Loading...
Resolution 2781-04 - \., 1 RESOLUTION NO. 2781-04 2 A RESOLUTION DECLARING INTENTION TO REIMBURSE 3 EXPENDITURES FROM THE PROCEEDS OF OBLIGATIONS TO BE ISSUED BY THE SOUTH TAHOE PUBLIC UTILITY DISTRICT 4 5 RESOLVED, by the Board of Directors of the South Tahoe Public Utility District 6 (the "District"): 7 WHEREAS, the District proposes to undertake the project referenced below, to 8 issue or cause to be issued bonds or certificates of participation (in either case, the 9 "Obligations") for such project, and to use a portion of the proceeds of such Obligations 10 to reimburse expenditures made for the project prior to the issuance of the Obligations; 11 WHEREAS, United States Income Tax Regulations section 1.150-2 provides 12 generally that proceeds of tax-exempt obligations are not deemed to be expended when 13 such proceeds are used for reimbursement of expenditures made prior to the date of 14 issuance of such obligations unless certain procedures are followed, one of which is a '-' 15 requirement that (with certain exceptions), prior to the payment of any such expenditure, 16 the issuer declares an intention to reimburse such expenditure; and 17 WHEREAS, it is in the public interest and for the public benefit that the District 18 declares its official intent to reimburse the expenditures referenced herein. 19 NOW, THEREFORE, it is hereby DECLARED and ORDERED, as follows: 20 1. The District intends to issue the Obligations or cause the Obligations to be 21 issued for the purpose of paying the costs of acquiring and constructing capital 22 improvements to its sewer collection and treatment system, as more particularly 23 described in Exhibit A (the "Project"). 24 2.The District hereby declares that it reasonably expects (i) to pay a portion of 25 the costs of the Project prior to the date of issuance of the Obligations, and (ii) to use a 26 portion of the proceeds of the Obligations for reimbursement of expenditures for the 27 Project that are paid before the date of issuance of the Obligations. 28 3. The principal amount of the Obligations not to exceed $15 million. \" 29 /1/111/11//1/111/ 30 11/11/11/11//1/1 4w \., 1 2 3 Resolution No. 2781-04 Page 2 We, the undersigned, do hereby certify that the above and foregoing resolution 4 was duly and regularly adopted and passed by the Board of Directors of the South 5 Tahoe Public Utility District at a regular meeting duly held on the 5th day of February, 2004, by the following vote: 6 7 8 9 10 11 12 13 14 15 16 Directors Schafer, Jones, Comte, Mosbacher None AYES: NOES: ABSENT: Director Wallace ". / k,~~ I iJ mes R. Jones, oard President outh Tahoe lic Utility District ATTEST: 17 18 ~ --t/. ~ ~--s.l-x>. Aa#J ~Shar , 'Ierk of the Bo . d and 19 Ex-officio Secretary to the Board of Directors 20 21 22 23 24 25 26 27 28 \., 29 30 -2- ~ Exhibit A Sewer Infrastructure Projects Collection System Improvements Crossing 89th & 5th St Wildwood Interceptor Planning Documents Alpine Co. Master Plan Collection System Master Plan WWTP Future Connections Pump Station Improvements AI Tahoe VFD Beecher PS Wet Well Upgrades FLL Pumps & Motors Gardner Mountain Pump Station Generator Set USFS Generator Sets Generator Trout Creek Johnson Generator Set LPPS Motor Rebuild LPPS Vegetation Security Measures Tahoe Keys Motor Rcondition, VFDs, Miltronic Telemetry USFS Trout Creek PS Pumps, Motors, VFD Indian Creek TMDL Indian Creek Riparian Habitat \., Recycled Water System Improveml AC Projects B-Line Ditch Meters Fencing Diamond Valley Ranch Sand Traps Dressler Ditch Snowshoe Thompson Phase I Upper Dressler Ditch Treatment Plant Improvements Aeration Basin Alarm Blower Bldg VFD Control Panels Fencing WWTP Final Pump Flock Basin Bypass Fuel Tank Generator Lower Shop Groundwater Nitrate Sentinel Wells Hypochlorite Conversion Propane Tank Primary Covers SCADA Sludge Handling Facility Sludge Storage Tank WAS Pump WEIR Washer ~ In-House Engineering