Loading...
AP 10-17-02SOUTH TAHOE PUBLIC UTILITY DISTRICT "Basic Services for a Complex World" REGULAR BOARD MEETING AGENDA Thursday, October 17, 2002 2:00 P.M. City Council Chambers 1900 Lake Tahoe Boulevard, South Lake Tahoe, California Robert Duane Wallace, President Cathie Becket, Director w BOARD MEMBERS James R. Jones, Vice President Mary Lou Mosbacher, Director Eric W. Schafer, Director CALL TO ORDER REGULAR MEETING - PLEDGE OF ALLEGIANCE COMMENTS FROM THE AUDIENCE (Short non-agenda items that ara within the subject matter jurisdiction of the District. Five minute limit. No action will be taken.) CORRECTIONS TO THE AGENDA OR CONSENT CALENDAR ADOPTION OF CONSENT CALENDAR (Any item can be discussed and considerad separately upon raquest.) CONSENT ITEMS BROUGHT FORWARD FOR ACTION / DISCUSSION ITEMS FOR BOARD ACTION a. Lake Tahoe Restoration Act: Stormwater Study (Ivo Bergsohn) REQUESTED BOARD ACTION Approve Proposal from Swanson Hydrology & Geomorphology, in the Amount of $300,000 (Half of All Project Expenditures Shall be Reimbursed to the District Under Lake Tahoe Erosion Controls Grant No. 02-DG-11051900-036, Hydrocarbon Evaluation) REGULAR BOARD MEETING AGENDA - OCTOBER 17, 2002 PAGE - 2 B-Line Phase 3 Export Pipeline Replacement Project (Richard Solbrig) Approve Technical Advisory Committee Consultant Contracts 2003 Board Calendar (Director Schafer) (1) Cancel the First Regular Meeting in January; and (2) Cancel the December 31 Regular Meeting Payment of Claims Approve Payment in the Amount of $2,033,865.68 BOARD MEMBER COMMITTEE REPORTS a. Executive Committee (Wallace / Jones) b. Finance Committee (Wallace / Schafer) c. Water & Wastewater Operations Committee (Jones / Becker) d. Planning Committee (Mosbacher / Schafer) BOARD MEMBER AD HOC COMMITTEE REPORTS a. Legislative Ad Hoc Committee (Wallace / Jones) EL DORADO COUNTY WATER AGENCY PURVEYOR REPRESENTATIVES REPORT t0. 11. 12. BOARD MEMBER REPORTS GENERAL MANAGER/STAFF REPORTS NOTICE OFPASTANDFUTURE MEETINGS/EVENTS Past Meetin.qs I Events 10/09/02 - El Dorado County Water Agency Regular Board Meeting 10/10 -11/02 - Special District Administration Seminar 10/10 - 11/02 - B-Line Technical Advisory Committee Meetings Future Meetinqs / Events 10/09/02 - 10:00 A.M. - El Dorado County Water Agency Board Meeting 10/09/02 - 5:00 P.M.- Lahontan Regular Board Meeting at Lahontan Office, then at 7:00 P.M. Lahontan Meeting Reconvenes at City Council Chambers 10/10/02 - 8:30 A.M.- Lahontan Meeting Continued at City Council Chambers 10/14/02 - 4:00 P.M.- Operations Committee Meeting at District Office 10/15/02 - 9:00 A.M.- Alpine County Board of Supervisors Regular Meeting in Markleeville 10/15/02 - 6:00 P.M.- City of SLT Regular Council Meeting at City Council Chambers 10/16/02 - 8:00 A.M. - Tentative ECC (Employee Communications Committee) at District Office - Note: This meeting is tentative only. If it is held, Director Schafer will be the Board Representative. 10/17/02 - 2:00 P.M. - STPUD Regular Board Meeting at City Council Chambers 10/28/02 - 1:00 P.M. -Alpine County Contract Commission Meeting in Markleeville REGULAR BOARD MEETING AGENDA - OCTOBER t7, 2002 PAGE - 3 13. CLOSED SESSION Pursuant to Government Code Section 54956.9(a) Conference with Legal Counsel- Existing Litigation: STPUD v. John Breese Mumford, et. al. El Dorado County Superior Court Case No. SC20020030 Pursuant to Government Code Section 54956.9(a)/Conference with Legal Counsel- Existing Litiqation: F. Heise Land & Live Stock Company vs. STPUD and Does 1 through 10, Inclusive; Alpine County Superior Court Case No. Ct8644 Pursuant to Government Code Section 54956.9(a)/Conference with Legal Counsel- Existing Litigation: STPUD vs. F. Heise Land & Live Stock Company Inc., William Weaver, Eddie R. Snyder, Crockett Enterprises, Inc. CIV. S-02-0238 MLS JFM United States District Court for the Eastern District of Califomia, Sacramento, CA Pursuant to Government Code Section 54956.9(a)/Conference with Legal Counsel- Existing Litigation re: Meyers Landfill Site: United States of America vs. El Dorado County and City of South Lake Tahoe and Third Party Defendants, Civil Action No. S-01-1520 LKK GGH, United States District Court for the Eastem 14. 15. District of California Pursuant to Government Code Section 54956.9(a)/Conference with Legal Counsel- Existing Litigation: STPUD vs. Lakeside Park Association, et al, County of El Dorado, Superior Court Case No. SC20010165 ACTION I REPORT ON ITEMS DISCUSSED DURING CLOSED SESSION ADJOURNMENT (To the next regular meeting, November 7, 2002, 2:00 p.m.) The South Tahoe Public Utility District Board of Directors regularly meets the fimt and third Thursday of each month. A complete agenda packet, including all backup information is available for review at the District office during the hours of 8:00 a.m. - 5:00 p.m. Monday through Friday. Items on this agenda are numbered for identification purposes only and will not necessarily be considered in the order in which they appear on the agenda. Designated times are for particular items only. Public hearings will not be called to order prior to the time specified. Participation is encouraged. Public comments on items appearing on the agenda will be taken at the same time the agenda items are heard; comments should be brief and directed to specifics of the item being considered. Comments on items not on the agenda can be heard during "Comments from the Audience;' however, action cannot be taken on items not included on agenda, Please provide the Clerk of the Board with a copy of all written matedal presented at the meeting. south Tahoe Public Utility District · 1275 Meadow Crest Drive, South Lal(e Tahoe, CA 96150 · Phone 530.544.6474 * Facsimile 530.541.0614 SOUTH TAHOE PUBLIC UTILITY DISTRICT BOARD AGENDA ITEM TO: BOARD OF DIRECTORS FR: Ivo Berqsohn, Hydro-Geo O.Clist RE: BOARD MEETING October 17, 2002 AGENDA ITEM: ACTION ITEM NO: a. CONSENT CALENDAR ITEM NO: ITEM-PROJECT NAME: LAKE TAHOE RESTORATION ACT - STORMWATER STUDY REQUESTED BOARD ACTION: Approve proposal from Swanson Hydrolo.qy & Geomorpholo,qy, in the amount of $300,000 (half of all proiect expenditures shall be reimbursed to the District under Lake Tahoe Erosion Controls Grant No. 02-DG-11051900-036, Hydrocarbon Evaluation) DISCUSSION: In January 2002, District staff were notified that $500,000 in matchin.q qrant funds were available, throu.qh the Lake Tahoe Restoration Act (LTRA), to the District and the Tahoe Re.qional Plannin(~ A~ency (TRPA) to develop and produce a plan for the prevention and cleanup of hydrocarbon contamination of the surface water and .qroundwater of the Lake Tahoe Basin. In order to meet this directive, TRPA and District staff identified several issues for further study. District staff believes that an assessment of the potential impact of urban and h .qhway runoff on groundwater quality needs to be completed, since the infiltration of collected stormwater throu.qh detention basins is a widely used best mana,qement practice in the Lake Tahoe Basin. The uses of these stormwater treatment and disposal systems are expected to increase and may provide a means for contaminatin,q .qroundwater. In order to perform this study, District staff formed a Technical Review Team (TRT) composed of members of the TRPA, City of South Lake Tahoe, Tahoe Research Group and the Re,qional Water Quality Control Board and developed an initial request for proposal (RFP) to address this issue. This RFP was solicited to more than ten (10) consultants and seven (7) consultants submitted proposals for consideration. Based on the careful review and evaluation of the submitted proposals, the TRT and District staff recommend, that the Board select Swanson Hydrolo,qy & Geomorpholo.qy to perform the Stormwater Study. SCHEDULE: To be completed by October 15, 2004. COSTS: $300,000 (estimated) ACCOUNT NO: 2002-4405 BUDGETED AMOUNT REMAINING: $511,256 ATTACHMENTS Letter ro osal from Nicole Beck to I. Ber sohn dated October 4 2002. CONCURRENCE WITH REQUESTED ACTION: CATEGORY: GENERAL MANAGER: YES~.?' NO GENERAL ! CHIEF FINANCIAL OFFICER: YE~"~ ~-~.j~...,~O WATER X SEWER Swanson Hydrology & Geomorphology 115 Limekiln Street Santa Cruz, C~Tornia USA 95060 phone 831-427-0288 / fax 427-0472 / erm~il: : becl~slrat~sontJ2o, corn October 7, 2002 VIA EMAIL: ibero-sobn~stpud.dst.ca.us Ivo Bergsohn, Hydro-Geologist South Tahoe Public Utility District 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Re: LTRA Stormwater Study Dear Ivo: Swanson Hydrology and our consultant team are pleased to have been selected to submit a modified proposed scope for the above project. While we are sort3' to hear that the scope of the project has been substantially refined, we believe that our initial approach to identify the role detentions play in stormwater fate and transport can still be implemented. We would like to remind you of the strengths this team brings to the project: Swanson Hydrology has demonstrated the ability to conduct and manage a variety of successful environmental improvement projects within the Lake Tahoe Basin. Through many of our local projects we have developed a strong working relationship with the City of South Lake Tahoe. As project manager, I will apply by my expe~lise of water sampling and analytical techniques to design and implement an innovative monitoring project that is focused on understanding the impact erosion control projects may have on the quality of the shallow groundwater resources within the Lake Tahoe Basin. The success of this project will undoubtedly be dependant upon the ability to collect reliable surface water and groundwater samples during the array of runoff events that occur in the Tahoe area. Excellent local field personnel are committed to this project. Both RaffTownsend and Troy Alexander are knowledgeable and well-respected field technicians who will conduct all of the necessary storm sampling. Weber Hayes and Associates (WHA) has conducted hundreds of groundwater investigations over the last 14 years which have focused primarily on the characterization and cleanup of chemical releases in the subsurface, witb clients ranging fi'om lin'ge Fortune 500 finns to public and regulatory agencies. WHA has expertise in defining the interactions between surface water and groundwater in a variety of geologic conditions, aquifer testing, percolation testing, recharge basin design, and hydrocarbon transport evaluatiou. WHA bas extensive experience with the design, installation and monitoring of groundwater investigations, aquifer mapping, and groundwater basin evaluations. Their personnel include talented and experienced hydrogeologists and environmental engineers with extensive experience designing and implementing MtBE assessments and remediation projects. WHA will provide the state of the art detailed groundwater investigation techniques necessary to make this project a success, in addition to training the local field personnel on all aspects of lysimeter and monitoring well sampling to ensure the collection of quality storra sample data. Hydrology / Restoraffon Engineering / Water Resource 3lanagemenr / Construction Plantffs~g & Superxqsion Swanson Hydrology & GeomorphoIo~' Page 2 SCOPE OF WORK Primary Goal The primatT goal of this project is to determine ifstormwater loads are inadvei~tently impacting shallow groundwater via erosion control projects. Tasks Task J. Detention basin selection The purpose of Task I will be to select no more than three existing deteutioa basins for the detailed three- dimensional analysis in order to address the above goal. Given monetary constraints and the associated costs necessm7 to adequately focus our project to obtain the primary goal, we feel that this project should be based on the detailed investigation of two (2) basins. The detention basin selection will be based on the review of any and all existing data provided by the Technical Review Team (TRT) and any additional data collected by the consultant team relevant to the proper selection of the detention basins to satisfy the goal of this project. Information that will be reviewed may include, but is not limited to, existing bore log data, soils reports, detention basin construction designs, groundwater flow maps, previous water quality data collected from both surface and groundwater, water supply well data, etc. Given the revised scope of this project, ~ve propose to conduct a scaled back version of the initial Phase I project. Rather than the originally proposed source identification GIS analysis of the entire South Lake Tahoe Basin (Task IA pg. 15), the GIS analysis data collection will be driven by the location of the detention basins. The additional information included in the GIS map layers will include, but is not limited to, the location of the District water supply wells, previously reported leaking nnderground storage tanks, general groundwater flow directions, existing stormwater monitoring projects, location of existing monitoring wells and lysimeters, etc. Based on this information, any detention basins that are identified for potential inclusion in the study will be subjected to simple field observations. Qualitative data collection will include a simple delineation of the detention basins' watershed, an identification of the potential land use hydrocarbon sources within the ~vatershed, and a review of any subsurface information relevant to the detention basins. Approximate basin geometry and si~nple infiltration measurements will be conducted to estimate the relative hydraulic residence time for each basin. We believe the following opportunities and constraints of selecting specific detention basins must be considered. At least one of the selected detention basins should not exist in a location such that any hydrocarbon pollution detected in the subsurface beneath the basin can be the result of a previously identified leaking underground storage tank. The separation of a known subsurface contaminant source will improve our interpretation of the data collection efforts for the goals of this project. Sites should be selected based on the relative anticipated hydrocarbon stormwater loading. Investigation of a site xvith a relatively low signal of hydrocarbon pollution introduced to the basin will make our assessment difficult. Because of the limitation of the number of sites that can be thoroughly investigated, we propose to select sites that are anticipated to be the 'worst-case scenarios'. All efforts will be made to include detention basins with pre-existing stormwater and/or groundwater sampling equipment to allow collaboration of monitoring efforts, decrease equipment purchasing and installation costs, and provide additioual information and data that could be used to further our understanding of these systems. Hydrology./Restoratlon t;~gineerin=o- / llTa ter Resource :~lana~enlent / Construction PlannJn~ & SupemJsion Sxvanson Hydrology & Geomorphology Page 3 The detention basins that are selected should have different physical characteristics, such as permeability rates, soil and subsurface composition, and thus hydraulic residence times to provide comparable hydrocarbon fate and traaspo:~t dynamics given these key physical characteristics of the basins. While the product of Task I will not be as compreheusive as the initially proposed GIS spatial analysis, these efforts will provide invaluable information to help target the basins that will provide the most valuable data for the needs of this project. In addition, these eflbrts will provide a framework for future G1S efforts to delineate stormwater hydrocarbon and other pollutant source characterizations that could potentially be completed by the District or other agencies in the future. TASK I PRODUCT: Folloxving the consultant's data review and GIS spatial analysis, the consultant team will produce the results of the GiS map layers and a recommended DrcO Sctmplh~g Plan for the selected detention basins. Based on the conditious and existing equipment installed at each of the sites, the exact details of the future sampling and instrumentation needs can then be identified. The Saint)ling Pla~ will include the location of the detention basins selected, the type of existing or planned stormwater and groundwater sampling instrulnentation available at the selected site, recommended additional instrumentation for installation and ali of the details of upcoming monitoring efforts. The Samplb~gPla~ will include a minimum number of seasoaaI events that will be sampled, the specific techniques that will be used for groundwater and unsaturated zone sampling, the timing of the groundwater sampling relative to the stormwater runoffevents, the timing of soil sample collections and analyses for hydrocarbon constituents, the timing and details of potential tracer experiments and/or one time pilot studies (such as vertical sampling for pemhlorate or dye tracer experiments to determine surface water/groundwater connections via the detention basins), and any other data collection details that are proposed to be conducted on the selected detention basins. Task lL Stormn,ater Characterizatio~ The seasonal variation of hydrocarbon stormwater characterizations and loads will be assessed for each of the basins included in the groundwater investigation. Each site should be equipped with autmnated stormwater sampling units at the inlet and outlet to ensure quantitative assessment of stormwater volnmes into and out of the basin. If pre-existing equipmeut is not installed, efforts will be made to locate Sigma automated sampling units owned by other local agencies (City of South Lake Tahoe, El Dorado County Transportation District, TRNA, etc) that are currently available to borrow for this project. Augmentation of the Sigma units may be possible to allow flow-weighted samples to be properly collected for hydrocarbon analyses. Flow-weighted sampling will be coupled with grab sample efforts to ensure load estimates for the array of runoff events (rain on snow, snow melt, and first flush rain events). At the very least, two influent and one effluent sample will be collected, with the goal of capturing three of each of the storm event types over the course of the project. Due to the limited existing information on the stormwater pollutant characterization within tile Tahoe Basin, a small additional sampling effort will be conducted to provide a more representative dataset. Based on the land use characterization of the selected detention basins, additional stormwater sampling efforts will be conducted at additional sites. Over the course of the project, an effort will be made to sample at least one event from each runoff type fi'om commercial, residential, industrial, highway, parking lot and recreational snow mobile m'eas, with a total water sample collection for hydrocarbon analysis not to exceed 30 samples. The additional stormwater effm't will focus on both potential hydrocarbon constitueuts and any other pollntants contained in stormwater that may be used as tracers as a result of their physical transpm'c characteristics to address our primary goal. The details of the Stormwater Characterizatiou will be finalized in the Samplb~g Plan snbmitted in Task I. With relatively little effort and expense, this data will provide the initial information on the potential hydrocarbon constituents and relative land use distribution contained in stormwater runoffwithin tile South Lake Tahoe Area. I-ij-drolog? / Restoration l~nffineering / Water Resource ~llana~ement / Construction Planning & Supert~sion Swanson Hydrology & Gcomorphology Page 4 A fuel scan for the Total Extractable Petroleuln Hydrocarbons and Total Volatile Petroleum Hydrocarbons ~vill be conducted on the initial samples collected for the stormwater characterization to give a full suite of the chromatographic curves present in local stormwater. Giveu the results of the initial scans, subsequent analyses will be reduced to focus on the hydrocarbon constituents potentially impacting groundwater. Based on the results of the first few storm events, the analytical needs can be reduced to focus on the primaw pollutants identified in the stormwater loads and in particular those having higher potential to readily transpmX to sm'face. We anticipate th~.t future analyses may consist of MtBE, BTEX and TPH-gasoline, some TPH-extractables and possibly percblorate, substantially reducing per smnple analytical costs. TASK II PRODUCT: The data collection and analysis to be completed for Task Il will allow, I) quantification the seasonal and annual hydrocarbon pollutant loads both entering and exiting tile selected detention basins via surface water, and 2) a preliminary assesslneut of the primary hydrocarbons and other pollutants contained in the stormwater runoff that have a high likelibood of impacting groundwater resources from an an'ay of potential land use sources within South Lake Tahoe. Task Ilk Detailed Grozmd~vater bn,estigation A detailed groundwater investigation will be conducted on each of the detention basins selected in Task I. The primaly purpose of the groundwater investigation will be to develop seasonal vertical profiles in the saturated zone of the primary hydrocarbon constituents and other potential pollutants identified in the stormwater characterization. The following data collection efforts may be conducted at each of the basins selected. The specific details of each of the detention basin investigations will be determined collectively with the consultant team and the TRT and presented in the Sampl&g £lan (Task I). As stated above, the consnltants believe that limiting the groundwater study to 2 detention basins will allow a more thorough understanding of the impact erosion control projects may have on the beneficial uses of the South Lake Tahoe groundwater resources. · Determine physical dimensions, design characteristics and any existing subsurface stratigraphic information for each basin. Seasonal influent and effluent hydrocarbon loads will be characterized as part of Task II. Seasonal mass balance calculations will be conducted to determine the relative loss of hydrocarbon loads in surface water and thus retained within the detention basin. Determination of the physical soil characteristics of the surface and subsurface stratigraphy including porosity, soil composition, bulk density, organic cm'bon content, depth to groundwater, and other factors that will allow calculations of potential fate and trausport rates for the variety of hydrocarbon constituents of concern. If this information does not already exist for the site, soil samples will be collected during any well and/or lysimeter installation and submitted to laboratory, for analyses. Routinely sample an existing shallow groundxvater monitoring well(s) upgradient of the detention basin to constrain background hydrocm'bon levels. If monitoring xvells are not currently located upgradient, a monitoring well will be installed. Routinely sample existing shallow grouudwater monitoring well(s) downgradient to evaluate the potential impact of the detention basin on tile groundwater hydrocarbon concentratious. If mouitoring wells are not currently located downgradient, two monitoring well will be installed. l-Iydrology / Restoration ]~gineering / IVater Resource ~¥Ianagcment / Construction Planning & Supenqsion Swanson Hydrology & Gcomorphology Page 5 Depth to groundwater, hydraulic head and tile subsurface soil characteristics ,,viii be used to estimate groundwater flow directions and rates in the saturated zone within the vicinity of the subject detention basins. If the selected basins are not already properly equipped with lysimeters, a set will be installed at 5 ft intervals in order to sample at discrete depth increments in the unsaturated zone between the bottom of the detention basin and the top of the groundwater table. The lysimeter sampling will be conducted following the loading of the detention basins with a stormwater runoff event in order to potentially tract tile vertical migration of hydrocarbon constituents in the vadose zone. An initial tracer experiment will be conducted to quantify vertical transport rates through the unsaturated zone using a conservative, non-toxic tracer such as bromide. First, bromide will be applied to water introduced to each of the basins and then a time-series of water samples will be colIected from each of the lysimeters and subsequently analyzed for bromide. This data will produce caIculations of the relative mobility of a variety of hydrocarbon constituents, using the physical composition of the soils and the pollutants relative retardation characteristics. The application of simple water sample collection devices fi'om the unsaturated zone will be explored. For example, a modification of pore water diffusion samplers (peepers)~ could be created and installed vertically in the surface sediments (top 2 ft of the detention basins) to collect vertically distributed water samples. Pore water diffusion samplers are polyethylene rectangular structures approximately 2 inches thick, 6 inches wide and a variety of lengths, and contain a number of verticaI compartments for sample collection, via diffusion. The fi'ont of the peepers is covered with a semi-permeable membrane that allows diffusive exchange between the sample compartment and the outside waters, providing representative water samples fi'om discrete depths. Peepers could be installed into the detention basin surface sediments prior to a storm event and left to remain at the site for a number of days, enabling the collection of water samples from vertically discrete locations. This simple and inexpensive technique ~vould provide invaluable information on the vertical distribution of hydrocarbons from the surface waters to a variety of shallow depths in the subsurface. The potential for perchlorate contained in roadway flares could be investigated as a conservative tracer to determine the influence detention basins may have on shallow groundwater. This is a relatively new tracer technique, and information from other studies will be available within a fe~v months. If the technique shows to be promising, we could conduct a surface water and vertical profile groundwater sampling pilot study to determine if perchlorate is present in detention basin influent influenced by local highway runoff. Our instrumentation and sampling capabilities will be available for use to satisfy the needs of other existing monitoring projects at coincidental sites. In particular, many of these sampling techniques could be used for the collection of nutrient samples where applicable. The routine monitoring efforts, physical site characteristics, tracer experiments and any other data collected as part of Task III will be used to determine if erosion control projects have any impact on shallow groundwater quality. The exact details of Task III will be outlined in the Sampl#~g£lan (Task I) following the initial data collection effort, detention basin selection and the meeting between the consultant team and the TRT. i Developed by Jahnke, R.A. 1988. (A simple reliable pore u'ater sampler. Limnology & Ocemtography, v. 33 p. 483-487) and applied by many including RiveraDuane, l and Flegal, AR. 1997. (Porewatergradients anddiJfi~sive benthic fluxes of Co, ,Vi, Cu, Zn, and Cd hi San Francisco Bay. Croatica Chemica Acta. APR, V70(N 1), p. 389-417.) Hj'drolo~ / Resto~atio~ ~gineeri~ / IPhter gesource :lfanagemeat / Construcgoa Plaa~i~g & Super*5sioa Swanson HydroIogy& Gcomorphology Pagc 6 Task l~. Technical Report The findings of this project will be presented in a Technical Report. The Technical Report xvill include any and all graphs, data tables, statistical analyses, pollutant loading calculations, seasonal vertical transpoit rates through the unsaturated zone, analytical results, geologic cross-sections and other valuable information collected and utilized to address the goals and objectives of this project. The results of the stormwater investigation will be to provide a preliminary interpretation on the primary land use's contributing and characterize stormwater pollution for both hydrocarbons and other potential contaminants. Given the available data, an assessment will be made to determine if shallow groundxvater at the selected sites is or has been impacted by the presence of detention basins. Based on the physical differences of the detention basins selected, inferences may be made as to the characteristics of the detention basins that may prevent or limit the connection between surface and shallow ground waters. Schedule Tusk I Time siuce contract execution Estimated Date Task I. Begin Immediately November 2002 Task I. Completion Final Sampling Plan 3 months January 31, 2003 Task II & III Begin Sampling Efforts 3 months February 1, 2003 Task 1I &IlI Completion 21 months Septemberl, 2004 Task IV Draft Technical Report 22.5 months October 15, 2004 Task IV Final Technical Report 24 months December 1,2004 Budget For the project elements described above, the consultant team would complete all of the tasks for a fixed cost orS187,965 as outlined in Table t. The remaining budget orS1 I2,000 will be allocated to the instrumentation, equipment, analytical, and other additional costs. Given the large number of existing stormwater monitoring projects located in South Lake Tahoe, we believe it is safe to assume we can select either the Park Ave Site, Golen and 8t~', or another site that is ah'eady (or soon to be) equipped with the necessary monitoring wells and lysimeters. Therefore, we have allocated the equipment budget to assume the cost to instrmnent one site in its entirety. The cost to conduct the Groundwater Investigation for an existing site will be consulting and analytical costs ($86,000), and for a site where all sampling equipment, including monitoring wells m~d lysimeters would have to be installed would cost approximately $114,000. In reality, we anticipate that the cost per basin will be somewhere in between. See the attached budget for estimated allocation breakdowns. Thank you again for your review and consideratiou of our proposal. We look forward to hearing from you. Sincerely~_. Nicole G. Beck PhD Swanson Hydrology Mitchell Swanson, Swanson Hydrology Joseph Hayes, Weber Hayes and Associates Patrick Hoban, Weber Hayes and Associates ttj,drology / RestoraNon }?n~ineerin~ / IPhter Resource ~lana~ement / Construction Planning & SupenSMon Tasks PROPOSED BUDGET LTRA Stormwater Study, South Lake Tahoe, California Prime Consultant Subcon ran fir SII &G SI/ &G SII &G SII &G Weber Ilaycs Weber [lays Weber Hayes Weber 1 [:ryes Subcontractor Subcontractor 1'r,ocooal Senior Assoc. Senior Assn l'ecbnical :\osisnnl Principal Engineer Ilydrogcalogin Technical Assistant Field I'osom,d Fold I'rrsnnnd 'food labor (Swanson) (neck) (Dworsky) Asseiav /Draping (Hayes) P)rivrn) (I &ban) Field Porsom,rl (Alexander) (Lmnsrm0 Guts Per Task 151190 90.00 90.011 1 6500 1_2500 1415101 9111X1 - 15.10 5000 50.110 Task 1. Dnr01000 Radio Sarrnlon Data and klerllun' collodion anal row,,', Fold visits 0 20 11 20 11 0 20 10 Il 11 53,350 EIS Wrap generation 0 l0 50 r4) 0 0 n n 0 0 50,30) Sampling Ilan Pr,panl ion (Includes drift moranliun, mooting, preparation and auendena- alai finaq 8 -In 0 20 In 1u 20 u u 0 0111,20 'Task 1. Total 8 70 50 100 I0 10 40 11) 0 0 524,850 Task 11. 1°mrnvtrr (,,o in,od,ou Sturnnv0er monitoring of selected &Ionia In mains Il 0 Il 10 0 Il 0 0 80 F0 58.650 SOmcr nnmiang of sites 0 0 0 0 II 0 0 -l0 10 mmn ,n 51,000 Data manlpuiatiu11 ;memo lion anti prui,Y 1 management 15 10) 0 00 20 0 W 220 11 11 510,8511 Task II. Total 15 80 90 20 0 20 20 120 120 532,5011 Task 111. LmnurMvhr lncoblo0on She preparation and manncnann {og,lipmenl design, vuly tenmin :11 i,stallatlrn 0 -III 11 0 10 20 LI An -III An 511.050 hold Sampling 0 2(1 0 21 16 0 -10 411 2200 2)0) 5111,51,5 I)am manipulation, interpretation, and pmirtl mvugtment 30 240 I 200 40 -10 101 -lu 0 0 559,110) Task 111. Total 30 300 221 66 60 180 120 2-10 240 5106,015 Task IV. 'Trrhuio,/ [upon Technical kopun Propitiation (melon, O dn0 prop n, nursing preparation and ama,dn :a' and final) 20 80 10 -1 2 20 60 211 $21.6101 'ISmk IV. Total 20 80 10 40 0 20 0 0 0 20 60 20 0 0 5 24,600 '1'0m personnel hours 73 Issti,n:um1 Additional Cosa Err) vM,mn Well and I.ysi meter Installation Maximum estimate u, install 3 30'.40' monitoring molls in unconsolidated material to cumnrain ono dcuntion basin site 513100 >Gait nno estimate to equip one dcunlum basin site with .1 to 6 lysinnacts 515,000 Stormwmer Sampling and misc,llmcn,, equipment oasis 52,010 Total Equipment Budget 5311,0181 Analytical Budget Analytical linlpeI per basin (includes ...nb¢e and grunedwater alulyse)J Additional analytical Wends fur surmaaIerd0naenoatu,n Total Analytical Budget 533,100.x1 5.1,100 5711,11011 /tdnimnvrirc m,tr (,Sumn,ou IIrrk ILyon Notion-6m Afi/a ca and r (84-00 run i) 55,01X) 52,000 5510X) Total Additional Gnats $112,000 530 60 451 116 90 300 170 3611 360 'lima[ Consultant Few 5187,965 Ad,fi line al Costs 5112,0011 TOTAL 13lIDGET $299,965 TO: FR: RE: ACTION ITEM NO: SOUTH TAHOE PUBLIC UTILITY DISTRICT BOARD AGENDA ITEM BOARD OF DIRECTORS Richard Solbrig, Assistant Manager/Engineer BOARD MEETING October 17, 2002 AGENDA ITEM: b. CONSENT CALENDAR ITEM NO: ITEM-PROJECT NAME: B-LINE PHASE 3 EXPORT PIPELINE REPLACEMENT PROJECT REQUESTED BOARD ACTION: Approve Technical Advisory Committee consultant contracts DISCUSSION: In order to complete the Draft EIR/EIS for the project, a risk analysis of the various alternatives is required. In response to this requirement, and at the suqgestion of TRPA, the District assembled a Technical Advisory Committee (TAC), similar to what was done in 1994 at the start of the export pipeline project. Along with District staff and the proiect managers from Parsons and Carollo, the followin.q experts have been assembled: John Calmer - Civil/Mechanical En.qineer, for pipeline designs Charles Hoes - Safety Engineer, for risk analysis methodology Jon Corley - Construction Superintendent, for construction risks/methods John List - P.E., for surge analysis Each of the above consultants will be working under a not to exceed $7,000 contract (John List is already a subconsultant to Carollo Engineers). The total cost to the District, including Parsons and Carollo staff (working under existin.q contracts) and expenses is estimated at $40,000. The risk analysis tables produced by the TAC will be included in the revised EIR/EIS. SCHEDULE: TAC meetin.q conducted Oct. 10 &l 1; report included in EIR/EIS by end of Oct. COSTS: $40,000 ACCOUNT NO: 9098-8828-BLNIII BUDGETED AMOUNT REMAINING: $1,846,051 ATTACHMENTS: Task Orders CO.CUR.E.CE WIT. REQUESTED/ CT,O.; GENERAL MANAGER: YES ,h'~ff_7.~/,~- NO CHIEF FINANCIAL OFFICER: CATEGORY: GENERAL WATER SEWER X JON CORLEY TASK ORDER NO. 1 CONSULTING SERVICES This Agreement is made and entered into as of the __ day of October, 2002 by and between South Tahoe Public Utility District, hereinafter referred to as "DISTRICT" and Jon Corley, hereinafter referred to as "CONSULTANT". I. PURPOSE The purpose of this Task Order is to perform alternative analysis and risk assessment for the B Line Phase 3 Export Pipeline Replacement Project. 2. SCOPE OF WORK The scope of work for these Consulting services is to participate in a Technical Advisory Committee (TAC) convened in South Lake Tahoe for the purpose of reviewing, evaluating and assessing the relative risks of the various alternatives for the project. 3. STAFFING Staffing will consist ofJon Corley, Project Manager. CONSULTANT shall not change staffing without approval by DISTRICT. Any changes shall provide for equivalent qualifications as far as possible and practical. 4. DISTRICT RESPONSIBILITIES DISTRICT agrees that its officers and employees will cooperate with CONSULTANT in the performance of services under this Task Order and will provide information on alternative routes under study; background plans for the site and the routes; and other background data as deemed relevant by the TAC. 5. TIME OF PERFORMANCE Tasks will commence under the direction of the General Manager until formal approval by Board on October 17, 2002, and end with the completion of the Risk Analysis, to be incorporated in the Administrative Draft Environmental Impact Report for the project. It is expected that work will be completed under this Task Order No. 1 by the end of October, 2002. 6. PAYMENT Payment to CONSULTANT for services performed under this Task Order shall be at an hourly rate of $100 per hour, and total payment shall not exceed the amount of Seven Thousand Dollars ($7,000.00) unless the scope of work is changed and an increase is authorized by DISTRICT. 7. LABOR CODE REOUIREMENTS All State of California prevailing wage laws must be complied with in the performance of work related to this Task Order. These include, but are not limited to, Labor Code Sections 1720 throug[~ 1860. 8. EFFECTIVE DATE This Task Order Not I will become effective upon execution by both parties and shall serve as a Notice to Proceed upon execution by District. IN WITNESS WHEREOF, this Agreement is executed by the General Manager and Clerk of the Board of the South Tahoe Public Utility District, and CONSULTANT has caused this Agreement to be executed the day and year first above written. Robert G. Baer, General Manager/Engineer October 1 7, 2002 Board Approval Date Attest Kathy Sharp, Clerk of Board Jon Corley, Project Manager 2 JOHN CALMER, PE TASK ORDER NO. 1 ENGINEER]NG SERVICES This Agreement is made and entered into as of the __ day of October, 2002 by and between South Tahoe Public Utility District, hereinafter referred to as "DISTRICT" and Joim Calmer, PE, hereinafter referred to as "ENGINEER". In consideration of the mutual promises, covep, ants, and conditions as addressed in the Master Agreement dated October__., 2002, and as specifically hereinafter set forth, the parties do hereby agree as follows: I. PURPOSE The purpose of this Task Order is to perform akernative analysis and risk assessment for the B L]ne Phase 3 Export Pipeline Replacement Project. 2. SCOPE OF WORK The scope of work for these Engineering services is to participate in a Technical Advisory Committee (TAC) conve~ed in South Lake Tahoe for the purpose of reviewing, evaluating and assessing the re!afire risks of the various alternatives for the project. 3. STAFFING Staffing will consist of John Calmer. ENGINEER shall not change staffing without approval by DISTRICT. Any changes shall provide for equivalent qualifications as far as possible and practical. 4. DISTRICT RESPONSIBILITIES DISTRICT agrees that its officers and employees will cooperate with ENGINEER in the performance of services under this Task Order and will provide information on alternative routes under study; background plans for the site and the routes; and other background data as deemed relevant by the TAC. 5. TIME OF PERFORMANCE Tasks will commence under the direction of the General Manager until formal approval by Board on October 17, 2002, and end with the completion of the Risk Analysis, to be incorporated in the Administrative Draft Environmental impact Report for the project. It is expected that work will be completed under this Task Order No. 1 by the end of October, 2002. 6. PAYMENT Payment to ENGINEER for services performed under this Task Order shall be as provided in Article tV of the 10/ /02 Master Agreement and shall not exceed the amount of Seven Thousand Dollars ($7,000.00) unless tt3e scope of work is changed and an increase is authorized by DISTRICT. 7. INSURANCE COVERAGE ENGINEER's Errors & Omissions coverage shall be $t,000,000 aggregate with a deductible of not more than $100,000 for the duration of this Task Order. 8. LABOR CODE REOUIREMENTS All State of California prevailing wage laws must be complied with in the performa~ce of work related to this Task Order. Yhese include, but are not limited to, Labor Code Sections 1720 through 1860. 9. EFFECTIVE DATE This Task Order No. 1 will become effective upon execution by both parties and shall serve as a Notice to Proceed upon execution by District. IN WITNESS WHEREOF, this Agreement is executed by the General Manager and Clerk of the Board of the South Tahoe Public Utility District, and ENGINEER has caused this Agreement to be executed the day and year first above written. Robert G. Baer, General Manager/Engineer October 17, 2002 Board Approval Date Attest Kathy Sharp, Clerk of Board John Calmer, PE License No. C Expiration Date 2 HOES ENG]NEiER]NG, INC. TASK ORDER NO. 1 ENGINEERING SERVICES This Agreement is made and entered into as of the __ day of October, 2002 by and between South Tahoe Public Utility District, hereinafter referred to as "DISTRICT" and Hoes Engineering, Inc., hereinafter referred to as "ENGINEER". I. PURPOSE The purpose of this Task Order is to perform alternative analysis and risk assessment for the B Line Phase 3 Export Pipeline Replacement Project. 2. SCOPE OF WORK The scope of work for these Engineering services is to participate in a Technical Advisory Committee (TAC) convened in South Lake Tahoe for the purpose of reviewing, evaluating and assessing the relative risks of the various alternatives for the project. 3. STAFFING Staffing will consist of Charles Hoes, Principal and Senior Safety Engineer. ENGINEER shall not change staffing without approval by DISTRICT. Any changes shall provide for equivalent qualifications as far as possible and practical. 4. DISTRICT RESPONSIBILITIES DISTRICT agrees that its officers and employees will cooperate with ENGINEER in the performance of services under this Task Order and will provide information on alternative routes under study; background plans for the site and the routes; and other background data as deemed relevant by the TAC. 5. TIME OF PERFORMANCE Tasks will commence under the direction of the General Manager until formal approval by Board on October 17, 2002, and end with the completion of the Risk Analysis, to be incorporated in the Administrative Draft Environmental Impact Report for the project. It is expected that work will be completed under this Task Order No. 1 by the end of October, 2002. PAYMENT Payment to ENGINEER for services performed under this Task Order shall be as provided in Hoes Engineering, Inc. Fee Schedule, Invoices and Conditions, dated January 1, 2002. Hourly rate is set at $130 per hour, and total payment shall not exceed the amount of Seven Thousand Dollars ($7,000.00) unless the scope of work is changed and an increase is authorized by DISTRICT. INSURANCE COVERAGE ENGINEER's Errors & Omissions coverage shall be $1,000,000 aggregate with a deductible of not more than $100,000 for the duration of this Task Order. LABOR CODE REQUIREMENTS All State of California prevailing wage laws must be complied with in the performance of work related to this Task Order. These include, but are not limited to, Labor Code Sections 1720 through 1860. 9. EFFECTIVE DATE This Task Order No. 1 will become effective upon execution by both parties and shall serve as a Notice to Proceed upon execution by District. IN WITNESS WHEREOF, this Agreement is executed by the Genera] Manager and Clerk of the Board of the South Tahoe Public Utility District, and ENGINEER has caused this Agreement to be executed the day and year first above written. Robert G. Baer, General Manager/Engineer October 17, 2002 Board Approval Date Attest Kathy Sharp, Clerk of Board HOES ENGINEERING, INC. By: Charles P. Hoes, Principal and Senior Safety Engineer License No. SF-3280 Expiration Date: TO: FR: SOUTH TAHOE PUBLIC UTILITY DISTRICT BOARD AGENDA ITEM BOARD OF DIRECTORS Eric Schafer, Director RE: BOARD MEETING October 17, 2002 AGENDA ITEM:__ ACTION ITEM NO: ¢. CONSENT CALENDAR ITEM NO: ITEM-PROJECT NAME: 2003 BOARD CALENDAR REQUESTED BOARD ACTION: (1) Cancel the first regular meeting in January; and (2) Cancel the December 31 re.qular meetin.q. DISCUSSION: The attached celendar indicates the proposed regular Board meeting schedule for 2003. The January 2 Board meeting is one day after the New Year's Day holiday. I suggest that meeting be cancelled so holiday plans can be made without interruptions, and conduct only one regular meeting on January 16. January 1,2004 is the first Thursday of the month, and is also New Year's Day, which is a District holiday. Ordinance 457 provides "that if any regular Board meeting days fall upon a legal holiday, then said meetings, #'deemed necessary, shall be held at the same time on a day to be determined by the Board." The Clerk of the Board tentatively rescheduled that meetin.q to be held on the business day prior to the holiday, which falls on Wednesday, December 31,2002. I sug.qest that since that meetin.q is so close to the holiday, that it too be cancelled, and conduct only one regular meeting on January 15, 2004. it is anticipated that any significant business could be placed on agenda either before or after the holidays; if it is a matter of approving Payment of Claims, we should devise an alternative procedure, such as delegating that item for that period to a Committee. SCHEDULE: COSTS: BUDGETED AMOUNT REMAINING: ATTACHMENTS: 2003 Calendar ACCOUNTNO: CONCURRENCE WITH REQUESTED ACTION: CATEGORY: GENERAL MANAGER: /'~¢ YES NO GENERAL. X CHIEF FINANCIAL OFFICER.'-~YES NO WATER ~ I~.~,~ c~. ,c~*,~ ,~(~-"vY~, ~'~ ~-~,~ SEWER JANUARY T W APRIL SMTWT F S FEBRUARY- S M T W T F S 1 2 345~6178 9 10 11 ~ 1~ 14 15 16 ~ 18 19 ;~u] 21 22 23 24 25 26 27 28 MAY S M T W T F S ITl 2 3 4 5 6 7 ~ 9 10 11 12 13 14{~ff] 16 17 18 19 20 21 ~ 23 24 25 27 28 29 30 31 2003 MARCH W T F S S M T W T $ M T W T F S AUGUST S M T W T F S 1 2 3 4 5 6 ~'7~ 8 9 10 11 12 13 ~ 15 16 17 18 19 20 ~t~ 22 23 24 25 26 27 28 29 30 31 S M S M T W T F S NOVEMBER S M T W T F S 2 3 4 5 ~J 7 8 16 17 18 19i 21 22 23 24 25 26 ~-~ 3O MEETING S M T W T F S =HOLIDAYS (Union & Managers) · = UNION HOLIDAYS = MANAGERS' FLOATING HOLIDAYS = 3 HRS. (FLOATING FOR GOOD FRIDA Y) Action item 6 d. Payment of Claims FOR APPROVAL October 17, 2002 Payroll 10/02/02 Total Payroll 280,615.86 $ 280,615.86 Cost Containment - health care payments IGI Resources - natural gas Bank of New York - loan payment Total Vendor EFT Accounts Payable Checks Sewer Fund Accounts Payable Checks Water Fund Accounts Payable Checks Self-funded Ins Accounts Payable Checks Grant Funds Total Accounts Payable $ 0.00 1,605,031.05 133,595.38 14,122.39 501.00 $ 1,753,249.82 $ 2,033,865.68 Grand To~l Payroll EFTs & Checks 10/02/02 EFT EFT EFT EFT EFT EFT EFT CHK EFT EFT CHK AFLAC Medical & Dependent Care CA Employment Taxes & W/H Federal-Employment Taxes & W/H Hartford Deferred Comp ManuLife Pension ManuLife Pension Loan Payments Orchard Trust Deferred Comp Stationary Engineers Union Dues United Way Contributions Employee Direct Deposits Employee Paychecks Adjustments Sub-total 1,114.38 11,344.36 67,464.02 1,484.99 22,835.82 6,341.47 11,467.28 1,430.04 77.18 128,850.09 28,206.23 0.00 $ 280,615.86 10-Oct-02 Payment of Claims wb3 South Tahoe P.U.D. 10/10/02 PAYMENT O F CLAIMS REPORT 10/04/2002- 10/17/2002 Paces 2 THU, CCT 10, 2002, 10:59 PM - -reg: ECUGL - -1eJ: lam: CZ151'IE ]cb: 259770 #J7305- - -pro3: 09 <1.07 > - -sort id: EC Default Selection: Check Stock ID: AP ; Check Types: NW, HW, RV, VH Verrbr Nam pmt # Departnrent Description An cunt deck # Type ALPINE, COUNTY OF ALSEURY, MARY 10 -28 -6651 ALPINE carry' 10 -37 -6200 INFORMATTCN SYSTEMS 20 -37 -6200 JEFcR4ATICN SYSIENE AMEC EARLE & IlWIRGVEN ,SL INC 20 -29 -8273 ENGINEERING 10 -29 -8235 ENGINEHII3 20 -29 -8157 EN3INEEItINE AMERICAN CHEMICAL SX EIY ARAMARK. U IIRDRM SERVICES ASCIM HASL R I.EASIl AVISTA UiTLSTIES 3 18 H BENEFIT DESIC E B 0 C GASES 10 -07 -6250 LABORATORY 20 -07 -6250 IAB3ATORY 10 -00 -2518 GENRRAL & AU4INISIRATTCN 10 -38 -5020 CUSTOMER SERVICE 20 -38 -5020 C]STCNER SERVICE 10 -00 -6350 GENERAL & ALNItNISIPATZCN 20 -00 -6350 GENERAL & AtMENISIRATTCN 10 -22 -4405 HUMAN RESXKES 20 -22 -4405 HUMAN RESOURCES DIRECTOR 20 -02 -4790 AMPS LAND TAXES CY '}c Total : TRAVEL /MEETIN.;S /FTICN Check Total: WATERLINE, TiN3S ELI HANDL= Ma TANK, GARINT. MIN #1 REPIAC Qmck Total : DJFS/MEMBFRSIIPS- FICATI Check Total : INIFCR7 /RUGS /TCWEL9 PA`EABLB Check Total : EC<XJITNENT RENTAL /TEASE EQUIPMENT RIINIAL� Total : NATURAL CAS NATURAL GA.S Cock Total: O NIRACTU AL SERVICE'S m SERWc Check Total : OTHER SUPPLIES Check Total: 8,201.32 8,201.32 00051377 144 147.45 98.30 245.75 00051378 NW 11,315.00 10,890.00 4,240.00 26,445.00 00051379 NW 73.20 48.80 122.00 00051380 NW 924.32 924.32 00051381 NW 80.92 53.94 134.86 00051382 NW 140.64 88.22 228.86 00051383 NW 750.00 500.00 1,250.00 00051384 NW 663.95 663.95 00051393 NW , S o u t h T a h o e P.U.D. 10/10/02 PAYMENT O F CLAIMS REPORT 10/3N2002-10/17/2002 Facie 3 TI U, OCT 10, 2002, 10:59 PM - -reg: w CAS -- -leg: C1 3L--lcc: CNS17E-- - -jcb: 259770 #J7305- - -prog: 09 <1.07 >-- report id: GCMG Default Selection: ClCk Uerrbr Nave Stork ID: AP ; Check Types: YIN,FF1,RV,VH ACC= # Department Description Amxnt CYtCk # Type B S K ANALYTICAL LABS BAC N CO INC, ELEARD R HAY TOOL & SUPPLY INC BECK & Q1RRID0, ER BERRY -IENCE E'Y =TRIES BIND MATERIALS BLARES HULSE BOARD OF REGENTS PCCE"P\N, MARGIE 20 -29 -8290 ENGINEERING 10 -05 -6011 EQJIAMENT REPAIR 10 -00 -0422 GENERAL & ALNIINISIRATICN 10 -06 -6075 OPERATTQE 10 -04 -6042 HEAVY M'U IIIIltE 10 -00 -0415 COAL & ATNItNISIRATICN 10 -02 -4630 PUMPS 20 -02 -4630 AMPS 10 -00 -0416 GENERAL & AUVIINISIRATICN 20 -01 -6052 UNDERGROUND ND REPAIR 10 -21 -6520 AINENISIPATICN 20 -21 -6520 AU» NISIRATICN 10 -22 -6200 20 -22 -6200 10 -22 -6200 20 -22 -6200 alvAN RESOURCES HAAN RESOURCES DIRECTOR AHOMA-NN DIRBYCIOR mE7aMENr, AR PD WL #3 Check Total• AURMITIVE Check Total : JANITORIAL SUPPLIES INVENICE. Check Ibtal: SAFETY EQUIFTh NT /PHYSICALS Check Total : GROUNDS & MAINTENANCE GASOLINE INVENIORY OIL & & LD&ZUCANI5S DIESEL IIWENiORY Check Total: PIPE, COVERS, & MANHOLES CheCk Ibta1: SUPPLIES SUPPLIES Cneck Total: TfavErasacN TRAUEL /Ecu3 TICK check Ibtal: TTPAUVEL /MEET /Ei7 icti Check Total : 285.00 285.00 00051385 MK 25.63 25.63 00051386 M4 28.90 28.90 00051387 NW 124.00 124.00 00051388 NW 175.61 2,996.09 43.82 43.82 2,074.22 5,333.56 00051389 NW 1,096.53 1,096.53 00051390 NW 70.79 47.19 117.98 00051391 NW 486.00 324.00 810.00 00051392 MST 20.40 13.60 34.00 00051394 NW S o u t h Tahoe P.U.D. 10/10/02 PAYMENT O F CLAIMS REPORT 10/0412002- 10/17/2002 TTJ, OCT 10, 2002, 10:59 PM - -req: DxTEAS- - -leg: GL JL- -lcc: CNSfiE--- -jc:b: 259770 #J7305-- -pro3: 09 <1.07>- -report id: I fault Selection: Check Stcck ID: AP ; Check Types: MW,HW,RV,VH Vendor Nave Acccunt # D I1YbTeI t Description Mount Check # Type BJYLE II INEERIM. CORP CWEA CWEA CALIF RARE) OF E 1T LSTATION 20 -29 -8290 E[ 10 -01 -6200 LNCERGROCIND REPAIR 10 -03 -6250 ELECTRICAL SHOP 20 -01 -6250 UThRBXD REPAIR 10 -04 -6250 HEAVY MAINTENANCE 10 -01 -6200 UNCER2RaND REPAIR 10 -03 -6250 ELECTRICAL SHOP 10 -04 -6250 HEAVY MINTERANCE 10 -39 -6520 FINANCE 20 -39 -6520 FThWSNCE CALIF WATER RESOURCES CTRL ED 10 -02 -6250 REPS CP.LIFORNTIA OVERNIIC E CALLIAN, JER IA FF CANADA LIFE 20 -07 -4810 LABORATCRY 20 -29 -8290 E 3INIEE RING 10 -21 -6200 AY NISIRATICN 20 -21 -6200 AIMI ISIRATTCN 10 -00 -2512 GENERAL & TE IINISIRATTCN 30 -00 -6744 SELF FUNDED INSURANCE TRIIILMENT, ARROWHEAD WL #3 Check Total: IRA 11ES IxIES DUES IRA LIES WEE I:I 1 I: :r `I s :1r'•`I SUPPLIES SUPPLIES PS /CFEITTI= 1 PS /CERTIFICATI 1PS /CERTIFICATI Check Total : PS /CERITFTCATI 1PS /CELIITFICATT Check Total: Verdbr Total : Check Total: LUES /N1ENEERS[ DIPS /CERTIFICATT Check Total: TREATMENT, ARRCHTAD WL #3 Check Total: /Check Total: TRAVEL TRAVEL ID 1 !. ID 1i. LIFE INSURANCE EXCESS INS SR F IMSURFD MED Check Total: 6,485.47 6,485.47 00051395 MW - 880.00 - 184.00 - 67.00 - 92.00 - 1,223.00 00051266 RV 880.00 184.00 92.00 1,156.00 00051396 144 - 67.00 36.00 24.00 60.00 00051397 MCI 90.00 90.00 00051398 NW 11.00 40.00 51.00 00051399 MW 35.05 23.36 58.41 00051400 MW 2,372.05 11,384.47 13,756.52 00051401 NW S o u t h T a h o e P.U.D. 10/10/02 PAYMENT O F CLAIMS REPORT 10 2002- 10/17/2002 5 THU, CST 10, 2002, 10:59 AM --rag: tcU3LAS -- -leg: GL JL - -lcc: CNS11- -- -job: 259770 #J7305- - -pm3: 09 c1.07 > -- report id: PPC Default °electicn: Check Stock ID: AP ; Check Types: MnI,HW,RV,VH Vendor Nacre Account # Department CAPITAL RUBBER CD LTD 10 -04 -6042 HEAVY NAINIE KE CARRICIV, PAUL 20 -05 -6200 EQUIPMENT REPAIR CPR. l'S CY\K OUTLET 20 -39 -8389 FINANCE CHENA30, BRIAN 10 -07 -6200 LAB:RA:DRY 20 -07 -6200 LABORATORY COAST CRANE INC 10 -05 -6011 EQUIPMENT REPAIR COST C NTAIl IT (INCEPTS INC 30 -00 -6741 SELF TUNE D INSURANCE 30 -00 -6742 SELF FUNDED INSURANCE ID & H TRARSPORTATICN INC D VI LABORATORIES DELL NARKEITICI L P DICK'S FULLER - DI(NEC CARP 20 -29 -8264 EN3INE DJ3 20 -07 -6110 LABGRATURY 20 -37 -8391 INFtR'YLTTCN SYSTEMS 10 -02 -6051 RNIPS 10 -07 -4760 LAPiRATORY Description Pasant Check # Tye GRaNDS && ,IIIS ENANCE l • TRAVEL %MEEPIlNC� /ELLS 1TICN C nec k Total : REPLACE DESK (DH) Check Total: TRAVEL /MEETII s /auniICN Check 'Total : AUICM7IIVE Check Total: AEM NISIRATICN FEE PPO FEE Check Total: WELL, CIFNNICOD REERrr r Check Total: MLNTI JRINE Check Total : ECMAIN aNIROI LER Check Tbtal: PLMP STATIONS Check Total: LABORATORY SUPPLIES 18.16 18.16 00051402 76.50 76.50 153.00 00051403 983.33 983.33 00051404 - 75.60 - 50.40 - 126.00 00051276 133.11 133.11 00051405 1,858.92 336.00 2,194.92 450.00 450.00 1,470.00 1,470.00 10,795.81 10,795.81 17.91 17.91 328.18 00051406 00051407 00051408 00051409 00051410 MAI MV M^I RV NW Mid NW Md Ma Nod S o u t h Tahoe P.U.D. 10/10/02 PAYMENT O F CLAIMS REPORT 10/0412002 - 10/17/2002 Paae 6 THU, OTT 10, 2002, 10:59 AM - -rsx: DOUGLAS- --leg: GL JL - -lcc: QEIIE - -- -fob: 259770 #J7305- - -prog: 09 <1.07 >-- rt'pert id: 3KRF SFC Default SPlecticn: Check Suck ID: AP ; Check Types: NW,HW,RV,VH Verxbr Natte Account # Department Description Pmxmt auk # Type DCU:1LAS DISPOSAL E N S RESOURCES II'E EL DORADO COLNIY EL IDRAIYJ CuNIY FISHER SCIENTIFIC FRYE, W71 T TAM 20 -07 -4760 LAR1RATORY 10 -00 -6370 GENERAL & PDtLNISIRAPICN 20 -21 -4405 ALNIINISIRAPION 10 -21 -4405 ALNIINISIRATICN 20 -02 -6650 PIMPS 10 -06 -6650 OPERATICNS 20 -02 -4810 RMPS 20 -21 -4810 AINDNISIRAT CN 10 -39 -4810 FINANCE 20 -39 -4810 FINANCE 20 -29 -8264 HDTNE RJN3 10 -29 -8235 EN3INFIERING 10 -07 -4760 LAVATORY 20 -07 -4760 LABORATORY 10 -37 -6200 IIpC44STTCN SYSTEMS 20 -37 -6200 INFORvATICN SYSTEMS LAITY SUPPLEES E- ]c Tbtal: REFUEE DISPOSAL Check Tbtal CCNIRPL UAL SERVICES Check Total: OPERATE PERMITS Check Total: OFERAZIM PERMITS Check Total : Verrbr Total: POSIPLE E? EENSES MOBILE EXPENSES FC6PPL4; EXPENEES ICbTPC-E EXPENSES WELL, G ENflOD RESFL? SURGE HAN= FACILTIY Check 'Ibtal : LABORATORY SUPPLIES IAPC1RAICRY SUPPLIES Check Total: TRAvaimEanzsaav IFAVEL/flS/ELUCATICN Check Tbtal : 218.78 546.96 00051411 NW 82.43 82.43 00051412 MW 3,375.00 1,125.00 4,500.00 00051413 M4 412.00 412.00 00051414 YW 00051415 MW 366.42 366.42 778.42 15.67 14.03 9.40 6.27 14.03 78.26 137.66 466.05 360.12 826.17 43.80 29.20 73.00 00051416 NW 00051417 VW 00051418 N^1 S o u t h Tahoe P.U.D. 10/10/02 PAYMENT O F CLAIMS , REPORT 10/04/2002-10/17/2002 m 9HU, OCT 10, 2002, 10:59 PM - -red: AS -- -leg: GL JL- -lc : CLETIE:-- - -]cb: 259770 #J7305-- -prog: 09 <1.07 >- -report id: re fault Selectic : Check Stock ID: AP ; Check Types: IM,HW,RV,VH Vender Nacre Acoc nit # Department Description Prrount Check # Type G C S SERVICE INC G F S CHEMICAL G L I ]NIETI\T.AT'ICNAL I C GILLFSPIE ENTERPRISES INC GLOBAL DATA SPEETALISIS GOLDEN STATE CELLULAR G2A1NGER INC, W. W. GRANT DtPNICIN LLP GUARDIAN, THE HACH =ANY 10 -07 -6025 LAVATORY 20 -07 -6025 LABORATORY 10 -07 -4760 LABORATORY 20 -07 -4760 LAB3RIC X Y 10 -07 -4760 LAVATORY 20 -07 -4760 LABORATORY 10 -02 -7442 AMPS 10 -06 -8328 OPERA[ Ls 10 -28 -6310 ALPINE (JOLLITY 10 -04 -6012 HEAVY MAINIENANCE 10 -03 -8281 EIECTRICAL SDP 10 -39 -4470 FINANCE 20 -39 -4470 F'INANCE 10 -00 -2531 GENERAL & ALNINISIRATICN 10 -07 -6025 LABOR= 20 -07 -6025 LA&PATC Y LABORATr EQUIPMENT LAIC EQUIPMENcl -ec.' 'Ibra1 : LABCRATCRY SUPPLIES LABORATORY SUPPLIES k 1bra1 • LABORATORY SUPPLIES LABORATORY SUPPLIES Eck ,Total • DIESEL TANK REPLACEMENT -FLL Check Total: PI Check Tbtal : Check Tbtal: 480V SPIIN Check Total: ATJD AUDI Check Total: LONE TERM DISABILITY N%MT ctEdc Total : EQUIPMENT PENT 76.68 51.14 127.82 47.12 31.41 78.53 133.39 88.90 222 29 320.00 320.00 2,183.50 2,183.50 186.16 186.16 00051419 NW 00051420 NW 00051422 NW 00051423 MAI 00051424 NW 00051425 MAI 224.17 321.22 545.39 00051426 NW 10,080.00 6,720.00 16,800.00 00051427 NW 1,661.40 1,661.40 00051428 NW 679.76 419.60 South Tahoe P.U.D. 10/10/02 PAYMENT O F CLAIMS REPORT 10/04 2002 - 10/17/2002 Page 8 THU, CCT 10, 2002, 10:59 AM - -req: DOUGLAS -- -leg: C;L 3L- -lcc: QQS1'1E-- - -Jcb: 259770 #J7305-- -prof: 09 <1.07 > - -a • <1.07>--report id: FC Default Selection: Check Stock ID: AP ; Check Types: NW,H^1,RV,VH Vendor Nam Account # Department Descripticn Arcunt Cock # Type WEN E INEE RING BATCH AND PARENT IBCI TECH I M P A C GOVERNMENT SERVICE'S 20 -29 -8264 EU3INEEPDD 10 -39 -4480 FIN=E 10 -00 -2504 GENERAL & AEM NISIRATICN 10 -38 -4820 C USICMER SERVICE 20 -38 -4820 CUSTOMER SERVICE 10 -01 -6083 IlflD REPAIR 10 -01 -6200 UNDERCRCUND REPAIR 10 -21 -6200 AE IINISIRATICN 20 -02 -6042 PUMPS 20 -02 -4820 PUMPS 10 -28 -6042 ALPINE COUNTY 10 -28 -6200 ALPINE COUNTY 10 -28 -8285 ALPINE °ONIY 10 -05 -6011 DJUIPWNT REPAIR 10 -27 -4830 DISIRICT INFCH'ATICN 20 -27 -4830 DISIRICT INFCEMATICN 10 -27 -6200 DISIRICT INKO TTCN 20 -27 -6200 DISTRICT INFORMATICN 10 -27 -6620 DISTRICT INFcHVATIQV 20 -27 -6620 DISTRICT INECidvATICN 10 -38 -6200 QEIQ'4 R SERVICE 20 -38 -6200 CUSTOMER SERVICE 10 -37 -4820 INFcWY TICN SYSTEMS 20 -37 -4820 I1NFOR"ATICN SYSTEMS 20 -19 -6200 HOARD OF DIRECIC S 20 -01 -6200 UNDERGRaND REPAIR Check Tbtal: WELL, L, G RFTIRTTT Cock Total : LEMIrREGULAR SUSPENSE Check Total: OFFIC'E SUPPLIES OFFICE SUPPLIES Check Total : IIUflCN OFFICE SUPPLIES mva / ELL ncLcN ALPINE CNTY ° 0 PLAN AUIC DAVE SUR RIP1'1CNS F SE TRAVEL P1'1QYE TICK TRAVELL /N]EEIIID X TI N PUBLIC RELATI LMS P F TlSE PUBLIC • 2 • CRS EXPENSE TEA 10 I eyEcuoITICN TRAVEL/ns /Ffl. fQV OF'F'ICE SUPPLIES OFFICE SUPPLIES TRAVEL /MEEmI /EDnITTCN 1,099.36 00051421 NW 1,160.00 1,160.00 83.85 92,031.94 92,115.79 406.12 270.75 676.87 366.23 188.76 98.20 109.29 64.76 198.65 33.08 30.54 115.69 390.00 260.00 57.00 38.00 402.81 268.54 360.57 240.38 50.10 33.40 201.11 1,048.10 00051429 NW 00051430 Ma 00051431 M4 Scuth Tahoe P.U.D. 10/10/02 PAYMENT OF CLAIMS REPORT 10/W002-10/17/2002 9 TH1J, COT 10, 2002, 10:59 PM --req: GL 3L--l�: CNSiTE----job: 259770 #.17305---prog: 09 <1.07>--report id: CKMFC fault Selection: Check Stodk ID: AP ; Creak Types: NIN,HALRV,VH Vernor Narre Acoduat # Departrrent Arcunt ClEck # Type 10-37-6200 aNEOFIvATICN SYSTEMS 20-37-6200 INFORWATICN SYSTEMS 10-39-6200 FINANCE 20-39-6200 FINANCE 10-29-8235 EMINEER11\U 20-29-8273 =NEER= 10-22-6075 HUMANFF=0ES 20-22-6075 HUMAN RESCIURCES DIRELIGN 10-22-4820 HUMAN RESOURCES 20-22-4820 HUMAN RESCURCES DIRECTOR 20-02-6071 PUMPS 10-02-6200 PUMPS 20-02-6200 PUMPS 10-06-6200 OPERATICNS 10-06-6310 OPERATICNS 10-06-6250 OPERATICNS 10-39-4820 FINANCE 20-39-4820 FINANCE 10-19-6200 BOARD OF DIRECICRS 10-07-4760 LABOR= 20-07-4760 LABORAICEff 10-07-4820 LABORATORY 20-07-4820 LABORA= 10-07-6200 IABCRATCRY 20-07-6200 LABORATORY 20-21-6200 ALMNISTRATICN 10-29-6200 ENCINEERIM 10-37-8361 INERMATICN SYSTEMS 20-29-6200 HMIS 20-29-6520 EICINEERING 10-02-6083 PUMPS 20-02-6083 PUMPS 10-02-6048 PUMPS 10-29-6520 EICINFE= TRAVEL/MEETINGS/EDUMITCN TRAVEL 2 • es /maN TRA DI ID I c../IIITATICN TRAVEL 0 1 c./EDU:ATICN STITTF HANCLII\U FACILITY NATIRLINE I1NGS SAFETYKLEMENT/PHYSICALS SAFEIY EQUIFNE\IIIPHYSICALS CiinCE SUPPLIES anCE SUPPLIES SHDP SUPPLIES TRAVEL/nS/EDUCATICN TRAVEL/MEETMS/EMCATICN ilaVEL ID • e+./EarN • • I aEUES/MENEERSHIPS/CEITEIFIGATT .EICE SUPPLIES OF1.10E SUPPLIES TRAVEL 0 1.7A2:ATION Amok 0, LABORATORY SUPPLIES OFFICE SUPPLIES 01,E10E SUPPLIES TRASs/EarmatT TRAVEL/MEETINCS/EDU:ATICN TRAVEL/MEEIINS/ECUCAITCN IRA Di ID I es /inn SO rs • T.13 TRAvEL vEgnms/Ecuanav SUP SIANDBYACOCK=CNS SIANDBYACOCM2=CNS UJIHER PASS PUT SIATTag SUPPLIES 180.56 120.36 218.24 145.49 58.68 62.48 330.13 220.08 111.76 74.51 3.21 25.03 25.03 2,204.30 12.50 148.00 - 34.65 - 23.10 8.33 94.82 63.21 61.81 41.21 1,011.79 674.52 55.60 812.37 97.76 571.79 450.62 41.79 41.79 55.00 580.37 S o u t h Tahoe P.U.D. 10/10/02 PAYMENT O F CLAIMS , REPORT 10/04/2002- 10/17/2002 Pacfe 10 THU, Ca 10, 2002, 10:59 AM - -req: D [AS- 1e3: GL JL lc�: QQS1'1E-- - -job: 259770 #J7305 - - -pt : 09 <1.07 >--report id: PC Eefaitt Selection: check Sta k ID: AP ; Check Types: NW,114,RV,VH Vendor Nam Account # went Description BMOC DISIRIECTTIQV CORP. IMPACT STRATEGIES INLUSIRIAL SAFELY INSIY- PRINIIS INTERSTATE SAFETY & SUPPLY JACOBS & TOLHURST ARCHITECTS JENSE.V PRE -CAST INC KAISER FaMA ICN HEALTH PLAN KEN'S TIRE CENTER 20 -29 -8290 E INEE 1 N 10 -07 -4760 LAIDRY 20 -07 -4760 LAai ATORY 10 -21 -4405 ALNIINNISIRATICN 20 -21 -4405 P MINISIRATICN 10 -01 -6075 TDDEID REPAIR 10 -27 -4920 DISTRICT INFORMAT CN 20 -27 -4920 DISTRICT INIECWATTCN 20 -19 -4820 BSARD OF DIRECTORS 20 -02 -4820 PUMPS 10 -00 -0425 COAL & AIPINIISIRATICN 10 -39 -6077 FINANCE 20 -29 -8130 20 -01 -6052 30 -00 -6745 10 -05 -6011 EMII3 LddD REPAIR SELF FUNCED INSURANCE EQUIPMENT REPAIR TROUMENT, ARID WL #3 Check Tbtal: LABORATORY SUPPLIES LABCRATIOEff SUPPLIES Check Total: =RAC= SERVICES CLNIRACTUAL SERVICES Check Total SAFETY EQUIPMENT /PHYSICALS Check Total: PRINT PRTNTINU OEr'ICR SUPPLIES OFFICE SUPPLIES Check Total: SAFETY SUPPLIES INVENTORY FREIGIT DI TPS Total: AEMIN MSTR PiAN,1d1AD /IILXTES C3'�c.K 'Total : PIPE, COVERS, & M"MDLES Check Total: CLAIMS SELF :NE MEDICAL PLAN Check Total: AUIOMDTIVE Pirount Check # Type 39.08 13,139.68 00051434 NW 1,448.00 965.32 2,413.32 00051435 NW 1,254.50 3,763.50 5,018.00 00051436 NW 424.50 424.50 00051437 NW 647.31 431.53 58.33 6.44 1,143.61 00051438 NW 146.72 6.56 153.28 00051439 NW 240.00 240.00 00051441 NW 627.41 627.41 00051442 NW 543.00 543.00 00051443 NW 552.77 S o u t h Tatra P.U.D. 10/10/02 PAYMENT O F CLAIMS REPORT 10/04/2002-10/17/2002 11 Pate aJ-U, CCr 10, 2002, 10:59 PM - -reg: EGUGL7IS- - -1sU: GL JL - -lcc: a JLll - -- -job: 259770 #J7305-- -prcg: 09 <1.07 >- -revLL id: PC Default Selection: Check Stock ID: AP ; Check Types: MAI,HW,RV,VH Vendor Nave Account # Department Description Arrc unt Check # Type KEYS PRODUCTIVITY CENTER LAKESIDE NAPA TAMATIER INC 10 -22 -6200 HUMAN RESOURCES 20 -22 -6200 HUMAN RF;SCJRCE'S DIRECTOR 10 -01 -6052 LINCER2M1ND REPAIR 10 -02 -4630 AMPS 10 -02 -6048 PUAPS 10 -02 -6051 PIMPS 20 -02 -6050 PUMPS 10 -02 -6071 AMPS 20 -02 -6071 RAPS 10 -04 -6024 HEAVY M4INIENATTE 10 -04 -6041 HEAVY MAINTENANCE 10 -04 -6071 HEAVY MAINTENANCE 10 -04 -6073 HEAVY MAINTIII:E 10 -05 -6013 EQUIPMENT REPAIR 10 -05 -6012 EQUIPMENT REPAIR 20 -05 -6012 EXTRA= REPAIR 10 -05 -6073 EQUIPNENT REPAIR 20 -05 -6073 EXThNENr REPAIR 10 -05 -6011 EQUIPMENT REPAIR 20 -05 -6011 E2JIFMFNr REPAIR 10 -05 -6071 EQUIPMENT REPAIR 20 -05 -6071 EQUIPMENT REPAIR 10 -07 -6025 LABORATORY 10 -28 -6042 ALPINE COUNTY 20 -01 -6052 LNDER9FLEJ REPAIR 20 -01 -6073 UNDERGRaND REPAIR 10 -38 -6075 OUSILNIER SERVICE 20 -38 -6075 CUSICMER SERVICE CI-Eck Total : naves,/ / acv check Total: PIPE, COVERS & MK>LES OIL & MERICcNIS LUTHER PASS RNP ST.4TIaB PUMP SI:4TTaE TELLS SHDP SUPPLIES SDP SUPPLIES FURIACE EQUIPMENT =DINGS DINGS SHOP SUPPLIES SELL T03L5 MILE E UIRA T YOBILE SMALL TOOLS SMALL TOOLS AUTOMETIVE AUICMYTIVE sm SUPPLIES L ES SHDP SUPPLIES LABCRATOFff MOUNDS & MAIN N P, PIPE COVERS, & MANEDLFS TOOLS Check Total SAFETY EQUIFMSTr /PHYSICALS 552.77 00051444 NW 119.40 79.60 199.00 00051367 Ma 1.60 8.03 26.78 28.55 10.23 21.28 21.28 6.34 13.71 28.89 114.64 85.72 139.06 139.05 151.31 151.31 563.40 585.19 37.83 37.82 12.61 10.79 17.12 24.76 2,237.30 00051445 M4 101.70 67.80 South Thlte P.U.D. 'H3U, CCT 10, 2002, 10:59 Default Selection: Check Vendor Narre 10/10/02 PAYMENT OF PM - -rag: LOM S- - -le3: GL 3L- -loo: CLAIMS REPORT 10/04 2002 - 10/17/2002 12 CNS1'1E-- - -,�cb: 259770 #37305-- -prog: C 09 <1.07 > - -rrt id: CPC Sto k ID: AP ; Check Types : Ma, HW, RV, VH Pccxult # It Eescripti Amount Check # Type TEE, JEFl T.TTTY'S TIRE SERVICE INC. M C I WORILO:NI M W H LABDRATDRIES MARTIN, DaaLD L & MR3C IE MSRITN, GERALD E & THELNA V 10 -06 -6200 OPERATIONS 10 -05 -6011 FEJJIMINT REPAIR 20 -05 -6011 EQUIPMENT REPAIR 10 -05 -6012 EI TIHENT REPAIR 10 -00 -6310 GENERAL & PEI NISIRATICN 10 -02 -6310 PUMPS 20 -02 -6310 PUMPS 10 -01 -6310 WND REPAIR 20 -01 -6310 IN:ERGRaND REPAIR 10 -06 -6310 OPERATTCNS 10 -07 -6310 LABORATORY 20 -07 -6310 LABORATORY 10 -22 -6310 HUMAN RESOURCES 20 -22 -6310 HU v1 N RESOURCE'S DIREEIGR 10 -37 -6310 INKRMkTICN =DAMS 20 -37 -6310 INFO MATTCN SYSTEMS 20 -29 -8290 EMINEERIM 20 -07 -6110 LABORATORY 20 -39 -6709 FINANCE 20 -39 -6710 FINANCE 20 -39 -6709 FINANCE 20 -39 -6710 FIlNANRE Check 'Total : 'TRAVEL /MEETING>S /E TIGN Check Total: EVE ALTITIUTIVE NUBILE E2UIR'1ENT Check Total: TFTFN -INF TELEPHONE TFT FPHCNR TELEPIENE TFT PHONE TEIEPHaE TFT FPf -X NE TIIIENTNE TFT FFEENF Cock Total : TRETMENT ARRCNEEPD WL #3 NONTICRIN Check Tbral LOAN PRINCIPAL PAYMENIS TNTFRF.ST DEESISE Check Ibtal: LOAN PRINCIPAL AYMENVI5 I MEST EXPENSE 169.50 00051446 MW 34.00 34.00 00051447 NW 41.22 25.72 638.01 704.95 00051448 NW 40.53 30.34 30.29 9.33 9.32 21.65 9.58 6.38 21.61 14.41 123.13 82.09 398.66 225.00 150.00 375.00 4,369.80 3,272.77 7,642.57 4,369.80 3,272.77 00051508 NW 00051449 Ma 00051450 NW szuth Tahoe P.U.D. THI, CCT 10, 2002, 10:59 L1?fault Selection: Check Vendor Natte 10/10/02 PAYMENT OF PM - -req: DC h AS -- -leg: GL CLAIMS REPORT 10/04/2002 - 10/17/2002 Page 13 CNSI1E-- - -jcb: 259770 #J7305-- -prog: 09 <1.07 >-- report id: CiQ2FX'SSFC Stock ID: AP ; Check Types: NW, HW, RV, VH Accoert # went Description A punt Check # Type MARTIN-E BELAS, LOUISF PC MASTER CARR SUPPLY CO MEEKS EUIIDIN:h CENTER MEIZ, DOUGLAS MICRO WAREHOUSE 20 -39 -6709 FINANCE 20 -39 -6710 FINANCE 10 -04 -6042 HEAVY M4INIE A 10 -02 -6051 AMPS 10 -02 -7442 RNFS 10 -01 -6052 UNDERGROUND REPAIR 10 -01 -7035 UNDERGROUND REPAIR 10 -02 -6051 PUMPS 20 -02 -6051 PUMPS 10 -02 -6071 AMPS 20 -02 -6071 AMPS 10 -02 -6073 PUPS 20 -02 -6073 PUMPS 20 -03 -6071 ELECTRICAL SHOP 20 -03 -6073 EIECIRICAL SHOP 10 -04 -6041 HEAVY MY.E 10 -04 -6042 HEAVY NAINIENANLE 10 -28 -6042 ALPINE COUNTY 10 -04 -6071 HEAVY M'V NIFt tE 20 -01 -6052 UNDERGROUND REPAIR 20 -01 -6071 UNDERGROUND REPAIR 10 -39 -6200 FINANCE 20 -39 -6200 FINANCE 10 -37 -4840 INECEMATTCN SYSTEMS Check Total: THAN £RINCTFAL PAYMagIS INTEREST EXPENSE Check Total: GROUNDS & NAINIEI`TANCE DIFSEL• STATITANK REPLACE\TIIT -ELL Check Tbta1: PIPE COVERS & NAN -%FLEE yA'CcYEA CWS -LATERAL LINING F[NP SPATICNS PUMP STATIONS S OP SUPPLIES SHOP SUPPLIES S"ALL 'OJLS SMALL :CUE SI-DP SUPPLE SHALL :cols BUILDINGS GRC ND3 & NAIlVIII AN E cauQES & NA]NIFWN E SHOP SUPPLIES COVERS PPIIPEE, SUPPLIES & YANK/ES Check Total: TRAUE• L//MEEl NGS/ 1- ed k I 'Dotal al: DISIRICT COMPUIER SUPPLIES 7,642.57 00051451 NW 2,028.76 1,519.43 3,548.19 00051452 NW 893.89 179.68 147.13 1,220.70 00051453 Ma 161.81 135.50 507.34 20.86 10.35 10.35 13.89 32.33 12.12 40.05 33.62 778.91 80.06 9.76 9.65 11.43 1,868.03 00051454 NW 28.78 19.18 47.96 00051455 NW 99.29 S o u t h T a h c e P.U.D. 10/10/02 PAYMENT O F CLAIMS REPORT 10/04 2002 - 10/17/2002 Page-14 s THU, CCT 10, 2002, 10:59 PM - -r: nnIs -- -leg: GL 3L- -lo: CLETIV.-- - - ,�cb: 259770 #J7305-- -prcg: 09 <1.07 > - -art id: OKRECSPC Lefault Selection: Check Stork ID: AP ; Check Types: NW,HW,RV,VH Vendor Nane Acccurt # DaparbTent 20 -37 -4840 INEDEVATICN SYSTEMS MICROCHEE C INC MLLLTRIQICS M7fICN INEUS RTES TNT NELS TAHOE HARL4ARE NDLAN, LYNN NJRIH AvERICAN FU DINTh 20 -07 -4760 LAR1 AIr Y 10 -03 -6021 ELFEIRICAL SEEP 10 -03 -6022 E[EtTRIC L SEEP 10 -01 -6041 IEDEFE CND REPAIR 10 -02 -6048 PUPS 10 -04 -6042 I-E4VY nE 10 -04 -6071 HEAYY M INTII EE 10 -07 -4760 LAB PTC Y 20 -07 -4760 LABORATORY 10 -39 -4405 FINANCE 10 -06 -8328 OPERATIONS 20 -39 -4405 FINANCE 90 -98 -8829 =CRT PIPELINE GRANT 10 -38 -5010 CUSTOMER SERVICE 20 -38 -5010 C USICMER SERVICE D scripticn OF'F'ICE DEPOT EUSINEISS SERV DIV 10 -29 -4820 EMINEE NG 20 -29 -4820 El\DINE RIND 10 -39 -6081 FEE 10 -00 -0428 GENERAL & AUvII1NISIRATTCN DISTRICT CLMPUIER SUPPLIES Check Total: TABCPAIC Y SUPPLIES Cock Total PRIMARY EQUIPMENT k Total : =NARY EQUIPMENT Total: EUILDINS WIRER PASS REP SIATICIV GROWLS & IvAINIENANC SEEP SUPPLIES LA.BJRATDRY SUPPLE LADDRATCRY SUPPLIES k Total: =RACTCF L SERVICES PLANT SCALA SYSTEM aNTRACUAL =NE IIASE II END Check Total: LAND AND BUIIDINGS LAND AND BUILDINGS Check Total : OFF'1C� SUPPLIES OF'F'ICE SUPPLIES OFFICE SUPPLY ISSUES OFFICE SUPPLIES INVENTORY Amount ctak # 58.14 157.43 00051456 160.00 160.00 00051457 409.90 00051480 596.93 00051458 409.90 596.93 8.50 34.82 4.91 24.97 8.47 5.64 87.31 00051459 Ma 345.00 30.00 345.00 345.00 1,065.00 00051460 IMW 514.46 342.97 857.43 00051461 144 87.48 58.30 754.01 36.81 South Tahoe P.U.D. THU, C r 10, 2002, 10:59 Default Selection: Check Vembr Na[re 10/10/02 PAYMENT OF CLAIMS R E P O R T 10/0412002 - 10/17/2002 pae 15 PM - -req: D AS- - -le3: CL JL - -lcc: C EEIE- - - -jdx 259770 437305—grog: 09 <1.07>--report id: C PC Stock ID: AP ; Check Types: MV, HW, RV, VH Account # Department Description Amount Check # '1je CNE CN CNE PACIFIC MECEA IC71L CORP PERFOM YE PIPEL.ThTh EC PETTY CASH 10 -37 -4820 INKRNATICN SYSIENE 20 -37 -4820 INEDEVATICN SYSTEMS 10 -39 -4820 FINANCE 20 -39 -4820 FINANCE 10 -37 -4840 INECWVv ITCN SYSIEMS 20 -37 -4840 INEORNATICN SYSTEMS 10 -29 -8235 L 3IINE= 10 -37 -4830 INEORMATTCN SYSIENS 20 -37 -4830 INFO&V\TICN SYSTEMS 10 -29 -8235 EN3Th E 11D 10 -29 -4610 E,INFERIM 10 -29 -4620 EiOIIffi?IIG 10 -01 -7035 T. EERGR ND REPAIR 10 -01 -6200 20 -01 -6075 10 -21 -6621 20 -21 -6621 10 -22 -6670 20 -22 -6670 20 -27 -6620 10 -37 -4440 20 -37 -4440 10 -39 -6200 20 -39 -4810 20 -39 -6200 T_INDER:RCUND REPAIR T.EDERCRaND REPAIR ALMINISTRATICN RERAN RES`URCES Iv AN RESOURCES DIRFX IOR DISTRICT ICNII SYSTEMS FINANCE INFORMATICN SYSTEMS FINANCE FINANCE OFFICE SUPPLIES OFFICE SUPPLIES OFFICE SUPPLIES OFFICE SUPPLIES DISTRICT COURIER SUPPLIES DISTRICT COMPUTER SUPPLIES STIFF HAND= FTCIZSTY Check 'Ibtal : SUESCRIP1'1CLE EXPENSE SLES RIP1'1CNS F' FTy9E Check Tbtal: ST I )f iF HAND L= = F'ACILI CLINE DID Check Total: TAHOE ME 1S- LATER2AL Tot 1 : ���CSneck Ibtal : S�FETi�BTIFN NI' PHYSICALS INCENTIVE & RECOGNITION PROP. INCENTIVE & RECOGNITION MGR PERSONNEL FEE PERSONNEL Fxpalm FURLIC IIRELATICNS EE AW PE TI40: 4 TRAUEL D 1 t. /ffJfl'iICN 't. Pe EXPENSES TRAVEL mmu S s /EarATICN Check Total• 128.73 85.83 22.23 14.80 154.81 103.21 92.88 1,539.09 00051463 NW 83.40 55.60 139.00 00051464 MW 1,188,806.60 - 397.40 - 2,808.64 1,185,600.56 00051465 M4 3,940.00 3,940.00 00051466 NW 30.00 8.13 8.98 5.98 15.00 10.00 2.98 14.50 9.66 24.93 8.00 16.62 154.78 00051467 MW S o u t h T a h o e P.U.D. 10/10/02 PAYMENT O F CLAIMS REPORT 10/04/2002 - 10/17/2002 Page 16 THU, CCT 10, 2002, 10:59 AM - -red: E a LAS -- -leg: GL 3L- -loc: JJE - -- -job: 259770 #J7305- - -prog: 09 <1.07>--report id: CK SFC Default Selection: Check Stock ID: AP ; Creek Types: NW,HW,RV,VH Verthr Nacre Accant # rrepamrent PINE DINT LOCATIA3 EQUIPMENT & 20 -05 -6012 EJ3JIFMENT REPAIR PIONEER AMERICAS INC rRLETO, ANICNIO PRESS SOFZVWRE R SUPPLY RADIO SHACK RFfl ER EQUIFIAENT CO 10 -06 -4750 OPFRATIQS 20 -01 -6250 UNDERGROUND REPAIR 10 -37 -4840 IIVF TTCM SYSTEMS 20 -37 -4840 J1 FOR"AfICN SYSTEMS 10 -01 -6052 INDERGIRCUND REPAIR 10 -03 -6048 ELECTRICAL SHOP 10 -05 -6012 EQUIPMENT REPAIR REEL N RCAL VALLEY- SACRPMENIC 1 RICH'S SMALL ENGINE SERVICE SACRAMENTO HAG C SCOTT SPECIALTY CASES 0 -06 -8328 OPERA TOMS 10 -04 -6071 HEAVY M INIFNA1t 10 -04 -6021 HEAVY NAINIENA E 10 -04 -6042 HEAVY M NIIIN=NKE 10 -06 -8112 OPERATIONS Description P'm rt Check # 'Type M OTT E EQUIPMENT Cock Total : CHLORINE Check Total: EUES /ME`UERS[EPS /C SFIC9TI Check Total: DISIRICT CSNPUIER SUPPLIES DISTRICT Q`I"IE'LTiEL2 SUPPLIES Check 'Ibtal : PIPE, COVERS, & MANHOLES Check Total: UMIER PASS PUMP STATION Check Total: MOBI E EQUIPMENT Check Total: PLANT SCAM SYSTEM Check Total: arp SUPPLIES PF2H4LRY EQUIPMENT' Check Total : GROUNDS & MI E Total: =mums EMISSIais N= Check Total: 355.29 355.29 2,419.15 2,419.15 67.00 67.00 00051468 Ma 00051469 144 00044958 HW 4.01 2.67 6.68 00051470 Ma 250.58 00051471 IVW 56.78 00051472 M^1 3.73 3.73 00051473 NW 26,196.80 00051474 144 250.58 56.78 26,196.80 69.32 1.07 70.39 00051475 NW 506.61 00051476 NW 746.82 00051477 Ma 506.61 746.82 S o u t h T a . h c e P.U.D. 10/10/02 PAYMENT O F CLAIMS REPORT 10/04/2002-10/17/2002 17 'HHU, CGT 10, 2002, 10:59 AM - -req: DCUC AS- - -leq: GL JL - -lc : CNS11E-- - -jdD: 259770 #J7305-- -pxog: PP 09 <1.07>--report id: FC Default Selection: Cl-:eck Stock ID: AP ; Check Types: NW,H^I,RV,VH Vendor Nacre Amount # Departnent Description A ant Click # Type SCOTIYS HAR:WARE SENSUS IECS NDL DIES IlVC . SHERWIN-WELLIPMS SIERRA C3EIvE AL CO SIERRA FOOIHILLL LABORATORY SIERRA PACIFIC PUIE.R SIERRA PACIFIC POWER W SIERRA SPRIM WATER CO 10 -02 -6041 AMPS 10 -02 -6051 AMPS 20 -02 -6054 PUMPS 10 -02 -6071 PUMPS 20 -02 -6071 AMPS 10 -02 -6073 AMPS 20 -02 -6073 PUMPS 10 -37 -6030 INIECEMATICN SYSTEMS 20 -37 -6030 INECTICN SYSTEMS 10 -04 -6041 HEAVY MAINTENANCE 20 -02 -4790 PUMPS 20 -02 -4750 PUMPS 10 -07 -6110 LABORATORY 10 -00 -6740 GENERAL & AUVIIINISIRATTCN 10 -00 -6330 COAL & AEM NISIRAncN 20 -00 -6330 ORAL & AUI NISIRATICIQ 20 -29 -8264 EN3IAffiRINE 10 -01 -6520 UNDERGRa.ND REPAIR 20 -01 -6520 UNDERGROUND REPAIR 10 -02 -6520 FCMPS pup V, QE REP' r TaTER TANKS SDP *PLIES SHOP SUPPLIES EN4 T TOO R SMALL TODLS CYe'k Tbtal : SERVICE QNIRACIS SERVICE CNIRACTS Check Total : BUJIDINGS Check Total: OTHER SUPPLIES CHLORINE Check 'Total : NLNTIOR.IN; C1xrk Total: STREET LIC IPIING EXPENSE ELECTRICITY ELECTRICITY Check Moral: WELL, REfl Check Total: SUPPLIES SUPPLIES SUPPLIES 18.63 69.39 30.56 5.59 5.59 17.83 17.82 165.41 00051478 MW 482.63 321.75 804.38 00051440 NW 27.00 27.00 00051479 NW 1,417.95 1,645.95 3,063.90 00051481 NW 150.00 150.00 00051482 NW 1,388.55 57,656.71 27,269.02 86,314.28 00051484 NW 235.00 235.00 00051483 NW 45.92 45.92 30.62 S o u t h Tahoe P.U.D. 10/10/02 PAYMENT O F CLAIMS REPORT 10/04/2002 - 10/17/2002 Page 18 L=U THU, CCT 10, 2002, 10:59 PM --req: 3LAS --leg: GLL JL - -loc: CNSITE-- - -jeb: 259770 #J7305- - -pro3: 09 <1.07 >- -report id: F refai:lt Selection: Check Stm_k ID: AP ; Check Types: NI,q,HW,RV,VH Vendor Nam J cant # Arent Descripticn Arrant Check # Type SIERRA TAHOE READY MIX SMITH, GREG SO TAHOE PUB UTILITY DISTRICT SaNOSIRATE;IES 10 -03 -6520 ELECTRICAL SHOP 20 -03 -6520 ELECTRICAL SHOP 10 -04 -6520 HEAVY MOE 10 -06 -6520 OFERAIIICNS 10 -05 -6520 ETIPVENT REPAIR 20 -05 -6520 EQUIPMENT REPAIR 10 -02 -6051 PUMPS 20 -02 -6042 PUMP'S 10 -06 -6250 10 -06 -6200 10 -29 -8235 OPEPATICNS OPERATIONS - 10 -27 -6620 DISTRICT INFORMLrICN 20 -27 -6620 DISTRICT INECRNATICN SOUTH mILE NEyWSPAPBR Pi ICI 10 -21 -4830 PLJV NISIRATICN 20 -21 -4830 AUvIINISIRATICIS SOUTH TAEiEE PLLMB1NS SUPPLY SOJIH ')E REFUSE 10 -04 -6041 HEAVY nE 20 -02 -6050 PUMPS 20 -02 -6051 PUMPS 20 -29 -8290 MGT TNG 20 -02 -6050 PUMPS SUPPLIES SUPPLIES SUPPLIES SUPPLIES SUPPLIES SUPPLIES deck Total: RMP SIATIICNS GROUNDS & MAINIENANCE metal TRAU�[ WEETIL\BS/ x=CN Check Total: SLUDGE HANELIN3 FACILITY check Total: RELIC RELATICNS EXPENSE PUBLIC RELATTCNS EXPENSE Check Total: SUBSCRIPIICNS EXPENSE SUBSCRIPT-ENS EXPla\EE Check Total: EUThIN3S WELLS 1 MMTICNS REATNIENT, ARID WL #3 Check Total: WETS 15.31 15.31 61.23 61.23 15.31 15.31 306.16 630.09 347.49 977.58 53.00 82.49 135.49 00051485 NW 00051486 NW 00051487 M'J 131,733.40 131,733.40 00051488 P14 58.80 39.20 98.00 00051489 P14 59.78 39.86 99.64 00051490 NW 424.17 140.29 21.16 1.23 586.85 00051491 NW 9.25 S o u t h Tahoe P.U.D. 10/10/02 PAYMENT O F CLAIMS , REPORT 10/04 2002 - 10/17/2002 Pane 19 'TRIU, CCT 10, 2002, 10:59 AM - -ze: ECLQLAS -- -leg: C3, JL - -lcc: CNSITE-- - -job: 259770 #J7305-- -p/cg: 09 <1.0 >--report id: CKR�SPC Default Selection: Vertbr ISsne Check Stock ID: AP ; Check Types: M4,HW,RV,VH Account # Departtrent Description Amount Check # Type SOUTH TAHOE ICKITh SPR1 K SOFTWARE INC SIM-ELI:NE OFFICE SUPPLY SCNRD BI -TE3iI TIC. TAHOE ASPHALT INC 10 -00 -6370 GENERAL & AUVUNIISIRATICN 20 -00 -6370 GENERAL & AU4INISIRA'1Ta\T 10 -05 -6011 EQUIPMENT REPAIR 20 -05 -6011 EQUIPMENT REPAIR 10 -37 -8361 IITICN SYSTEMS 10 -38 -4820 COSIGNER SERVICE 20 -38 -4820 cusTavER SERVICE 10 -37 -6030 INIPGRMATICN SYSTEMS 20 -01 -6052 UNCERCRGED REPAIR TAHOE BASIN CiNIAINTIZ SERA= 10 -00 -6370 GENERAL & ALMtNISIRATICN TAHOE BIUEPRIIV' TAHOE C 1R9aV AREA NEWS 10 -29 -4820 E JIINEERII3 10 -29 -8235 INEERIN3 20 -29 -8264 ENGINE = 10 -02 -8303 AMPS 10 -22 -4930 H MAN RESOURCES 20 -22 -4930 HCNPN RESOURCES DIRECTOR REFUSE DISK AL REFUSE DISPOSAL Check Total: AURI DAVE AUICMITIVE 9DFP/ RRE, LE Check Total: Check Total: OPEIC E SUPPLIES OPIiiCE SUPPLIES Check Total: SERVICE CagIRACIS Check Iotal : PIPE, CCAERS, & MANACRES Check Total: REFUSE DISFCOL Eck Total: MICE SUPPLIES SLUDGE HANDL1N3 Check WELL, aEMACCID REEPIIL 3vALL INK @ LPPS ADS LEML NOTICES ACE /La MJTICES Check Total: 2,167.45 159.87 2,336.57 00051492 Ma 292.50 292.50 585.00 00051493 Ma 1,335.51 1,335.51 00051494 Mri 147.37 98.25 245.62 00051495 Ma 1,002.25 1,002.25 00051496 Ma 3,230.00 3,230.00 00051497 Ma 1,568.00 1,568.00 00051498 Ma 12.87 1,636.90 1,649.77 00051499 Ma 76.12 70.28 111.37 74.25 332.02 00051500 Ma Scuth Tahoe C,`T 10,P20022, 10:59 PM 10/10/02 : D PAYMENT - l: L - -loc: CS1'1E-- --jcb: 259770 #J7305- - -pxcg /04 090 <1.07> - -report id: C'KREIrSPC Default Selection: Check Stock ID: AP ; Check Types: MAI,HW,RV,VH Description Mount Check # Type Vendor Na e Account # Ttr errt _ -- ___ TAHOE SAND & GRAVEL 20 -01 -6052 UNDERGRaND REPAIR PIPE, COVERS & M?sN3OIES 1,747.09 10 -02 -6051 F N1PS AMP =tat 266.87 Check Ttta1 : 2,013.96 00051501 VW TAHOE 'VALLEY EL IRIC SUPPLY 10 -03 -6071 ELECTRICAL SHOP SHOP SUPPLIES 122.02 Check Total: 122.02 00051502 NW U S PCSINASIER 10 -38 -4810 CUSIOVER SERVICE PCEIALE OTENEES 5,000.00 Check Total: 5,000.00 00044955 HW U S RO6IIASIER 10 -38 -4810 CUSTOMER SERVICE POSICE EMENSES 3,000.00 Creek abtal : 3,000.00 00044956 HW U S POSTMASTER 10 -38 -4810 CEIQ'4ER SERVICE POSTAGE EXPEZES 200.00 Check Total: 200.00 00044957 HW Vendor Total: 8,200.00 VONDERSCHER, RICHARD E 10 -29 -6200 EN3Ii EER1N3 'TRAVEL /MEE INS /E UCATICN 153.00 20-29-6200 ENCNEERINE aRAVEL/mEnS/E2TATTCN Total: 255.00 00051503 ma VALLACE, P LUANE 20 -19 -6200 BARD OF DIRFCIORS TRAVEL /nS /EarATICIy 59.42 10 -19 -6200 BOARD OF DIRE= Rs apAvEins/Earmar 15.77 Check Total: 75.19 00051504 Mg WEECD INS 10 -03 -6051 FI CUZICAL SR-DP PLMP STAIICNS 20 -03 -6071 ELFEWICAL SHOP SHOP SUPPLIES Check Total : WESTERN NEVADA SUPPLY 20 -38 -6045 CUSTOMER SERVICE WATER METERS 20 -01 -6052 UnH ROUND REPAIR PIPE, COVERS & MANHOLES 20 -02 -6051 AMPS PUMP =Tat 10 -02 -6051 PUMPS AMP STATICS 377.67 7.87 385.54 00051505 Ma 40.21 2,129.34 902.22 557.15 THSouth Tahoe U, CCT 10,P20022, 10:59 1MM 10/10/02 : DOUGLASPAYMENT OF —leg: GL JL--lcc: IIE -- --jobs 259770 #J7305--- prog: /04 090 <1.07>- -2i LL id: Default Selection: Check Stcck ID: AP ; Check Types: NW,HW,RV,VH Vendor Nbrre Account # Department Description A*iunit Check # Type WITH ROW OXYGEN SERVICE XEROX CDRP 7P1TIl VIC , NICK ZEE MEDICAL SERVICE 10 -04 -6042 HEAVY WAINIE IE 10 -01 -6071 IND R2 AED REPAIR 10 -04 -6041 HEAVY M'INIE ANCE 10 -01 -6052 w: RAND REPAIR 10 -04 -6071 10 -04 -6073 10 -02 -6071 20 -02 -6071 10 -07 -4760 20 -07 -4760 HEAVY NRIINIIISANCE HEAVY MAJNIENANCE F MPS PIMPS LABORATORY LABORATORY 20 -01 -8339 LEID1 ND REPAIR 90 -98 -8828 EXPORT PIPELINE GRANT 10 -29 -6250 E LINE RIM 20 -29 -6250 ENGINEERING 10 -02 -6075 20 -02 -6075 10 -04 -6075 10 -05 -6075 20 -05 -6075 10 -06 -6075 10 -07 -6075 20 -07 -6075 10 -39 -6075 20 -39 -6075 AMPS AMPS HEAVY MAINTENANCE EQUIP/IFNI' REPAIR EQUIPMENT REPAIR LABDRATORY LABORATORY FINAN:E FINANCE GROUNDS & NAINIFNPN E SI-CP SUPPLIES BUE DiN PIPE, COVERS, & NANEELFS Check Total: SHOP SUPPLIES SNAIL, TOOLS SHOP SUPPLIES SLOP SUPPLIES LABCRATOFE SUPPLIES LABORATORY SUPPLIES Check Total: REPL COPIER U/R ELLINE PHS I'II LaAd-CAMPGRaN Check Total : LLJES /MEDEERSEIIPS /C LFICATI CSeck Total : SAFETY I1MENP /PHYSIC III SAFETY EQUIPMENT /PHYSICALS SAFETY BQTIFD9FNi /PHYSICALS SAFELY D;RTIFMCSTP /PHYSICALS SAFETY EQUI ®PHYSICALS SAFETY E40IFM IVP PHYSICALS SAFETY EQUI PHYSICALS SAFETY E UI SAFETY EXI /H3YSICP.LS SAFETY EQTIl VI' /PHYSICALS Check Ibta1: 125.56 32.27 11.45 17.42 3,815.62 00051506 NW 594.13 274.40 22.75 22.75 35.10 23.40 972.53 00051507 NW 3,922.59 156.00 4,078.59 00051509 NW 84.00 56.00 140.00 00051510 NW 15.24 15.23 32.36 4.92 4.91 99.81 6.70 4.46 6.65 4.44 194.72 00051511 NW cCT 10,P20022, 10:59 AMO- -tttq: D�- S- --1e�: GL JL - -lo : CNSC1E-- --job: 259770 #J7305 - - -pr 10/04/2002-10/17/2002 09<1.07rqnrt id: C[�FSS Default Selection: Check Stork ID: AP ; Check Types: NW,HW,RV,VH Vertbr Name Account # Depa trrent ZYTinsX IINVJ%7IDS]NJLLYY 20 -07 -6110 �� Description Amount Check # Type aRflr ARROWHEAD WL #3 Check Total: (rand Total: 416.00 436.00 852.00 00051512 MW 1,753,249.82 SOUTH TAHOE PUBLIC UTILITY DISTRICT BOARD AGENDA ITEM TO: BOARD OF DIRECTORS FR: Robert Baer, General Mana.qer RE: BOARD MEETING October 17, 2002 AGENDA ITEM: ] 3 ~ _ ACTION ITEM NO: CONSENT CALENDAR ITEM NO: ITEM-PROJECT NAME: CONFERENCE WITH LEGAL COUNSEL - EXISTING LITIGATION: STPUD vs. JOHN BREESE MUMFORD, ET. AL EL DORADO COUNTY SUPERIOR COURT CASE NO. SC20020030 REQUESTED BOARD ACTION: Direct staff DISCUSSION: Pursuant to Government Code Section 54956.9(a), Closed Session may be held for conference with e.qal counse re.qardina existina t ~ation. SCHEDULE: COSTS: BUDGETED AMOUNT REMAINING: ATTACHMENTS: ACCOUNT NO: CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO CATEGORY: GENERAL WATER SEWER X SOUTH TAHOE PUBLIC UTILITY DISTRICT BOARD AGENDA ITEM TO: BOARD OF DIRECTORS FR: Robert Baer, General Manager RE: BOARD MEETING October 17, 2002 AGENDA ITEM: 13 b. ACTION ITEM NO: CONSENT CALENDAR ITEM NO: ITEM-PROJECT NAME: CONFERENCE WITH LEGAL COUNSEL - EXISTING LITIGATION: F. HEISE LAND & LIVESTOCK vs. STPUD and DOES 1 THROUGH 10; INCLUSIVE; ALPINE COUNTY SUPERIOR COURT CASE NO. C18644 REQUESTED BOARD ACTION: Direct staff DISCUSSION: Pursuant to Government Code Section 54956.9(a), Closed Session may be held for conference with legal counsel re.qardin,q existing litigation. SCHEDULE: COSTS: BUDGETED AMOUNT REMAINING: ATTACHMENTS: ACCOUNT NO: CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO CATEGORY: GENERAL WATER SEWER. X SOUTH TAHOE PUBLIC UTILITY DISTRICT BOARD AGENDA ITEM TO: BOARD OF DIRECTORS FR: Robert Baer/General Manager, Gary Kvistad/District General Counsel RE: BOARD MEETING October 17, 2002 AGENDA ITEM: 13 c. ACTION ITEM NO: CONSENT CALENDAR ITEM NO: ITEM-PROJECT NAME: CONFERENCE WITH LEGAL COUNSEL- EXISTING LITIGATION: STPUD VS. F. HEISE LAND & LIVESTOCK COMPANY, INC., WILLIAM WEAVER, EDDIE R. SYNDER, CROCKE'I-I- ENTERPRISES, INC. CIV S-02-0238 MLS JFM UNITED STATES DISTRICT COURT FOR THE EASTERN DISTRICT OF CALIFORNIA, SACRAMENTO, CA REQUESTED BOARD ACTION: Direct staff DISCUSSION: Pursuant to Government Code Section 54956.9(a), Closed Session may be held for conference with legal counsel regarding existing litigation. SCHEDULE: COSTS: BUDGETED AMOUNT REMAINING: ATTACHMENTS: ACCOUNT NO: CONCURRENCE WITH REQUESTED ACTION: CATEGORY: GENERAL MANAGER: YES NO GENERAL CHIEF FINANCIAL OFFICER: YES NO WATER SEWER X SOUTH TAHOE PUBLIC UTILITY DISTRICT ADDENDUM TO BOARD AGENDA TO: BOARD OF DIRECTORS FR: Robert Baer, General Mana.qer RE: BOARD MEETING October 17, 2002 AGENDA ITEM: 13 d. ACTION ITEM NO: CONSENT CALENDAR ITEM NO: ITEM-PROJECT NAME: CONFERENCE WITH LEGAL COUNSEL - EXISTING LITIGATION RE: MEYERS LANDFILL SITE: UNITED STATES OF AMERICA V. EL DORADO COUNTY AND CITY OF SOUTH LAKE TAHOE AND THIRD PARTY DEFENDANTS1 CIVIL ACTION NO. S-01- 1520 LKK GGH, UNITED STATES DISTRICT COURT FOR THE EASTERN DISTRICT OF CALIFORNIA REQUESTED BOARD ACTION: Direct staff DISCUSSION: Pursuant to Government Code Section 54956.9(a), Closed Session may be held for conference with eRal counsel re.qardin.q existin.q ti.qation. SCHEDULE: COSTS: BUDGETED AMOUNT REMAINING: ATTACHMENTS: ACCOUNT NO: CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES NO CHIEF FINANCIAL OFFICER: YES NO CATEGORY: GENERAL X WATER SEWER SOUTH TAHOE PUBLIC UTILITY DISTRICT BOARD AGENDA ITEM TO: BOARD OF DIRECTORS FR: Robert Baer, General Manager RE: BOARD MEETING October 17, 2002 AGENDA ITEM: ~[3 e. ACTION ITEM NO: CONSENT CALENDAR ITEM NO: ITEM-PROJECT NAME: CONFERENCE WITH LEGAL COUNSEL- EXISTING LITIGATION: STPUD VS. LAKESIDE PARK ASSOCIATION, SUPERIOR COURT CASE NO. $C20010165 REQUESTED BOARD ACTION: Direct staff DISCUSSION: Pursuant to Government Code Section 54956.9(a), Closed Session may be held for conference with le,qal counsel regarding existing litigation. SCHEDULE: COSTS: BUDGETED AMOUNTREMAINING: ATTACHMENTS: ACCOUNT NO: CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES. NO CHIEF FINANCIAL OFFICER: YES NO CATEGORY: GENERAL WATER X SEWER CONSENT CALENDAR OCTOBER 17, 2002 ITEMS REQUESTED ACTION MTBE Litigation Hydrologic Models (Ivo Bergsohn) Approve Proposal from Dr. Eric M. LaBolle, in the Estimated Amount of $17,000 Gardner Mountain Tank Replacement (John Thiel) Approve Change Order No. 1 to Spiess Construction Co. Inc., in the Amount of $1,690.90 Sludge Handling and Odor Control Facilities (Jim Hoggatt) Approve Change Order No. 1 to Pacific Mechanical Corporation in the Amount of $32,511 South Tahoe Public Utility Distdct · 1275 Meadow Crest Drive, South Lake Tahoe, CA 96150 · Phone 530.544.6474 · Facsimile 530.541-0614 SOUTH TAHOE PUBLIC UTILITY DISTRICT BOARD AGENDA ITEM TO: BOARD OF DIRECTORS FR: Ivo Ber.qsohn, Hydro-Geoloqist RE: BOARD MEETING October 17, 2002 AGENDAITEM: ACTION ITEM NO: CONSENT CALENDAR ITEM NO: ~ ITEM-PROJECT NAME: MTBE LITIGATION HYDROLOGIC MODELS REQUESTED BOARD ACTION: Approve proposal from Dr. Eric M. LaBolle, in the estimated amou~ DISCUSSION: Staff have requested that a computer, hydrolo.qic models, and related files ~s~'ct. The com uter and ~mon for the MTBE trial. The com uter files need to be reor anized into a rational order for archivin and the ~ae Groundwater Vistas currentl used b the District. The lit~el could then be used b the District staff to run ~llCm the South Y area. T~ work ~'s summarized in the ~ated Se tember 252002. SCHEDULE: To be completed within one month from the date of authorization to proceed . COSTS: $17,000 (estimated) ACCOUNT NO: 2002-4405 BUDGETED AMOUNT REMAINING: $511,256 ATTACHMENTS:_ Letter from Dr. LaBolle CATEGORY: CONCURRENCE WITH REQUESTED~C~TION: GENERAL MANAGER: YES:=..~ NO GENERAL. WATER X CHIEF FINANCIAL OFFICER: YES~ t'~[%-~-~10 SEWER Eric M. LaBolle, Ph.D. Hydrologic Science 1927 E1 Dorado Pl. Davis, CA95616 530-753-8999 FAX: 530-753-5185 emlaboll._e~ucdavis.edu Ivo Bergsohn South Tahoe Public Utilities District 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 530-544-6474 FAX: 530-541-0614 September25,2002 Dear Ivo, This letter follows our recent phone conversation in which we discussed pgparing hydrologic models, developed by Dr. Fogg and n~self during the recent MTBE litigation, for delivery to the District. These models played a key role in the litigation and may also serve as tools for the District to fiather un--ding of groundwater flow and co~ migration in the S outh-Y are~ We discussed the following tasks related to mmsfer of the models: i. prepanng the District's dedicated computer for delivery a. archiving,~ hard disks b. reilk~alling Windows 2000 OS 2. hydrologic model preparation a. organizing model files for &liveryto the Dislfict b. converting MODFLOW models to Groundwater Vistas format currently used by the DishSct 3. delivery andlraining a. delivery of the computer and models b. training District personnel on development and use ofthe models I estimate the total time neeessmy to complete tasks i and 2 aI eppro:dmalely 2 weeks. I e~imate one to two days for delivery of the computer and training, with a possible ovemiglat slay in the Tahoe area. I propose billing based on time and expenses. My proposed hourly rate for STPUD is $135 and remains unchanged since the lifigafior[ I estimate approximately $17,000 to complete the proposed worlc I am glad to be of assistance and look forward to working with you. Yours Truly, Eric M. LaBolle, Ph, D. TO: FR: RE: SOUTH TAHOE PUBLIC UTILITY DISTRICT BOARD AGENDA ITEM BOARD OF DIRECTORS John Thiel, Senior En.q neer BOARD MEETING October 17, 2002 AGENDA ITEM: ACTION ITEM NO: CONSENT CALENDAR ITEM NO: b. ITEM-PROJECT NAME: GARDNER MOUNTAIN TANK REPLACEMENT REQUESTED BOARDACTION: Approve Chanqe Order No. 1 to Spiess Construction Co. Inc., in the amount of $1,690.90 DISCUSSION: The contractor has installed additional electrical conduit and wir n,q resulting in a chan,qe order amount of $515.90. The contractor has also provided an extended exterior ladder, including fabrication and installation, resulting in a change order amount of $1,175.00. Staff recommends approval of these two change order items for a total amount of $1,690.90. The contractor has also requested a 21-day extension to the contract time. Since th~, contractor has worked diligently, and since this chan.qe will not increase costs to the District or require a grading extension, staff recommends approval of this contract time extension and waiver of liquidated dama.qes. SCHEDULE: Tank to be completed and in service by October 31. COSTS: $1,690.90 ACCOUNT NO: 2029-8157 BUDGETED AMOUNT REMAINING: ($1,079} ATTACHMENTS: Supporting documents from Spiess, budget analysis CONCURRENCE WITH REQUESTED A~,A~TION: GENERAL MANAGER: YES~ NO_ CHIEF FINANCIAL OFFICER: YESj~ ~-c~,--~. CATEGORY: GENERAL WATER X SEWER CHANGE ORDER NUMBER 1 Project Gardner Mountain Tank Replacement Contractor Spiess Construction Co., Inc. Date October 17, 2002 The Contract Shall Be Changed As Follows: PO # 12425 1) Extend Contract Time by 21 days to 101 days total. 2) Additional electrical conduit and wiring - $515.90 3) Additional ladder extension, fabrication and installation - $1,175.00 Total - $1,690.90 Dollar Amounts Contract Time Original Contract $139,325 80 Previous Chan~e Order $0 0 Current Contract $139,325 80 THIS CHANGE ORDER $1,690.90 21 New Contract Total $141,015.90 101 This Change Order constitutes full and mutual accord and satisfaction for all time and all costs related to this change. By acceptance of this Change Order the contractor agrees that the Change Order represents an equitable adjustment to the contract price and time, and further agrees to waive all right to file a claim arising out of or as a result of this change. Authorized By STPUD Board President Date: Accepted By Contractor Date: Date: Reviewed By Gardner Mountain Tank 1 2029-8157 BUDGET REMAINING ANALYSIS: 2002/03 All Years Spent to date 122,051 342,322 Outstanding Purchase Orders- Carollo Engineers 3,857 3,857 Corrpro Companies 3,000 3,000 McMaster Cart Supply Co. 96 96 Spiess Construction 22,075 22,075 Total Encumbered 29,028 29,028 Total Spent & Encumbered 151,079 371,350 .Budget 150,000 338,182 Over Budget -1,079 -33,168 Note 1: The amount over budget reduces the Capital Outlay Reserve. __10/01/02 16:48 FAX 805 934 4432 SPIESS CONST. ~001 Spless AZ #119975 Constructio~ Co., Inc. 1 October 2002 CA #333989 NV#0038929 P.O. Box 2849 Santa Maria, CA 93457-2849 (805) 93%5859 Fax (805) 934-4432 South Tahoe Public Utility District Attn: Mr. Jim Hoggart 1275 Meadow Drive South Lake Tahoe, CA 91650-7401 Fax: (530) 541-0614 Re: Gardner Mountain Tank Subj: Request for Additional Time Dear Mr. Hoggart: We are writing this letter to request that the District grant to us an additional three weeks completion time due to the excessive time that it took for the initial plan check review and .return of our tank shop drawings. According to the contract specifications we could not order materials without approval, and then the shop fabrication, shop blasting and coating work had to be completed before we could commence work in the field. We hope that you will look favorably upon this request by granting us a 2% calendar day time extension. Sincerely, Spiess Construction Co. Inc Barry Matchett, Project Manager Encl. C;Imsw/jobsip/2243/Ltr072802 10/01/02 16:48 FAX 805 934 4432 SPIESS CONST. ~002 Spiess Conslructio~ Co., Inc. FAX TRANSMITTAL P. O. Box 2949 SaataMatia, CA. 93457 (805) 937-5859 Fax (805) 934-4432 DATE: I October 2002 FROM: Barry Matchett TO: John Thiel COMPANY: So. Tahoe Public Services Dist. FAX NO: (530) 541-0614 TOTAL PAGES: 2 PROJECT PROJECT NO: 2243 NAME: Gardner Tank ORIGINAL TO FOLLOW: Yes [ ] No [ ] MESSAGE: As you requested, we herewith submit the attached cost breakdown from Buffo Electric, our electrical subcontractor to furnish and install some additional conduits and wiring. We will need to add on a small mark-up of $46.90 (10%), for a total price of $515.90 If this is acceptable, please indicate below and fax back to our office. Thank you ~rry~Mngr Accepted by: Date: 10/01/02 16:49 FAX 805 934 4432 SPIESS CONST. I! BUFFO:-, ' EI, ECTRIC ~003 p.02 Bid Proposal for South Lake Tahoe Water Storage Tank Sept.~.7, 2002 Page 1 of I Spmss Constructw P.O. Box 2849 Santa Maria, CA 93457 Pax (805) 934-4432 Bnrry Matchett Re: Sodth Lake Tahoe Tank Barry, The following is a price for the additional items:on this job. Thc price in~iudcs the installation qftwo//12 conductors from thc switch in oablnet DP to the 400war fixture installed at top of tank, ' Material $ I 0.00 Labor J~0,00 $140.00 The pdcc also includes thc installation of one 2" conduit between the existing 2" PVC Material $ 69.00 stub-up and c~binet DP. Labor 6.~ Total S 329.00 ' , ·, ' d payroll. Prices also include prevadmg wage and cedific prir~ does not inolude: Welding, fees or permits. If you have ~ Questions please contact me si my office. Total Bid Price $ a,69.00 Sincerely~ ,Dave Buffo P, O. BOX 1010 , Garoinetville,NV 89410 * (775)782-5555 · NV UC #31440 · CAUc; ~504285 09/25/02 11:32 FAX 805 934 4432 SPIESS CONST. [~001/001 FAX TRANSMITTAL P. O. Box 2849 Santa Maria, CA. 93457 (805) 937-5859 Fax (805) 9~ ~.32 DATE: 25 September 2002 FROM: Barry Matchett TO: John Thiel COMPANY: So. Tahoe Public Services Dist. FAX NO: (530) 541-0614 TOTAL PAGES: 1 PROJECT PROJECT NO: 2243 NAME: Gardner Tank ORIGINAL TO FOLLOW: Yes [ ] No [ ] MESSAGE: Our price to fabricate, furnish and install an additional 6-foot exterior ladder below the anti- climb will be a lump sum of: $1175.00 If this is acceptable, please indicate below and fax back to our office. Thank you Barry Matche'ft, Pmj. Mngr Accepted Date: SOUTH TAHOE PUBLIC UTILITY DISTRICT BOARD AGENDA ITEM TO: BOARD OF DIRECTORS FR: Jim Ho.q.qatt, Construction Mana.qer/En.q neer RE: BOARD MEETING October 17, 2002 AGENDA ITEM: ACTION ITEM NO: CONSENT CALENDAR ITEM NO: ¢. ITEM-PROJECT NAME: SLUDGE HANDLING AND ODOR CONTROL FACILITIES REQUESTED BOARD ACTION: Approve Chan.qe Order No. 1 to Pacific Mechanical Corp. in the amount of $32,511 DISCUSSION: Part A, in the amount of $14,022, is the cost to relocate the new water servic~ to the Slud.qe Handlin.q Buildin.q. The ori.qinal desi.qn called for the new water line to cro$~ property owned by the Conservancy, but they would not provide a easement. The extra cost is for the additional len,qth of water line required in the redesi.qn to provide the domestic water. Part B, in the amount of $18,489, is for redesignin.q the entrance to the plant, which will improve security at the plant and meet the requirements of the TRPA permit. The ori~qinal desi,qn celled for the dirt road from the main entrance to the plant to the upper loop road on the plant Rrounds to be paved. The TRPA permit required a bike trail from the colle.qe I~rol~ertv line to the main .qate entrance be provided. The extra cost is for a permanent fence to be installed between the plant and the bike trail. A new .qate will be installed near the main entrance to b~, used by the contractor and kept locked in non-workin~q hours. Staff recommends the Board approve Chan.qe Order No. 1 SCHEDULE: As soon as possible COSTS: $32,511 ACCOUNT NO: SHPOCP 1029/8235,8349,8234,8236, & 2029-8130 BUDGETED AMOUNT REMAINING: ($3,475,780) ATTACHMENTS: Chan~qe Order No. 1, Bud.qet Analysis CONCURRENCE WITH REQUESTED ACTION: GENERAL MANAGER: YES ~L~. NO CHIEF FINANCIAL OFFICER: YE~%~-~-~-.~=~.NO CATEGORY: GENERAL WATER SEWER X CHANGE ORDER NUMBER Project SLUDGE HANDLING AND ODOR CONTROL FACILITIES Contractor PACIFIC MECHANICAL CORPORATION Date OCTOBER 17, 2002 PO # P12445 The Contract Shall Be Changed As Follows: A) Delete reference to the 8 inch water line and related notes on sheet R-4 Sheet 30 of 91, R-5 sheet 31 of 91 and W-1 sheet 35 of 91. Also On Y-1 sheet 23 of 91 delete reference to College Well water main For Continuation see W-1 and delete approximately 156 If 8" #1w to west and reference to reuse existing FH and 6" lW. On each of these sheets add the note for domestic water see sheets WL-1 through WL-5. Install new 8 inch water Main as shown on the sheets WL-1 through WL-5. Cost to perform this work including credit for deleted line is $14,022.00. See attachment A for break down of all cost. TOTAL FOR ITEM A IS $14,022.00 B) Construct 290 linear feet of permanent chain link fence per the project specifications including a gate and 275 linear feet of a temporary 8 foot wide bike path as detailed on sheet BP-1 for the lump sum amount of $18,489.00 this price also includes removing and deposing of 230 linear feet of existing fence. See attachment B for break down of all cost. TOTAL FOR ITEM B IS $18,489.00 TOTAL FOR CHANGE ORDER NUMBER 1 IS $32,511.00 Dollar Amounts Contract Time Ori~linal Contract $7,744,000.00 Previous Chan~le Order $ 0.00 Current Contract $7,744,000.00 THIS CHANGE ORDER $ 32,511.00 New Con~,~[ Total $7,776,511.00 This Change Order constitutes full and mutual accord and satisfaction for all time and all costs related to this change. By acceptance of this Change Order the contractor agrees that the Change Order represents an equitable adjustment to the contract price and time, and further agrees to waive all right to file a claim arising out of or as a result of this change. Authorized By STPUD Board President Date: Accepted By Contractor Date: Date: Reviewed By SOLIDS HANDLING FACILITY AND ODOR CONTROL PROJECT Accounts: 1029-8234-8236, 8349, 2029-8130 BUDGET REMAINING ANALYSIS: 02/03 All Years Spent to date 1,385,893 2,100,397 974 89,681 6,555,193 3,762 9,250 4,339 676,688 Outstanding Purchase Orders- Amec Earth & Environmentar 974 Carollo Engineers 89,681 Pacific Mechanical Corp. 6,555,193 Tahoe Basin Container Service 3,762 GS Concepts 9,250 Jacobs & Tolhurst Architects 4,339 Westfalia Separator Inc. 676,688 Total Encumbrance 7,339,887 7,339,887 Total Spent & Encumbered 8,725,780 9,440,284 Budget FY 2003 5,250,000 5,964,504 2003 Amount Exceeding Budget -3,475,780 -3,475,780 PACIFIC MECHANICAL CORPORATIOL"; GENERAL ENGINEERING CONTRACTORS Calif State Lic No 138920 ~' NV State Lie No 0006244 P.O. Box 4041, Concord, CA 94524 (925) 827-4940 ~ FAX (925) 827-0519 August 23, 2002 South Tahoe Public Utility District 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Attention: Jim Hoggat~ Reference: Subject: Sludge Handling and Odor Control Facilities South Tahoe Public Utility District Change Order Request No.2 Fax: (530) 541-0614 Dear Mr. Hoggatt, As you requested our price to install Fencing, Asphalt Grindings provided by the District, placed and compacted by PMC. Your cost for this change is $18,440.00. Attached is a typical detail for a gate with three strands of barbed wire. The gate will be of galvanized finish. Very truly yours, Project Manager Enclosures: cc: 248 COR#2 PACIFIC MECHANICAL CORPORATION SHEET ~[ OF PACIFIC MECHANICAL CORPORATIOn.' GENERAL ENOINEERING CONTRACTORS P.O. Box 4041, Concord, CA 94524 (925) 827'-4940 -~ FAX. (925) 827-0519 September 6, 2002 South Tahoe Public Utility District 1275 Meadow Crest Drive South Lake Tahoe, CA 961 50 Attention: Jim Hoggstt Reference: Sludge Handling and Odor Control Facilities South Tahoe Public Utility District Subject: Change Order Request No. 2 Fax: (530) 541-061 4 Dear Mr. Hoggatt, As we discussed our price to install fencing for the subject chanqe was in error, the new revised price for the change order is $ 21,341.00. Please advise as soor~ as possible how you wish us to proce ed. Very truly yours, Gar Bailey Project Manager Enclosures: cc: File 248 COR ~2 22, £002 ?: 26A1~I PACIFIC MECHANICAL CORPORATION GENERAL ENGINEERING CONTRACTORS P,O. Box 4041, Concord, CA 94524 (925) 827-4940 · FAX (925) 827-0519 September 23, 2002 South Tahoe Public Utility District 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 At'ten[ion: Jim Hoggatt Reference: Sludge Handling and Odor Control Facilities South Tahoe Public Utility District Su~)ject: Quote for Fencing at Plant Road Letter No: 248-00011 Fax: (530) 541-0614 Dear Mr. Hoggatt, We have, since our last correspondence, gotten a quote of $8.00 less per foot than quoted to you in our change order. The cost of the change would therefore be $2,852.00 Jess, Please advise if you wish us to proceed with this new quote. Very !.r,,uty yours, ,,,;.',~, ..!; I f/...." , Gar Bai~g' Pro ect ~anager Enclosures: None cc: Mel Belding PACIFIC MECHANICAL CORPORATION GENERAL ENGINEERING CONTRACTORS Calif State Lic. No 138920 ~ NV State Lic No 0006244 P.O. Box 4041, Concord, CA 94524 (925) 827-4940 ~ FAX (925) 827-0519 August 23, 2002 South Tahoe Public Utility District 1275 Meadow Crest Drive South Lake Tahoe, CA 96150 Attention: Jim Hoggatt~ Reference: Subject: Sludge Handling and Odor Control Facilities South Tahoe Public Utility District Change Order Request No.1 Fax: (530) 541-0614 Dear Mr. Hoggatt, As requested our quote to revise the 8" water line, add a concrete slab at the 8" BFP and enlarge the structure to 6 ft X 12 ft and add rigid foam insulation. We have not included cost for supply of the Fire Hydrants, break off spools or Fire Hydrant dsers as these are supplied by the District. The additional cost of $14,022.00 includes credit for the pipe deleted and the 4fl X 8fl Building. Gar Bailey Project Manager Enclosures: cc: File 248 COR#1 PACIFIC MECHANICAL CORPORATION SHEET ~ OF JOB ~q ~' ~' DA~E PMC ~0 PACIFIC MECHANICAL CORPORATION SHEET I (DF PMC 4O