational methods that were or will be used for project development, such as use of specific grades of building materials or use of specific, tested, and established models (or software). Also discuss the status of project design and bid solicitation efforts. · Identification of all necessary permits and the status of securing such permit. · A discussion of the status of preparation and completion of requirements to comply with the CEQA, NEPA, and other environmental laws. If environmental compliance efforts have not been completed, include a plan for environmental compliance. Discuss the status of environmental mitigation or enhancement actions. · A description of submittals tothe granting agency for assessing progress and accomplishments, such as quarterly and final reports. · Any other work items that may be applicable to describe implementation of the projects but are not listed above. Sub-task 3-F: Attachment 8. Scientific and Technical Merit Documentation of the description of the scientific and technical merit for the proposal and each project contained within the proposal. A discussion of the technical adequacy of the data and feasibility of each project will be provided. Sub-task 3-G: Attachment 9. Monitoring Assessment and Performance Measures Discussion of the project monitoring, assessment, and performance measures that will ensure project goals and outcomes are achieved. As part of this attachment project 5 -60- performance measurement tables will be completed for each project which will include the following information: · Project goals · Desired outcomes · Output indicators · Outcome indicators · Measurement tools and methods · Targets Projects with the same goals and outcomes may be combined in the same table. Any completed Project Assessment and Evaluation Plan (PAEP), Monitoring Plans, or Quality Assurance Project Plans may be submitted as supporting documentation. Sub.task 3-H: Attachment 12. Program Preferences Discussion on how the proposed projects meet the Program Preferences as described in Section II.E of the Guidelines as follows: · Include integrated projects with multiple benefits; · Support and improve local and regional water supply reliability; · Contribute expeditiously and measurably to the long-term containment and maintenance of water quality standards; · Eliminate or significantly reduce pollution in impaired waters and sensitive habitat areas, including areas of special biological significance; · Include safe.drinking water and water quality projects that serve disadvantaged communities; or · Include groundwater management and recharge projects that are located 1) in San Bernardino or Riverside counties; 2) outside the service area of the Metropolitan Water District of Southern California; and 3) within one mile of established residential and commercial development. Sub-task 3-h Attachment 13. Statewide Priorities Prepare a discussion on how the proposed projects in the proposal meets the Statewide Priorities as described in Section II.F of the Guidelines as follows. Reduce conflict between water users or resolve water rights disputes, including interregional water rights issues; · Implement Total Maximum Daily Loads that are established or under development; · Implement Regional Water Quality Control Board (RWQCB) Watershed Management Initiative Chapters, plans, and policies; 6 -61- · Implement the SWRCB's Non-point Source (.NPS) Pollution Plan; · Assist in meeting Delta Water Quality Objectives; · Implement recommendations of the floodplain management taSk force, desalination task force, recycling task force, or state species recovery plan; · Address environmental justice concerns; and · Assist in achieving one or more goals of the CALFED Bay-Delta Program. Sub-task 3-J: Attachment 14. Changes from Step I to Step 2 Prepare a discussion of the necessary modifications to the proposal that occurred between Step 1 and Step 2. These changes include modifications to improve the IRWM Plan, modifications to the project list to reduce the total funding request to $25 million, and changes in the schedule to reflect the revised proposal. Sub-task 3-K: Attachment 15. Modification of River or Stream Channel (If applicable) Prepare a discussion of any river or stream channel modification resulting from implementation of a project included in the Work Plan. Documentation on the environmental impacts and discussion of the balance between the potential project benefits and mitigation requirements will be provided. Sub-task 3-L: Attachment 16, CALFED ROD Consistency Complete Form 1 from Exhibit E of the PSP for each project that is consistent with any of the CALFED Bay-Delta program goals. · Sub-task 3-M: Attachment 17. Letters of Support or Opposition Compile various letters of support. Sub.task 3-N: Graphics Prepare graphics to support the grant application. Graphics are expected to include: · Maps from either USGS topo or GIS files available · Extraction and/or or modification of figures prepared from existing maps or graphics · New graphics to illustrate concepts of integration or other relevant topics · Application cover 7 -62- Task 4: Project Management, Quality and Communications Kennedy/Jenks will provide project management and communication to attain District satisfaction and compliance with the contract terms. Sub-task 4-1: Project Management This sub-task includes project management functions including coordination of Kennedy/Jenks staff, internal project setup, review of project status repods, preparation of monthly billings, and other project management duties. Sub-task 4-2: Quality Assurance/Quality Control This sub-task includes quality assurance/quality control review on a technical and editorial basis. Sub-task 4-3 Meetings and Conference Calls This sub-task includes conducting up to eight conference calls and two meetings with Kennedy/Jenks staff at the District office. 8 -63- South Tahoe Public Utility District General Manager t~chard H. Solbrig Oire('.Cors Tom ¢omt~ James R. Jones Mary Leu Mosbacher Duane Wallac~ Eric 9chafer 1275 Meadow Crest Drive · South Lake Tahoe · CA 96150-7401 Phone 530 544-6474 · Fax 530 541-0614, w .~.stpud.us BOARD AGENDA ITEM 6b TO: Board of Directors FROM: Randy Curtis, Manager of Field Operations MEETING DATE: May 4, 2006 ITEM - PROJECT NAME: 2006 Asphalt Patching ServiCes REQUESTED BOARD ACTION: Award bid to the lowest responsive, responsible bidder. DISCUSSION: Underground Repair WatedSewer complete repairs of numerous waterline leaks and services tie-ins, then temporary patch repairs are made to the damaged or cut out asphalt. When the weather permits, professional paving contractors must permanently repair these patches. Bids will be opened on May 2, 2006. A summary of all bids, along with a staff recommendation will be distributed prior to, and at the Board meeting. SCHEDULE: Spring, Summer, and Fall 2006 COSTS: Estimated $130,000 ACCOUNT NO: 2001-6052, 1001-6052 BUDGETED AMOUNT REMAINING: 05/06 1001-6052 $15,588, 05/06 2001-6052 $73,895 06/07 1001-6052 $50,117, 2001-6052 $248,861 ATTACHMENTS: City of South Lake Tahoe paving requirements; Summary of bids to be distributed prior to, and at the Board meeting. CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES /~ NO CHIEF FINANCIAL OFFICER: YES If~¥'Y'~C--- NO CATEGORY: Water & Sewer NEW PAVEMENT 4" MIN. IN TWO SAWCUT TO A NEAT STRAIGHT ~ NEW 6' AGG BASE. COMPAC~D TO 95~: R.C. APPLYTACK COAT TO EDC.~ PRIOR TO PA ~-' NAIVE BACK FILL COMPACTED TO 90~[ R.C. ~ PROPOSED U31UTY ~ 12' BO~I SIDES 0'~6~'~ f BEDDING MA3ERIAL rain UNDISTURBED EARTH NA'IWE MA~RAL AT ~-- 90~ RELATIVE COMPAC~ON TO 6' BELOW BoTroM OF BEDDING MATERIAL 1/2 O0 OR 1' pAVEMENT PATCH AND AGGREGAll~ BASE MATERIAL SHAM. EX3EN0 BEYONO TRENCH 12" MIN. EACH SIDE. EX PAVEMENT .~ (VARIES IN DEPTH) EX BASE (VARIES IN DEPTH) NOTES: AC S~IALL BE 'CITY MIX' AR--8OOO OR APPRO~-O EQUAL POLYMER BONDED AC MAY BE REQUIRED ON SOME ROADWAYS. WHERE REMAINING PAVEMENT WIDTH FROM SAWCUT UNE TO GUTTER, CURB, OR EDGE' OF PAVEMENT IS LESS THAN 24" FOR AC. FULL DEPTH PAVEMENT REPAIR SHALL EX3~=J~D TO GUTTER, CURB, OR EDGE OF PAVEMENT. ALL R.O.W. IMPROVEMENTS AFFECTED IN CONJUCTION WITH PROPOSED WORK SHALL BE REPLACED TO CI~I' STANDARDS. CITY APPROVAL IS REQUIRED BEFORE ANY WORK COMMENCES. SECTION A-A TRANSVERSE TRENCH PAVEMENT RESTORATION HTS CiTY OF SOUTH LAKE TAHOE PUBLIC WORKS DEPARTMENT TRANSVERSE TRENCH PAVEMENT RESTORA31ON STANDARD ~ AM) Ch~L~Y P~N PROPOSED UTILITY 0.165' DEEP AC COLD MILL AND O~[RLAY 'CITY MIX AR 8000 AC OR APPROVqEO EQUAL VARIES ~ID'IH OF TRAVEL LANE.. 12' TYP.) SAWCUT TO A NEAT STRAIGHT APPLY TACK COAT TO EDGE PRIOR TO PAVtNO NE~ PAVEMENT 4.' MtN, IN TWO UFTS 6' AC,~ BASE: COMPACTED TO gs~ R.C. SECTION A-A COAT EDOE EX PAVEMENT VARIES IN DEPTH) EX BASE (V~ES a oe=m) NOT~:S: AC SHAll BE 'CITY MIX~ AR-8000 OR APPRO~:D EQUAL POLYMER BONDED AC MAY BE REQUIRED ON SOME ROADWAYS. WlHE]~E REMAINING PA~T MOTH FROM SAWCUT UNE TO CUTLER, CURB, OR EDGE O~ PAVEMENT IS [.ESS 1HAN 24-' FOR A.C. FULL DEPTH PAVEMENT REPAIR SHALL EXTEND TO GuTrER, CURB, OR EDG[ ~ PAVEMENT. AU_ R.O.W. IMPROVIEMENTR AFFECTED IN CONJUNC'~ON WORK SHALL BE REPt~CED TO CITY STANOAROS. CITY APPROVAL IS REQUIRED BEFORE ANY WORK COMMENCES. LONGITUDINAL - TRENCH PAVEMENT RESTORATION CITY OF SOUTH LAKE TAHOE PUBLIC WORKS DEPARTMENT LONGITUDINAL TRENCH PAVEMENT RESTORATION BY: J.M. STANDARD 0104 -68- South Tahoe Public IJt!iity District General Manager I~ichard H. 5oll~rig Direct:ors Tom Comt~ James F-. Jones Mary Lou Mosbacher Puane Wallace Eric 5chafer 1275 Meadow Crest Drive · South Lake Tahoe · CA 96150-7401 Phone 530 544-6474. Fax 530 541-0614. www. stpud.us REQUEST TO APPEAR BEFORE THE BOARD BOARD AGENDA ITEM 6c TO: Board of Directors FROM: Ed James, Carson Water Subconservancy District MEETING DATE: May 4, 2006 ITEM - PROJECT NAME: Indian Creek Reservoir (ICR) REQUESTED BOARD ACTION: Use Spring Runoff to Increase Water Storage DISCUSSION: Due to the large amount of precipitation that occurred in 2005 and this year, there may be an opportunity to dived extra water into ICR. This water can only be used for recreational purposes and cannot be sold for down-stream use. I request the Board to authorize STPUD staff to dived and monitor flows out of the West Fork of the Carson River into Indian Creek Reservoir. The diversion and storage of this water will be done with the oversight of the Federal Water Master for the Carson River. 69 South Tahoe Public Utility District Fax Cover Sheet Richard Solbrig, General Manager Board Members Tom Comte james R. Jone~ Mary Lou Mo~bacher Duane Wallace EHc 5chafer Date: May 1, 2006 To: Board Members From: . Kathy Total Number of Pages: 2 Subject: Backup to Agenda Item 6. c re: Ed James' Request to Appear re: ICR When Ed James made his request to Richard to appear before the Board on May 4, he mentioned that he had all the approvals and did all the leg work on behalf of the District getting the necessary permissions, etc. that would allow water to be diverted from the West Fork of the Carson River into ICR. I called him and asked that he forward all written documentation, approvals, etc. related to this issue. This is what he sent. South Tahoe Public Utility District · 1275 Meadow Crest Drive, South Lake Tahoe, CA 96150 Phone 530.544.6474 · Facsimile 530.541.0614 · www.stpud.us CARSON WATER SUBCONSERVANCY DISTRICT 777 East William Street, Suite 110A Carson City, NV 89701 775/887-7450, fax 775/887-7457 Garry Stone Federal Water Master 290 S. Arlington Ave. Reno, NV, 89501 April 28, 2006 Re: Storing Flood Waters in Indian Creek Reservoir Dear Mr. Stone: Below is the proposal to store flood waters in Indian Creek Reservoir for 2006. Starting after May 4, 2006, South Tahoe Public Utility District (STPUD) will begin diverting water out of the West Fork of the Carson River to Indian Creek Reservoir. The amount diverted will depend on the ditch carrying capacity. This water will be known as Temporary Flood Storage Water. Water will be diverted until the West Fork goes on regulation or the Federal Water Master orders the water to be shut off. STPUD will measure the amount of water entedng into Indian Creek Reservoir. If Lahontan Reservoir does not spill in 2006, the Federal Water Master can request the Temporary FloOd Storage Water released. If the river has gone on regulation, the water will not be released until the Fall when the river is no longer being regulated. The amount of water released will be calculated based on the amount of water that flowed into Indian Creek Reservoir less evaporation. If Lahontan Reservoir does spill then all the Temporary Flood Storage Water will remain in Indian Creek Reservoir. If you have any questions regarding this proposal, please give me a call. Sincerely, ED J/ti Edwin D. James General Manager F'"5"..~-,~"/Z-- 7,~7,3 ~,-' PAYMENT OF CLAIMS FOR APPROVAL Ma)/4, 2006 Payroll 4/26/06 Total payroll · BNY Western Trust Company Cost Containment - health care payments LaSalle Bank Hatch & Parent -legal services Total Vendor EFT Accounts Payable Checks Sewer Fund Accounts Payable Checks Water Fund Accounts Payable Checks Self-funded Ins Accounts Payable Checks Grant Funds Total Accounts Payable Grand Total 311,889.71 311,889.71 0.00 0.00 0.00 0.00 0.00 142,975.89 7O3,034.72 0.00 0.00 846,010.61 1,15~90~32 Payroll EFTs & Checks EFT EFT EFT CHK EFT EFT CHK EFT EFT CHK AFLAC Medical & Dependent Cato CA Employment Taxes & W/H Federal Employment Taxes & W/H CalPERS Contributions John Hancock Pension Loan Pmts Groat West Deferred Comp Stationary Engineers Union Dues United Way Contributions Employee Direct Deposits Employee Paychecks Adjustments 4126106 266.27 13,600.98 76,829.84 20,340.74 4,116.27 13,402.21 1,952.19 92.00 161,173.25 20,115.96 0.00 311,889.71 -?:I.- )0 Tahoe P.U.D. 04/26/06 PAYMENT OF CLAIMS REPORT 04/2112006 - 05/04/2006 Vim, APR 26, 2006, 10:00 AM - -rrq: C YN ---10 : GL JL- -loo: C STIE-- - -jcb: 360105 #J033-- - -�Og: (1tti09 <1.07 > - -rent i Default Selection: Check Very Nan Stork ID: AP ; Check 'I pes : M4, Lb1, RV, VH Acoamt # Depart Tent AFLAC A W DIRECT AWWA A -1 CHEMICAL INC ALPEN SIERRA 001.1.E CCMPANY ALSWRY, MARY ARAMRK UNIFORM SERVICE'S ARCS, IIANTIEL 10 -00 -2532 ORAL & AIIMINIISIRATTCN 10 -00 -2538 GENERAL & AEMINISIRATICN 20 -05 -6071 E JIRvENT REPAIR. 10 -37 -6250 INECRATICN SYSTEMS 20 -37 -6250 INFORA TICK SYSTEMS 20 -00 -6520 10 -00 -6520 10 -00 -0422 10 -00 -0421 10 -00 -6520 20 -00 -6520 10 -37 -6200 20 -37 -6200 10 -00 -2518 10 -07 -6200 20 -07 -6200 COAL & ALMINISIRATICN GENERAL & AUvINIIS]PPT CN GENERAL & ALMINISIRATTCN COAL & ADNIISIRATICN Description INSURANCE EE; SUPPLEMENT AFLPG Check Total: SHJP SUPPLIES DJES VD" 1 • 1 Check lbtal : /CERCIFICEI /CMTIFICATI dC Total: SUPPLIES SUPPLIES JANTIORTAL SUPPLIES INVENT R SHOP SUPPLY INVENICRY Check 'Ibtal : ORAL & ATMINISTRATICN SUPPLIES ORAL & AEMINISIRATICN SUPPLIES CN SY5'IIIvE GENERAL & ALNIINISIRATICN LABDRATCRY ASBESTOS TEM LAB 1 P C: IES, INC 20 -07 -6110 LABORATORY Check 'Total: TRRAAVE I' //E ITICN Check 'lbtal : LNIFCRIA/RLIS/ MAPLE : M'IRAW//EUXATIEELICATICNCN KNTIORIM Check Total: • i •4D•V• Amount Check # "Ace 835.18 110.00 945.18 00062907 M*7- 134.74 134.74 00062909 Ma 65.00 65.00 130.00 00062910 M7 177.34 177.33 478.36 142.49 975.52 00062911 144 101.66 101.65 203.31 00062912 144. 32.92 32.91 65.83 00062913 144 1,350.47 1,350.47 00062914 144 5.00 5.00 10.00 00062915 Ma - 400.00 - 400.00 00062658 RV South 'Tahoe P.U.D. 04/26/06 PAYMENT OF CLAIMS REPORT 04/21/2006-05/04/2006 , WED, APR 26, 2006, 10:00 AM - -req: CARCLM- - -1eg: GL JL- -loc: CI�r1E--- -jc�b: 360105 #J033--- -prcg: 09 <1.0 >-- report id: Default Selecticn.: Check Stock ID: AP ; Check Types: M'7, HW, RV, VH Vendor Name A count # DepartnEnt ASSURANT /1uuls B B & H BENa-TT EESIGNS B M H CCCUPATICIT L MEDICINE BASIC LABORATORY INC. EENILY ASFGADYNAMICS 1 -HEY INDUSTRIES BI STATE PROPANE BRIAN TRAINIM, HARRY CDW -GCORP 10 -37 -4314 INFQ3ATICN SYSTENB 20 -37 -4314 INFCIWATICN SYSIENS 10 -00 -2539 GENERAL & ALM NIS RATTCN 20 -22 -4405 BUYANFTBCURCES DIRECICR 10 -22 -4405 HLM'N RCS 10 -37 -6075 INECRNATICN SYSTEMS 20 -37 -6075 INR3WA 'ION SYSTEMS 10 -07 -6075 LABCRATCRY 20 -07 -6075 LABORATORY 10 -07 -6110 10 -06 -6652 10 -00 -0415 10 -00 -0416 20 -00 -6360 20 -01 -6200 LABORATORY OPERATICNS GaTERAL GENERAL & AIIMINISIRAATICN COAL & AEMINISIRATICN INEERSRCIND REPAIR 10 -39 -4820 FINANCE 20 -39 -4820 FTNANCE Description LCIZ TERM DISABILITY, LrIICN LGI3 TERM DISABILITY, INICN LEM TERM DISP,BILTIY UNION Cheat Tbtal: CCNIRACILAL SERVICES CONTRACTUAL SERVICE'S Check Tbtal: SAFETY SAFETY SAFELY SAFETY De • a• 12 Eft • 2 RENT PHYSICALS PHYSICALS /FHYSICkLS Check Tbtal: Check Tbtal: BICEELID DISPCSAL CCSIS Check Tbtal: DIESEL INVE Check Tbtal: PROPANE Check Tbtal: TRAVEG/MMIIMS/ECUJCATICN Check Tbtal: OFFICE SUPPLIES OFFICE SUPPLIES Check Tbtal: An -cunt Check # 'Type 7.51 7.51 1,428.88 1,443.90 00062916 MW 624.50 624.50 1,249.00 00062917 NW 83.71 83.71 131.21 131.21 429.84 00062918 MAI 402.00 402.00 00062919 NW 3,080.16 3,080.16 00062920 NW 6,963.95 7,324.99 14,288.94 00062921 NW 55.38 55.38 00062922 MW 350.00 350.00 00062923 MAT 33.33 33.31 66.64 00062924 M' South Tahoe P.U.D. 04/26/06 PAY M ENT O F C L A I M S R E P O R T 04/542006-N04/2006 CE 3 MD, APR 26, 2006, 10:00 AM --rag: ( ffI-- -1er3: GL JL - -loc: C7STIE-- - -jcb: 360105 #3.033 - -- -wog: 09 <1.07 >-- report Id: DefPn ilt Selectiaz: Check Stock ID: AP ; Check Types: NW,HW,RV,VH Vendor Narre Accra nt # Deuertnent CWEA 10 -04 -6250 HEAVY NAINDINANZE CALIF WATER RESCURCES CIRL ED 10 -06 -6250 MME'S C S CAROLLO ENGINEERS 10 -29 -8238 ENS 20 -29 -7055 EN IN R:1Z CHERNAGO, BRIAN 10 -07 -6200 LABS 3IRY 20 -07 -6200 LABORNTORY aNIE, 'IHCMAS CAS (S<TT INSURANCE, J & C CREEK ENVJMNENIAL TARS 10 -19 -6200 ECIARD OF DDS 20 -19 -6200 BOARD OF DIRECIURS 20 -22 -4405 HIM AN RESCIRCES DIRECIU 10 -22 -4405 }DM RESCURCES 10 -29 -6250 EL3INEE2IlNU 20 -29 -6250 EN 20 -07 -6110 LABS CRCESPOINIE PAR RS LLC 20 -27 -4405 DISTRICT INFORNATTCN 10 -27 -4405 DISTRICT INETTCN Descripticn L SS/N BPS /CERTIFTC ATI Check 'Lbta1: I M S PS /C 1 rIFTC4TI E ES PSADMITICATI Clerk 'Ibta1: Z =0.'1 1 SNP SIN MY RENER MIN Cock 'Ibtal : TRAW//CN Check 'Ibta1: TRA 1�S/ TCN TRA Check Tbbt Ch ta1: C:NIRACIUAL SERVICES CCNIRACIUAL SERVICES Ck Tbtal: E PS /CERTIFTC ATI �! S'EIIPS /C TIFICATI Check Tbtal: NENTICRILZ Check Tbta1: CCNIRACILAL CCNIRALTUAL SERVI� Check Tbtal: Pntunt (lack # Type 200.00 200.00 00062925 MW 530.00 170.00 700.00 00062926 M7 2,508.00 8,127.50 10,635.50 00062927 M4 51.28 51.28 102.56 00062928 MW 13.35 13.35 26.70 00062929 MW 30.80 30.80 61.60 00062930 MN 156.50 156.50 313.00 00062931 Ma 1,985.00 1,985.00 00062932 MI 2,750.00 2,750.00 5,500.00 00062933 MAI South Tahce P.U.D. 04/26/06 PAYMENT OF CLAIMS REPORT 04/21/2006-05/04/2006 , a 4 WED, APR 26, 2006, 10:00 AM - -1eq: C�,ROLrN -- -leg: GL JL- -lo : CNSIIE-- - -dab: 360105 #J033--- -grog: 09 <1.07 > - -art id: Default Selection: Check Stock ID: AP ; Check Types: NW, HW, RV, VH Vend= Narre Aooamt # DepartnEnt DATW SERVICES CQZP EEL NARKEI'IM L P DIAZ, ANILNIO I DICK'S FULLER - DICNEK CQZP E N S RESU RA S INC E -FI T ,TA'IE .QCRP EL DCRADO CCUNIY 20 -22 -6079 RUTIN RESOURCES DIRECIU 10 -22 -6079 MAW R 10 -37 -4840 II RCN SYSIEAS 20 -37 -4840 ICF'PiTICN SYST AS 10 -01 -6200 IIEUND REPAIR. 10 -04 -6051 HEAVY MINIENANCE 20 -07 -4760 LABOIZAT:R( 10 -07 -4760 LABORATORY 10 -27 -4405 DISTRICT INIFCM0ATICN 20 -27 -4405 DISTRICT 1NPO MATICN 10 -37 -4840 INFOWATICITSYS1EMS 20 -37 -4840 INRIMTICNSTSIEMS 20 -01 -6650 LEEERGROUND REPAIR REMURCES AS90 10 -07 -4760 LAECRATORY 20 -07 -4760 LABORATORY ENVIRCNMENIAL SYSTEMS RBI 10 -28 -6051 DI IVtND VALLEY RANCH Description SAFELY PR: CRAMS SAFETY PROGRAMS Check Tbtal: ETSTRICTCOMMINZEUPPLIES DISTRICTOaMPUMRSUPPLIES Check Tbtal: TRAY VE UMICN Check Tbta1: PUMP STAZZQNS Check Tbtal: LAB:RAT:RC SUPPLIES LAB:RAICRY SUPPLIES Check Tbtal: CCNIRACIU L SERVICES CQNIRPcR L SERVICi�Sk Tbtal: DISIRICT CCMRJIER SUPPLIES DISIRICT C / UTFR SUPPLIES Check Tbtal: OPERATIM PERMITS Check Tbtal: LABORATORY SUPPLIES LABORATORY SUPPLIES Check Tbtal: PUT SIATIQM Amt Check # Type 477.75 477.75 955.50 00062934 NW 2,150.81 2,150.85. 4,301.66 00062935 NW 116.59 116.59 00062936 M4 39.72 39.72 00062937 M' 580.16 562.99 1,143.15 00062938 M4 3,343.07 6,686.15 00062939 MAI 195.32 195.36 390.68 00062940 Md 136.00 136.00 00062941 NW 57.10 28.00 85.10 00062942 NW 442.96 S uth Tat-re P.U.D. 04/26/06 PAYMENT O F CLAIMS R E P O R T 04/21/2006-05/04/2006 a� ea�5 WED, .APR. 26, 2006, 10:00 AM -- : CAROL N -- -leg: GL 3L--loc: � -- - -jcb: 360105 #J033 - - -Wig• 09 <1.07 >- -fit id: C RE E Iefault Selecticaz: Check Stack ID: AP ; Check Types: NW, i4W, RV, VH Vend= Nane Accc nt # Department FAMILY ENTER RISES FECEX FREIGHT WEST FISHER RI3SEARCH LAB INC ME, WILLIAM G C S SERVICE INC G FOA G F S CHEMICAL G L I IINIERNAT'ICNAL - HACH OD 10 -27 -6620 20 -27 -6620 10 -00 -4810 20 -00 -4810 20 -07 -4760 10 -07 -4760 10 -37 -6200 20 -37 -6200 DISTRICT INECEMICN DISTRICT INTECEMITCN GENERAL Sc ALM NISIRATICN GENERAL & ALMINISIRATICN IB ICAT MECIRM4TICN SYSTEMS INFORMUICN SYSIEIE 10 -07 -6025 LABCPA1U Y 20 -07 -6025 LAS 10 -39 -4830 FINANCE 20 -39 -4830 FINANCE 10 -07 -4760 20 -07 -4760 10 -07 -4760 20 -07 -4760 IABZRATOFff LAY B RAT LABMICRY LAB:RAI -MY Descripticn Check Ibtal: RELIC RELATIONS EXPENSE RELIC RECA'ITCLIS MIME 'Ibtal: Check Check Ibtal: LAI:MA SUPPLIES IABCIRATCRY SUPPLIES Check 'Ibtal : ZRP, LLP,BC�2ERYRy E Check 'Ibtal: SUESCRIPTICNS S«9CRIPITCINS DOME Check Ibtal: LABCRATORY SUPPLIES LABMATCRY SUPPLIES Check Zbtal: IABCRATCRY SUPPLIES LAB IRATORY SUPPLIES Check Total : Arrant Check # Type 442.96 00062943 NW 207.50 207.50 415.00 00062944 NW 59.07 59.07 118.14 00062945 NW 464.32 390.95 855.27 00062946 NW 18.00 18.00 36.00 00062947 M1 127.00 117.98 244.98 00062948 NW 27.50 27.50 55.00 00062949 MAI 66.97 32.85 99.82 00062950 NW 163.63 143:63 307.26 00062951 NW South Tahoe P.U.D. 04/26/06 PAYMENT OF CLAIMS REPORT 04/21 2006 - 05/04/2006 WED, APR 26, 2006, 10:00 AM -- : CAROUN- - -1eg: GL 3L - -loc: CNSIaE - -- -jab: 360105 4J033 - - - -p og: 09 <1.07 > - -sort id: Default Selection: Check Stack ID: AP ; Check Types: MW, HW, RV, VH Vencbr Name Account # LppartmEnt COAL DATA SPECIALIST'S GRAIN3ER. INC, W. W. GRAY, SANDY S GROVE MAUS'EN =UM= HASL R FIIEAL SERVICES TT r IICC i SEIM 13U.SINESS SYSTEMS INFO= SCREEN= SERVICES =MATE SAFETY & SUPPLY J &L PRO KLEENINC 10 -03 -6051 ELECTRICAL SFDP 10 -00 -0425 CAL & ALMINISIRATICN 20 -38 -6200 10 -38 -6200 10 -02 -8631 20 -29 -8401 10 -38 -5020 20 -38 -5020 20 -21 -6030 10 -21 -6030 10 -22 -6670 20 -22 -6670 10 -00 -0421 10 -00 -0425 10 -39 -6074 20 -39 -6074 CISICNER SERVICE PIMPS End NEERfl WSSIcIVER SERVICE AIIMIDNISIPATICN ALNBNISIRATTCN HUNAN RE HLNAN RESC1RCES DIRECICR ORAL & A MI ISIRATICN GENERAL & ALM NISIRATICN FINANCE FINANCE Description RNNP STAI'IQ S Check Ibta1: SAFETY SUPPLIES � . 1171 " Check Zb -il UPPER TRKE PS UPGRADE C EIt1 ER SERVICE C ENIER Check Tbta1: CCNIRACTS SERVICE Check Thal: PERSONNEL EXPENSE PERSONNEL EXPENSE Check Total : SHOP SUPPLY INVENTORY SAFETY SURUES INVENTORY Check Total: JANITORIAL SERVICES Check Total: Amtxmt Check # 'Type 75.00 75.00 00062952 M 122.65 122.65 00062953 M7 32.00 32.00 64.00 00062954 MW 846.00 4,124.00 4,970.00 00062955 !W 122.57 122.57 245.14 00062956 MW 148.40 148.41 296.81 00062957 MW 54.40 54.40 108.80 00062958 MW 345.74 891.71 1,237.45 00062959 MW 1,473.50 1,473.50 2,947.00 00062960 MW South Tahoe P.U.D. 04/26/06 PAYMENT OF CLAIMS REPORT 04/21/2006-05/04/2006 7 WED, AM. 26, 2006, 10:00 AM - -1 : C .SST -- -leg: GL JL- -lo : C NST1E - -- -dab: 360105 #J033-- - -pmg: CK509 <1.07 > - -repart id: C Default Selection: Check Stock ID: AP ; Check Types: MV, I-A RV, VH Verr2or Nacre Acaxnt # Departrrent JOB'S PEAK PRIMARY @RE 20 -01 -6075 10 -02 -6075 20 -02 -6075 10 -04 -6075 10 -06 -6075 10 -07 -6075 20 -07 -6075 � REPAIR PLIAPS HEAVY MAINIENANCE OPERATICIZ IA• ECRATCRY KENNEDY /3B iF S CONSULTANTS INC 10 -29 -8572 E 13 KL INE CD, SIEVEN L LAKESIDE NAPA 10 -37 -6075 INECEMATICN SYSTEMS 20 -37 -6075 IlTTCN SYSIFNS 10 -04 -6075 HEAVY MAINTENANCE 10 -05 -6071 10 -07 -4790 20 -07 -4790 20 -05 -6071 LIVE WIRE MEDIA PARTNERS 20 -27 -6660 M S C INDUSIRIAL SUPPLY OD 10 -04 -6071 10 -04 -6051 M X LOGIC INC 20 -37 -4405 10 -37 -4405 a• 1• ;� REPAIR LABMATCRY ELUIPVENT REPAIR DISIRICT IIICN • V NAINIEINANZE IN• FORMATICN SYSIE S Description SAFETY SAFETY SAFELY SAFEIY SAFELY SAFELY • 18 • ,a • IC PIPELINE, SAFEIY SAFELY P PHYSICALS PHYSICALS PHYSICALS PHCALS SIC /PHYSICALS Check Tbta1: Check Ibtal: z• • a PHYSICALS m• PHYSICALS mei • ID /PHYSICALS Check Tbtal: SHOP SUPPLIES C SUPPLIES OIHER SUPPLIES alDP SUPPLIES Check Tbtal: ViDiTFR CCNSERVATTCN EKPENSE Check Tbtal: SRDP SUPPLIES POMP SMICNS Check Tbtal: CC7NIRAGTLIAL SERVICES SERVIICIC Tbtal: Anna nt C he ck # Type 105.00 52.50 52.50 210.00 105.00 52.50 52.50 630.00 00062998 NW 7,236.15 7,236.15 00062961 NW 87.00 87.00 235.00 409.00 00062962 M4 33.81 33.81 33.81 33.82 135.25 00062963 M4 336.00 336.00 00062964 MW 665.67 14.32 679.99 00062965 NW 85.67 85.68 171.35 00062966 Mi South Tahoe P.U.D. 04/26/06 PAYMENT OF CLAIMS REPORT 04/21/2006-05/04/2006 CKPac� 8 WED, APR 26, 2006, 10:00 AM - -req: CPJL2T-- - -1eg: GL Q�151'1E-- - -jdb: 360105 #J033---- prang: 09 <1.0 >-- report id: REE tC Default Selection: Check Stock ID: AP ; Check Types: NW,IW,RV,VH Vend= Nacre Acc c nt # repertuent MDIRSHALL, REK B M2 DCNALD, MICHELE My FARLANE, RIICtIak ND N S11 R CARR SUPPLY CD NC IVR, PHIL MENIDO A, MkTII-3EW MJ.ICR INTRIMTICN SYSIEIVE Orr10E MAX - A EOISE OD. P D M SIEEL POWERS, TERENCE H 10 -38 -6200 QE'ICNER SERVICE 20 -38 -6200 CUSTOMER SERVICE 10 -37 -6200 1NFORMATICNSYSTEMS 20 -37 -6200 INPORANTICN SYM S 10 -39 -6200 FINANCE 20 -39 -6200 FINANCE 20 -02 -6071 PUMPS 10 -02 -6071 PUMPS 20 -01 -6200 INEERGROUND REPAIR 10 -29 -6200 ENGIl P]N3 20 -29 -6200 ENGINEERMI3 10 -05 -6071 EQUIPMENT REPAIR 10 -21 -4820 PENENISTRATIM 20 -21 -4820 ALNENIS RATTCN 10 -04 -6071 HEAVY M NIE 10 -07 -6200 LABORATORY Descripticn Check Total: 'IRA Total: SEDP SUPPLIES 0-DP SUPPLIES RCN CN Check Total: Check Total: TRAUFL/MEET N /E TAITCN Check Total: TRAM /ID CN Crack Total: SE-DP SUPPLIES Check Total: OFFTCE SUPPLIES OFFTCE SUPPLIES Check Total: SEDP SUPPLIES Check Total: TRAVEL/MEF TIN S/E ltATTCN Amcumt Check # Type 32.00 32.00 64.00 00062967 M' 14.00 14.00 28.00 00062968 NW 80.00 80.00 160.00 00062969 NW 813.10 508.56 1,321.66 00062972 NW 126.00 126.00 00062973 MTV 81.09 81.09 162.18 00062974 NW 377.13 377.13 00062975 WI 146.25 29.82 176.07 00062976 NW 123.22 123.22 00062977 Ma 129.16 South Tahoe P.U.D. 04/26/06 PAYMENT OF CLAIMS REPORT 04/21/2006-05/04/2006 YID, APR. 26, 2006, 10:00 AM - -rag: CAR . N---1eg: C4, JL - -1cC: C Si n-- - -jcb: 360105 143033--- -pttg: OK509 <1.07 > - -repert id: Default Selecticn: Check Stock ID: AP ; Check Tines: NW,BW,RV,VH Vendor Nacre A mrit # repartirent pfo LEE RADIO SEAM INC 20 -29 -8401 EN INEE fl 3 S BC 20 -00 -6320 ORAL & AIIMENTISIRAT'ICN 10 -00 -6320 COAL & ALM NISIRATICN 20 -07 -6200 LABORATORY 10 -21 -6621 ALNEINISIRATICN 20 -21 -6621 Atrv1INIS RATION 10 -01 -6012 UNDERMINE) REPAIR SBC /MCI 10 -00 -6310 20 -00 -6310 10 -02 -6310 20 -02 -6310 10 -06 -6310 10 -37 -6310 20 -37 -6310 10 -39 -6310 20 -39 -6310 COAL & AI NIINISIRATICN GENERAL & PEDENISIRATICN PUMPS PUMPS O RCN SYSTEMS INFOR\RTICNI SYSTEMS FINANCE FINANCE SIETvPJ E EDGY & AUIC TICK 10 -02 -8631 PUMPS SIERRA CHEMICAL CD 10 -06 -4755 OPERATIONS Descripticn TRA /EU]CTICN Check Tbtal: INCENTIVE & R13:031\IITICN PRZR INCENTIVE & RIMOGNI .'ICN PR SR. Check Tbtal: MILE ETXIAMENT Tbtal: Check CLEIU E RR SERVICE CENTER Check Tbtal: SIGI\AL CHARGES Cif Check Tbtal.: TELEPHONE TELEPHONE TELEPHONE TELEPHONE TELEPHONE TELEPHONE E TELEPHONE NE TELEPHONE TELEPHONE Check Ibtal: UPPER TRIG PS UPGRADE Check Tbtal: HYPOMICRTIE Check Tbtal.: a At c n t Check # 1e 129.14 258.30 00062978 NW 00062979 M✓1 32.31 32.31 00062980 MW 00062981 NW 00062908 NW 86.41 86.41 172.82 526,038.30 526,038.30 32.02 96.06 128.08 7.18 7.17 20.66 20.66 21.54 82.19 82.18 7.03 7.03 255.64 2,172.91 2,172.91 4,368.39 4,368.39 00062982 NW 00062983 MTV 00062984 NW South Tahoe P.U.D. 04/26/06 PAYMENT OF CLAIMS REPORT 04/21/2006-0504/2006 P 1100 WED, APR 26, 2006, 10:00 AM - -req: C LYDT -- -lei: GL JL - -loo: CNSI1 - -- -job: 360105 #J033--- -prog: 09 <1.07 >-- report id: befau1 t Selection: Check Stock ID: AP ; Check Types: Mni, HW, RV, VH Vendor Narre Account # DepartmEnt SIERRA SIERRA FC CAHI r , LABO ATORY SIERRA NEVAt 7 C IASSIF ID2S SIERRA PACIFIC PCWER SIMS PCNP VALUE cD INc SMITH DESIGN CtJP SMITH, GREG SOUIHIAEST C14S SIANIB2 CCNSULTIEZ Il 2 TRPA TRPA 20 -07 -6110 LAB32 " cRY 20 -07 -6110 LAB AICEU 10 -22 -4930 %iNAN RESOURCES 20 -22 -4930 MAW RESaIRCES DIRECICR 10 -00 -6330 CAL Sc AEMINISIRATTCN 20 -00 -6330 CORAL & AEMENISTRATICN 10 -02 -7514 RMPS 20 -29 -8401 E NEERIM 10 -06 -6250 OPERATTCNS 10 -00 -6350 GENERAL & ALMENISIRATICN 20 -00 -6350 GENERAL & AEMENISTRATICN 20 -29 -8401 ENSINEERIM 20 -29 -7047 ENGINEERIM 20 -00 -1510 COAL & P v NISIRATICN Descripticn NENTIORING (deck Tbtal: NENIIC IM Check Tbtal: AIS� N7IT� Check Tbtal: Check 'Total: IDS T E , TR MK PS PCNP #2 Check Tbtal: QE'ILNER SERVICE CENIFR Check Tbtal: CUES BPS /CERIZFICATI Check 'Total: NATURAL C76 NATURAL CgiS Check Tbtal: C EICMER SERVICE CENIER Check Total: LAND, PAYVIEW WELL Check Ibtal: IRPA SEEIJR IY DEPOSIT Amxuit Check # Type 646.00 646.00 00062985 M4 293.00 293.00 00062986 Mn1 409.74 409.74 819.48 00062987 M' 73,733.64 22,996.55 96,730.19 00062988 NW 4,435.08 4,435.08 00062989 MV 13,839.07 13,839.07 00062990 NW 90.00 90.00 00062991 MAT 197.82 184.45 382.27 00062992 NW 2,930.15 2,930.15 00062993 NW 3,720.00 3,720.00 00062905 NW 40,000.00 V� AP Tahoe , P.U.D. 10 :00 PM --re06 C YPAYMENT 1:C 1JL-- o QNsCLAIMS i — jab 360105 #J033-- - -pnmg 04/21/2006-05/04/2006 C E509061.07 > --r r rt id: CKRECSPC Default Selecticn: Check Stock ID: AP ; Check Types: Ma, BW, RV, VH Ve ±u Naire Acoa_mt # DEpartmEnt TRPA TAPLE Filth GCNIRCL MICE MMNIAIN NEM THER D EUECIICN map 'IREE:7ITCH, =RES L USARIREOM USBAl�<: VWRTICN 20 -29 -7049 ENGINSDRUS 20 -29 -8574 End 10 -02 -6075 FIVES 20 -02 -6075 MAPS 20 -27 -6660 10 -07 -6025 20 -07 -6025 10 -07 -6200 20 -07 -6200 10 -01 -6055 20 -29 -8401 20 -07 -4760 10 -07 -4760 DISTRICT INPORtilATICN LATKPIATCRY IABCPATC Y LA LABCRATCRY t[ ID REPAIR LAABCRAICRY Descripticn Check 'Ibtal : WATERLINE, BAYVIEW Check Tbtal: Vendor Tbtal: WELL, BAYVIEW SAFETY SAFETY 2• 1• 2• 1• 2 Check 'Ibtal : PHYSICALS glaidYStICALS TIER C ISERVATICN EXPENSE Check Tbtal: macIAECM Check Tbtal: TRAaCN Check Tbtal: nmTRATIC & INFILW k Check Tbtal: QSIt1 ER SERVICE C E I ER. Check Tbtal: IAEMATCRY SUPPLIES Check Tbtal: Iitwnt Check # Type 40,000.00 00062906 Ma 1,094.00 1,094.00 00062994 NW 44,814.00 56.34 56.34 00062995 NW 525.19 525.18 1,050.37 00062996 NW 250.00 250.00 00062997 NW 99.48 84.47 183.95 00062999 Mg 5.00 5.00 10.00 00063000 Mg 2,059.22 2,059.22 00063001 MA 58,448.70 58,448.70 00063002 Ma 30.73 24.18 54.91 00063003 Ma South Tahoe P.U.D. 04/26/06 PAYMENT O F CLAIMS R E P O R T 04/21/2006- 05/04/2006 id: WED, APR 26, 2006, 10:00 AM - -reg: C �YN -- -- leg: GL 3L- -loc: CNSi E - -- -fob: 360105 #J033- - - -fig: 09 <1.07 > -- Default Selection: Check Stock ID: AP ; Check Types: NW,HW,RV,VH Vencbr Nacre Aocc nt # Departrrent VERIZIN WALLACE, P MANE WEIXO INC 6T NEVALA SUPPLY Y MEDICAL INC 10 -28 -6310 DID VALLEY RANCH 20 -19 -6200 B FD OF DIRECICRS 10 -02 -8631 AMPS 20 -03 -6050 ELECTRICAL SDP 20 -38 -6045 20 -01 -6052 10 -01 -6075 20 -01 -6075 10 -02 -6075 20 -02 -6075 10 -04 -6075 10 -05 -6075 20 -05 -6075 10 -06 -6075 10 -07 -6075 20 -07 -6075 10 -39 -6075 20 -39 -6075 CUSICNER L[ REPS alCERSRaND REPAIR UNCERGRCCND REPAIR AMPS REPS HEAVYFNE 01 • 10 REPAIR. CNS 0• LA RAac1 LABCRATCRY FTNANCE FINANCE ]scriptim =ENE Check Tbtal : TRAVEL/ ETINGS /ED CAT'ICN Check Tbtal: UPPER TRKE PS UPGRADE ViE T S Check Tbtal: WATER MEiIFRS PIPE, ODVERS, & FAUDI ES Check Tbtal : SAFELY SAFETY SA Y SAFE SAFELY DUTI SAFELY DWI SAFETY SAFELY SAFETY SAFETY • /PHYSICALS EN A�NI` /PHYSICALS PHYSICALS PHYSICALS PHYSICALS PHYSICALS PHYSCALS PHYSICALS PHYSICALS PHYSICALS PHYSCALS /HHYSION S Check Total: Grand Tbtal: Ar►umt Check # Type 185.05 185.05 00063004 NW 62.30 62.30 00063005 rq 1,380.96 67.82 1,448.78 00063006 NW 464.39 7.17 471.56 00063007 NW 14.66 14.65 19.10 19.09 48.86 18.86 18.85 135.78 15.60 15.59 32.65 32.65 386.34 00063008 NW 846,010.61 South Tahoe Public Utility District General Manager Richard H. SolbHg OJ?eccors Tom ¢omt~ James R. Jones Mary Lou Mosbacher Duan~ Wallac~ Eric 5chafer 1275 Meadow Crest Drive · South Lake Tahoe · CA 96150-7401 Phone 530 544-6474, Fax 530 541-0614, www. Stpud. us BOARD AGENDA ITEM 14a TO: Board of Directors FROM: Rhonda McFarlane, Chief Financial Officer Richard Solbrig, General Manager MEETING DATE: May 4, 2006 ITEM - PROJECT: Real Estate Negotiations REQUESTED BOARD ACTION: Direct negotiators. DISCUSSION: Pursuant to Section 54956.8 of the California Government Code, Closed Session may be held to discuss real estate negotiations. Negotiating Parties: Board Ad Hoc Committee, General Manager, Assistant General Manager/Engineer, Chief Financial Officer, Under Negotiation: Terms and Price Property Identification: Lukins Water Company, 2031 West Way, South Lake Tahoe, CA 96150 SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES CHIEF FINANCIAL OFFICER: YES NO NO CATEGORY: Water -85- South Tahoe Public Utility District General Manager IRichard H. Solbrig Directors "rom Comte James P~ Jones Ma~ Lou Mosl~acher Duane Wallace Eric $chafer 1275 Meadow Crest Drive · South Lake Tahoe · CA 96150-7401 Phone 530 544-6474, Fax 530 541-0614, wwW. stpud, us BOARD AGENDA ITEM 14b TO: FROM: MEETING DATE: Board of Directors RiChard H. Solbrig, General Manager May 4, 2006 ITEM - PROJECT: Conference with Legal Counsel- Existing Litigation REQUESTED BOARD ACTION: Direct staff. DISCUSSION: Pursuant to Section 54956.9(a) of the California Government Code, Closed Session may be held for conference with legal counsel regarding existing litigation: Beth Jeff, Kendall Pearce, and Pearce Family Trust dated 1-20-88 vs. South Tahoe Public Utility District, Cox & Cox Construction, Inc., a California Corporation, Nimbus Engineers, a Nevada Corporation and Does 1-100, inclusive, Civil Action No. PC 20050567, Superior Court, County of El Dorado, State of California. SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: CONCURRENCE WITH REQUESTED ACTION: GE.ER^, M^.^GER: YES CHIEF FINANCIAL OFFICER: YES '~YY'~-.- NO NO CATEGORY: Sewer -8?- South Tahoe Public Utility District General Manager Richard H. $olbdg Directors Tom Com~ James I~ Jones Mary Lou Mosbache~ Puane Wallace EHc 9chafer 1275 Meadow Crest Drive · South Lake Tahoe, CA 96150-7401 Phone 530 544-6474, Fax 530 541-0614, www. stpud.us BOARD AGENDA ITEM 14c TO: Board of Directors FROM: Richard H. Solbrig, General Manager Gary Kvistad, Legal Counsel MEETING DATE: May 4, 2006 ITEM - PROJECT: Conference with Legal Counsel- Existing Litigation REQUESTED BOARD ACTION: Direct staff. DISCUSSION: Pursuant to Section 54956.9(a) of the California Government Code, Closed Session may be held for conference with legal counsel regarding existing litigation: STPUD vs. 1442.92 Acres of Land in Alpine County, California; United States District Court for the Eastern District of Ca., Sacramento Division, Case No. CIV S-02- 0238 MCE JFM. SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES CHIEF FINANCIAL OFFICER: YES NO NO CATEGORY: Sewer South Tahoe PUbliC Utility l istrict General Manager Richard H. $olbrig D~recr. ors Tom Comte James P~ Jones Mary Lou Mosbacher Puane Wallace Eric 5chafer 1275 Meadow Crest Drive, South Lake Tahoe, CA 96150-7401 Phone 530 544-6474, Fax 530 541-0614, www. stpud.us BOARD AGENDA ITEM 14d TO: Board of Directors FROM: Richard H. Solbrig, General Manager MEETING DATE: May 4, 2006 ITEM - PROJECT: Conference with Legal Counsel- Existing Litigation REQUESTED BOARD ACTION: Direct staff. DISCUSSION: Pursuant to Section 54956.9(a) of the California Government Code, Closed Session may be held for conference with legal counsel regarding existing litigation: Meyers Landfill Site - United States of America vs. El Dorado County and City of South Lake Tahoe and Third Party Defendants, Civil Action No. S-01-1520 LKK GGH, United States District Court for the Eastern District of California. SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES /~1[ .d~ OFFICER: YES ~'~'~ CHIEF FINANCIAL NO NO CATEGORY: Sewer -91' South Tahoe Public Utility District General Manager I~ichard H. Solbrig Tom Comt~ James R. Jones Mary Lou Mosl~acher Duane Wallace Eric ~chafer 1275 Meadow Crest Drive · South Lake Tahoe · CA 96150-7401 Phone 530 544-6474 · Fax 530 541-0614 · www. stpud.us BOARD AGENDA ITEM 14e TO: Board of Directors FROM: Richard Solbrig, General Manager, Paul Sciuto, Assistant General Manager/Engineer MEETING DATE: May 4, 2006 ITEM - PROJECT: Conference with Legal Counsel - Anticipated Litigation (two cases) REQUESTED BOARD ACTION: Direct legal counsel. DISCUSSION: Pursuant to Section 54956.9(b) of the California Government Code, Closed Session may be held for conference with legal counsel regarding anticipation of litigation. SCHEDULE: COSTS: ACCOUNT NO: BUDGETED AMOUNT REMAINING: ATTACHMENTS: CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES /~.~ NO CHIEF FINANCIAL oFFICER: YES '~)~f~c.. NO CATEGORY: -93-